Loading...
HomeMy WebLinkAbout20110909 Ver 1_Approval Letter_20111208� .,..,.. North Caiohna Department of Environment and Natutal Reso«rces Drvision of W�ter Qualrty Beverly Faves Perdue Coleen H Sullms llee Freeman Governor Dtrector Secretary December 8 2011 Pitt County DWQ Pro�ect No 20110909 Bridge 79 over Old Woman Branch TIP BD 5102 B APPROVAL of 401 WATER QUALITY CFRT[F[CATION and NEUSE BUFFER AUTHORIZATION w�th ADDITIONAL CONDITIdNS Mr Jay Johnson North Ca�olma Department oi Transportation P O Box 1587 Greenvilte NC 27835 Dear Mr Johnson You have our approval in accordance with the conditions I�sted below for the following impacts for the purpose of repiacmg Bi �dge No 79 over Old Woman Branch on SR 1200 (Stantonsburg Rd) m Pitt County ream and Buffer Im acts m the Neuse River Basm Buffer Zone 1 Buffer Zone 2 Streams Wetlands Site Number ,__ ,.�� ,__ ��� ,,,,, �.� ,,,,,, Pitt 79 4050 Total * unpacts due to bridge pilmgs 6 347 2297 I 124* I 0 06 The pro�ect shall be constructed m accordance with your appl►cation dated received October 12 2011 After reviewing your application we have dec�ded that these impacts are eovered by General Water Qualtty Certificat�on Number 368'7 Th�s cert�ficat�on corresponds to the Nationwide Permrt 3 issued by the Corps of Cngmeers In addrtion you should acqu�re any other federal state o� local permrts before you proceed wrth your p�o�ect mcludmg (but not l�mited to) Sediment and Eros�an Control Non Discharge and Water Supply Watershed regulations T h�s approval will expire with the accompanying 404 permrt Thts approval is valid solely foi the purpose and design descr�bed m your application (unless modified below) Should your pro�ect change you must not�fy the DWQ and submit a new appl�cat�on lf the property is sold the new owner must be given a copy of th�s Certificahon and approval letter and �s thereby respansible for cornplymg w�th all the condit�ons If total wetland fills for th�s proJect (now or in the future) exceed one acre or of total �mpacts to streams (now or �n the future) exceed 150 linear feet compensatory mirigation may be ieqtured as descr�bed in 15A NCAC 2H 0506 (h} (6) and (7) For th�s approval to remam valid yau must adhere to the cond►tions listed rn the attached cerhfication I The �ssuance of this cert�fication does not exempt the Permittee from complymg with any and all statutes rules regulations or ordrnanc.es that may be imposed by other gove�n►nent agenc�es (i e local state and federal} havmg Jur�sdict�on mcludmg but not l�mited to apphcable buffer iules stormwater management rules soil erosion and sedimentation control requirements etc North Carohna Dtws�on of Water Qual�ty Intemet www ncwaterc{ualitv ore �g 943 Washmgton Square Mall Phone 252 946 6481 NQ Caro/l/ma Washmgton N(. 27889 l AX 252 946 9215 v�tut+�`[j/ �Y J An Equal OpportumtylAffirmative Ac�on Empioyer— 50 / Recycled1101 Post Consumer Paper Page 2 of 5 2 The Permittee shall report any v�olations of this certificatton to the Divis�on of Water Quality w�thm 24 hours of d�scovery 3 The Permittee shall ensure that the final design draw�ngs adhere to the certiFication and to the draw�ngs submitted for approval 4 The permittee and its authorized agents shall conduct �ts achvities m a manner consistent with State water quality standards (mclud�ng any requ�rements resultmg from compl�ance with §303(d) of the Clean Water Act) and any other appropr�ate requirements of State and Federal law If DWQ determmes that such standards or laws are not being met (tncludmg the fa�lure to sustam a designated or achieved use) or that State or federal law �s bemg v►olated or that further conditions are necessary to assure compliance DWQ may reevaluate and modify this cemfcahon 5 Erosion and sediment control practices must be m full compl�ance with all spec�ficat�ons governing the proper design installat�on and operation and mamtenance of such Best Management Pract�ces in order to protect surface waters standards a The erosion and sediment control measures for the pro�ect must be designed mstalled operated and mamtamed m accordance with the most recent vers�on of the North Carolina Sedrment and Eros�on Conlrol Planning and Des�gn Manual b The design mstal(ation operat�on and maintenance of the sed�ment and eros�on control measures must be such that they equal or exceed the requirements spec�fied in the most recent vers�on of the North Carolina Sedrment and Erosron Control Manual The devices shall be mamtamed on all construction s�tes borrow sites and waste pile (spoil) pro�ects mcludmg contractor owned or leased borrow pits associated w�th the pro�ect c For borrow prt s�tes the eros�on and sed�ment control measures must be designed installed operated and mamtamed m accordance with the most recent version of the North Carolena Surface Mtning Manual d The reclamation measures and unplementation must comp(y with the reclamation m accordance with the requirements of the Sedimentat�on Pollution Control Act 6 If concrete is used durmg construction a dry work area shall be ma�ntamed to prevent direct contact between curuig concrete and stream water Water that inadvertently contacts uncured concrete shall not be d�scharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills 7 The use of r�p rap above the Normal High Water Mark shall be mm�m►zed Any rip rap placed for stream stabil�zat�on shall be placed m stream channels �n such a manner that ►t does not impede aquatic l�fe passage 8 Durmg the construction of the pro�ect no stagmg of equipment of any kind �s permitted in waters of the U S or protected ripar�an buffers 9 The dunension pattern and profile of the stream above and below the crosstng shall not be mod�fied Disturbed floodplams and streams shall be restored to natural geomorphtc condttions 10 I-Ieavy equ�pment shall be operated from the banks rather than m the stream channel m order to mm�mize sedimentat�on and reduce tlie mtroduct�on of other pollutants mto the stream 11 All mechan�zed equipment operated near surface waters must be regularly mspected and mamtamed to prevent contammation of stream waters from fuels lubr�cants hydraulic fluids or other tox►c materials 12 No rock sand or other materials shall be dredged from the stream channel except where author�zed by th�s certification 13 D�schargmg hydroseed m�xtures and washmg out hydroseeders and other equipment m or ad�acent to surface waters is prohibtted Page 3 of 5 _ �4: 14 The outside buffer wetland or water boundary located wrth�n the construchon corrtdor approved by th►s certificat�on shall be clearly marked by h�ghly v�sible fencmg prior to any land disturbmg activit►es Impacts to areas withm the fenctng are proh�b�ted unless otherwise authorized by this cert�ficatton 15 All stormwater runoff shall be d�rected as sheetflow through stream buffers at nonerosive velocit�es unless otherwise approved by this certificahon 16 Ali riparian buffers impacted by the placement of temporary fill or clearmg activrties shall be restored to the preconstruction contours and revegetated Mamtamed buffers shall be permanently revegetated with non woody spectes by the end of the growmg season followmg complet�on of construcrion For the purpose of th�s conditton mamtamed buffer areas are defined as areas w�th�n the transportat�on corridor that will be sub�ect to regular NCDOT mamtenance act�vit�es mcludmg mowmg The area with non mamtamed buffers shall be permanently revegetated with nattve woody species before the next grow�ng season followmg completion of construction 17 Pursuant to 15A NCAC 2B 0233(6) sediment and erosion control devices shall not be placed m Zone 1 of any Neuse Buffer without prior approval by NCDWQ At th�s t�me NCDWQ has approved no sediment and erosion control devices m Zone 1 outs�de of the approved pro�ect unpacts anywhere on this pro�ect Moreover sediment and eros�on control dev�ces shall be allowed m Zone 2 of the buffers provided that Zone 1 is not comprom�sed and that discharge is released as diffuse flow 18 New roadside ditches must be m compl�ance w�th the mtrogen control and dtffuse flow requ�rements outlmed m ] SA NCAC 2B 0233 19 Nat�ve ripar�an vegetatton (ex list trees and shrubs native to your geographic region) must be reestabl�shed wrth�n the construct�on l�mtts of the pro�ect by the end of the growing season followmg completion of construction 20 There shall be no excavation from or waste disposal �nto Jurisdictional wetlands or waters associated w�th th�s cert�ficat�on without appropr�ate modification Should waste or borrow s�tes or access roads to waste or borrow s�tes be located m wetlands or streams compensatory mitigation will be required smce that �s a d�rect impact from road construct►on activit►es 21 Strict adherence to the most recent version of NCDOT s Best Management Pract�ces For Bridge Demolition and Removal approved by the US Army Corps of Engineers is a condition of the 401 Water Qual�ty Certification 22 Bridge p�les and bents shall be constructed usmg dr►ven piles (hammer or vibratory) or dr�lled shaft construct�on methods More spec�fically �etting or other methods of pile drivmg are prohibited without prior wr�tten approval from NCDWQ 23 All pile drivmg or drilltng activities shall be enclosed m turbid�ty curtains unless otherw�se approved by NCDWQ m this certification 24 Bridge deck drams shall not d�scharge d�rectly mto the stream Stormwater shall be directed across the bridge and pre treated through s�te appropriate means (grassed swales pre formed scour holes vegetated buffers etc ) before entermg the stream Please refer to the most current version of Stormwater Best Management Prnct�ces 25 R�prap shall not be placed in the act�ve thalweg channel or placed in the streambed in a manner that precludes aquatic l�fe passage Btoengmeermg boulders or structures should be properly destgned s�zed and mstalled 26 Upon completion of the pro�ect (includmg any impacts at assoc�ated borrow or waste s�te) the NCDOT Div�sion Engmeer shall complete and return the enclosed Certification of Completion Form to notify DWQ when all work included ui the 401 Cert�fication has been completed ' Page 4 of 5 27 A copy of this Water Quatity Certificat�on shall be maintamed on s�te at the construction site at all t�mes In addition the Water Qual�ty Certification and al( subsequent mod�fications if any shall be mamtained with the Divts�on Enginee� �nd the on srte pro�ect manager If you do not accept any of the cond�tions of this certificat�an you may ask for an ad�udicatory hear�ng You must act within 60 days of the date that you iecetve this lette► To ask for a hearmg send a wr�tten pet�t�on that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Adm►mstrative Hearings 6714 Mail Service Center Rale�gh N C 27699 This cert�ficahon and its conditions are final and bmdmg unless you ask for a hearmg Th�s letter completes the review of the D�vision of Watei Qualrty under Sechon 40l of the Gean Water Act If you have any questions please contact Garcy Ward at (252) 448 3922 � Sm�r ly J L, _ for oleen n Attachments (C,eneral Certificlhon and Ceihficate ofCompleUon form) cc I'om Stcffens US Army Gorps ot bngme�rs Washmgton Nield Oi'tice Sonia C�rrillo NC DWQ 401/Wetllnds Unrt f ile Copy