HomeMy WebLinkAbout20050249 Ver 1_Complete File_20050222W A rFR?G
r
CIO
o ?
Michael F. Easley, Governor
r., Secretary
North Carolina Department of Envirl Resources
.E. Director
er Quality
ay at
%--.5
m A .
2005
DV rjeject N0249
SR 13V?Long Branch Rd)
APPROVAL of 401 Water Quality Certification
Mr. Mike Pettyjohn, P.E.
Division Engineer, Division 11
N C Department of Transportation
Post Office Box 250
North Wilkesboro, North Carolina 28659
Dear Mr. Pettyjohn:
You have our approval, in accordance with the attached conditions and those listed below, to incur the following impacts
in order to pave, widen and improve traffic safety on SR 1352 (Long Branch Rd) in Ashe County.
• 115 linear feet of new piping impacts to two unnamed tributaries to Stagg Creek (75 feet of new pipe and 40 feet of
rip-rap);
Wetland Impacts of .0381 acres for cut; and
Temporary dewatering impacts of approximately 0.007 acres at station 6+14.
The project shall be constructed in accordance with your application dated February 4, 2005 (received February 10, 2005).
After reviewing your application, we have decided that this fill is covered by General Water, Quality Certification Nos.
3404 and 3366, corresponding to the U.S. Army Corps of Engineers Nationwide Permit Numbers 14 and 33. In addition,
you should acquire any other federal, state or local permits before you proceed with your project including (but not
limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will
expire with the accompanying 404 permit, unless otherwise specified in the Water Quality Certification.
This approval is valid solely for the purpose and design described in your application (unless modified below). Should
your project change, you must notify the Division of Water Quality (Division) and submit a new application. If the
property is sold, the new owner must be given a copy of this approval letter and certifications, and is thereby responsible
for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or if
total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as
described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the conditions
listed in the attached certification and any additional conditions listed below.
1. Instream work and land disturbance within the 25 foot wide buffer zone are prohibited during the brown and
brook trout spawning season of October 15 through April 15 to the egg and fry stages of trout from off-site
sedimentation during construction. Floodplain benches should be preserved or restored in order to maintain or
provide natural stream dimensions and base flow water depths.
2. Stagg Creek and its tributaries are classified as Trout waters. NCDOT shall strictly adhere to the Erosion
Control Guidelines for Sensitive Watersheds [15A NCAC 4B .0124 (a)-(e)] throughout design and construction of
the project.
North Carolina Division of Water Quality 585 Waughtown Street
Internet: h2o.enr.state.nc.us Winston-Salem, NC 27107
None Carolina
-atura!!y
Phone (336) 771-4600 Customer Service
FAX (336) 771-4630 1-877-623-6748
An Equal Opportunity/Affirmative Action Employer- 50%a Recycled110% Post Consumer Paper
Mr. Mike Pettyjohn, P.E.
February 22, 2005
DWQ# 05-0249
Page 2
3. Erosion and sediment control practices must be in full compliance with all specifications governing the proper
design, installation and operation and maintenance of such Best Management Practices in order to protect surface
waters standards:
a. The erosion and sediment control measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control
Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be
such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina
Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow
sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the
project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Surface Mining Manual.
d. The reclamation measures and implementation must comply with the reclamation in accordance with the
requirements of the Sedimentation Pollution Control Act.
4. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of
the impacts depicted in the Preconstruction Notice Application. All construction activities, including the design,
installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be
performed so that no violations of state water quality standards, statutes, or rules occur.
5. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent
practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they
shall be removed and the natural grade restored within six months of the completion of the project.
6. Riparian vegetation must be reestablished within the construction limits of the project by the end of the growing
season following completion of construction.
7. Stormwater should be directed to vegetated buffer areas, grass lined ditches or other means appropriate to the site
for the purpose of pre-treating stormwater runoff, and must not be routed directly into streams. Mowing of
existing vegetated buffers is strongly discouraged, so that they may be utilized for stormwater sheet flow.
8. Where practicable, culverts that are less than 48-inch in diameter should be buried to a depth equal to or greater
than 20% of their size to allow for aquatic life passage. Culverts that are 48-inch in diameter or larger should be
buried at least 12 inches below the stream bottom to allow natural stream bottom material to become established
in the culvert following installation and to provide aquatic life passage during periods of low flow. These
measurements must be based on natural thalweg depths. This may require increasing the size of the culvert to
meet flow conveyance requirements. If any of the existing pipes are perched, they shall be removed and replaced,
and re-installed correctly, unless demonstrated that this is topographically unfeasible. All waters must flow
through without freefalling or damming on either end of the culverts during low flow conditions, to maintain
aquatic life and/or fish passage.
9. The dimension, pattern and profile of the stream above and below the crossing should not be modified by
widening the stream channel or reducing the depth of the stream.
10. Disturbed floodplains and streams should be restored to natural geomorphic conditions.
11. Use of rip-rap for bank stabilization is to be minimized; rather, native vegetation is to be planted when practical.
If rip-rap is necessary, it must be limited to the stream bank below the high water mark, and vegetation must be
used for stabilization above high water. Any rip-rap used must not interfere with aquatic life passage during low
flow conditions.
12. If concrete is used, work must be accomplished so the wet concrete does not contact the stream water. This will
lessen the chance of altering the stream's water chemistry and causing a fish kill.
13. Heavy equipment must be operated from the banks rather than in the stream channel in order to minimize
sedimentation and reduce the likelihood of introducing other pollutants into the stream.
Mike Pettyjohn, P.E.
February 22, 2005
DWQ# 05-0249
Page 3
14. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent
contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials.
15. The presence of equipment in the channels must be minimized. Under no circumstances must rock, sand or other
materials be dredged from the wetted stream channel under authorization of this permit, except in the immediate
vicinity of the culverts.
16. Temporary dewatering sites must be restored to preexisting conditions unless more natural geomorphic conditions
can be provided.
17. All work shall be performed during low flow conditions.
18. Upon completion of the project, the NCDOT shall complete and return the enclosed "Certification of Completion
Form" to notify DWQ when all work included in the 401 Certification has been completed. The responsible party
shall complete the attached form and return it to the 401/Wetlands Unit of the Division of Water Quality upon
completion of the project.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act
within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to
Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center,
Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have
any questions, please contact Sue Homewood at 336-771-4600 extension 287 or at Sue.Homewood@ncmail.net.
Sincerely,
Alan W. Klimek, P.E.
Attachment
cc: Wilmington District Corps of Engineers
John Thomas, USACE Raleigh Field Office
Heath Slaughter, Division 11, Division Environmental Officer
-* ?tlands/401_ Unit,
Winston Salem Regional Office
Central Files
Mr. Mike Pettyjohn, P.E.
February 22, 2005
DWQ# 05-0249
Page 4
DWQ Project No.:
Applicant:
Project Name:
Date of Issuance of 401 Water Quality Certification:
County:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina
Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by
the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of
these.
Applicant's Certification
I, , hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and
other supporting materials.
Signature:
Date:
Agent's Certification
I, , hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and
other supporting materials.
Signature:
Engineer's Certification
Partial Final
Date:
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature
Registration No.
Date
i
v
G?Y f ?
?Y' yy?
STATE OF NORTH CAROLINA
050249
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY P. O. Box 25201, Raleigh, NC 27611-5202 LYNDO TIPPETT
GOVERNOR PHONE: 919-733-2520 SECRETARY
February 4, 2005
Mr. John Thomas
U. S. Army Corps of Engineers
Raleigh Regulatory Field Office 0 ? ,?:,,, a ?Vp 76-n
Falls of Neuse Road, Suite 120 L.a t i
Raleigh, NC 27615 FEB 1 0 2005
Subject: Nationwide Permit #14 & #33 DEN - VVA,i-Fr Q kLIiY
WETLANDS AND STOR'rAWMER BRANCH
SR 1352 (Long Branch Road)
Ashe County, North Carolina
Project Number: 11C.005084 (DWQ Permit Fee: $200)
Dear Mr. Thomas:
P"Yl ENT
REca vED
The NC Department of Transportation is scheduled to grade, drain, base and pave SR 1352, Long
Branch Road in Ashe County. Total project length is approximately 0.55 miles. The roadway
width will increase from 16' to 18' and be paved. Impervious surface area will increase by 0.13
acres. This project will require the replacement of three (3) wet pipes and 0.0381 acres of
wetland impacts as shown below:
Station Number Existing Structure
Size Proposed Pipe
Size Riprap Impacts
feet Total Impacts at
this Station ft.
6+14 40'x42"x60" 60'x81"x59" 20 40
10+48 30'x18" 55'x24" 10 35
17+09 50'x48" 80'x48" 10 40
Total Stream Impacts =115 feet
Wetland Impact Summa Sheet
Station No. Impact Acres
11+00 Lt.) 0.0381
The replacement of the existing wet pipe at station 6+14 will require temporary dewatering. An
impervious sandbag dike will be constructed approximately 20 feet upstream of the existing
structure to create a small pool. Clean water will temporarily be pumped around the construction
area and will be discharged into a buffer area downstream. Any dirty water located inside the
construction area will be pumped into a silt bag. The dewatered area at station 6+14 will total
P. O. Box 250, N. WILKESBORO, NC 28659
PHONE (336) 667-9111 FAX (336) 667-4549
4.
Mr. John Thomas
SR 1352, Long Branch Road, Ashe
Page 2
February 3, 2005
approximately 0.007 acres. Once the new structure is in place, the impervious dike will be
removed and the preconstruction streambed elevation will be restored.
Construction of this project will require impacts to waters of the United States in the New River
Basin. Wet pipes located at stations 6+14 and 17+09 carry the same unnamed tributary to Stagg
Creek (Class: C: Tr:+). The remaining wet pipe carries a different unnamed tributary to Stagg
Creek. This project was reviewed for the presence of threatened and endangered species on
February 3, 2005. This project will have no effect on any federally listed endangered plant or
animal species. Historic compliance work will be scheduled and concurrence with the State
Historic Preservation Office will be obtained if required.
The proposed project should not remove or degrade existing water quality uses. Pipe sizes used
will be the minimum necessary to create a safe roadway. All pipes with a slope greater than 6%
will remain perched and an energy dissipator pad will be installed at the pipe outlet. By utilizing
the erosion control measures outlined in the attachments to this application, downstream water
quality standards will be protected. All appropriate BMPs will be used during construction.
Attached is a Preconstruction Notification Form, plan sheets with proposed erosion control
measures, a marked county map, a marked topography map, photographs, and routine wetland
determination forms.
By copy of this letter, it is requested that Mr. Ron Linville, Mountain Region Coordinator, with
the North Carolina Wildlife Resources Commission comment directly to you concerning the 404
Nationwide Permit application with a copy sent to me. Please note that a trout buffer variance
will be requested for ground disturbance within the 25-foot buffer zone of an unnamed tributary
to Stagg Creek in the following area: 13+75(Rt.) - 17+00(Rt.).
By copy of this letter, I am forwarding seven (7) copies of this application package to John
Hennessy, NCDEIv'R, Division of Water Quality, 401/Wetlands Unit, for his review. It is
requested that any comments related to the 401 certification be forwarded directly to me with a
copy sent to the US Army Corps of Engineers.
We would like to begin construction as soon as possible. If further information is required, please
let me know. Your early review and consideration will be appreciated.
Sincer ly,
Gc?c.
- 4K?
Staci Hining
Division Environmental Specialist
Enclosures
Mr. John Thomas
SR 1352. Long Branch Road, Ashe
Page 3
February 3. 2005
cc: John Thomas, US Army Corps of Engineers (1 additional copy)
Ron Linville, Western Piedmont Region Coordinator, NCWRC
John Hennessy, Division of Water Quality (7 copies)
Sue Homewood, Division of Water Quality
Matt Gantt, PE, Land Quality Section
Mike Pettyjohn, PE, Division Engineer
Doug Tetzlaff, District Engineer
Doug Eller, County Maintenance Engineer
Heath Slaughter, Division Environmental Officer
Neil Trivette, Roadside Environmental Field Operations Engineer
Dennis Bennett, Bridge Maintenance Engineer
Office Use Only: 0502-49 Fonn Version April 2001
USACE Action IDNo. DWQ No.
If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than
leaving the space blank.
1. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit
? Section 10 Permit
® 401 Water Quality Certification
? Riparian or Watershed Buffer Rules
2. Nationwide, Regional or General Permit Number(s) Requested: NW 914 & #33
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (see section VIII - Mitigation), check here: ?
II. Applicant Information
1. Owner/Applicant Information
Name:_ North Carolina Department of Transportation
Mailing Address: P. O. Box 250, North Wilkesboro NC 28659
Telephone Number: (336) 903-9203 Fax Number: (336) 667-4549
E-mail Address: sshining a,dot.state.nc.us
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.)
Name: Staci Hininiz Division Environmental Specialist
Company Affiliation: North Carolina Department of Transportation
Mailing Address: P. O. Box 250, North Wilkesboro, NC 28659
Telephone Number: (336) 903-9203 Fax Number: (336) 667-4549
E-mail Address: sshining@dot.state.nc.us
Page 3 of 12
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: SR 1352. Long Branch Road
2. T.I.P. Project Number (NCDOT Only): 11C.005084
3. Property Identification Number (Tax PIN): N/A
4. Location
County: Ashe Nearest Town: Comet
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc.): See attached SR map.
5. Site coordinates, if available (UTM or Lat/Long): 6+14 DD: 36.4870° N, 81.5547° W
17+09 DD: 36.4893'N, 81.5534° W
(Note If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Describe the existing land use or condition of the site at the time of this application:
Forest/Residential/F arm
7. Property size (acres): Approximately 3.33 acres.
8. Nearest body of water (stream/river/sound/ocean/lake): UT's to Stagg Creek
(Class: C:Tr,+),
9. River Basin: New
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at )
10. Describe the purpose of the proposed work: Grade, drain, base and pave SR 1352
Page 4 of 12
11. List the type of equipment to be used to construct the project: Trackhoe/backhoe, motor
grader and dump trucks.
12. Describe the land use in the vicinity of this project: Forest/Residential/Farm
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
V. Future Project Plans
Are any additional permit requests anticipated for this project in the future? If so, describe the
anticipated work, and provide justification for the exclusion of this work from the current
application: N/A
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Wetland Impacts
Page of 12
Wetland Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Located within
100-year Floodplain**
(ties/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
Station 11+00 (Lt) Cut 0.0381 No 0 (adjacent to) Ephemeral
T List eacn impact separately and identity temporary impacts. impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditelming/dranmage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at . ?; ;
*** List a ?tetlaiid type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.)
List the total acreage (estimated) of existing wetlands on the property: 0.10
Total area of wetland impact proposed: 0.0381 acre
2. Stream Impacts, including all intermittent and perennial streams
Stream Impact Length of Average
Perennial or
Site Number Type of Impact* Impact Stream Name** Width of Intermittent?
(indicate on map) (linear feet) Stream Before
(Please specify)
Impact
Station No. 6+14 Pipe replacement 20 feet UT 41 Stagg Creek 3 feet Perennial
Station No. 10+48 Pipe replacement 25 feet UT 42 to Stagg Creek 1 foot Perennial
Station No. 17+09 Pipe replacement 30 feet UT #1 to Stagg Creek 2 feet Perennial
List eacn impact separately and identity temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and afler, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. iJSGS maps are available through the USGS at 1-800-358-9616, or online at
Several Internet sites also allow direct download and printing of USGS maps (e.g.,
etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 75 In. ft. of new permanent impacts.
3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any
other Water of the U. S.
Open Water Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres)
Name of Waterbody
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.)
Station 6+14 Temporary dewatering 0.007 UT#1 to Stagg Creek Perennial Stream
See attached cover
letter Miscellaneous rip-rap
placement for
stabilization .004
(40 feet)
UT's to Stagg Creek
Perennial Stream
List eacn impact separately and identity temporary impacts. Impacts include, but are not limited to: till, excavation, dredging,
flooding, drainage, bulkheads, etc.
Page 6 of 12
4. Pond Creation
VII.
VIII.
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): N/A
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
By utilizing the erosion control measures as shown in the attached drawings, adverse impacts to
streams in the area will be minimized. Since this is an existing roadway, the stream impacts
cannot be avoided. However, the replacement pipe lengths will be the minimum needed to
safely construct the paved roadway. All appropriate BMPs will be used during; construction.
Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
Page 7 of 12
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc us/ncwetlands/strmi?ide html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that
you would like to pay into the NCWRP. Please note that payment into the NCWRP must be
reviewed and approved before it can be used to satisfy mitigation requirements. Applicants
will be notified early in the review process by the 401/Wetlands Unit if payment into the
NCWRP is available as an option. For additional information regarding the application
process for the NCWRP, check the NCWRP website at hnp://li2o.enr.state.nc.tis/NNEp/index htin. If
use of the NCWRP is proposed, please check the appropriate box on page three and provide
the following information:
Amount of stream mitigation requested (linear feet): To be determined by COE
Amount of buffer mitigation requested (square feet): N/A
Amount of Riparian wetland mitigation requested (acres): To be determined by COE
Amount of Non-riparian wetland mitigation requested (acres): N/A
Amount of Coastal wetland mitigation requested (acres): N/A
IX. Environmental Documentation (DWQ Only)
Does the project involve an expenditure of public funds or the use of public (federal/state/local)
land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes E] No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA fmal approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only)
Page 8 U12
U
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion:
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes ? No ® If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet)
Multiplier Required
Mitigation
1 3
2 1.5
Total
-- . ?At«ILuZ5 UUL Jv KXL PLIFeucucuiar from near oanK of cllaimel; Gone 2 extends an
additional 20 feet from the edge of Zone 1_
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 213.0242 or.0260.
N/A
XL Stormwater (DWQ Only)
Describe impervious acreage (both existing and `proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Impervious surface area will increase by 0 13 acres All appropriate best management practices
for sediment and erosion control will be implemented during construction.
X11. Sewage Disposal (DWQ Only)
Page 9 of 12
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
N/A
XIII. Violations (DWQ Only)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application?
Yes ? No
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
Applicant/Agent's Signature
(Agent's signature is valid only if an
Date
ion letter from the applicant is provided.)
US Army Corps Of Engineers Field Offices and County Coverage
Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell Union
US Army Corps of Engineers Wilkes Clay Jackson Polk Watauga
151 Patton Avenue Buncombe Cleveland Lincoln Rowan Yancev
Room 208 Burke Gaston Macon Rutherford
Asheville, NC 28801-5006 Cabarrus Graham Madison Stanley
Telephone: (828) 2714854 Caldwell Haywood McDowell Swain
Fax: (828) 2714858 Catawba Henderson Mecklenburg Transylvania
Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham Wilson
US Army Corps Of Engineers Alleghany Edgecombe Lee Stokes Yadkin
6508 Falls of the Neuse Road Ashe Franklin Nash Sum'
Suite 120 Caswell Forsyth Northampton Vance
Raleigh, NC 27615 Chatham Granville Orange Wake
Page 10 of 12
u,
3•
(D
0
(Q
00
N
3
n
3•
((D
..
v
3
Q
N
Q
tD
n
O
z
?
LP
r
C O4 D
C? Z
O
z D
nN
;u O
r
3 m tt D
to n
U)
n
C r.
- _..
37 -i
O
v r_ _
:r
O
U) n
713 C3
m
0 n m
m
m .'
O
m
z? -
m 7
? 0 ?
m
Z w k <
I / k k/
LTI
C= ko
30m
m c c-)
7D o
CO
c
m _ z
m
o +
I m m D
(7 z -<
o m +
m N
* • n
U)
o m
m O
z o O.
mm
0
O
-p
r
z cn
m
m o
cn
m
_ X
N
A
.., 'U
u
m
cn
m
m
Z X
O
,
.
O
O
N
f7
D E
r D
m -<
DATA FORM
ROUTINE WETLAND DETERMINATION
(1987 COE Wetlands Determination Manual)
Project / Site: SR 1352, Long Branch Road Wetland sampling point Date: 1/28/05
Applicant/ Owner: NCDOT County: Ashe
Investigator: Heath Slaughter and Staci Hininci State: NC
Do normal circumstances exist on the site? Yes x No Community ID:
Is the site significantly disturbed (Atypical situation)? Yes No x Transect ID:
Is the area a potential problem area? Yes No X Plot ID:
(explain on reverse if needed)
VEGETATION
Dominant Plant Species Stratum Indicator Dominant Plant Species Stratum Indicator
1. Juncus effusus Herb FACW+ 9.
2. Fescue spp. Herb 10.
3. Sphagnum spp. Herb 11.
4. 12.
5. 13.
6. 14.
7. 15.
8. 16.
Percent of Dominant Species that are OBL, FACW, or FAC excluding FAC-). 100%
Remarks:
Minor logging disturbance uphill of ivetland
HYDROLOGY
Recorded Data (Describe In Remarks): Wetland Hydrology Indicators
Stream, Lake, or Tide Gauge
Aerial Photographs Primary Indicators:
_ Other x Inundated
Y Saturated in Upper 12"
x No Recorded Data Available Water Marks
_ Drift Lines
Field Observations: _ Sediment Deposits
Drainage Patterns in Wetlands
Depth of Surface Water: 1/2 (in.)
Secondary Indicators:
Depth to Free Water in Pit: 0 fin.) x Oxidized Roots Channels in Upper 12"
_ Water-Stained Leaves
Depth to Saturated Soil 0 (in.) Local Soil Survey Data
x FAC-Neutral Test
Other (Explain in Remarks)
Remarks:
SOILS
Map Unit Name
(Series and Phase): Evard loam Drainage Class: Well Drained
Taxonomy (Subgroup): mesic Tvpic Hapludults Confirm Mapped Type? Yes_ No _x
Profile Description:
Depth Matrix Colors Mottle Colors Mottle Texture, Concretions,
(inches) Horizon (Munsell Moist) (Munsell Moist) Abundance/Contrast Structure, etc.
0-6 A 10YR 5/6 NONE N/A Claey loam
6-12 B 10YR 3/1 NONE N/A Claev login
Hydric Soil Indicators:
Histosol _ Concretions
Histic Epipedon _ High Organic Content in Surface Layer in Sandy
Soils
_ Sulfidic Odor Organic Streaking in Sandy Soils
Aquic Moisture Regime Listed On Local Hydric Soils List
Reducing Conditions Listed on National Hydric Soils List
Gleyed or Low-Chroma Colors x Other (Explain in Remarks)
Remarks: Oxidized rhizospheres
WETLAND DETERMINATION
Hydrophytic Vegetation Present? Yes x No
Wetland Hydrology Present? Yes x No
Hydric Soils Present? Yes x No
Is the Sampling Point
Within a Wetland? Yes x No
Remarks:
DATA FORM
ROUTINE WETLAND DETERMINATION
(1987 COE Wetlands Determination Manual)
Project / Site:_ SR 1352, Long Branch Road, Upland sampling point Date: 1/28/05
Applicant/ Owner: NCDOT County: Ashe
Investigator: Heath Slaughter, Staci Hining State: NC
Do normal circumstances exist on the site? Yes x No Community ID:
Is the site significantly disturbed (Atypical situation)? Yes No x Transect ID:
Is the area a potential problem area? Yes No x Plot ID:
(explain on reverse if needed)
VEGETATION
Dominant Plant Species Stratum Indicator Dominant Plant Species Stratum Indicator
1. Fescue spa Herb - 9.
2. Taraxacmn officinale Herb FACU 10.
3. 11.
4. 12.
5. 13.
6. 14.
7. 15.
8. 16.
Percent of Dominant Species that are OBL, FACW, or FAC excluding FAC-). 0%
Remarks:
HYDROLOGY
Recorded Data (Describe In Remarks): Wetland Hydrology Indicators
Stream, Lake, or Tide Gauge
Aerial Photographs Primary Indicators:
Other Inundated
Saturated in Upper 12"
X No Recorded Data Available Water Marks
Drift Lines
Field Observations: _ Sediment Deposits
Drainage Patterns in Wetlands
Depth of Surface Water: N/A (in.) Secondary Indicators:
Depth to Free Water in Pit: >12 in.) Oxidized Roots Channels in Upper 12"
Water-Stained Leaves
_ Local Soil Survey Data
Depth to Saturated Soil: >12 (in.) FAC-Neutral Test
Other (Explain in Remarks)
Remarks:
SOILS
Map Unit Name
(Series and Phase): Evard loam Drainage Class: Well Drained
Taxonomy (Subgroup): mesic Typic Harludults Confirm Mapped Type? Yes x No.
Profile Description:
Depth Matrix Colors Mottle Colors Mottle Texture, Concretions,
(inches) Horizon (Munsell Moist) (Munsell Moist) Abundance/Contrast Structure. etc.
0-12 A 10YR 5/8 None N/A Loam
_ Histosol
Histic Epipedon
Hydric Soil Indicators:
Soils
_ Concretions
High Organic Content in Surface Layer in Sandy
Organic Streaking in Sandy Soils
Listed On Local Hydric Soils List
Listed on National Hydric Soils List
Other (Explain in Remarks)
Remarks:
WETLAND DETERMINATION
Hydrophytic Vegetation Present? Yes No x Is the Sampling Point
Wetland Hydrology Present? Yes No x Within a Wetland? Yes_ No x
Hydric Soils Present? Yes No x
Remarks:
_ Sulfidic Odor
Aquic Moisture Regime
_ Reducing Conditions
Gleyed or Low-Chroma Colors
Project Na e `- Nearest Road -
County 3A_? etland Area acres Wetland Width
Name of evaluator AAWh
Adjacent land use
(within 1/2 mile upstream, upslope, or radius)
Wetland Location
_ on pond or lake
on perennial stream
on intermittent stream
_ within interstream divide
other
Soil series Lyoyd 16a "'I
predominantly organic - humus, muck,
or peat
predominantly mineral - non-sandy
predominantly sandy
Date !.%,lr
forested/natural vegetation %
agriculture, urban/suburban y 7 %
impervious surface l %
Dominant vegetation
(2)
(3)_ cDn? nu nl-? '-_)[X) .
J
Flooding and wetness
Hydraulic factors
_ steep topography
ditched or channelized
total wetland width z 100 feet
semipermanently to permanently
flooded or inundated
seasonally flooded or inundated
intermittanly flooded or temporary
surface water
no evidence of flooding or surface water
Wetland type (select one)*
_ Bottomland hardwood forest Pine savanna
_ Headwater forest Freshwater marsh
- Swamp forest Bog/fen
_ Wet flat ? Ephemeral wetland
_ Pocosin Carolina Bay
- Bog forest Other
*the rating system cannot be applied to salt or brackish marshes or stream channels
---------------
salt bra---------------------------------
-
R
A
T
I
N
G
weight
Water storage 0/1 x 4.00 =
Bank/Shoreline stabilization
Pollutant removal
x 4.00 =
* x 5.00 =
Wildlife habitat x 2.00 =
Aquatic life value yl x 4.00 =
Recreation/Education
x 1.00 =
Wetland
Rating
*Add 1 point if in sensitive watershed and >10% nonpoint disturbance within 1/2 mile upstream, '
_ u sloe or radius
• L ? QatiC kS?A 5,- Co
-o. Q. zQ?-oo Co-?? N•? .? ??? ?-oN ??a.
/ I ? -_ ; -+'?\c?w. v,s? hls? ? 4 - 17se ? 13f4 1? - :i•• ? i
I / - Cr- I. ?, .2':.1=3a ..i I jai/ - •
u C H E R O K E E •. a ,3_se +?1 r- ;r. ;ti•. Snurpilu ^_ +=
•4 / Eidr?trt?`? S; qv. n \ _ :3K ,? t3):
N A T 10 N A L 1326 'moo ?• ? •,?' •f, '•\ -.- '•\ 'c .•,:,, .1 -r ?'_,
F O R E S T i n :I^ ?? s I z o! ?W _? tl?s 13Ee .• :_ .law q ><
^ /)J N 6
..? t? .i. 1356 ?.'135c 13? .._ 1361- O
W
C ? } c[ im
YC'? '?. E .pplo G10.! t ,.? .I?l noon Z-G
i 1 „ rDV.On 1.9
tl)V t3^' , \ _ -0 N•: \'' 137< .. y 136E :•1 -
C ?lY . 1 `\ .? •R.V .1356
V, ` 1310 ;?
%
_ ? .3ec ft"•`-LT.T-?? 1319 '- '?? . ?.
'-
V) '3-- 1330._ - •' 133?
c 1 6 131` + l
1,_=•? I_ 0 1v t3a: ?u..21 13]`.`- .3X . •s,E
? ? H?miork ? 1311 +? ".) • ,
t aao \
crae- Cn-1111 /•LSIfiG
;..? I ? !• 131 .? ! I lror.tn
13r +? ? ? °I
.13CE E=1 • 2 E \
v?Cc t3.? :• 1 t:±G'. ?' ' C.
l ??3'? , / 1?IE 'R. sW E Cncosl
132S 13.E P 1?51 1309 +•.. `16•:.:
r-?- 1- ? y ? V.15.?
f-' 130°-. ? _ ?y 13:e t13t+ \ '? PN'J_NIT
,a Fencer ? ? > ,3t" ,R .'vim.; .? ? •a. ? ? //??v
' o \ .E -?? = `•t ?c ., t3aa 13a? ? ., '.!t ? K'amnsviiw
-i . S •p „yjW 1 l ` `DtasCen ie
-n tTO.. Grove ?J
1.21
Fic
13r .-P 13[a"F ?; to s•?i9i .rlfffoc`,_2• ,ra. -a YOC+ ,5W
Ailllond :? r, n •i 3B1^ `" e?r 1I.Z IT[+ tom` -''f uZ w. 1 Cy,
1,93 I PO
. ? _ 130E 'ti -^ '•\'• !. 5 I` 'C
,1,?? '` •L f 1?9` i171 .? S7K ::?fl .y+l9C• :SnWtnDor!
/ J ? .!. /,? 1,h ?.? ? ? ,,131 .u?. r•oooy i .
i ^ a IMK Q 1
vrean ,'Mdrwll TH: P:4r. au fa _\
R"
1f? •3E16. }DI1..• _ F \ ,?.' e` ?tw. ?N?ST _?__.;
/ ( n w Y 1171 C •? _?' i IEFFEPSON
\. ?\ Sutnerionlu i - 1136 F. 1,102 .?,.?:,•.• r' / 'rout i ?' ct ??y,?
?? r 111E 1 ) ._l' V? urn ?
?' } \ ?? /? f? Fr• Q"' w?.. i+j' I 113... 1 ' '- :\I?_•l`?_-?
±\ \. ?GM?•. N
1 36
-
of \•1, 0LD FI"_;.C BALD
ELF\'. S 9aG 1100 H' 4 3 \ t 1143 I IeS 114E
Bl4CK NTH:. - I ]? 174E
\ 2b
4 a..?. r n1 Q tO
MTr
I
f
Name: WARRENSVILLE
Date: 2/3/2005
Scale: 1 inch equals 1333 feet
Location: 036.4925377° N 081.5533392° W
Caption: SR 1352, Long Branch (E. Stagg's Creek) Road
1998, Maptech, Inc.
SR 1352, Long Branch Road
EROSION CONTROL DETAILS AND
SPECIFICATIONS
STANDARD DESCRIPTION SYMBOL
462.01.(5e.Gtj_Qn).....Rip Rap Fill Slope Protection ........................
876.04 .................... Rip Rap Lined Ditch ..............................
1060.08: 59rj;ign)...Matting For Erosion Control ................
1605.01 ....... ............. Temporary Silt Fence ....................................
1.606.O L...... Special Sediment Control fence..:. .
1622.01 ...............Temporary Slope Drain ..... ......... .......-..........
1630.02 ...................Silt Basin Type B................
1630.03........ .. .Temporary Silt Ditch ... ........... .............: TS
1630.04 -Stilling Basin ............................
1630-05 ..... ......Temporary Diversion .................
-
1632.01...... .......:..---Rock Inlet Sediment Trap Type-A ...................... OIL
1632.02.... ...............Rock Inlet Sediment Trap Type-B.................
1632-03.0-0.-o ........Rock Inlet Sediment Trap T3'Pe-C.-................
• icy: oR 1 c ? -
163-31-010- .......:.......Temporary Rock Silt Check Type-A....... .------- EM J
1633.02 ................... Temporary Rock Silt Check Type-B......... ...... ,
1634.01 ..............:....Temporary Rock Sediment Dam Type-A... ........
1634.02 ..................... Temporary Rock Sediment Dam Type-B... ......
?
1635.01 .....Rock Pipe Inlet Sediment Trap Type-A............ P_ U'
1635.02 .................... Rock Pipe Inlet Sediment Trap Type-B..... .......g :?•
1636.01 ....................Rock Silt Screen .................-
..........
.... .......?
Small Stream or Branco ....................•-
.................................... •------- -? - - - -?
Pipe Outlet Energy Dissipater ..................... !
sets
CONSTRUCTION SEQUENCE FDR INSTALLING ROADWAY CULVcRTS
1- Clear only enough area and install the downstream measures such as sift check dams,
silt screens, and basins as noted on plans.
2 - Excavate the Z base tail ditch.
3 - Excavate and install the roadway culvert.
4-.Install sediment control measures at inlet as noted on plans.
S-install additional pipe outlet protection and inlet protection _as noted.
EROSION CONTROL SCHEDULE
(1) All adequate temporary erosion control measures will be installed before
clearing and grubbing operations begin.
(2) As construction progresses, temporary and permanent erosion control
devices shall be installed in a timely matter, according to any special permit
requirements and or requirements set out in G. S. 11 3A-57.
MANDATORY STANDARDS FOR .LAND-DISTURBING ACTIVITY
Pursuant to G.S.113A-57 (3).provesions fora ground cover-
sufficientto restrain erasion must be accompftbed within 15
working daysflr30 calendar days following completion -of
construction ?or-cfevelopment,-whichever period is shorter, except
as provided in 15A NCAC 4B .DD24 (e).
'DESIGN STANDARDS IN -SENSITIVE WATERSHEDS
- Pursuantto G. S. I13A-57x(3) provisions for a ground cover
'- suffiienttorestrainerosionmtmtbe.providedforanyportion*fa;
Sand-distiirbmg activity m a I?QW zone ?nrthin 15 woi?cing days or 3D
;calendar idays following completion of construction or
-development, whicheverperiod is shorter_
(3) All -siltation and erosion control devices shall be properiy maintained until no
longer needed.
(4) On projects performed by D.O.T_ Maintenance Forces; request will promptly
be made to the Division Roadside Environmental Unitfor stage and
per-manent seeding.
(5) Any removal of siltation devices will be based on the condition of established
ground cover of that area the device is serving.
h
HIGH QUALITY RATERS
1. Uncovered areas are limited at any given time to a maximum total area of
20 acres.
2. Erosion and sedimentation control measures shall be designed to provide
protection from the 25-year storm.
3. Large Type-A basins shall be designed and constructed with a settling
efficiency of at least 70% for the 40 micron soil particle size transported
by runoff from the 2 -year storm
4. Newly constructed channels shall be constructed with side slopes no
steeper than 2:1, unless slopes are to be stabilized by methods other than
vegetation
5. Aground cover sufficient to restrain erosion must be provided for any
disturbed area.
SEC 1 ION' IO 42
RIB RAP A- T ATEIJInLS
1042-1 PLAIN RIP HAI'_
done for Dlain r11) rapsllalI consist of fin-ld stone 0I- rollc-h untie .,n quarry
clcine- lie Stone shall he sound, touzll, tlense, reslstani to the action of air
anti wafer, and suitable in all Ether resl)ects for ille 1)U!-DOSe Intendea_
Where broken concrete from demolished siriictures or Pavement is.avail-
,ibleJt-nmy be us'd in Place of stone vI-ovided f1111t such use meets -with the
aDprDVal of the En c ineer_ - H' ever, the -,use of hrokeI1 CDIICI-e# e
contains ??inforcing sieel,??illnot lie uermiifed_ -
1he stone or'hI'oen cD1)Crete shall he- gl-ceded i0 --nee the fDllowi-Ilg
reguirements:
I: F or?Class I Rip Rap-Sioneshall vary in'veighl% TrDM 5to 200 Dtilinds:
A, least 30. Y)eir;cp_ni -of ih-e-iDtal W:eighi DT.i_11-e rl) TRID. shall be. in
individuzl pieces ?tifeighlllga anI3113I1llm of fi0:DounaS?i1L' l_ ?l. Inol'e
_ .h2I1 1'0 ?IeI'C:eI1? Od le ?OtL?1 137.elg?l? DI ills r]D I-aI)Tilay heln individllal
:.:mer-es vvelghln2 less than 10 pomnds eacla_
- O?' '?l-zs IT) as?_ iOlle Shall --nry in -w-m-12
Dounds_ A?least00 percent of the t0i_1'v+,ei hto.-iherlDraDshall hein
1ntilVldllal 1)IeCeS ZVeiIlI7c-, a 1i1121II71uTin; DI ZOO -DoaI1QS e=c11_-Notmore
than 5 j)ercei)L of the total zveight of the r I1) ran mLy he IIl 1nc11V]C1llL?1
nieces lvei r.llin? less than 50 -Dounds each-
.001
EROSION CONTROL ? Sheet ? of 3;
SR X352
COUNTY ASNE -
LOCAL NAME Lo .rG B/za??c H
WORK ORDER NO.
FIELD PLANS BY_D.X 64 /,.g4Al
? UN NAM 60 i?tg
DRAVI'N BY AT CAP*,d,?
-jy
DISTRICT ENGINEER -' - - ?xls?. ?fZx (s0 X y L
t?y fas- ??EPcE 81 "K :5-1 „x
ROADSIDE ENTVIRO1v1ENTAL EN . LEER
sJ? N>`ADt?fc?
NOTES:
Outie; basins with rock checks shall be
placed (a, low points along silt fence
while installation is being performed.
These basins are not shown on plans.
All pipe location may vary due to grade
changes in road'WaV.
Rock checks and basins arc to be removed
before rip-rap or matting placement. Basins
is crosslines to remain.
All Nvet crossiine placements that require more
that. 1 (one') wori: day to install require a
silt screen 0 the outlet end.
Scaie i = 100'
41 &51,45 st!o wd Ak6 /o x 3x 1
PG l -3
4®
i
i
?EtA??! Pi p ? ct 1.1
TO PAVtzM? SEC
? `
- sTa, o fo 9
Extsr, ???2Y``
?r
Fui r 61TC1 / t
C ) 0,0
FNp of PA VEMENT, CoNSTjR,ct
n.Af
EROSIO, CONTROL
SR
COUNTY
LOCAL NAME
WORK ORDER NO.
Sheet of 3
i i
,
j
30'X /SnLS? nl...i
,fix i 5-1 /iv t4' - So: z vs„ \d Pt
FIELD PLANS BY ?FPl?Cf 50- z y8
DRAWN BY I t
1 -
DISTRICT ENGINEER {
ROADSIDE ENVIRONENTAL ENGINEER-
i
7: z
t
? t4?4
I E ??
1
f t
NOTES: l'
Outlet basins with rock checks shall be
placed @ low points along silt fence
while installation is being performed. If
These basins are not shown on plans:
l
All pipe location may van due to grade ,
cnanees in roadway.
i f
Rock checks and basins are to be removed ` !1
before rip rap or matting placement. Basins
i
(al crosslines to remain.
All wet crossline placements that require more
than I (one) work day to install require a
silt screen @^. the outlet end.
® j
UO oAmeb Tong,
C
Sale I"= 100'
fx? 5T JR/? 3d ? X 1
Ty??e -, l D ? o0
t,
4PP
E ,'OSION CONTROL Sheet3 of 3
SR ?- SR 1-31-1
St I3S'7 ---? - -
COUNTY 1 1 25 +65 Aff- o, p -
LOCAL NAME
WORK ORDER NO. J
i
I i
?- i
®® I J i 2774 Ll o
0
Ir - ?3p Tqc -3
FIELD PLANS BY
- f
DRAVdN BY
DISTRICT ENGINEER {
ROADSIDE EW. MOMENTAL ENGINEER-
0o Z i
® ZS'?So
tip- ;ya e
0
Zyfso
I 4d,4 30'x is"
Ac/
NOTES:
Outlet basins with rock checks shall be I -
placed @ low points along silt fence
while installation is being performed I
These basins are not shown on plans.
All pipe location may van' due to grade
changes in roadway. I 1
I ? ? v
Rock checks and basins are to be removed I -
before rip-rap or matting placement. Basins
(a_' crossiines to remain.
I ?
All wet crossline placements that require more i
than 1 (one) work day to install require a E2 Q
silt screen !d the outlet end. Y '
r
?o• Zof9o
Scale I-= 100'
$ Aar 5?o x /'3
T 1 v
{
06400
4-
L
Ditch Liner Requirements
SR1352
LONG BRANCH
ASHE CO.
Station Station Rt/Lt Liner Required
0+00 6+14 RT
6+14 10+48 LT
10+48 12+50 LT
12+50 17+09 LT
17+09 29+00 RT
RIP RAP
ROVING
ROVING
RIP RAP. -
RIP RAP
u
SR1352
LONG BRANCH
COUNTY: ASHE
PIPE STATION SIZE CLASS REMARKS
A 0+09 TYPE B RcTAin/ -;' SfE Norc o,,J E/c
B 6+14 ( o'X$l TYPE B REPLACE W/ NEAbWACc
C 10+48 55'X24" TYPE B REPLACE
D 17+09 go'z yg' TYPE B REPLACE
E 18+25 30'X15" PLAIN ADD
G 20+90 40'X18" TYPE B REPLACE
H 24+50 30'X15" PLAIN ADD
1 25+50 40'X18" TYPE B REPLACE
1 27+40 40'X18" TYPE B REPLACE
4
t
ir
Y ~
W
W U
U to
a
U U
C9
aZ
?O
V) F
ma
U
1- V)
W Q
< J
Q
Z U
Oir
zw
H
a
3
?1
Q
OZ
a
s
q,
J
J
a
3
p
Q
W
= 3w
a J
z3I0 v
} N
O ?- m
UzX O
?(A z
W F
=wZ3
V) o ?
Q 0
a pz
J
W
W
a
Il
O d
J
r-
a , •
4if
O ••
w ?
V)
x f ``'.JJ O
O ??lT? Q
? W
Q. d 2
d LA
Q U \
Q =
W a-
w I- ZQ
Q Z I- x O V
w N. a
J X N O
z wI- dLn
E ? x
w x
F-
< LL OD
W O X
p 00
O
O
d
O
2
Q-
0)
?n
M
O
to
N_
r
O
C
rn
v
c
ca
Q.
N
a
a
t
U
C
N
m
m
c
J
i
v
W
N
? m
O
Q
cr
O O
Z
ti
M
N
O
H ?
AA
M
W M
W
W d V Q N
w O
D W t-
O Q N =
J
Q
11.
LLJ
N LL N 3
Z
W Q U
X -
W
W W
:2
E W
-r Q
LL.
Z O
H
N ti
p
Q U
0 Z
W W
F--
N
N n
LO
W > ?
W X x O U W
LL. O I X
W
J Z
O F-
Q
O Q i O F U
3 0 X
LL.
w-
> i w
Co
Q W
o U-
O
o
W t
Sd
N
J
Z W
C J -
Z
F- Y
N W +
W W
Cr
U I
F '
N U O
J
M Z
U 0 W
co
w
Q F- 0
= W
N HQ
O
co
O N
0
W
Q
F- _
co J Q
e
F- Q W
a
J
O
v
Q ~
N
1- U cr) W
M ?
Q: W
Q w N
Q
F - N
Z) 0
_ F-
N
LL
0
W
Q
Z
O
Z
O
O
O
O
f?
O
tc)
O
N_
r
O
C
t3)
.p
N
O
L
Q
I.1.1
a
s
U
C
N
m
c
O
J
w
N`-t
Da-
... ? S?lal
\ o
'--- -J
'yew Pipe , - ' - - _ - ,o
1 ? 1
-_1 ... ' Sz la Aj qT j_ p
C°hfea- T III - ? ? ..
to 9?
•I 1 1 1 1 1 I t°I I-I I'I-? I I I I I I I I t t 1 1 1 1 1 1 1 1 1 1 I I 1:! I: ..,t 1 1 1 1 1 1 1 1 1 I
1 1 1 1 1 t I I I 1 1 J l a I I _ ..
Existing Road
New Rcad .. .
pj opossed T1 >TZ]
?.'..5'IiI1Q PIDe -
r l I I! I I l l l l t l 1 1 1 1 1 1 1 1! r"' -, 1 1 1 1 1 1 1 1! 1 1 '1
a i l t l !. I I I I 1 17 I l l l l l i l l l l 1 1 1 1! 1 1 1 1 7 1 1 1 1 1 1 1 1 I I 1 1 1 1 I'! _ I I J
i
r„ I I I i I l 1 1 i 1 1 1
I I I 1 1 1 1 1 1 1 ! i, 11 1 1 1 1 1 1: 1! I
1 1 1 1 1 1:! 1 1 1 1
l l l l j l
I
??
I
- ll( l l
I l: i: l l+ l l! I t 7 1 i l t 1 1 1 1! I
I: 1 1 1 i t
I
1 I I 1 1 1 1 1 1 1 1
I I 1 1 1 1 1 1 1 1 1: i l: l: t l:!! I I' I l l i i l l l l+ l l l t 1: 11 I
! 1 1 1 1
1 1 1 1 1' l.. l l
l i l l l!! I I I i I l I l i i i! I! I!. i l i l! l i l: i l; I! i l I l l
?
l l l i l l i l t l l l l i l l l
l l l l l t l l l l
l l i l
I
t l: I! I l l l l l l i i l l l t l l l l: l! l i l l 1 l i i
,
+
l l l l l t l l t l l l l
l l l
1
E l l l l l l l t
1 1
' I r I I I I I r ,
I I 1 1! 1 1
1! 1! 1
? 1 1 1 t l l l t l l l l i l l l
1 1 1 1 I i i l l t i: l l i
1 1 1 11 t l l: 7 1 1 1: 1 1 1! 1! 1 l i ?
r I I I I I I I I I I I I 1 1 f 1
i i
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1!: I l? i+ l l l l! I l j: 1 1 1 1 1!! 1
( 1 1 1 1 I l i l i: i j l l l
'! i
1 1 1• ' 1 1 1 1: 1 1 1
t 1=! 1 1 c l l
? I I I!! I I 1 1 1
i: l! I r l l l l: I l i :!
; I I I!
! ° i I 1 ? I I
l r I 1 1 i i i i I I I I 1
I l j
I!: 1 1 1! I I l t l t i 771 1 1 1: 1 1
! i l+ I ,
I i t '
I I I !
l l i:
: I 1 I I
l l l j l l l
.
.
I, I 1 1 1 1 •,
I i 1 i l: Y i l i: I t l l! i l i l i i l+! I
I I I z:, l l i! I 1
I! I 1 1 1:
t l! l i l t I I
'
I! I l l l l l
1
' i i; l i l l l l i l l i l i l t l: I i i j 1 1; I
i 1 1 1 1 1 i
l t l! 1 1 1 1
i l l! i l l
l
l! I r l l
!!+ 1: : 1 1 1! 1 l l i l l II !, I; 7-7-7-7--777777
'
• l l
'. 1 1 1 l t l l l l l l
1 1!
.
! ! 1 1 1 I 1 1 1 I i 1 I i I I 1- I l; l t l! i l l
!
l l l l l: :.
! j! l i l l l l l l
1 1 +' + :: 1 1 i t I I 1 i I 1 +' 1 1 i 1,:? I I I I t I i 1
1 I
i 1 1 I t l i l; l
I 1 1 i r !" 1 1 I I i 1 I I
I
; i t r L I l i i!! I I l
1: ' 1 1 1 1 1 I I 1 ,+
I I? l i l i 1 ; ;! i l+!! I l l l i l l i
I l l i+ l? l ! i
1 1: 1 1 i-I j l I l i I i l l! 1 1
I I! 1 1 I I I l i l
l
l i i!: I! i i I I 1 1 1 7 1 1 1 ? 1 1! r 1: 1 1;: 1 1 1 1 1 1 1 1
: •! I :! I l l l l l l l i l l t f
l i
? l i l : I 1 i. i I l l i
11 1 1 1 1 I I I
' l .1 1 1 1 1 1 1! •t 1 1 1 1
l i l j
:
I 1 1
1 I
l l i ! I
+ 1 1 1 1
I :: 1 I. 1 1: 1
l i l i l I
I I
1
, i 1 1 1 1 1! 1 ! 1+ t
? I I I I ! 1 1 1 1 1
1 .
l l i
! 1 1 1 1
7 I I I! i I
I' 1 1 1 1 I i I I 1
I : I l i i l
, ? I I I
i 1 ! 1 1:: 1 1 1 1
1 7 1 1!! 1
1 1 1
,
i l 1 1 1!! ! !' I i r l !! I! I l i 1 I 1: 1 1
I
' 1 '! t Iw 1 ! 11 I+ I! !! 1 1 1: + i l l •I 11: •I 1
1
r 1
' 1 1 1 1 1 1 1
ry 1 1
:
rr : 1 1 I l , 1
l l j
1 1 7 I I ! + i 1 r ; 1
' I 1,!
! : 1 1 1 1; 1 I I
!
'
1 I t I
, i 1
?
I l l i j l! I
1 1 1
i 1 I + 1 : 1 1, 1 1 ! I I 1 1 1 1
1
ii 1 1 1 I I: i l
I
1 1 1
I ! 1 1! !! I1 I l i
!
; 1 . I 1 i I 11 I i i
I i
' i : : I
: i
! I I' I I I 1 1 I .I
t
!
I! i
1 1 1 1 ! 1 I I ? 1
I I 1 I 1 I l r i I
1
f l 1
? 1 + i l l i l
r 11 1
' '! I
!;
i i
! 1 ,
1 1! it i 1 1 i l I
. ! 1 1 1 1 1 1 1 1 1 1 1
+
--ut??; ?T ?TDSIDn ?Dnu of
=v,==s nDi shDv•>,, bur -aU
.07
7--=I: Zht j: u2- -s and silt
b-23-m-s, as n== =d
Coazluc td 3y TIC, L??ki " '' G
V - ail??I J Or
Dat' ?-13
i " sag Road
New Road ... ? , '
Proposed Rte'
lxisa g Pipe
i '-
L -J
I-------1 Q
New Pine _ - -- - `?
Cent
Li
er
ne • • _ --_
C
j4- C' 5 P
0117
-I ! I l l l t•?I I-!
'
?
:
-.
i
I-1 I I I 1 1 1 1 1; I l t l i l l l l l t l 1 1
+ --_
. •
. _ .'.
d-
: I
1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 L a L t I I 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 l i
!
'
:
1 1 1 1,,, 1 1 1
! I t!! I ! H 1
! I ! 1 1 t/, 1 1 1 1 1 1 1 1 1
1 i _?
? i 1 1 1 1 1 1 1-:I
I 1 1 1
1 1 1 1
11
! 1 1 1!! I! t l l 1 1 1 ! 1 1 ! 1
•. l l l l l l l l l
? I l l i {. I I i I 1 1 t f 1 1 1 1 1 1 7 1 t
I
1 1, 1
1 1
1 1 1 1 1 '1 t l l l
l l l l l l
1 1 1
'
1 1 i 1 1 1 1!
I l l r: b!! t l I'i 1 1 i I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 t
1 I l i
l
•'
t ! I f I,
1
t l l
!
1 1 1
1
1 1 1 - I I
l
l l l t
1 I I e I I I 1 1 f i I l I l T f' I f• I• T 1 1-I i l
1 1 1 1 7 1 1 1 1 1 1; 1! 1! 1! 1
I I I _
1 1 1; i
f i 1 1 1 1 1 1
1 1 1! 1 1 i, •
; 1 1
l l l l l
.
I; I I I t l 1 1 1 1 1 1 1; i!
' 1 1 I I I I!! i
I l i i l l l l l l l l l l l l l l l l l l l l l 1( i l l
1 1 1 1 1!
I i! I 1 I 1:
•i 1! 1 1 1
l l l i t l l l 1 1
I -I I l l l l l l
I I I I I I I I I I l l l l l l l l l i l! I l l l t !•1 1
I! I I I I I I 1 1 ?
l l i l I
I l l l l
I l i
l l l 1 1 1 1 1!,
!: l i l f l
I I f I l l l l l l l l i l l l; l l l l ,
l l i
i l f l l i l l l l l
i
1
1
l l l l l l l l
1 1-1 t l l 1 1 1 1 1 1 1 1 1
c l l l l l l l l I?1 I I I I I I f 1 1 7 1 .
1 7 1 1 -1 1
; 1; I 1 i 1 I I I I I 1 i I 1 I J
1 1
f! 1 1 1
1 1 1 I ! t
I l l f l l l 1.1 11' I! t l l!! 1 I I I
t 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 I I
l !• I l
1 1 1 1 I l l t l l l i I l l l l l l
'.1111111!1•II1111111111 t l l l
l i l l l l l l l l i; ?
11111
111
!lllllllllilllllllllllt;
- 1 1 1 1 1 1 1 I t I l i l t l l l l l I l l; t 1111
1 !i11?1111111?
l i l l l
1 1 1 1
I I I I I I I I I I I I I I I l I l l l l l l
_ 1 f 1 1 I 1! I I I I il-1 t{ 11 1.1 I I I I I I I I I I 1 1 1 1 1 •1 1
l l 1 1 1 1 1 1 7 1 1 1
l
I l f l i l l f i
!. ( 1 1 1 1
1 1! I 1 1 1 1
- I t! i i l l l l l t l l I! 1 I I l l l l l l l i 1 1 1 1 1
f l; l! 1 1 1 1 1 1 I•! I I I I I I
I I I I! I t l l -) I.I f
1! 1 1 I l l t 7 1 1 •I
1 1 1 1 1 t l l l l l t! I
1
I 1 1 1! 1 1 1 I 1 1 I I 1 1 1 I I i I I I I t 1 1
1 1 1 F: l i l t l l f l 'I
l i l
1 I 1 1 I t
l l b l l l
I I f l; l! I l i i i l;! I I i
t
I I 1 I I I
( 1 1 1 1{
i l t l l 1
t: l l l l l!! f i 1 ? 1 1 1 1
I l( l l l l l f
I l l i l i l l l l l l l' 1 1 1 1+ I l l t;! I I i i 1 1: 1, 11 1 1 1 1: 1! I
t 1 1 1 1 1 1 1 f 1 1 1 1 1 1 1 1. 1 1 1 1 1
t
'
l i l! I I I I t I I 1 1+ I t: i I; 1: I l:!! 1 1! 1 1 1: i+ t l l 1 1 1 1 1 ?
l i l 1 1!
f: l 1 1 1 1 1 1' I
- I I f 1 1
I I
i l i
! I l l l l l l l i i i: l!
!:: i l i I; l i i! i l 1! i l l l
1 1 l l l; f f;
l l l l l i l l l
' f! 1 1 7 1 f l i
l
1
1 1 1
1 1 7 1 1 1 1(; I f I 1 1 1 I; I J! I i 1 1 1 1 I: i t!! I 1 1 1 l
i l 1 1 1 1 1 1 1 1 1
1 1 1 1: l 1 1: 1 1 1 I I
1
l 1 1
l! I! t: f 1 I: 1! i+ l l! 1 1 1 t 1 1: l I 1: I I I
1! I: 1;, 1 1 1 f l l l l i l l l
i i 1 1 1 i„ i
I I I 1 1 i l l i l l l I I I 1 I I I 1
! l i l_ I I 1 1 1 1 1 1 1 1 1 1! I 1 1
+ 1
I
: I I t; i 1 1 1 I l 1
1' f i 1 1 1 1 1! I l i 1 1 1 1 1 1
1
' I I 1 1,
1! 1 f l: 1 1 1
1 ' 1 i i l i i i l f i ,
1 1 1 1 1
l l l!: 1 1 1 1+
1
1
f 1 1
1 1 1: 1! 1 I I I I ,
1 17f"
1 1 1; t l I• I I J i i: i 1 1 1 „ ? i i
1 1 1 1! 1 1
l i i i i i l l l l
1 1 1: 1 1;! i l l t ,'f i l I I l i 1
l i l
i f :
I I I
' l l l
+ f l l l
1 1 1 1
i i l;; 1 1 1 1 1 1 t l I
I l i ,+ l i; t l l l
1 l: I 1
1! l i l l'
1 1 1, 1 I I
I I! 1 1 1: 1
!
l l( l l: t l l i i,! 1
1 1 1 1 I
1 1 1 I l l i
1
1
i t:: f 1: '
I
i i
1
1
1 ' I l l
I
1 1
I I
I
? 1 t l 1 1
1 1 1
1 1 1 1 1
l l l
+ l l
;
i i ! i! I i 1 1 i 1 1 1
l I t i
;
i „
! t t f l:+
I t I l i! i 1
11 1 1 1 f
t i l; l
t
1 1 ? 1 I l l i t
! 1 l f t ' I I I l i l I I• ! I l t; l l f
'
1 I? 1 1 1
i
1 I I I! I I I I f l I l
! 1 1 I+
1 I: i i! I l l l l i l l i
l i l i
? t 11
! I I I I+ I S I l i
1! i 1 I '1 i f I l i i t L i
1 1! I!! I 1 1 1 1 1 1, 1
l f! 1
I I
l i i!: I I:;: 1 i I I I 11, {
?' ? t t'+!:: I t
" l i l: :: I I I I I I I I t 1 1 1 1
l l l{
•! 1
;: I: l i i 1 1 7 i
1 1: I! I I I! I: I:! 1 1 f:
1 1 l i l+ l 1!
! 1 1 1 1 1 1 1 1 1 1•t 1 1 1
l l l i-
I I L?!:
: t l! f l l l
i 1 1 1 1 1! 1 1 t l 1 i
I I I I 1 1 1 1!
f 1 1 7 i 1 I 1 1 1 1;
l l l
1 I 1 1!
1
i! I?
I I I I I i I I I!
' i t
?
I I I i !;! I l
' ! I(:: I I I
I I I
1 i
! 1 1!: 1 1 1
-r
.!
?„ i
1 11
l l i
r 1!
1 1
:!! I n
1 T. 1!! 1 1 1 •1 1 1 •t 1
t l
t , , 1 + 1 1 ' : I!: 1
! ! 1: f 1 : I!;:;! 1 1 1 1 11
J
f l
,
f i
t i ! f I l l i! I 1 I! 1 I I
t l,
1 1 1 I 1 ! f i I I 1, 1 1 1 1 ! I l l i I I I
!!
i 1 1 ? 1 1 1 1 f :+ i! I l l i i t!{
1, 1
I i
I l i i I ,
1 I i
1 , I I 1 1 J-7 1 1+
I I
t l
1
1 1 f 1 i I 1 1
t f i
i ' E I:: ' 1 1
1 1 1 1 1 1
1 1 1 1 1 : 1 1
; 1 !
f f l
1
! ' : 1 i+;
1 1
1 1 I I
•
l 1 f l
I
,
+ I
l i: + 1 1 1
1
•
? f I; f I r l f l 1 t l
? I I! ? I :: 1;
I
, 1 1 1
f:
! 1 I ! ! 1 1 1 1 1 11
1 1
1 1 1 1 1
I 1 1 1 1 ,
tresion conzol -
;::-s nXshD,"T, but will
7--_i ch=h Ca`Ts and silt C:1?`T1Ci?s 33
/ -
as r=d?d-
W
U
Z
a
a
ir
W
z
0]
O
Lu F-
Q >
=)
Z Q a- ir
~ z 0
on- a z
Q:? O W o
N W
Q Z
Q CL
U V co N
zQ?
_ (NQ? xo a
W J
I- a a
O co 4
z LL- ``' °
? J
Q a a
iy- U
L.t_ a
O ?-- x r
? F
Z 0 V)
LLJ (_yj
p z
?- ~
Q
W U
? r N
V Q
n O
W U
C) N
x
F
W
F
O
z
W
z_
J
cr
W
z
W
v
c?
Z_
F
N
x
W
W
x
F
W
O
F
x
t7
d'
W
x
f-
0
F
N
W
2
N
J
J
W
z
J
of
W
F
Z
W
U
0
W
N
O
a-
0
a
L. J
F-
0
z
i"
z
- z
W
U
IS
0
D:
Z
O
fV U
Lr) W
M VI
- O N
C W LO N
In NCO
Q -
Z v
O H O
Q Z F
U = Q W
O O F 0
J U N N
c
/
cq a '
I
o y,
-0
d i
? s
i
42
d
;
a?
w W
z 0
N N
c F
W
co
O
F O
o p-
F O
F
W
X Ln
F ?
Z M_
2
F
3
S
U
Q
O
x
u
Z
W
F-
Q
F
N
Z
O
F
Q
F -
V)
06
0
W
J
J
Q
F • w
Z F Z
- U O
W 7 N
[O O
J d
J W
3 = m
W O N
m W
x W =
Er J
Q Z_
WWx
xF
? ~ 3
W F
:) N
U O W_ M _j
LLJ 0
W D >-
F 0 Q
J x 3
N F Q
>- O z
LLI a z (D
WaZ
O F P
d
?zN
a
F W
W W
z z
2
a
c?
00
M
ti
O
LC)
O
O
O
C
0)
C
O
U
N
X
N
L
1
4
.O
1
H
Q
O
W V
f-
ao
I It
N WO
W J
> _
N
W
Z
Q
J z
C
W F.
a
Z
V
Z
4
r
Cp.
m
LLJ
v
Q '
z V
F- W
Q 0
0 0 oC
M 0 a.
N
W L
>
Q u
a
L
a
C L)
z
v
W ?
Z 4
Q
J ?
J
W
>
Q
f-
N ui
W W
O
J
D
> _
- N
r?
U
?
i
O ?=
w
Q
w
p
m
m
;r j
N
z
O
P-4
U W
a
W -
- J
a
a m
z
o
Q W L1J
U Z
_
f-
? z w J
- o a
n W v u
W O
V) w
W
? Q
J
N
w
U) J
W
0 a-
a
?
O
W W
Z
n
L.L M Cc 4m
:) J
O ?.+ " ar
` Z C
° Z
$ o° o
v
N
3c
'
C
CD
Z
Y 2
N
W
Cf)
N m ~ F'
LLS
N
?
z U ?
?-
Z
t-
w a
a
Q D O W W
O O
U Q o 0
Z Z