Loading...
HomeMy WebLinkAbout20000980 Ver 1_Mitigation Information_20100921♦ AAIr STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEVERLY EAVES PERDUE GOVERNOR Mr Doug Huggett NC Division of Coastal Management Parker Lincoln Building 2728 Capital Boulevard Raleigh NC 27604 O0- O ice( uj c,s v 1��-Hvy Z EUGENE A CONTI 7R SECRETARI September 10 2010 „ s � Dill SEP Z 1 2010 t 11� N) Re US 64 Bypass Temporary Impact Sites Washington & Tyrrell Counties State Project No 6 149001 T TIP No R 2548A &E Action ID No 199703132 DWQ WQC Project No 000980 DCM Permit No 166 00 Mr Huggett As you are aware the Department has monitored the US 64 Temporary Impact Sites since their construction in August of 2005 (R- 2548A) and September of 2005 (R 2548E) Located in Washington and Tyrrell Counties adjacent to the US 64 Bypass site 6A contained 0 005 acre and site 8E contained 0 007 -acre of temporary fill for work bridge piles The sites were to be monitored for temporary wetland impacts associated with the R 2548A &E projects The temporarily impacted area where fill material was placed was left to revegetate naturally and must re attain jurisdictional status at the end of three years Hydrologic monitoring was not required for these sites According to permit conditions NCDOT was requ red to monitor the US 64 Temporary Impact Sites for three years or until success entena were met with vegetation monitoring conducted each year After each growing season annual monitoring reports were submitted to the appropriate regulatory agencies via the Natural Environment Unit s (NEU) website 17M) dii tit �i ncdot or aldolzlprc coizstructlPCIIIOII/MonctOI rnZIMonitoz u7gRc poi [s htnil After three years of vegetation monitoring the US 64 Temporary Impact Sites monitoring indicates that natural re vegetation has occurred and the temporarily impacted areas have re attained jurisdictional status Individual annual monitoring data is provided within the monitoring reports available on NEU s website between 2008 and 2009 MAILING ADDRESS NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1596 MAIL SERVICE CENTER RALEIGH NC 27699 1598 TELEPHONE 919 431 2000 FAX 919 431 2001 WEBS1 rE WWW NCDOT ORG LOCATION ENVIRONMENTAL RESOURCE CENTER 4701 ATLANTIC AVENUE SUITE 116 RALEIGH NC 27604 A site visit was conducted on August 26` ", 2010 with the regulatory agencies and NCDOT personnel present It was determined at that meeting that the site success criteria had been met and that no further monitoring would be required NCDOT requests that the appropriate resource agencies provide documentation stating that no further monitoring is required and that the site is closed If you have any questions about this project please contact Mr Randy Griffin at (919) 431 -6529 Sincerely 0 Philip S Harris III P E Unit Head PDEA Natural Environment Unit cc Mr William Biddlecome ACOE Mr David Wainwright DWQ Mr Travis Wilson WRC Mr Chris Militscher EPA Mr Gary Jordan USFWS Mr Scott McLendon ACOE Mr Brian Wrenn DWQ Ms Cathy Brittingham DCM Mr David Harris P E, NCDOT REU Mr Clay Willis NCDOT DEOI Mr Randy Griffin NCDOT NEU