HomeMy WebLinkAbout20021105 Ver 1_Monitoring Report_20100429It ffl'rA
NC®ENR
North Carolina Department of Environment and Natural Resources
Division of Water Qualit
Y
Beverly Eaves Perdue Coleen H Sullins
Governor �-P lhs In L Q Director
Mr�Jason Elliot
NCDOT Roadside Environmental Unit
North Carolina Department of Transportation
1542 Rock Quarry Road
Raleigh North Carolina 27610
Dee Freeman
Secretary
April 29 2010
Subject Annual 2009 Reports and Winter 2010 Monitoring Reports in Division 7 9 and l l
Dear Mr Elliot
The Division of Water Quality (Division) has reviewed your annual 2009 Reports and your Winter 2010
Monitoring reports that have been updated to date in Divisions 7 9 and l l The Division subsequently
visited most of the sites Project specific comments are included below Sites not visited are not listed
below
DIVISION 7
cU 3100A (Michael sBranch- Mitigation Site)
Site visited March 1 2010 Two beaver dams present in the restoration reach Banks appear to be stable
however it s really hard to tell in some areas because of the inundation from the dams Lots of beaver
activity is visible including worn tracks and dams
U 2524AB (Site 7 and 17)
Site visited April 6 2010 The beaver dam has been removed The channel continues to be inundated
with cattails and relatively stagnant water The Division may need to assess the type of water feature at
this site at project closeout to determine the appropriate mitigation ratios
U2524AB (Site 3)
Site visited April 9 2010 Vegetation (cattails willows) is established in sections of the channel There
are few surviving trees upstream of the pipe crossing Otherwise channel appears stable and caddisflies
colonizing the lower reach
U 2524AC Woodlyn WE
Didn t visit Culvert upgrade by City of Greensboro on Woodlyn Way recently completed
U 2524AC (Site 1)
Site visited April 9 2010 Stream appears unchanged since last year Unstable crossvem above pipe inlet
has stabilized There is good success with vegetation
U 2524AB (Site 28)
Site visited April 9 2010 Two beaver dams are present as noted in the monitoring report It appears that
there are few trees in the buffer with the exception of those along the stream channel
U 2524AC (Site 2B) Long Branch
Site visited March 31 2010 Localized heavy scour has occurred on the left side of the channel on the
lower stretch of the project Construction of Hornaday Road and bridge crossing of new loop has begun
North Carolina Division of Water Quality 585 Waughtown Street Phone (336) 771 5000 Customer Service
Internet www ncwaterquality org Winston Salem NC 27107 FAX (336) 771 4630 1 877 623 6748
An Equal Opportunity /Affirmative Action Employer — 50 / Recycled /10 / Post Consumer Paper
NorthCarolrn
NatiiC61lldf
This site needs to closely monitor for changes in stability during and after bridge construction to ensure
that channel remains stable and the vegetation survives
R 0609IA Mile Branch (Site 6)
Site visited April 23 2010 There is an unstable cross vein at last meander before enter culvert This
needs to be repaired Tributary 2 cross vein at the edge of right of way has been cut around This also
needs to be repaired
DIVISION 9
R 2568B (Site 4)
Didn t visit No changes were noted since the Winter 09 monitoring
Martin Site (B 3045 WM)
Site visited March 2010 Floods continually damage the fencing at the crossing and on the right side of
the channel Flooding also resulted in damage to the culverts that DOT installed upstream for a crossing
(I didn t see this but conversations with DOT indicated as much) There is evidence of trampling in the
buffer Beavers are present just upstream of the project Discussions with DOT indicate that they are
holding the landowner is responsible for fixing the fence damage The structures in the stream channel
are stable and I found lots caddisflies on the rocks in the riffles
UT Town Creek Mitigation Sites
Site 5 visited March 30 2010 There is lots of trash especially downstream of 185 Some bank scour
present There is very little tree buffer present both up and downstream of 185 crossing Upstream of I
85 the channel is becoming braided and appears to be straightening itself out
Site 8 not visited
R 2911E
Visited April 4 2010 The Division requests that you continue to closely monitor this buffer area for any
more disturbance from mowing by the adjacent landowner At the culvert outlet a lot of material has
deposited on the floodplam bench and the channel is cutting back into the bench resulting in the bent
material to slough into the channel
12511 CB Town Creek Site 5
Visited April 12 2010 Localized heavy bank scour is present in front of bent behind J hook This was
noted on the stream monitoring form Possible repairs need to be discussed
B 3157 (Michael s Branch AO
Visited April 12 2010 Bank scour around cross arms between photo points 3 and 4 This was noted on
the Summer 09 stream monitoring form However it was noted the problems had been addressed
however the arms still look unstable At pipe inlet a lot of sediment has deposited creating a very
narrow channel However outlet has never filled in and is still very wide
Division 11
R3427 US 601)
Didn t visit No changes were noted since the Winter 09 monitoring
If you have any questions or require additional information please contact Amy Euliss at (336) 771 4959
Sincerely
Amy Eu its ���. -
Environmental S P ecia is`7 t
cc John Thomas USACE Raleigh Field Office e copy
Andy Williams USACE Raleigh Field Office e copy
Ix Monte Matthews USACE Raleigh Field Office e copy
Jerry Parker DEO Div 7 e copy
Kent Boyer DEO Div 9 e copy
Heath Slaughter DEO 11 e copy
Chris Militscher EPA e copy
Marla Chambers NCWRC e copy
Travis Wilson NCWRC e copy
DWQ Wetlands 401 Transportation Unit
File Copy