Loading...
HomeMy WebLinkAbout20101017 Ver 1_Site Inspection_20111019WDENR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Governor Mr. J. J. Swain, Jr., P.E. Division 13 Engineer N.C. Department of Transportation Post Office Box 3279 Asheville, North Carolina 28802 Coleen H. Sullins Director October 6, 2011 Subject: Inspection DWQ Project 10-1017 TIP No. U-255OB NC Highway 18 @ 1-40 Burke County Dear Mr. Swain: Dee Freeman Secretary On September 21, 2011: I inspected the construction work on TIP Project No. U-255013, NC Highway 18 at Interstate 40 in Burke County. Work on the project includes heavy grading and culvert construction. Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are performed as required to protect State surface waters. Also, please refer to the attached inspection report for any specific items noted during the inspection. If you have questions, please call me at 828-296-4500. Attachment cc: Brian C. Skeens, PE Roger Bryan, Division 13, DEO Ed Ingle, Roadside Environmental Transportation Permitting Unit Mike Parker, Asheville Regional Office R-25508 NC Highway 18 Q 140 September 2011 Inspection Letter Sincerely, Michael R. Parker Environmental Senior Specialist SURFACE WATER PROTECTION SECTION -Asheville Regional Office 2090 U.S. 70 Highway, Swannanoa, NC 28778-8211 Phone: 828-296-45001 FAX: 828-299-7043 Customer Service: 1-877-623.6748 One Internet: www.ncwatemualitv.oro NOrthCarOhna An Equal Opportunity l Affirmative Action Employer atiml l ff N? t Natural Resources U CV DWO Site Visits for DOT Proiects Field Sheet DWQ representative: Michael R. Parker Date: September 21, 201 ] County: Burke Region: Asheville DOT Division: Division 13 Activity: X 401 Compliance Evaluation ? Complaint ?DWQ Follow Up Evaluation ? Other DWQ 401 #: 20101017 NW Permit #1 1 IP #: 3853 Project Name: Location of Project: TIP No. U-2550B The project is located at the intersection of NC Highway 18 and Interstate 40 at Morganton, NC Burke County. Project Complete: ?Yes X No Activities (DOT): X? Bridge X? Culvert ? Bottomless Culvert ? Bottomless Arch ? Riprap Inlet/Outlet Stabilization ? Spoil Pile ? Borrow Pit ? Wetland Mitigation ? Stream Restoration ? On-site Stream Relocation ? Buffer Restoration X? Bank Stabilization X? Other Fill If no, estimated date of completion: U Steam Standards Violation X? Turbidity ? Evidence of spills ? Oil/Petroleum ? Solid Waste ? Failed E & S control measures X? Sedimentation Impacts ? Stormwater Permit Violation X? Fill ? Buffer Impacts (see below) ? Other Additional Wetland Impacts: ? yes ? no Estimated Acres ? Zone 1 Est Acres ? Zone 2 Est Acres Additional Stream Impacts: ? yes X? no Est Linear feet Estimated linear feet of impact: Buffer Impacts: ?Neuse ?Tar-Pam ?Randleman ?Catawba Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ac Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Buffer Designation: ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibited 41 . . Name of Waterway(s): DWO Site Visits for DOT Projects Background Info Unnamed tributary of East Prong Hunting Creek and Hunting Creek Basin/ Subbasin: CTB 040302 Wetland Type: []Isolated []Non-Isolated (Waters of US) Stream Class: []Class B ?303d Listed ?WS-II ?WS-V ?SB ?ClassC ?ORW []Trout ?WS-III []NSW ?HQW ?WS-I X?WS-IV ?SA ?CA Type of Authorized Impact: X?Culvert []Bottomless Culvert X?Bridge []Bottomless Arch X?Riprap Inlet/Outlet Stabilization []Fill Authorized Wetland Impacts: ?0 - 1/10th acre ?1/I Id' to 1/3rd acre ?1/3`dto 1.0 acre ?> 1.0 acre Authorized Stream Impacts: ?< 150 linear feet X?> 150 linear feet 1,531 linear ft. I. Work is underway on construction of new culvert between NC Highway 18 and westbound 1-40 on ramp. Most of the clearing and grubbing work has been completed along Interstate 40. 2. Stormwater from the car lot and roadway is causing sediment and turbidity problems along the new 1-40 eastbound off ramp. Recommend installing slope drains and/or basins to control stormwater from these three areas. 3. Sediment and erosion control structures have been installed. 4. Maintain erosion control devices and seed and mulch areas as required to protect State surface waters. U-25508 NC Highway 18 @ 1-40 Inspection Report September 2011