Loading...
HomeMy WebLinkAbout20081809 Ver 1_Site Inspection_20120626_A4 t.® NC®ENR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Charles Wakild P E Governor Director June 26 2012 Mr J J Swain Jr P E Division 13 Engineer N C Department of Transportation Post Office Box 3279 Asheville North Carolina 28802 0 2 Natural ResourcitZ, , <021 reeman retary Subject Inspection US Highway 221 DWQ Project 08 1809 Individual Certification No 3784 TIP Nos R 2233AA and AB Sections Rutherford County Dear Mr Swain On June 11 2012 I inspected the construction work on the US Highway 221 Project R 2233AA and AB Sections in Rutherford County Construction continues along most of the project with heavy grading bridge construction culvert construction pipe installation and roadbed preparation Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are performed as required to protect State surface waters Also please refer to the attached inspection reports for any specific items noted during the inspection If you have questions please call me at 828 296 4500 Sincerely zpelfr'`°— Michael R Parker Environmental Senior Specialist Attachment cc Brian C Skeens PE Roger Bryan Division 13 DEO Ed Ingle Roadside Environmental Transportation Permitting Unit Mike Parker Asheville Regional Office US Highway 22 Uune 2012 Inspection Letter SURFACE WATER PROTECTION SECTION — Asheville Regional Office 2090 U S 70 Highway Swannanoa NC 28778 8211 Phone 828 296 -45001 FAX 828 299 7043 One Internet www ncwaterguality orq No�}rthlCaro /h/na An Equal Opportunity Affirmative Action Employer �//j"/ J/ ally Project Num Project Name County Location Latitude SW Plan Location Site Owner Name Inspection Date Wetland Inspection Report 20081809 NCDOT US 221 (R 2233a) Rutherford NCDOT US 221 (R 2233a) +35 1221 NC DOT PDEA 06/11/2012 Reason for Inspection Routine Inspection Type Site Inspection (DOT) Inspection Contact Person On Site Representative(s) Primary Inspector Michael R Parker Secondary Inspector(s) Version 1 Status Issued Project Type Road /Highway Widening Region Central Title Longitude 81 5018 Facility compliance Status E Compliant n Not Compliant Program Area 401 (includes isolated /non 404) Phone Phone 828 296 4500 Question Areas N Permit (401 WQC) Inspection Summary Construction is continuing on project with bridge construction culvert construction and heavy grading Continue to maintain all sediment and erosion control structures and seed and mulch all areas within 15 days As mentioned in the meeting remove sediment from unnamed tributary to Floyds Creek near Floyds Creek Bridge while there is no water in the stream Permit (401 WQC) Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and /or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment E I I I I I ■n ❑n ■000 Page 1