Loading...
HomeMy WebLinkAboutPenny Farms Master Planning_Land Planning and Rezoning ProjectROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Craig M. Davis Davis Park Leasing, LLC 940 NW Cary Parkway Cary, NC 27513 NORTH CAROLINA Environmental Quality January 28, 2021 Subject: Surface Water Determination Letter NBRRO#20-385 Johnston County Determination Type: Buffer Call Isolated or EIP Call ® Neuse (15A NCAC 2B .0233) ❑ Tar -Pamlico (15A NCAC 2B .0259) ❑ Ephemeral/Intermittent/Perennial Determination ❑ Isolated Wetland Determination ❑ Jordan (15A NCAC 2B .0267) Project Name: Penny Farms Master Planning/Land Planning & Rezoning Project Location/Directions: The projected area is 68.7-acres of property located within the northeastern quadrant of the intersection of NC 42 and US Highway 70 in Clayton, Johnston County Subject Stream: UTs to Swift Creek Determination Date: 1/21/2021 Stream E/I/P Not Subject Subject to * to Buffers Buffers S1 I I X Pond I l X S1 P S2 I P X S3 I X Pond 2 X *E111P = Ephemeral/Intermittent/Perennial Staff: Cheng Zhang Start@ End of culvert Culvert at dam of Pond 1 Stop@ Soil Survey DWR flag X X X X USGS Topo X X X Explanation: The feature(s) listed above has or have been located on the Soil Survey of Johnston County, North Carolina or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each feature that is checked "Not Subject" has been determined not to be a stream or is not present on the property. Features that are checked "Subject" have been located on the property and possess characteristics that qualify it to be a stream. There may be other streams located on your property DE Q�� North Carolina Department of Environmental Quality I Division of Water Resources Raleigh Regional Office 13800 Barrett Drive I Raleigh, North Carolina 27609 WO CAROLINA awwwa.na„� / 919.791.4200 that do not show up on the maps referenced above but, still may be considered jurisdictional according to the US Army Corps of Engineers and/or to the Division of Water Resources (DWR). This on -site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR or Delegated Local Authority may request a determination by the Director. An appeal request must be made within sixty (60) days of date of this letter or from the date the affected party (including downstream and/or adjacent owners) is notified of this letter. A request for a determination by the Director shall be referred to the Director in writing If sending via US Postal Service c/o Paul Wojoski DWR — 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617. If sending via delivery service (UPS, FedEx, etc.) Paul Wojoski DWR — 401 & Buffer Permitting Unit, 512 N. Salisbury Street Raleigh, NC 27604 This determination is final and binding unless, as detailed above, you ask for a hearing or appeal within sixty (60) days. The owner/future owners should notify the Division of Water Resources (including any other Local, State, and Federal Agencies) of this decision concerning any future correspondences regarding the subject property (stated above). This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the Division of Water Resources (Central Office) at (919)-807-6300, and the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554-4884. If you have questions regarding this determination, please feel free to contact Cheng Zhang at (919) 791-4259. Sincerely, Docu Signed by: BCDA9D825D4A46D... Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources cc: RRO DWR File Copy RRO# 20-385 Penny Farms Master Planning/Land Planning & Rezoning Project CZ 1-15-2021 I f ON ESTATE RD Pond 2: not subject Legend rrI Project Study Area Kimley>)) Horn Pond 1: subject S2: subject �- Subject to Neuse River Basin Riparian Buffer Rules 0 400 800 Feet Figure 2: USGS Topographic Map Penny Farms Master Planning/Land Planning Project Clayton, Johnston County, INC November 2020 RR04# 20-385 Penny Farms Master Planning/Land Planning & Rezoning Project CZ 1-15-2021 P2 and S1 Belo to Neuse River Basin Riparian Buffer Rules } waa r fk qe A3 ' . Lc S1: subject 40 5 Cec Was -�'V W D S2: subject S2 Subject to Neuse River Basir S3 Subject l S3: subject] Riparian Buffer Rules Ripari%4W -.k Legend Project Study Area 0 400 800 Faet Figure 4: NRCS Soil Survey Mar Kimley»)Horn Penny Farms MasterPlanning/Land Planning Project Clayton, Johnston County, NC November 202C