Loading...
HomeMy WebLinkAbout20081809 Ver 1_Site Inspection_20110519Ar NCDENR North Carolina Department of Environment and Natural Beverly Eaves Perdue Governor Division of Water Quality Coleen H. Sullins Director May 19, 2011 Mr. J. J. Swain, Jr., P.E. Division 13 Engineer N.C. Department of Transportation Post Office Box 3279 Asheville, North Carolina 28802 114) Subject: Inspection-US Highway 221 DWQ Project 08-1809 Individual Certification No. 3784 TIP Nos. R-2233AA and AB Sections Rutherford County Dear Mr. Swain: On May 9, 2011, I inspected the construction work on the US Highway 221 Project, R-2233AA and AB Sections, in Rutherford County. Construction continues along most of the project with heavy grading and bridge construction on the AA Section and heavy grading along the AB Section. Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are performed as required to protect State surface waters. Also, please refer to the attached inspection reports for any specific items noted during the inspection. If you have questions, please call me at 828-296-4500. Attachment cc: Brian C. Skeens, PE Roger Bryan, Division 13, DEO Ed Ingle, Roadside Environmental Transportation Permitting Unit Mike Parker, Asheville Regional Office US Highway 221May 2011 Inspection Letter S??iinf'nnc/ccerely, /"r y Q? Michael R. Parker Environmental Senior Specialist SURFACE WATER PROTECTION SECTION -Asheville Regional Office 2090 U.S. 70 Highway, Swannanoa, NC 28778-8211 Phone: 828-296-45001 FAX: 828-299-7043 Customer Service: 1-877-623-6748 Internet: www.rimatergualilv.ong An Equal Opportunity 1 Affirmative Action Employer NorthCarolina Naturally 1 o 19?o?, D Freeman Secretary DWO Site Visits for DOT Projects Field Sheet DWQ representative: Michael R. Parker Date: Mav 9, 2011 County: Buncombe Region: Asheville DOT Division: Division 13 Activity: X 401 Compliance Evaluation ? Complaint ?DWQ Follow Up Evaluation ? Other DWQ 401 #: 20081809 NW Permit IP #: 3784 Project Name: Location of Project: TIP No. R-2233AA The project is located on US Highway 221 approximately 3 miles south of the intersection of US Highway 74 and US Highway 221 in Rutherford County. Project Complete: ?Yes X No J Bridge Culvert Bottomless Culvert Bottomless Arch X? Riprap Inlet/Outlet Stabilization ? Spoil Pile ? Borrow Pit ? Wetland Mitigation ? Stream Restoration ? On-site Stream Relocation ? Buffer Restoration X? Bank Stabilization X? Other Fill If no, estimated date of completion: Water Quality Concerns (DWQ): ? Steam Standards Violation X? Turbidity ? Evidence of spills ? Oil/Petroleum ? Solid Waste ? Failed E & S control measures X? Sedimentation Impacts ? Stormwater Permit Violation ? Fill ? Buffer Impacts (see below) ? Other Additional Wetland Impacts: ? yes ? no Estimated Acres ? Zone i Est Acres ? Zone 2 Est Acres Additional Stream Impacts: ? yes X? no Est Linear feet Estimated linear feet of impact: Buffer Impacts: ?Neuse []Tar-Pam []Randleman []Catawba Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ac Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Buffer Designation: []Exempt []Allowable []Allowable w/mitigation []Prohibited DWO Site Visits for DOT Projects Background Info Name of Waterway(s): Broad River, Floyds Creek Basin/ Subbasin: BRD 030802 Wetland Type: []Isolated []Non-Isolated (Waters of US) Stream Class: []Class B ?303d Listed X?Class C ?ORW ?HQW ?WS-I Type of Authorized Impact: X[]Culvert XBridge X?Riprap Inl Authorized Wetland Impacts: 0.02 acres Authorized Stream Impacts: 2,686 linear feet ?WS-II ?WS-V ?SB []Trout ?WS-III []NSW ?WS-IV ?SA ?CA []Bottomless Culvert []Bottomless Arch .t/Outlet Stabilization []Fill X?0- I/10'" acre ?I/I Vh to 1/3`d acre ? 1/3'dto 1.0 acre ?> 1.0 acre ?< 150 linear feet X?> 150 linear feet Construction is underway on most of the project with heavy grading taking place along the entire length of the AA Section. The new Broad River Bridge has been completed. The south bank of the Broad River underneath and the new bridge is eroding due to high waters. Stabilization of this area may be required. All areas that have been graded and no construction has taken place in the last 14 days should be seeded and mulched. All sediment and erosion control structures/devices should be checked for proper operation including the silt fence. Any off-site sediment should be removed and the site remediated. Repair and maintain all erosion control devices and continue with seeding and matting as required to protect State surface waters. R2233AA Inspection Report May 2011 DWQ Site Visits for DOT Proiects Field Sheet DWQ representative: Michael R. Parker Date: May 9, 2011 County: Buncombe Region: Asheville DOT Division: Division 13 Activity: X 401 Compliance Evaluation ? Complaint ?DWQ Follow Up Evaluation ? Other DWQ 401 #: 20081809 NW Permit fP #: 3784 Project Name: TIP No. R-2233AB Location of Project: The project is located on US Highway 221 from North of US Highway 74 to the bridge over Floyd's Creek in Rutherford County. Project Complete: ?Yes X No If no, estimated date of completion: ] Bridge ] Culvert Bottomless Culvert Bottomless Arch X? Riprap Inlet/Outlet Stabilization ? Spoil Pile ? Borrow Pit ? Wetland Mitigation ? Stream Restoration ? On-site Stream Relocation ? Buffer Restoration X? Bank Stabilization X? Other Fill ? Steam Standards Violation X? Turbidity ? Evidence of spills ? Oil/Petroleum ? Solid Waste ? Failed E & S control measures X? Sedimentation Impacts ? Stormwater Permit Violation ? Fill ? Buffer Impacts (see below) ? Other Additional Wetland Impacts: ? yes ? no Estimated Acres ? Zone 1 Est Acres ? Zone 2 Est Acres Additional Stream Impacts: ? yes X? no Est Linear feet Estimated linear feet of impact: Buffer Impacts: ?Neuse ?Tar-Pam ?Randleman ?Catawba Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ac Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Buffer Designation: ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibited Name of Waterway(s): DWO Site Visits for DOT Projects Background Info Floyds Creek Basin/ Subbasin: BRD 030802 Wetland Type: ?Isolated ?Non-Isolated (Waters of US) Stream Class: ?Class B ?303d Listed ?WS-II ?WS-V ?SB X?Class C ?ORW ?Trout ?WS-Ill ?NSW ?HQW ?WS-I ?WS-N ?SA ?CA Type of Authorized Impact: X?Culvert ?Bottomless Culvert XBridge ?Bottomless Arch X?Riprap Inle t/Outlet Stabilization ?Fill Authorized Wetland Impacts: X?O - 1/10'h a cre ?I/I Vh to 1/3 rd acre 0.02 acres ?1/3`d to 1.0 acre ?> 1.0 acre Authorized Stream Impacts: ?< 150 linear feet X?> 150 linear feet 2,686 linear feet Review of sediment and erosion control devices indicate that the devices are operating properly. Recommend adding more tac to the straw mulch to keep it from blowing away. Please ensure that installation of sediment and erosion control devices are keeping pace with the construction. All areas that have been graded and no construction has taken place in the last 14 days should be seeded and mulched. All sediment and erosion control structures/devices should be checked for proper operation including the silt fence. Any off-site sediment should be removed and the site remediated. Repair and maintain all erosion control devices and continue with seeding and matting as required to protect State surface waters. R2233AB Inspection Report May 2011