July 22, 201 1
Mr. J. J. Swain, Jr., P.E.
Division 13 Engineer
N.C. Department of Transportation
Post Office Box 3279
Asheville, North Carolina 28802
o~
~~~0n,,
Natural Resourcg,~ l/~
-"`~~'~w. w 2 ~ ~~ge Fan
/W0STt1P~~ti(gy Secretary
4Tc`AB
~H
Subject: Inspection-US Highway 221.
DWQ Project 08-1809
Individual Certification No: 3784
TIP Nos. R-2233AA and AB Sections
Rutherford County
Dear Mr. Swain:
On July 11, 2011, I inspected the construction work on the US Highway 221 Project, R-2233AA and AB
Sections, in Rutherford County. Construction continues along most of the project with heavy grading, bridge
construction and pipe installation.
Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are
performed as required to protect State surface waters. Also, please refer to the attached inspection reports for
any specific items noted during the inspection.
If you have questions, please call me at 828-296-4500.
Michael R. Parker
Environmental Senior Specialist
Sincerely,
Attachment
cc: Brian C. Skeens, PE
Roger Bryan, Division 13, DEO
Ed Ingle, Roadside Environmental (electronic copy)
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
US Highway 22IJuly 201 I Inspection Letter
SURFACE WATER PROTECTION SECTION -Asheville Regional Office
2090 U.S. 70 Highway, Swannanoa, NC 28778211
Phone: 828-296-45001 FAX:828-299.7043
Customer Service: t-877b23-6748
Internet www.ncwatemualiN.om
An Equal Opportunity 1 Affirmative Action Employer
NorthCarolina
~aturallr~
DWO Site Visits for DOT Projects
Field Sheet
DWQ representative: Michael R. Parker Date: July 11, 2011
County: Buncombe Region: Asheville
DOT Division: Division 13
Activity: X 401 Compliance Evaluation ^ Complaint
^DWQ Follow Up Evaluation ^ Other
DWQ 401 #: 20081809 NW Permit #:~ IP #: 3784
Project Name: TIP No. R-2233AA
Location of Project: The project is located on US Highway 221 approximately 3 miles south of the
intersection of US Highway 74 and US Highway 221 in Rutherford County.
Project Complete: ^Yes X No If no, estimated date of completion
Activities (DOT):
X^ Bridge
X^ Culvert
^ Bottomless Culvert
^ Bottomless Arch
X^ Riprap [nleUOutlet Stabilization
^ Spoil Pile
^ Borrow Pit
^ Wetland Mitigation
^ Stream Restoration
^ On-site Stream Relocation
^ Buffer Restoration
X^ Bank Stabilization
X^ Other Fill
Steam Standards Violation
] Turbidity
Evidence of spills
Oil/Petroleum
Solid Waste
Failed E & S control measures
] Sedimentation Impacts
Stormwater Permit Violation
Fill
Buffer Impacts (see below)
Other
Additional Wetland Impacts: ^ yes ^ no Estimated Acres
^ Zone 1 Est Acres ~ ^ Zone 2 Est Acres
Additional Stream Impacts: ^ yes X^ no Est Linear feet ~~
Estimated linear feet of impact:
Butfer Impacts: ^Neuse ^Tar-Pam ^Randleman ^Catawba
Zone 1: ^Yes ^No Est linear ft/ acreage of buffer impact ~ ac
Zone 2: ^Yes ^No Est linear ft/ acreage of buffer impact ft/ ac
Buffer Designation: ^Exempt ^Allowable ^Allowable w/mitigation ^Prohibited
DWO Site Visits for DOT Projects
Background Iufa
Name of Waterway(s):
Broad River, Floyds Creek
Basin/ Subbasin: BRD 030802
Wetland Type: ^Isolated ^Non-Isolated (Waters of US)
Stream Class: ^Class B ^303d Listed ^WS-II ^WS-V ^SB
X^Class C ^ORW ^Trout ^WS-III ^NSW
^HQW ^WS-I ^WS-N ^SA ^CA
Type of Authorized Impact: X^Culvert ^Bottomless Culvert
XBridge ^Bottomless Arch
X^Riprap InledOutlet Stabi lization ^Fill
Authorized Wetland Impacts: X^0 - 1/10`h acre ^ 1/l 1's to 1/3rd acre
0.02 acres ^ 1/3`dto 1.0 acre ^> 1.0 acre
Authorized Stream Impacts: ^< 150 linear feet X^> 150 linear feet
2,6861inear feet
Construction is underway on most of the project with grading and pipe installation taking place along the entire
length of the AA Section. The new Broad River Bridge has been completed.
Sediment has been removed from both up and downstream at Station 41+00. This restoration looks good.
All areas that have been graded and no construction has taken place in the last 14 days should be seeded and
mulched.
All sediment and erosion control structures/devices should be checked for proper operation including the silt
fence. Also, clean around waddles and drop inlets.
North of Station 273+00 sediment should be removed from the stream bed. Now would be a good time to
remove any sediment since no water is flowing in the channel.
Repair and maintain all erosion control devices and continue with seeding and matting as required to protect
State surface waters.
R2233AA Inspection Report July 201 I
DWO Site Visits for DOT Projects
Field Sheet
DWQ representative: Michael R. Parker Date: June 13. 2011
County: Buncombe Region: Asheville
DOT Division: Division 13
Activity: X 401 Compliance Evaluation ^ Complaint
^DWQ Follow Up Evaluation ^ Other
DWQ 401 #: 20081809 NW Permit #:~ [P #: 3784
Project Name: TIP No. R-2233AB
Location of Project: The project is located on US Highway 221 from North of US Highway 74 to the bridge
over Floyd's Creek in Rutherford County.
Project Complete: ^Yes X No If no, estimated date of completion
Activities (DOT):
X^ Bridge
X^ Culvert
^ Bottomless Culvert
^ Bottomless Arch
X^ Riprap [nlet/Outlet Stabilization
^ Spoil Pile
^ Borrow Pit
^ Wetland Mitigation
^ Stream Restoration
^ On-site Stream Relocation
^ Buffer Restoration
X^ Bank Stabilization
X^ Other Fill
Steam Standards Violation
] Turbidity
Evidence of spills
Oil/Petroleum
Solid Waste
Failed E & S control measures
] Sedimentation Impacts
S[ormwater Perrnit Violation
Fill
Buffer Impacts (see below)
Other
Additional Wetland Impacts: ^ yes ^ no Estimated Acres
^ Zone 1 Est Acres ~ ^ Zone 2 Est Acres
Additional Stream Impacts: ^ yes X^ no Est Linear feet
Estimated linear feet of impact:
Buffer Impacts: ^Neuse ^Tar-Pam ^Randleman ^Catawba
Zone 1: ^Yes ^No Est linear fU acreage of buffer impact ft/ ac
Zone 2: ^Yes ^No Est linear ft/ acreage of buffer impact ft/ ac
Buffer Designation: ^Exempt ^Allowable ^Allowable w/mitigation ^Prohibited
. .....
Name of Waterway(s):
DWO Site Visits for DOT Projects
Background Info
Floyds Creek
Basin/ Subbasin: BRD 030802
Wetland Type: ^Isolated ^Non-Isolated (Waters of US)
Stream Class: ^Class B ^303d Listed ^WS-[I ^WS-V ^SB
X^Class C ^ORW ^Trout ^WS-[ll ^NSW
^HQW ^WS-I ^WS-IV ^SA ^CA
Type of Authorized Impact: X^Culvert ^Bottomless Culvert
XBridge ^Bottomless Arch
X^Riprap Inlet/Outlet Stabi lization ^Fill
Authorized Wetland Impacts:
0.02 acres
Authorized Stream Impacts:
2,686 linear feet
X^0 - 1/10's acre ^I/11'" to 1/3`d acre
^ 1/3`" to 1.0 acre ^> 1.0 acre
^< 150 linear feet X^> I50 linear feet
Review of sediment and erosion control devices indicate that the devices aze operating properly.
Please ensure that installation of sediment and erosion control devices are keeping pace with the construction.
Seed and mulch all bare soil areas. All areas that have been graded and no construction has taken place in the
last 14 days should be seeded and mulched. The slope a the Y line north of Station 323+00 needs seeding.
All sediment and erosion control structures/devices should be checked for proper operation including the silt
fence. Also, check all waddles and drop inlets.
At Station 455+00 remove small amount of off site sediment below concrete pipe and beyond fence. Remove
sediment from basin at Station 323+00. The graded area north of this station including the roadway is eroding
badly.
Repair and maintain all erosion control devices and continue with seeding and matting as required to protect
State surface waters.
R2233AB Inspection Report July 2011