HomeMy WebLinkAbout20081809 Ver 1_Site Inspection_20120425N
i
A 74A o
NCDENlt
North Carolina Department of Environment and Natural Resource k,)
Division of Water Quality 4'
Beverly Eaves Perdue Charles Wakild P E c�,�,� S e Fr
Governor Director vest ,Q 9l�ecre
April 24 2012�^y
Mr J J Swain Jr P E
Division 13 Engineer
N C Department of Transportation
Post Office Box 3279
Asheville North Carolina 28802
Subject Inspection US Highway 221
DWQ Project 08 1809
Individual Certification No 3784
TIP Nos R 2233AA and AB Sections
Rutherford County
Dear Mr Swain
On April 9 2012 I inspected the construction work on the US Highway 221 Project R 2233AA and AB
Sections in Rutherford County Construction continues along most of the project with heavy grading bridge
construction pipe installation and roadbed preparation
Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are
performed as required to protect State surface waters Also please refer to the attached inspection reports for
any specific items noted during the inspection
If you have questions please call me at 828 296 4500
Sincerely
Michael R Parker
Environmental Senior Specialist
Attachment
cc Brian C Skeens PE
Roger Bryan Division 13 DEO
Ed Ingle Roadside Environmental
Transportation Permitting Unit
Mike Parker Asheville Regional Office
US Highway 221April 2012 Inspection Letter
SURFACE WATER PROTECTION SECTION — Asheville Regional Office
2090 U S 70 Highway Swannanoa NC 28778 8211
Phone 828 296 4500 i FAX 828 299 7043 One
Internet www ncwaterguality org NorthCarohna
An Equal Opportunity Affirmative Action Employer Naturally
Wetland Inspection Report
Project Num
20081809 Version 1
Project Name
NCDOT US 221 (R 2233a)
County
Rutherford
Location
NCDOT US 221 (R 2233a)
Latitude
+35 1221
SW Plan Location
Site Owner Name NC DOT PDEA
Inspection Date 04/09/2012
Reason for Inspection Routine
Inspection Type Site Inspection (DOT)
Inspection Contact Person Title
On Site Representative(s)
Primary Inspector Michael R Parker
Secondary Inspector(s)
Status Issued
Project Type Road /Highway Widening
Region Central
Longitude 81 5018
Facility compliance Status M Compliant n Not Compliant
Program Area 401 (includes isolated /non -404)
Question Areas
N Permit (401 WQC)
Inspection Summary
Construction continues from the Broad River Bridge toward US 74
Floyds Creek Bridge is almost completed
Continue to maintain sediment and erosion control structures
Phone
Phone 828 296 4500
Permit (401 WQC) Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit? ■ D D D
Are the culverts and /or filled areas installed properly? ■ D D D
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? ■ D D D
Comment Seed banks below culvert at Station 274
Page 1