Loading...
HomeMy WebLinkAbout20081809 Ver 1_Site Inspection_20120425N i A 74A o NCDENlt North Carolina Department of Environment and Natural Resource k,) Division of Water Quality 4' Beverly Eaves Perdue Charles Wakild P E c�,�,� S e Fr Governor Director vest ,Q 9l�ecre April 24 2012�^y Mr J J Swain Jr P E Division 13 Engineer N C Department of Transportation Post Office Box 3279 Asheville North Carolina 28802 Subject Inspection US Highway 221 DWQ Project 08 1809 Individual Certification No 3784 TIP Nos R 2233AA and AB Sections Rutherford County Dear Mr Swain On April 9 2012 I inspected the construction work on the US Highway 221 Project R 2233AA and AB Sections in Rutherford County Construction continues along most of the project with heavy grading bridge construction pipe installation and roadbed preparation Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are performed as required to protect State surface waters Also please refer to the attached inspection reports for any specific items noted during the inspection If you have questions please call me at 828 296 4500 Sincerely Michael R Parker Environmental Senior Specialist Attachment cc Brian C Skeens PE Roger Bryan Division 13 DEO Ed Ingle Roadside Environmental Transportation Permitting Unit Mike Parker Asheville Regional Office US Highway 221April 2012 Inspection Letter SURFACE WATER PROTECTION SECTION — Asheville Regional Office 2090 U S 70 Highway Swannanoa NC 28778 8211 Phone 828 296 4500 i FAX 828 299 7043 One Internet www ncwaterguality org NorthCarohna An Equal Opportunity Affirmative Action Employer Naturally Wetland Inspection Report Project Num 20081809 Version 1 Project Name NCDOT US 221 (R 2233a) County Rutherford Location NCDOT US 221 (R 2233a) Latitude +35 1221 SW Plan Location Site Owner Name NC DOT PDEA Inspection Date 04/09/2012 Reason for Inspection Routine Inspection Type Site Inspection (DOT) Inspection Contact Person Title On Site Representative(s) Primary Inspector Michael R Parker Secondary Inspector(s) Status Issued Project Type Road /Highway Widening Region Central Longitude 81 5018 Facility compliance Status M Compliant n Not Compliant Program Area 401 (includes isolated /non -404) Question Areas N Permit (401 WQC) Inspection Summary Construction continues from the Broad River Bridge toward US 74 Floyds Creek Bridge is almost completed Continue to maintain sediment and erosion control structures Phone Phone 828 296 4500 Permit (401 WQC) Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? ■ D D D Are the culverts and /or filled areas installed properly? ■ D D D Is the site compliant with additional conditions of the 401 WQC or non 404 permit? ■ D D D Comment Seed banks below culvert at Station 274 Page 1