HomeMy WebLinkAbout20081809 Ver 1_Site Inspection_20120322,y
4
NCDENR
North Carolina Department of Environment and
Division of Water Quality
Beverly Eaves Perdue Charles Wakild P E
Governor Director
March 22 2012
Mr J J Swain Jr P E
Division 13 Engineer
N C Department of Transportation
Post Office Box 3279
Asheville North Carolina 28802
o�
Ak
27
Natural Res° �q �O'
osr�R �
Freeman
retary
Subject Inspection US Highway 221
DWQ Project 08 1809
Individual Certification No 3784
TIP Nos R 2233AA and AB Sections
Rutherford County
Dear Mr Swain
On March 8 2012 I inspected the construction work on the US Highway 221 Project R 2233AA and AB
Sections in Rutherford County Construction continues along most of the project with heavy grading bridge
construction pipe Installation and roadbed preparation
Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are
performed as required to protect State surface waters Also please refer to the attached inspection reports for
any specific items noted during the inspection
If you have questions please call me at 828 296 4500
Sincerely
Michael R Parker
Environmental Senior Specialist
Attachment
cc Brian C Skeens PE
Roger Bryan Division 13 DEO
Ed Ingle Roadside Environmental
Transportation Permitting Unit
Mike Parker Asheville Regional Office
US Highway 221 March 2012 Inspection Letter
SURFACE WATER PROTECTION SECTION — Asheville Regional Office
2090 U S 70 Highway Swannanoa NC 28778 8211
Phone 828 296 4500 1 FAX 828 2Q9 7043
Internet www ncwaterguallty orq
An Equal Opportunity Affirmative Action Employer
NorthCarollna
Naturally
Wetland Inspection Report
Project Num
20081809
Project Name
NCDOT US 221 (R 2233a)
County
Rutherford
Location
NCDOT US 221 (R 2233a)
Latitude
+35 1221
SW Plan Location
Site Owner Name NC DOT PDEA
Inspection Date 03/08/2012
Reason for Inspection Routine
Inspection Type Site Inspection (DOT)
Inspection Contact Person
On Site Representative(s)
Primary Inspector Michael R Parker
Secondary Inspector(s)
Facility compliance Status
0 Compliant
Program Area 401 (includes isolated /non 404)
Version 1 Status Issued
Project Type Road /Highway Widening
Region Central
Longitude 81 5018
Title Phone
n Not Compliant
Question Areas
0 Permit (401 WQC)
Inspection Summary
Work s underway at the bridge over the Broad River
The Floyds Creek Bridge deck has been poured
Grading continues to move toward US 74
Repair silt fence at Station 483
Repair sloughing banks below culvert at Station 274
Repair washed areas in the median between Station 217 and Station 221
Phone 828 296 4500
Page 1
Protect Num 20081809 Owner NC DOT PDEA
Inspection Date 03/08/2012 Inspection Type Site Inspection (DOT)
Reason for Visit Routine
Permit (401 WQC)
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and /or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment Repair silt fence at Station 483 and check slit fence on the project
The embankment below the culvert at Station 274 is sloughing and needs to be seeded
and matted
Repair washed areas in the median from Station 217 to Station 221
Ii__ - Ails AIC
■nnn
■nnn
■nnn
Page 2