Loading...
HomeMy WebLinkAbout20051437 Ver 1_Complete File_20050922CF \N ATE9 r? ? r- Alan W. Klimek, P.E. Director Division of Water Quality September 22, 2005 Craven County DWQ Project No. 20051437 APPROVAL OF 401Water Quality Certification with ADDITIONAL CONDITIONS and Neuse River Buffer Rules O ? ? ? D Mr. C.E. Lassiter, Jr., P.E. SEP 2 9 2005 NCDOT, Division 2 PO Box 1587 Greenville, NC 27835 WETLANDS AND S T? <?TOIWAT RI9BRAWH Dear Mr. Lassiter: You have our approval, in accordance with the attached conditions and those listed below, to impact 40 linear feet of jurisdictional streams for the purpose of replacing a bridge with two Arch Type Pipes on an unnamed tributary of Upper Broad Creek as necessary for the paving and widening of SR 1610 in Craven County. The project shall be constructed in accordance with your application dated August 1, 2005 (received August 2, 2005). After reviewing your application, we have decided that these impacts are covered by General Water Quality Certification Number 3404. This certification corresponds to the General Permit 31 issued by the Corps of Engineers. This approval is also valid for the Neuse River Buffer Rules 15A NCAC 2B .0233. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit, unless otherwise specified in the Water Quality Certification. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the DWQ and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the conditions listed in the attached certification. 1.) Upon completion of the project, the NCDOT shall complete and return the enclosed "Certification of Completion Form" to notify DWQ when all work included in the 401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the Division of Water Quality upon completion of the project. 2.) All stormwater runoff shall be directed to sheetflow through stream buffers at nonerosive velocities, unless approved otherwise by this certification. 3.) During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. 4.) Riparian vegetation must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. N. C. Division of Water Quality 943 Washington Square Mall Washington, N.C. 27889 PAV inert l A0 Mn-- Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Telephone(252)946-6481 5.) The dimension, pattern and profile of the stream above and below the crossing should not be modified by widening the stream channel or reducing the depth of the stream. Disturbed floodplains and streams should be restored to natural geomorphic conditions. 6.) Any riprap used must not interfere with thalweg performance and aquatic life passage during low flow conditions. 7.) All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 8) Discharging hydrosee4 mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. ` 9.) The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. 10.) There shall be no excavation from or waste disposal into jurisdictional wetlands or waters associated with this permit without appropriate modification of this permit. Should waste or borrow sites be located in wetlands or ,stream, compensatory mitigation will be required since it is a direct impact from road construction activities. 11.) Pursuant to NCACI5A 2B.0233(6), sediment and erosion control devices shall not be placed in Zone 1 of any Neuse Buffer without prior approval by the NCDWQ. At this time, the NCDWQ has approved no sediment and erosion control devices in Zone 1, outside of the approved project impacts, anywhere on this project. Moreover, sediment and erosion control devices shall be allowed in Zone 2 of the buffers provided that Zone 1 is not compromised and that discharge is released as diffuse flow. 12.) Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation, operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 13.) Heavy equipment must be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into the stream. 14.) No live or fresh concrete shall come into contact with waters of the state until the concrete has hardened 15.) The presence of equipment in the channels must be minimized. Under no circumstances must rock, sand or other materials be dredged from the wetted stream channel under authorization of this permit, except in the immediate vicinity of the culverts. 16.) All work shall be performed during normal or low flow conditions. 17.) All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1. 18.) A copy of this Water Quality Certification shall be posted on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on-site project manager. 19.) All protected riparian buffers impacted by the placement of temporary fill or clearing activities shall be restored to the preconstruction contours and revegetated with native woody species upon completion of the project construction. A post-construction as-built with the restoration activities included shall be submitted to the DWQ no later than 60 days after the project is closed out by the Department of Transportation. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Garcy Ward at 252-948-3922. Sincerely, ------------ - for Alan W. Klimek, E. Attachment cc: Wilmington District Corps of Engineers Mr. Bill Biddlecome, Corps of Engineers, Washington Field Office M . Jay Johnson, DEO, NC DOT Div. 2 , r• Rob Ridings, NCDWQ, Wetlands/401 Unit Central Files File Copy „a 5G17Fo? Man. STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY DIVISION OF HIGHWAYS GOVERNOR 08/01/05 Mr. Bill Biddlecomb Washington Regulatory Field Office U.S. Army Corps of Engineers 051437 P.O. Box 1000 Washington, NC 27889-1000 Dear Sir, LYNDo TIPPETT SECRETARY Description of Project: Division Two is planning to widen and pave SR 1610,Walker Road and will be replacing Craven Bridge Number 205, an existing 17'-10" timber deck on timber joists on timber caps and"timber piles with 2 @ 87" x 63" x 40' CMP,Arch Type Pipes on SR 1610 over a tributary of Upper Broad Creek in Craven County. The project is located in the Neuse River Basin. The pipes will be placed in an existing bridge location. The stream is not an Anadromous Fish Stream. NCDOT has avoided and minimized the impacts to jurisdictional resources to the greatest extent possible as described in the General Permit 31 permit application. The remaining impacts to jurisdictional resources will be 40 Linear Feet of Stream Impacts. If you have any questions or need additional information, please call Jay Johnson at 252-830- 3490. Thank you for your prompt attention to this matter. Sincerely: Jay hnson Division Environmental Officer NCDOT, Division 2 DIVISION Two • P.O. Box 1587 • GREENVILLE, N.C. 27835 PHONE (252) 830-3490 • FAx (252) 830-3352 ^I NI, n vvvD ?T?oEHti?. ? X04 s,?,o T??q?/ry S 1gR?cy PAir Office Use Only: Form Version April 2001 2 0 3 7 n?1QUSACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. $200.00 processing fee NCDOT Work order number: 2C.025007 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Section 10 Permit ® 401 Water Quality Certification ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: General Permit 31 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: II. Applicant Information 1. Owner/Applicant Information Name: North Carolina Department of Transportation Mailing Address: P.O. Box 1587 Greenville. N.C. 27835 Telephone Number: 252 830 3490 Fax Number: 252 830 3341 E-mail Address: 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Jav Johnson Company Affiliation: Division 2 Environmental Officer Mailing Address: Same as above Telephone Number: Same Fax Number: Same E-mail Address: jbiohnson( ,dot.state.nc.us Page 3 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: SR 1610, Walker Road, Craven Coun 2. T.I.P. Project Number (NCDOT Only): County: Craven Nearest Town: Subdivision name (include phase/lot number): N/A 3. Directions to site (include road numbers N/A 4. Property Identification Number (Tax PIN): N/A Location, landmarks, etc.):From Bridgeton, take NC 55 East For 1.8 miles, turn left onto SR 1614 for 0.3 miles, right on SR 1613 for 1.8 miles, right on SR 1611 for 2.8 miles. SR 1610 will be on the right. 5. Site coordinates, if available (UTM or Lat/Long): UTM 18 321756 E 3897875 N or Lat: 35^ 12' 29" N Long: 76^ 57' 30"W ;or 35.2081A N 76.9582^ W (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Agricultural/Undeveloped Forests 7. Property size (acres): N/A 8. Nearest body of water (stream/river/sound/ocean/lake): Upper Broad Creek 9. River Basin: Neuse Page 4 of 12 (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 10. Describe the purpose of the proposed work: Bridge to Pipe Replacement 11. List the type of equipment to be used to construct the project: _ Typical road construction equipment. 12. Describe the land use in the vicinity of this project: Agricultural/Undeveloped Forest IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. None V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: No additional permit requests are anticipated in the near future. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream Page 5 of 12 evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Wetland Impacts No 404 Wetland Impacts Wetland Impact Site Number (indicate on ma) Type of Impact* Area of Impact (S Ft) Located within 100-year Floodplain** (yes/no) Distance to Nearest Stream (linear feet) Type of Wetland*** Total: * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://www.fcma'2ovv. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: None Total area of wetland impact proposed: None 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number (indicate on map) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? (please specify) Culvert Installation 409 Tributary of Upper Broad Creek 20, Perennial * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at Page 6 of 12 www.usgs.gov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.manduest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: N/A 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. N/A Open Water Impact Site Number (indicate on map) Type of Impact* Area of Impact (Sq. Ft.) Name Wate (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation N/A If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. We are minimizing stream impacts by installing headwalls on the inlet and outlet ends of the proposed pipe. Page 7 of 12 VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at htti)://h2o.enr.state.nc.us/ncwetlands/strrngide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A Page 8 of 12 2. Mitigation may also be 'made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wm/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: N/A Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested(square feet): Amount of Riparian wetland mitigation requested (acres): None Amount of Non-riparian wetland mitigation requested (acres): 0 Amount of Coastal wetland mitigation requested (acres): 0 IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a Page 9 of 12 map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify Neuse )? Yes ® No ? If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. (Less than 40 Linear Feet) Zone* Impact (square feet) Multiplier Required Mitigation 1 0 3 2 0 1.5 Total 0 * Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as No Buffer Mitigation is reauired XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. Proposed side ditches will dissipate into the adiacent stream buffer and not directly into the tributary. XII. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 10 of 12 XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Applicant/Age Si' atu Date (Agent's signa re is lid only if an authorization letter from the applicant is provided.) US Army Corps Of Engineers Field Offices and County Coverage Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell US Army Corps of Engineers Avery Clay Jackson Polk 151 Patton Avenue Buncombe Cleveland Lincoln Rowan Room 208 Burke Gaston Macon Rutherford Asheville, NC 28801-5006 Cabarrus Graham Madison Stanley Telephone: (828) 271-4854 Caldwell Haywood McDowell Swain Fax: (828) 271-4858 Catawba Henderson Mecklenburg Transylvania Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham US Army Corps Of Engineers Alleghany Edgecombe Lee Stokes 6508 Falls of the Neuse Road Ashe Franklin Nash Surry Suite 120 Caswell Forsyth Northampton Vance Raleigh, NC 27615 Chatham Granville Orange Wake Telephone: (919) 876-8441 Davidson Guilford Person Warren Fax: (919) 876-5283 Davie Halifax Randolph Wilkes Washington Regulatory Field Office Beaufort Currituck Jones Pitt US Army Corps Of Engineers Bertie Dare Lenoir Tyrrell Post Office Box 1000 Camden Gates Martin Washington Washington, NC 27889-1000 Carteret* Green Pamlico Wayne Union Watauga Yancey Wilson Yadkin Page 11 of 12 SR 1610, WA CRAVEN VICINI ROAD OUN MAP N W S SR 1610 e? PROJECT ?r f? ;Qa <a 0 1,250 2,500 5,000 7,500 10,0_00 mooff- Feet E 1610, WA CRAVEN OU? REELSBORO USGS Ba Ba (toA P Ue Ra pa ?a Ly ?Q 5 Ba I \+ La F .F ;4a ROAD / N E ? S 1610 PROJECT Ba CRAVEN COUNTY SOILS MAP 5,000 7,500 10,OPeet K ?vv S R x,61- WA ROAD ' ;- CRAVEN OUNT REELSBO O"USGS Q Nf 1 j E ?° 41 .J t t 3U " 2 ?\? tia5 Y`' J `?? qy PROJECT`. ANA nina HOD", y , "`,25ftip0 UG Z 10,0 !?. c7`mQ ``? ' ?? ` ? ?';' ? ' a Isis'' \7a•, r?? ¢ti.`'? m x 'D co " - { r O, v ZZ ? A O D ~ r ?y o yZ cr) r O O> O y O n <o sl- 0 d? m O ?O Fr o y yrn ' D O r N O I 1-0 z y r y rn ?D ct W N :n ? k o, a O V m N ? D c C) 0 c n m 0 -P?l CO m o X oo rn x x 9w UR P 1@ CC) O ?> 59 - p -4 •-18 ? n G) E > - 0 ? D N O m _0 10 n rr , Z F- n °y # cn 0 9 O po ?c DZ ? Q v D ? ? m z p am rr, Z w Z rrn o ?? o ? rn °rn o -i m rn o~ d, 0 Do o Ln rn ti ti rr) d ° O z C ? rn z F o ~ 0 oc O y m ?? z z Fri t C ? ti o O O O ? o Z rn PROJECT NO. 2C.025007 CROSS SECTION OF BRIDGE NUMBER 205 DATE 07-27-05 SR 1610 ROAD SR 1610 , WAR ROAD ROAD NAME WALKER ROAD CRAVEN COEWTY EXISTIIKG BRIDGE: COUNTY CRAVEN 19 CLEAR ROADWAY 17'-10" LONG 17'10" SR 1610 .3 q MwL I 2.5' 1S, _ I NOT TO SCALE PROPOSED 2 @ 87"x63»x40' CORRUGATED ALUMINUM PIPESARCH SR 1610 21' ?- 2.0' „ w W Z Z p CAPA CAPA M w w o 2 :2 Z) 5.25 ' 87 " X 63 " 87 " X 63 > x OM/MMUM BEDUAG 12 Gauge 2' 12 Gouge PROPOSED RIP RAP a END v) (L TOP VIEW a OF PIPE c? z o o z 10. w w N L!) x - x o o w w w w YNDENCQf PROMSED PIPE DITCH SAMILL N07- TO SCALE DITCH P PIP IO' EXCAVATION ABOVE N W Lo FINISHED EARTH SLOPE AS REQUIRED 3'w x 441 x 2.0'd = 132 SQUARE FEET EXCAVATION BELOW NWLa PROPOSED RIP RAP @ END C PIPE 2Yw x 441 x 2.5'd = 924 SQUARE FEET m r 0 m O m o ? T a x o m 0 nv m m 0 m ? x ? V1 :'1 O m v y R I I I I 1 1 C I w! 2 I T y , I ? $ _ v I K I I I 0 •° 0 0 1r z m Z F y _ d !Y f!t r m ? 0 n C1 f7 N r A 2 m f') Z w m C H m -n1 v ? v E r ti a = z s o ° ? ? m x 'v m m p m m m 0 a ? x y N m a r z ? 2 n ? z ti Z x N 71 m w m m -+ m m SHOULDER POINT \ t- EDGE OF PAVEMENT EDGE OF PAVEMENT m D Z H a z > m o $ z m o ? o ? p ? R m g N r m =E > z Z5 r "' InTi n o ? -I N ? zv ? cn y 1n '" T m 6 ? r > C 1- m m m z a C z m -I -I -T J N nm ?z O K- p m K r H Z m Iv O T D y m m ? f'] D ? m = 2 m o moo X °A Oo 11 D - m ? C It C? p I" O ? N m - ? o O U C Z (n -a C m a m m a rrv?l1 ? J Z v `s ?a TN o S ? n i Z A ? ? O m m I1 -1- o O $ ® OO E © • i- 2 ? a m v _1 ? r" m? m v ? K ? m ? n n < Z p r pA z z m z G m m Z z v o m o m m n y r ? r Q z x CrJ ? C < ti ? r cry ?m N m? a m cm, n =m N Z m mti \` a O ? (A v~i a o r m ? n A? rn ?i ° m p C R , -0 n a a ( n it: n R ° ~ O p m 2 D y ? o Z ?? Z 11 c, "' rTl ? rn = N R o D ? orn ' rn rr, ' z m -i c z m O rrl y O 'I C r ? ~ C C ? n z o? R O? O ? ? O ti y (A N y y RR O rrn m T? y nl n r r,rl it rTl Z y n Z y O r -TI r,rl z o a 0 0 s m J (i111 o? ynimn,rn \? ?,b ?nnnn ? ? ? ?m C C') o Op 'Q U1 -p y OD n o O? O O Cal (n p? O y a m C ?N O?Z w>- :70 m c Coco -oc yrn;`I; 1 yrnrn ?yI?N--T, 41% rh -k-Lo x, b ??? n(I) C) C) '?crn?iano C:ZE a Ng ° r- r- C) Q1 n n n corn ' ) y'?yyynl? ??rn-0 ,. C) z w rn O rn -I, o 0 o m a Z 1l (? N 1? b c ? cn ? -I Crn?rnO O? n r3i 00000 O? n my n a l31 ,1 '` b 2 O ? b y bo Q Q OfNJ ? ? n (,/? ° b ? s o? o r v1v, -i ?I ?I ?I ?I O ? o w ° Q) rh rtl N ? n co?i ° o o ? z rn ° O O ?y y n ? n ° a orn??? ? a b o O rn [?rn 1? t C O y rr, NOO O O m-1 m?? o y ?c°n O O zo DUl ?m ?, y Z n?yyyy ??? 2ILO C) rn z rl?D f" Sloo I ?° o 0 (n U) cn to v?'j 'c"nn n m O C9 yo o Z ? -TJ rn???? N AN n N? rn m L cam y I m? Cn m? y?by b Z y In o ? m c rnn rJ 43? oa 6 To m k Zzkrn RIO ° ` N O p z = C-) n =o ? N? ' ( n o w ? n n v g ° II' II I o? II ? I 11 ;1 8 0 V rnc??00p ?? N :D 41 ?? O b ° S Z 6 ?Z II. ril z C) rz) N C?0) m? OrTl C) ~.?= n? O ??(A N Q x r CN tbNCC OCO m SO Ln n:rl O ? o=? ?O n °? n O ?:Z: ? \\ ' z W X o \\ ? O o ? O ? m , N Z? A ? ? W . 1 ?-4 IN I- I o ? n=i ?? O pz ~ c0 Pl-l n y? •A O ?yy C0 :::,r. %rri rny ?`" b V1 2?? Zit C'-) co ao -b C.) :70 nl cn" ° ? y 4 m co L I 1 -E T n 1 = I b I m 1 X 0 Im 1 0 0 1 0 1 m I m AS. A $N ° o C? rnb Op-'y?j0 y ?r cl0 co y c (.!) C7 ri ::o bo Q o orn?ZO??I bib C31yo \ ??Q? Q. Zz- 'D oonDQ?C Q fir, ?Cq rl, :zE IV 0 Z QD m? o O b r o x k y z ?? I ` O? rTl O Z Q y.0 Z SIB n N o o? t \ 'A \\