HomeMy WebLinkAbout19980260 Ver 6_U-2579DEF sediment loss_20210216
Wanucha, Dave
From:Euliss, Amy
Sent:Tuesday, February 16, 2021 12:49 PM
To:Wanucha, Dave
Cc:Wyrick, Scott D; Suggs, Phillip H; Kiser, Marcus K; McLaughlin, Zachery R
Subject:U-2579DEF sediment loss
The U-2579DEF project had a slope failure resulting in approximately 50, 5 gallon buckets into a jurisdictional stream at
permit site 11. The bulk of the material was contained by instream baffles. The contractor has been directed to remove
accumulated sediment from the stream, and stabilize the area. Its really wet out so it may take some time to get the
slope repaired. Temporary measures are being installed to reduce future losses. NPDES records are being updated.
Let me know if you have any questions or concerns.
Amy Euliss
Division 9 Environmental Officer
North Carolina Department of Transportation
336 747 7802 office
aeuliss@ncdot.gov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
1