Loading...
HomeMy WebLinkAbout20081809 Ver 1_Site Inspection_20111006AS ??. NCDENR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director October 6, 2011 Mr. J. J. Swain, Jr., P.E. Division 13 Engineer N.C. Department of Transportation Post Office Box 3279 Asheville, North Carolina 28802 ? cf V%, y CT I ?S'? Natural ResourcestiR_'? Z01I Seeman Sedetary Subject: Inspection-US Highway 221 DWQ Project 08-1809 Individual Certification No. 3784 TIP Nos. R-2233AA and AB Sections Rutherford County Dear Mr. Swain: On September 12, 2011, 1 inspected the construction work on the US Highway 221 Project, R-2233AA and AB Sections, in Rutherford County. Construction continues along most of the project with heavy grading, bridge construction, pipe installation and roadbed preparation. Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are performed as required to protect State surface waters. Also, please refer to the attached inspection reports for any specific items noted during the inspection. If you have questions, please call me at 828-296-4500. Sincerely, Michael R. Parker Environmental Senior Specialist Attachment cc: Brian C. Skeens, PE Roger Bryan, Division 13, DEO Ed Ingle, Roadside Environmental Transportation Permitting Unit Mike Parker, Asheville Regional Office US Highway 221 September 2011 Inspection Letter SURFACE WATER PROTECTION SECTION- Asheville Regional Office 2090 U.S. 70 Highway, Swannanoa, NC 28778-8211 i Phone: 828-296-4500 \ FAX : 828299-7043 I. Customer Service: 1-877-623-6748 Internet www.ncwatemualiry oro An Equal Opportunity l Affirmative Acton Employer NorthCarolina, Naturallry Naturally DWQ Site Visits for DOT Proiects Field Sheet DWQ representative: Michael R. Parker Date: September 12, County: Buncombe Region: Asheville DOT Division: Division 13 Activity: X 401 Compliance Evaluation ? Complaint ?DWQ Follow Up Evaluation ? Other DWQ 401 #: 20081809 NW Permit #:0 IP #: 3784 Project Name: Location of Project: FTIP No. R-2233AA The project is located on US Highway 221 approximately 3 miles south of the intersection of US Highway 74 and US Highway 221 in Rutherford County. Project Complete: ?Yes X No Activities (DOT): X? Bridge X? Culvert ? Bottomless Culvert ? Bottomless Arch X? Riprap Inlet/Outlet Stabilization ? Spoil Pile ? Borrow Pit ? Wetland Mitigation ? Stream Restoration ? On-site Stream Relocation ? Buffer Restoration X? Bank Stabilization X? Other Fill If no, estimated date of completion: I I LJ Steam Standards Violation X? Turbidity ? Evidence of spills ? Oil/Petroleum ? Solid Waste ? Failed E & S control measures X? Sedimentation Impacts ? Stormwater Permit Violation ? Fill ? Buffer Impacts (see below) ? Other Additional Wetland Impacts: ? yes ? no Estimated Acres ? Zone 1 Est Acres ? Zone 2 Est Acres Additional Stream Impacts: ? yes X? no Est Linear feet Estimated linear feet of impact: Buffer Impacts: ?Neuse ?Tar-Pam ?Randleman ?Catawba Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact fU ac Zone 2: ?Yes ?No Est linear f4/ acreage of buffer impact ft/ ac Buffer Designation: ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibited Name of Waterway(s): DWO Site Visits for DOT Projects Background Info Broad River, Floyds Creek Basin/ Subbasin: BPD 030802 Wetland Type: []Isolated []Non-Isolated (Waters of US) Stream Class: []Class B ?303d Listed ?WS-II ?WS-V ?SB X?ClassC ?ORW []Trout ?WS-III []NSW ?HQW ?WS-I ?WS-IV ?SA ?CA Type of Authorized Impact: X?Culvert ?Bottomless Culvert XBridge ?Bottomless Arch X?Riprap Inlet/Outlet Stabi lization []Fill Authorized Wetland Impacts: X?0 - 1/10'h acre ? I/I I'b to UP acre 0.02 acres ?1/3`dto 1.0 acre ?> 1.0 acre Authorized Stream Impacts: ?< 150 linear feet X?> I50 linear feet 2,686 linear feet Construction is underway on most of the project with grading and pipe installation taking place. Gravel has been placed on the new roadway north and south of the Broad River in preparation for paving. All areas that have been graded and no construction has taken place in the last 14 days should be seeded and mulched. All sediment and erosion control structures/devices should be checked for proper operation including the silt fence. Also, clean around waddles and drop inlets. Repair and maintain all erosion control devices and continue with seeding and matting as required to protect State surface waters. R2233AA Inspection Report September 2011 W.I. I DWO Site Visits for DOT Projects Field Sheet DWQ representative: Michael R. Parker Date: September 12, 2011 County: Buncombe Region: Asheville DOT Division: Division 13 Activity: X 401 Compliance Evaluation ? Complaint ?DWQ Follow Up Evaluation ? Other DWQ 401 #: 20081809 NW Permit #:0 IP #: 3784 Project Name: Location of Project: TIP No. R-2233AB The project is located on US Highway 221 from North of US Highway 74 to the bridge over Floyd's Creek in Rutherford County. Project Complete: ?Yes X No Activities (DOT): X? Bridge X? Culvert R Bottomless Culvert U Bottomless Arch X? Riprap Inlet/Outlet Stabilization ? Spoil Pile ? Borrow Pit ? Wetland Mitigation ? Stream Restoration ? On-site Stream Relocation ? Buffer Restoration X? Bank Stabilization X? Other Fill If no, estimated date of completion: Steam Standards ] Turbidity Evidence of spills Oil/Petroleum Solid Waste ? Failed E & S control measures X? Sedimentation Impacts ? Stormwater Permit Violation ? Fill ? Buffer Impacts (see below) ? Other Additional Wetland Impacts: ? yes ? no Estimated Acres ? Zone 1 Est Acres ? Zone 2 Est Acres Additional Stream Impacts: ? yes X? no Est Linear feet Estimated linear feet of impact: Buffer Impacts: ?Neuse ?Tar-Pam ?Randleman ?Catawba Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ac Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact fU ac Buffer Designation: ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibited i . .? Name of Waterway(s): DWO Site Visits for DOT Proiects Background Info Floyds Creek Basin/ Subbasin: BRD 030802 Wetland Type: ?Isolated ?Non-Isolated (Waters of US) Stream Class: ?Class B ?303d Listed ?WS-l1 ?WS-V • ?SB X?ClassC ?ORW ?Trout ?WS-III ?NSW ?HQW ?WS-I ?WS-IV ?SA ?CA Type of Authorized Impact: X?Culvert ?Bottomless Culvert XBridge ?Bottomless Arch X?Riprap Inlet/Outlet Sta bilization ?Fill Authorized Wetland Impacts: X?0- I/101h acre ? 1/I Vh to 1/3`d acre 0.02 acres ? 1/3`dto 1.0 acre ?> 1.0 acre Authorized Stream Impacts: ?< 150 linear feet X?> 150 linear feet 2,686 linear feet Review of sediment and erosion control structures indicate that most of the devices are clean and operating properly. Please ensure that installation of sediment and erosion control devices are keeping pace with the construction. All sediment and erosion control structures/devices should be checked for proper operation including the silt fence. Also, check all waddles and drop inlets. All areas that have been graded and no construction has taken place in the last 14 days should be seeded and mulched. Inspected site where gas pipeline blowout occurred. Area appears to have been cleaned up properly and there does not appear to be any lasting effects to the stream. Repair and maintain all erosion control devices and continue with seeding and matting as required to protect State surface waters. R2233AB Inspection Report September 2011