Loading...
HomeMy WebLinkAbout20081809 Ver 1_Site Inspection_20120127NCDENR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Charles Wakild P E Governor Director Mr J J Swain Jr P E Division 13 Engineer N C Department of Transportation Post Office Box 3279 Asheville North Carolina 28802 I Dear Mr Swain January 27 2012 r `r Natural ces Rk, ee Freeman FF& cretary �srQK 4l' 4`k4q, Subject Inspection US Highway 221 DWQ Project 08 1809 Individual Certification No 3784 TIP Nos R 2233AA and AB Sections' Rutherford County On January 9 2012 I inspected the construction work on the US Highway 221 Project R 2233AA and AB Sections in Rutherford County Construction continues along most of the project with heavy grading bridge construction pipe installation and roadbed preparation Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are performed as required to protect State surface waters Also please refer to the attached inspection reports for any specific items noted during the inspection If you have questions please call me at 828 296 4500 Sincerely ;W,4r� Michael R Parker Environmental Senior Specialist Attachment cc Brian C Skeens PE Roger Bryan Division 13 DEO Ed Ingle Roadside Environmental (electronic copy) Transportation Permitting Unit Mike Parker Asheville Regional Office US Highway 221 January 2012 Inspection Letter SURFACE WATER PROTECTION SECTION - Asheville Regional Office 2090 US 70 Highway Swannanoa NC 28778 -8211 Phone 828 296 4500 1 FAX 828 299 7043 Customer Service 1- 877 -623 6748 Internet www ncwateroualitywww org An Equal Opportunity Affirmative Action Employer NorthCarohna ;Vatlfl'all# i. Wetland Inspection Report Project Num 20081809 Version 1 Status Issued Project Name NCDOT US 221 (R 2233a) Project Type Road /Highway Widening County Rutherford Region Central Location NCDOT US 221 (R 2233a) Latitude +35 1221 Longitude 81 5018 SW Plan Location Site Owner Name NC DOT PDEA Inspection Date 01/09/2012 Reason for Inspection Routine Inspection Type Site Inspection (DOT) Inspection Contact Person Title Phone On Site Representative(s) Primary Inspector Michael R Parker Phone 828 296 4500 Secondary Inspector(s) Facility compliance Status E Compliant n Not Compliant Program Area 401 (includes isolated /non 404) Question Areas E Permit (401 WQC) Inspection Summary Page 1 Project Num 20081809 Owner NC DOT PDEA Inspection Date 01/09/2012 Inspection Type Site Inspection (DOT) Reason for Visit Routine Permit (401 WQC) Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and /or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment There are several areas that need seeding and matting In the median across from the Devere Construction Office and in the median near the DOT Construction Office Also there were some areas noted on the west side of US 221 adjacent to the new railroad line construction where sediment was being lost Particular attention should be placed on areas draining to the Parris pond V-- KJ- KIA AIC 0000 ■000 ■000 Page 2 P \1