HomeMy WebLinkAbout20081809 Ver 1_Site Inspection_20120127NCDENR
North Carolina Department of Environment and
Division of Water Quality
Beverly Eaves Perdue Charles Wakild P E
Governor Director
Mr J J Swain Jr P E
Division 13 Engineer
N C Department of Transportation
Post Office Box 3279
Asheville North Carolina 28802
I
Dear Mr Swain
January 27 2012
r `r
Natural ces
Rk, ee Freeman
FF& cretary
�srQK 4l'
4`k4q,
Subject Inspection US Highway 221
DWQ Project 08 1809
Individual Certification No 3784
TIP Nos R 2233AA and AB Sections'
Rutherford County
On January 9 2012 I inspected the construction work on the US Highway 221 Project R 2233AA and AB
Sections in Rutherford County Construction continues along most of the project with heavy grading bridge
construction pipe installation and roadbed preparation
Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are
performed as required to protect State surface waters Also please refer to the attached inspection reports for
any specific items noted during the inspection
If you have questions please call me at 828 296 4500
Sincerely
;W,4r�
Michael R Parker
Environmental Senior Specialist
Attachment
cc Brian C Skeens PE
Roger Bryan Division 13 DEO
Ed Ingle Roadside Environmental (electronic copy)
Transportation Permitting Unit
Mike Parker Asheville Regional Office
US Highway 221 January 2012 Inspection Letter
SURFACE WATER PROTECTION SECTION - Asheville Regional Office
2090 US 70 Highway Swannanoa NC 28778 -8211
Phone 828 296 4500 1 FAX 828 299 7043
Customer Service 1- 877 -623 6748
Internet www ncwateroualitywww org
An Equal Opportunity Affirmative Action Employer
NorthCarohna
;Vatlfl'all#
i.
Wetland Inspection Report
Project Num 20081809 Version 1 Status Issued
Project Name NCDOT US 221 (R 2233a) Project Type Road /Highway Widening
County Rutherford Region Central
Location NCDOT US 221 (R 2233a)
Latitude +35 1221 Longitude 81 5018
SW Plan Location
Site Owner Name NC DOT PDEA
Inspection Date 01/09/2012
Reason for Inspection Routine
Inspection Type Site Inspection (DOT)
Inspection Contact Person Title Phone
On Site Representative(s)
Primary Inspector Michael R Parker Phone 828 296 4500
Secondary Inspector(s)
Facility compliance Status E Compliant n Not Compliant
Program Area 401 (includes isolated /non 404)
Question Areas
E Permit (401 WQC)
Inspection Summary
Page 1
Project Num 20081809 Owner NC DOT PDEA
Inspection Date 01/09/2012 Inspection Type Site Inspection (DOT) Reason for Visit Routine
Permit (401 WQC)
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and /or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment There are several areas that need seeding and matting In the median
across from the Devere Construction Office and in the median near the DOT
Construction Office Also there were some areas noted on the west side of US
221 adjacent to the new railroad line construction where sediment was being lost
Particular attention should be placed on areas draining to the Parris pond
V-- KJ- KIA AIC
0000
■000
■000
Page 2
P
\1