Loading...
HomeMy WebLinkAbout20101055 Ver 1_Email_20110818FW: B-4422 Beaufort 81 Page 1 of 1 FW: B-4422 Beaufort 81 Ward, Garcy Sent: Thursday, August 18, 2011 12:36 PM To: Carrillo, Sonia Attachments: D00042611.pdf (334 KB) For 10-1055 E-mail correspondence to and form this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message----- From: Lane, Stephen Sent: Tuesday, April 26, 2011 4:16 PM To: Sutton, Michael W; Steffens, Thomas A SAW; Ward, Garcy Cc: Alligood, Dwayne H; Rogerson, Maria A; Jones, Larry L; Johnson, Jay B; Tran, Van K Subject: RE: B-4422 Beaufort 81 Hi Mike, Attached you will find a scanned copy of the modified CAMA Permit for Beaufort Bridge #81 for the additional water line relocation. Please let me know if you need any further assistance with this project. Stephen -----Original Message----- From: Sutton, Michael W Sent: Tuesday, April 26, 2011 11:22 AM To: Lane, Stephen; Steffens, Thomas A SAW; Cc: Alligood, Dwayne H; Rogerson, Maria A; K Subject: B-4422 Beaufort 81 Ward, Garcy Jones, Larry L; Johnson, Jay B; Tran, Van Good Morning Mr. Stepheh....The need for an emergency waterline installation has arisen on Beaufort 81,B-4422. Please advise if this installation can be made by permit mod or a Section 1600 permit. If a Section 1600 is required, we would like to request this permit.Attached is the proposed plan sheet for this installation. Thank You, Sir...mike Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. hops://mail.nc.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAADMSzLcd9W 2TJHI4%2bm... 8/18/2011 f9~CAlU'1:4 / C9rDF#EDGE & FILL ~' " ° ~ 4'l `~ I GENERAL PEFIMI'r' Previouspermit# L~New ^Modlftcation ^Complete Reissue ^ Partial Reissue Date previous permit issued 'As authorized by the State of North Carolina, Department oLEnvironment and Nawral Resources -~ o q Z ~ ~ o aril the Coastal. Resources Commission in an area of environmental concem,pursuant to I SA NCAC O ~ H' ' 6 ~.. r ' Projectl.ocatlon: County ,err,{~ 1;~~ ~9,~fi f `' '• StreetAddress/StateRoad%Lot#(s) .:~~-/IO-~y .r ~r ~~~: ..~.. (, S`r^r jel~~tii/.i mo't' .. ~..t1C 11U D-. ~: _~. - .. _ i' p i ,,pon eau-~o,'f' Bri/y~91`~1. 8 ~ ~~-: ~ City. ~Dlou~a7'. (~~:X iNL ZIP `a'-?~/~( Affected L9'~w ~~ [vTETA •OFS Cw~TS Phone# (_) River Basin Tai Onw. ~hc~ ^OFA ^HHF OIH ^UBA ~N/A ~ lou„r}"i Cl«k AEC(s). Adj. Wtr. Body ~ at /man /unkn) ^ PWS: ^FC: ~nM ~ic a e21 V.c.I~', ORW: yes / ~ pNi4 yes f ~:. SriE•Hab, yes I'fid '; Closest MaJ. Wtr. Body ,_.-_ ~•T z~aPRY -~~ i ~ ~ ~ c "~"',.~,~"~..~a&"a. ~a ~ Z /iJ,,E. ,:'io. ,r ~ar~ ~'I-e._ .Pin~V~J^9 ~~.6 ~; q I' Yly td1~~' ~:.. ..» ~rrlj~d. n ,e Iota e."°'_ ~~'~ ~ia an° t,/a~-Fr`'~ 'l~ cJ d ~'^f ~' : (scale:: N/A _...,.:.; per ~d«k~ Platfonn(i) Finger pled Groin.lengt rcutlic yards ~ - Qi ~ ' ,~: 33 _Baat ramp ~ ,€ -w Boazhouse/ BoatliR - ~ ~ .. ~ ~ ~' ~ ,~ , " ~~ .. .:: 'z~ Beath Bulldoyng ~ ''~ ~.otner 3a.°.X.y~1"J o, ''6 ,.,.... ; H 0 ,y . ~'r.' ,. ~ .1. i _4 y ::.. Yx: d a ~ ' ." . l~,. '~~' - - - A buildTg permit,may` be regLired by.-r~ ~ ~~~"-'"'~1~sT ~~d~i~AU ~~Y ~ . ~ LJ fee note bn back Yegarding River Sari? rules.. Notes/Specia.I Conditiorfa ~.~~,~ / ~2. '~X/.~~f+,~ ~/~.I4jJC ancQ /~/^.~f fri; c'er~1v~~ qn -. /'C}Ic llln~f~ (} b,te. rr~-`?v~,$ ln..~-1~ t..~~r~ ~ fl.f.: ~yy y l - Il ' 1 ~ ..... :... ..- .. N w NQO(±~f }r,Gl:yNMI'1 ~ b~ J V~,t :. ~A.:, F ,. 7 .>~ R _ . .. ~ t. ?+ ~.._'.TL li .. '.:G. ~.. . ::. /` 1- ac L. .w ''. _1 <:tn.VL .::... O.`..L J. 2; y F:_.: ,..-.. 19 ''6> N Z O F U H y 2 O )U F N J F O N P n N Additional Special Conditions Action I.D. #SAW-2005-11635 - NCDOT, Bridge Replacement No. 12 on NC Highway 32. Chowan County, NC, TIP # B-4463 a) All excavated materials will be confined above normal high water and landward of regularly or irregularly flooded wetlands behind adequate dikes or retaining structures to prevent spillover of solids into any wetlands or surrounding waters. b) Except as authorized by this permit or any USACE approved modification to this permit, no excavation, fills, or mechanized land-clearing activities shall take place at any time in the construction or maintenance of this project, within waters or wetlands, or any activities that cause the degradation of waters or wetlands, except as authorized by this permit, or any modification to this permit. This permit does not authorize temporary placement or double handling of excavated or fill material within waters or wetlands outside the permitted area. There shall be no excavation from, waste disposal into, or degradation of, jurisdictional waters or wetlands associated with this permit without appropriate modification of this permit, including appropriate compensatory mitigation. This prohibition applies to all borrow and fill activities connected with this project. c) The permittee shall require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this permit. A copy of this permit, including all conditions and any Corps approved modifications shall be available at the project site during construction and maintenance of this project. d) To avoid adverse impacts to spawning populations of fish species at this project site, no in-water work will be conducted between February 15 and June 15. For the purpose of this moratorium, in water is defined as those waters within Queen Anne Creek and its adjacent wetlands that during periods of inundation have an active connection to Queen Anne Creek. e) The permittee will follow NCDOT adopted anadromous fish stream crossing guidelines. f) Temporary BMP's will be utilized to minimize erosion and sedimentation from ground disturbing activities. Remove all temporary structures (cofferdams, erosion control devices, turbidity curtains) upon completion of the project. g) All work authorized by this permit must be performed in strict compliance with the plans which were submitted with the permit application and are considered part of this permit. Any modification to these plans must be approved by the US Army Cotps of Engineers (USACE) prior to implementation. h) Compensatory mitigation for impacts to 0.35 acres of wetlands associated with the proposed project shall be provided by the North Carolina Ecosystem Enhancement Program (NCEEP), sufficient to perform the restoration of 0.46 acres of riparian riverine wetlands in the Pasquotank River Basin, Cataloging Unit 03010205. NCEEP.shall become responsible for providing the required mitigation only after the Cops has received written confirmation from NCEEP stating that they agree to accept responsibility for the mitigation work required, in compliance with the NCEEP In-Lieu Fee Instrument, approved by the United States Army Corps of Engineers, Wilmington District on July, 28, 2010. Until the Corps receives this Confirmation letter from NCEEP, NCDOT remains responsible for this mitigation requirement. If the Corps has not received a confirmation from NCEEP within 150 days of the date of this verification, NCDOT shall provide plans to accomplish the required mitigation to the Corps of Engineers within 210 days of the date of this verification. Note - Of the mitigation being required, .11 acres (permanent fill) are being required to be compensated at a 2:1 ration while .24 acres (hand cleared for utilities) are being compensated at a 1: I ratio. i) Any violation of these conditions or violations of Section 404 of the Clean Water Act or Section 10 of the Rivers and Harbors Act must be reported in writing to the Wilmington District, U.S. Army Corps of Engineers, within 24 hours of the violation. j) All measures will be taken to avoid any temporary fill from entering into Queen Ann Creek from bridge demolition. Bridge demolition shall follow NCDOT best management practices for construction and maintenance activities dated August 2003 and incorporate NCDOT policy entitled "Bridge Demolition and Removal in Waters of the United States" dated September 20, 1999. k) No bridge demolition debris or excavated or fill material will be placed at any time, in any wetlands or surrounding waters, outside of the alignment of the fill area indicated on the work plans. 1) To ensure that all borrow and waste activities occur on high ground and do not result in the degradation of adjacent wetlands and streams, except as authorized by this permit, the permittee shall require its contractors and/or agents to identify all areas to be used [o borrow material, or to dispose of dredged, fill, or waste material. The permittee shall provide the USACE with appropriate maps indicating the locations of proposed borrow or waste sites as soon as the permittee has that information. The permittee will coordinate with the USACE before approving any borrow or waste sites that are within 400 feet of any streams or wetlands. The permittee shall ensure that all such areas comply with condition (b) of this permit, and shall require and maintain documentation of the location and characteristics of all borrow and disposal sites associated with this project. This information will include data regarding soils, vegetation and hydrology sufficient to clearly demonstrate compliance with the condition b. All information will be available to the USACE upon request. NCDOT shall require its contractors to complete and execute reclamation plans for each waste and borrow site and provide written documentation that the reclamation plans have been implemented and all work is completed. This documentation will be provided to the Corps of Engineers within 30 days of the completion of the reclamation work. m) Failure to institute and carry out the details of special conditions a. - l., above, may result in a directive to cease all ongoing and permitted work within waters and/or wetlands associated with TIP No. B-4463, or such other remedy as the District Engineer or his authorized representatives may seek.