HomeMy WebLinkAbout20052217 Ver 1_Complete File_20060106
0 W
4?qk
Alan W. Klimek, P.E. Director
Division of Water Quality
41V.1 7 . January 6, 2006
Henderson County
DWQ Project No. 052217
NCSR 1563 (Huckleberry Mountain Road)
APPROVAL of 401 Water Quality Certification with Additional Conditions
Mr. J. B. Setzer, P.E.
Division Engineer
N C Department of Transportation
253 Webster Road
Sylva, North Carolina 28779
Dear Mr. Setzer:
You have our approval, in accordance with the attached conditions and those listed below, to impact 15 linear feet of two
(2) unnamed tributaries to Harper Creek (15 linear feet of new pipe and temporary dewatering), in order to make
improvements to NCSR 1563 (Huckleberry Mountain Road) in Henderson County. The project should be constructed in
accordance with your application dated December 15, 2005 (received December 20, 2005), including the environmental
comments made in the application letter. After reviewing your application, we have decided that this fill is covered by
General Water Quality Certification Nos. 3404 and 3366, corresponding to the U.S. Army Corps of Engineers Nationwide
Permit Numbers 14 and 33. In addition, you must acquire any other federal, state or local permits before you proceed
with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply
Watershed regulations. This approval will expire with the accompanying 404 Permit unless otherwise specified in the
Water Quality Certification.
This approval is valid solely for the purpose and design described in your application (unless modified below). Should
your project change, you must notify the DWQ in writing and submit a new application. If the property is sold, the new
owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the
conditions. If total wetland fills for this project (now or in the future) exceed one acre, or if total impacts to streams (now
or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 211 .0506
(h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any
additional conditions listed below.
1. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design,
installation and operation and maintenance of such Best Management Practices in order to protect surface waters
standards:
a. The erosion and sediment control measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control
Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be
such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina
Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow
sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the
project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual.
o
N??rCaro ma
Naturally
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
North Carolina Division of Water Quality 2090 U.S. Highway 70 Swannanoa, NC 28778 Phone (828) 2964500 Customer Service
Internet: h2o.enr.state.nc.us FAX (828) 299-7043 1-877-623-6748
An Equal Opportunity/Affirmative Action Employer
Mr. J. B. Setzer, P.E.
January 6, 2006
Page Two
d. Any reclamation measures and implementation must comply with the reclamation in accordance with the
requirements of the Sedimentation Pollution Control Act.
2. No waste, spoil, solids, or fill of' any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the
impacts depicted in the Preconstruction Notice Application. All construction activities, including the design,
installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be
performed so that no violations of state water quality standards, statutes, or rules occur.
3. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable.
If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed
and the natural, grade restored within six months of the date that the Division of Land Quality has released the project.
4. Adequate sediment and erosion control measures should be implemented prior to any ground disturbing activities to
minimize impacts to downstream aquatic resources. All bare soil must be seeded within 15 days of ground disturbing
activities to provide long-term erosion control. Erosion control mating should be used in conjunction with appropriate
seeding on disturbed soils in steep slope and riparian areas. Matting should be secured in place with stables or
wherever possible, live stakes of native trees. Tall fescue and straw should not be used in riparian areas. Riparian
vegetation must be reestablished within the construction limits of the project by the end of the growing season
following completion of construction.
5. Culverts that are less than 48-inch in diameter should be buried to a depth equal to or greater than 20% of their size to
allow for aquatic life passage. Culverts that are 48-inch diameter or larger should be buried at least 12 inches below
the stream bottom to allow natural stream bottom material to become established in the culvert following installation
and to provide aquatic life passage during periods of low flow. This may require increasing the size of the culvert to
meet flow conveyance requirements. If any of the existing pipes are perched, they shall be removed and replaced, and
re-installed correctly, unless demonstrated that this is topographically unfeasible.
6. Rock check dams at culvert outlets should be removed at the project completion to avoid impeding the movement of
aquatic life.
7. The dimension, pattern and profile of the stream, above and below the culverts, should not be modified by widening
the stream channel or reducing the stream depth. Disturbed floodplains and streams should be restored to natural
geomorphic conditions.
8. Stormwater shall be directed to vegetated buffer areas, grass lined ditches or other means appropriate to the site for
the purpose of pre-treating stormwater runoff, and must not be routed directly into streams. Mowing of existing
vegetated buffers is strongly discouraged, so that they may be utilized for stormwater diffuse flow.
9. Removal of vegetation at stream crossings and adjacent to streams should be minimized. Native trees and shrubs (e.g.
rhododendron, dog hobble, willows, alders, sycamores, dogwoods, black walnut and red maple) should be planted
along the streambank to reestablish the riparian zone and to provide long-term erosion control in the vicinity of the
road crossing and along the streams within dedicated rights of way.
10. Any riprap placed for bank stabilization should be limited to the streambank below the high water mark, and
vegetation should be used for stabilization above the high water elevation. Riprap should not be place in stream
channels in such a manner that it impedes aquatic life passage.
11. Heavy equipment must be operated from the banks rather than in the stream channel in order to minimize
sedimentation and to reduce the likelihood of introducing other pollutants into the stream.
12. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent
contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials.
13. Excavation of the stream crossings and relocations should be conducted in the dry, if possible. Sandbags, cofferdams,
flexible pipe or other diversion structures should be used to minimize excavation in flowing water.
14. If concrete is used during culvert construction (e.g., headwalls), a dry work area should be maintained to prevent
direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete should
not be discharged to surface waters due to the potential for fish kills.
15. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is
strictly prohibited.
16. The presence of equipment in the channels must be minimized. Under no circumstances must rock, sand or other
materials be dredged from the wetted stream channel under authorization of this permit, except in the immediate
vicinity of the culverts. In-stream dredging has catastrophic effects on aquatic life, and disturbance of the natural
form of the stream channel will likely cause downstream erosion problems, possibly affecting other landowners.
Mr. J. B. Setzer, P.E.
January 6, 2006
Page Three
17. This certification does not authorize the discharge of waste rock and dirt into the stream or riparian zone except for
permitted areas associated with the culvert extensions.
18. All work shall be performed during low flow conditions (below bankfull).
19. Upon completion of the project, the NCDOT shall complete and return the enclosed "Certificate of Completion " form
to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall
complete the attached form and return it to the Transportation Permitting Unit of the NC Division of Water Quality
upon completion of the project. The NCDOT is strongly advised to send in photographs upstream and downstream of
each structure to document correct installation.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act
within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to
Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center,
Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have
any questions, please telephone Mr. Mike Parker of the Asheville Regional Office at 828.296.4500.
Sincerely,
11
Alan W. Klimek, P.E., Director
Division of Water Quality
Attachment
cc: Mark Davis, Division 14, DEO
Ed Ingle, Roadside Environmental
Angie Pennock, USACE Asheville Field Office
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
STATE n
STATE of NORTH CAROLINA
D ?^
DES 2 ??,.
C?
Syr??,y?,??3avoi?'?rEk 0 r005
srosF ?
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY LYNDO TIPPETT
GOVERNOR SECRETARY
December 15, 2005
Ms. Angie Pennock, NCDOT Regulatory Project Manager
U.S. Army Corps of Engineers
151 Patton Avenue, Room 208
Asheville, NC 28801-2714
Subject: Nationwide 14 Permit Application
SR 1563, Huckleberry Mountain Road
Henderson County
State Project # 14C.045068 (DWQ Minor Permit Fee $200.00)
Dear Ms. Pennock:
The North Carolina Department of Transportation (NCDOT) is proposing to widen, grade, drain
and pave SR 1563, Huckleberry Mountain Road, in Henderson County. This proposal entails
widening and paving the existing gravel road to a standard 18-foot roadway. The work is necessary
to improve safety and reduce maintenance costs. Funds have been allocated for this project and
NCDOT would like to perform this work during the 2005-06 paving season. Huckleberry Mountain
Road is a dead-end secondary gravel road, which conveys only local traffic.
I am enclosing a PCN, a straight-line diagram with the proposed erosion control and construction
limits along this project. In addition, I am sending a typical section of the road, drawings for the
pipe culvert replacements as well as a marked county and USGS quad map.
The North Carolina Natural Heritage Database was checked for records of threatened and
endangered species. There are no records for threatened or endangered species for the unnamed
tributary of Harper Creek. There are no records of threatened or endangered species for the entire
Harper Creek watershed. The UT to Harper Creek is small (4 feet wide) and does not have
sufficient flow to support mussels and is not likely to support fish. The impacts from the culvert
replacements will be minimal. For these reasons, there will be "no effect" on threatened or
endangered species.
Impacts to historic or cultural resources are not anticipated. If the State Historic Preservation Office
(SHPO) and the Office of State Archaeology determines that further investigations are required,
NCDOT will conduct the appropriate site investigations and obtain compliance from SHPO prior to
project construction.
The best management practices will be used to minimize and control sedimentation and erosion on
this project. The construction foreman will review all sedimentation control measures during
installation to ensure sedimentation is being effectively controlled. If the planned devices are not
functioning as intended, they will be replaced immediately with better devices. The sedimentation
°? --
------- --------
control devices will be in place prior to pipe culvert removal and will remain in place until the new
pipe is in place.
Impacts to Waters of the United States
The UT to Harper Creek is shown on USGS topographic maps. The stream appears to have
perennial flow. The channel is well defined and is composed of sand and gravel and the channel
lacks vegetation. For these reasons, we believe that the stream is under the jurisdiction of the U.S.
Army Corps of Engineers. In order to replace these culverts, it will be necessary to impact waters
of the United States in the French Broad River Basin. Specifically, NCDOT is requesting to replace
two metal culverts in an unnamed tributary to Harper Creek. (DWQ Class B Tr). Listed below is a
summary of the proposed impacts.
Site No. Existing Condition Proposed Net Impacts
Station Condition
Site 1 - 28+48 35' x 18" RCP 45' x 30" CMP 10'
Site 2 - 30+36 35'x 36" CMP 40'x 48" CMP 5'
,emu---_r_ .
i otai impact Li iiiicai 1"L
Permits Requested
NCDOT is hereby requesting authorization under Section 404 of the Clean Water Act to proceed
with the construction project outlined above. By copy of this letter, I am asking Mr. David
McHenry, Mountain Region Coordinator, of the North Carolina Wildlife Resources Commission
(NCWRC) to comment directly to you concerning the 404 Nationwide Permit request.
Also, by copy of this letter, I am requesting authorization under Section 401 of the Clean Water Act
from the North Carolina Department of Environment and Natural Resources (DENR), Division of
Water Quality (DWQ). In addition, I am asking Mr. McHenry and Mr. Ed Ingle, Roadside
Environmental Field Operations Engineer (NCDOT), to comment directly to me concerning this
permit request.
If you have any questions or need additional information, please contact Lori Jones or me at (828)
891-7911.
Sincerely,,
Mark Gibbs, P.E.
District Engineer
Enclosures
cc: Mr. John Hennessy, DWQ, DENR, Raleigh (7 copies)
Mr. David McHenry, Mountain Region Coordinator, NCWRC
Mr. Mike Parker, DWQ, DENR
Mr. J. B. Setzer, P.E., Division Engineer, NCDOT
Mr. Mark Davis, Division Environmental Officer
Mr. E. L. Ingle, Roadside Environmental Field Operations Engineer, NCDOT
Mr. Steve Cannon, P.E. Henderson County Maintenance Engineer, NCDOT
File
O?
?0
W ATF?
QG
r
Pre-Construction Notification (PCN) Application Form
For Section 404 and/or Section 10 Nationwide, Regional and General Permits, Section 401
General Water Quality Certifications, and Riparian Buffer and Watershed Buffer Rules
SR 1563 - Huckleberry Mountain Road
Henderson County
NCDOT Division 14
Office Use Only: 2 0 0 5 2Fy xerc on May 2002
USACE Action ID No. DWQ No.
(If any particular item is not appttcaute to tuts project, please enter 1NUL t1PP11G6U1G vi ?. n .?
I. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ? Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
® 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: NW 14
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts (verify availability with NCEEP prior to submittal of PCN),
complete section VIII and check here:
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
II. Applicant Information
1. Owner/Applicant Information
Name: North Carolina Department of Transportation
Mailing Address: 4142 Haywood Rd
Horse Shoe NC 28742
Telephone Number: 828-891-7911
E-mail Address:
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.)
Name: Mark T. Gibbs P.E.
Company Affiliation: North Carolina Department of Transportation
Mailing Address: 4142 Haywood Rd
Horse Shoe NC 28742
Telephone Number: 828-891-7911 Fax Number: 828-891-5026
E-mail Address: m ifi bbs a dot state nc us
Fax Number: 828-891-5026
Pagel of S
III. Project Information
3
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: SR 1563, Huckleberry Mountain Road
2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A
Property Identification Number (Tax PIN): N/A
4. Location
County: Henderson Nearest Town: Hendersonville (Henderson Co.)
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc.): From the intersection of SR 1006
and US 64, take US 64 east 0.94 miles to SR 1574 Turn left on SR 1574 and go 1.63 miles
to SR 1581 Turn left on SR 1581 and go 0.53 miles to SR 1582. Turn left on SR 1582 and
go 0.37 miles to SR 1562 Turn right on SR 1562 and go 0.12 to SR 1563. Turn right on SR
1563 and go 2,848 feet to the Site 1 Site 2 is 188 feet past Site 1. The project continues up
SR 1563 for an additional 34 feet beyond the site to the end of maintenance.
5. Site coordinates, if available (UTM or Lat/Long): Site 1:35.39278'N;82.41750' W
Site 2. 35.39306° N : 82.41806° W
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres): N/A
7. Nearest body of water (stream/river/sound/ocean/lake): Harper Creek (DWQ Class: B; TO
8. River Basin: French Broad
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http•//h2o.enr.state.nc.us/admin/maps/.)
Page 2 of 8
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Residential
10. Describe the overall project in detail, including the type of equipment to be used: The
existing, deteriorating pipes will be excavated and replaced. Crosspipes will be
replaced/extended to accommodate standard shoulder widths for safety. The road will be
widened and paved A backhoe loader, dump truck and standard hand tools will be used to
complete this work
11. Explain the purpose of the proposed work: To widen grade drain and pave an existing
substandard road to meet current NCDOT secondary road standards.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
Page 3 of 8
I . Provide a written description of the proposed impacts: In order to construct the project in
accordance with our current secondary road standards it will be necessary to impact waters
of the United States in the French Broad River Basin. Specifically NCDOT is requesting to
extend/replace two culverts in an unnamed tributary to Harper Creek (DWO Class: B TO.
Impacts are listed in table below.
2. Individually list wetland impacts below:
Wetland Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
acres) Located within
100-year Floodplain**
(yes/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, 1111,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at http://Nvww.fema.,ov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property: N/A
Total area of wetland impact proposed: N/A
3. Individually list all intermittent and perennial stream impacts below:
Stream Impact
Site Number
indicate on ma
Type of Impact* Length of
Impact
linear feet)
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
(please secif
Site #1 Culvert 10 UT to Harper Creek 3' Perennial
Site #2 Culvert 5 UT to Harper Creek 4' Perennial
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.usgs.eov. Several internet sites also allow direct download and printing of USGS maps (e.g., wW\ tOpozone.coin,
www.mapquest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 15 Linear Feet
Page 4 of 8
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below:
Open Water Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres)
Name Wat)
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.)
N/A
* List each impact separately and identify temporary impacts. impacts ineiude, but are not umttea to: un, excavauou, uicugmg,
flooding, drainage, bulkheads, etc.
Pond Creation
if construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): N/A
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.): N/A
Size of watershed draining to pond: N/A Expected pond surface area: N/A
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
Water will be diverted during the installation of the pipe to minimize sedimentation. The
pipe will be placed below the stream bottom to minimize fragmentation of aquatic habitat.
Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
Page 5 of 8
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete.
An applicant may also choose to review the current guidelines for stream restoration in DWQ's
Draft Technical Guide for Stream Work in North Carolina, available at
http•//h2o enr state.nc.us/newetlands/strm,gidc.btml.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
N/A
2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement
Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at
(919) 715-0476 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCEEP, check the NCEEP website at http://www.nceep.net. If use of the NCEEP is
proposed, please check the appropriate box on page three and provide the following
information:
Amount of stream mitigation requested (linear feet): 15
Amount of buffer mitigation requested (square feet): N/A
Amount of Riparian wetland mitigation requested (acres): N/A
Amount of Non-riparian wetland mitigation requested (acres): N/A
Amount of Coastal wetland mitigation requested (acres): N/A
Page 6 of 8
VIII. Environmental Documentation (required by DWQ)
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
IX. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed "herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Neuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify N/A )?
Yes ? No ® If you answered "yes", provide the following information:
Identify the square" feet
mitigation is required
multipliers.
and acreage of impact to each zone of the riparian buffers. If buffer
calculate the required amount of mitigation by applying the buffer
Zone* Impact
(square feet) Multiplier Required
Mitigation
1 3
2 1.5
Total i I 7:??
* Zone 1 extends out 30 feet perpendicular from near bank of channel; "Lone "1 extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
N/A
Page 7 of 8
X. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
N/A
XI. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
XII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application?
Yes ? No
XIII. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
N/A
/2
'05'
T_ Applicant/Agent's Signature bate
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 8 of 8
Site # 1 Sta. 28+48 Coordinates 35.39278 N / 82.41750 W
SR 1563
Huckleberry Mountain Road
Henderson County
Existing & Prop. Center Line
2 --------
-
-----
------------- ---------
------- 1
Oulet Invert Elev. Replace Existing Perched Inlet Invert Elev.
987.0 35', 18" RCP 991.6
with 45', 30" CMP and rock headwalls
Thalwegs Approximately 20' from shoulder of existing road
1 994.0
2 986.0
See plans for erosion control * Drawing not to scale
Site # 2 Sta. 30+36 Coordinates 35.39306 N / 82.41806 W
SR 1563
Huckleberry Mountain Road
Henderson County
Existing & Prop. Center Line
2 --------
(ff -------------- ------------- -------- 1
Oulet Invert Elev. Replace Existing Perched Inlet Invert Elev.
985.0 35', 36" CMP 987.0
with 40', 48" CMP and rock headwalls
Thalwegs Approximately 20' from shoulder of existing road
1 988.6
2 982.2
See plans for erosion control * Drawing not to scale
Henderson County
SR 1563 - Huckleberry Mountain Road
Site 1 - Sta 28+48
Inlet
"Note - 6" PVC water line servicing a private
water supply to be sleeved and
does not impact pipe replacement.
LIT
t? rP--
r
6 ? {
r
via l
f
.`t VIA.
y l??Jt;? c
Outlet
'r _3 l J1. 1
it !
Inlet Outlet
Site 2 - Sta 30+36
O
C
i+
O
.Q
V
M
CD
LO
r
1
Cl)
C
O
U
C
O
L
d
C
2
co
+
00
N
v/
r
m
Cn
CO
M
0
Cl)
N
CD
?t.
A13 ?, tt'rr ? ? ,? ... ?.1 ?`1\, I`? \?a? Il' r,,,•- % i'',/ ' w' F • • (? r?/ ? •\\?',?t..:
'111r li '??-lt('? , 'YY-Y ?.r. .. Y'/? 1? •l? 1j?}r ?.
f Y h Ir \ "'_'..`?' U t,, '\•`?/ l ? ?1? t/, '? ?, 1?11? l 1 ? -133
for
^ti 4 `rye _,f^\'` • +?? ?" ?,.,,•?? 1' - •f?? -° ?.,? s
ALI%
?r^\ % ?j r+rr?li ,.?" \ >,. •: r ?r f't??.• r G?r? \ 7? ? r y? ......
Iz,
V" ` r ?Y ??lr 'r.? 71 t?? t 1 ?_., ?1 t`+ `''?\\\`' • r ?•
17
,?v\,•- .''.--i }' 'j V y r,\?`}''r i 1,\, ?.? j?ly _a.,....'; \ `J \?'s..a'.
?Vr \. lr
It
72,
1 ?ti \9\, i ? C f ?i. .} ?'? ..?? iV ?. °) ? `•\l`^ 1~'? / r /1? _?`vvv -???'?- 1'^`'" .?\•;.?.
[X
1 i'^?. k•. o: x ??rY },, \ 1 t?\ \??e'!/ JJ re , 'r't
y ?'.. yrr l rv,
r?
??4 7 f S ? \r??l ???? `+??? ? ??? r} r • J ?? ! r J ?? ? ? } ? %rf r ,/t? r,?,,
\ \i,4?\'??rr`r'"r---^•.rJr?.+.? t:r1L ??f-!" r ? i ! 1 ? ??`. ? ? ? • ?\ %?? y , t, ` ?:
{ ?\ ?r,ll,,l?f ?!?y,-.'f?Ia'i }' 'L ', _ ? / ? 4 • d'' ;t?? C?? •!i j fit.(-'j
t _r it t1 \` ? r ?'1 r 1'r ! j ( "1? yr ? r Ji1(.,
1 U yt r' x ?' e ! r ?1 ?' } x ' I l { ?y
V'\, 1I ? i ' ir,;. ??,\ ' Sl '' 1 3 t '?` /r"?'! l ?.r-`~. 1?"?,'-, ``•" ? C
../ r!'(( t\ ? i . } ?
r
+ y 1+`t (?r"y?'Yr `" f r. 1' i l V rl t+ r.? +. r !, f t ?-?x^?
't`tY( ?r,?\S.\ ??J?f• '?Y y??-l 1 a. ?'f ?'! i /••,?.?, lil. t ?(,. 11` i a ?!% • ?l ,?`
.lV. • >i .1 .?t.. * ,?tl ?'I;Y (t • i`'??> l t ?+,} 'mss.
0
.yam.
.? r
O Z
a?
.iZ
a?
M
LO
NT
LL
Cl)
0.
c?
C
c
U
c
0
L
c
!2I I I / I
?/ NI
N
co
? N
/ N q
co
ET ?I
N
i
N
N
N W
r
N I
N
3
v `?> No
o v
r v
w
J0U -'?
col /
N
0
N.C. DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
SECONDARY ROAD SURVEY
SUBJECT: SR 1563 Huckleberry Mtn. Road
LOCATION: Begin at the intersection of SR 1562 and SR 1563 and
continue in a northerly direction for a total distance of 3,070 feet to the end
of project.
WORK TYPE: Grade, Drain, Base, Pave and Erosion Control
WORK ORDER: 140.045068 ' PRIORITY:
COUNTY: Henderson TOWNSHIP: Clear Creek
DATE: 12/02/2005 SCALE: 1" = 50'
NOTES: 45' R/W Current ADT Bracket : 0 - 360
Design ADT Bracket : 0 - 600
Water: Class B; Trout PREPARED BY: TSW/BA
45' 0"
MAX SLOPE
z:1
FILL h2:1
CUT 1:1
STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
EROSION SYMBOLS
STD # DESCRIPTION
245.03 TEMPORARY SILT DITCH ----------•--------------------- • - - -_ TSD
245.05 TEMPORARY DIVERSION ---------------------------------------------- ---? -TD -?-
893.01 TEMPORARY SILT FENCE ---------------------------------------------
890.05 TEMPORARY SLOPE DRAIN WITH EARTH BERM --•-------------- ----
245.01 SILT BASIN TYPE A --------------------------------------------------------------- -0
245.02 SILT BASIN TYPE B ------------------------------------------- -------------------
892.04 TEMPORARY ROCK SILT CHECK TYPE A -----------------------------.
895.10 TEMPORARY ROCK SILT CHECK TYPE B ------------------------------ -- y?
892.01 TEMPORARY ROCK SEDIMENT DAM TYPE A ---------------------- - 99?N
892.02 TEMPORARY ROCK SEDIMENT DAM TYPE B -----••------------------
897.01 ROCK PIPE
,
INLET PROTECTION -----------•--------------------------------
.01
894
ROCK SILT -----------------------------------------
SCREEN ------------•-------- --
?
245.04 STILLING B ASIN ---------------------------------------------------------- .-------- ---®
RR
868.01 RIP RAP ----- -----------------------•------ ------------------------
DITCH LINER ---------•----•--------------------------------------------
ENVIRONMENTALLY SENSITIVE AREA ------------------------------
PIPE OUTLET ENERGY DISSAPATOR--------------------------------------- r='•
EROSION CONTROL MATTING ----------------------------------- ECM
FIBER GLASS ROVING FGR -
SILT CHECK DAM TYPE•A-------------'------_- -- --------------------------
SILT CHECK DAM TYPE--B-------------------------------------------------------
Erosion Control Schedule
• Install erosion control measures according to plans in all outlets and at
other discharge points after clearing but before grubbing.
• Clear and clean outfall ditches leaving sideslopes at an angle that can be
retained by vegetation. These areas will require stage seeding and mulching.
• Begin grading of roadway ditches. Place erosion control measures along
roadway ditches as grading progresses and conditions allow.
• Seed and mulch all disturbed areas as soon as any phase of grading is
completed. (Note there are 15 working days/30 calendar days to complete
seeding and mulching. A working day is defined as a day exclusive of
Saturday or Sunday during which weather conditions or soil conditions permit
land-disturbing activity.)
• Clean out and/or rework all temporary erosion control measures after any
significant rainfall event (or as otherwise needed). These measures should be
maintained until a permanent vegetative cover is established.
Wet Pipe Installation Schedule
• Install erosion control devices.
• Remove material and existing pipe while limiting, as much as possible,
material and sediment from entering the stream and/or escaping from the
project.
• Prepare pipe foundation while taking care to limit material and sediment
from entering the stream and/or escaping from the project. Where possible
new grade should be below the existing streambed. If needed, bedding
material will be clean stone (especially in Trout and HQW waters).
• Place new pipe and compact fill.
• Install slope protection on outlet and inlet ends of pipe. Also complete
installation of erosion control measures and perform maintenance as needed
on existing measures.
• Establish permanent vegetation as soon as possible.
STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
CONVENTIONAL SYMBOLS
Culvert ----- ---------------------------------------
Fence -------------------------------------------------------
r
Guardrail ---------------------------------- T
Stream or Body of Water ------------------
Flow Arrow ------------------------------------ ---------------
:
- ---------
?
----------------
-----
Spring ---------------- --
----- ?
..
.
Exist. Pole ------------ ----------------------- ----------- ---
Exist. Power Pole --------------------------- ---------°° b
Exist. Telephone Pole --------------------- -------------- -0-
-6-
Exist. Joint Use Pole -----------------------
- -------------
------ In
---------------
Telephone Pedestal -------- --------
?
-------------------------
Cable TV Pedestal
-------
---------
---
Exist. Water Valve ----------------------
----------------
----------
-----------
Sewer Clean Out ------------~-
-----
------
--------------- P
Power Manhole ----------------------
Water Manhole ----------------------------- -----------------
Light Pole ----------------------------------- ----------------
Gas Valve -------------------- ---------------- O
Telephone Manhole ----------------------- -----------------
0
Transformer ------------------------
Power ----°°°°-----
Q
Sanitary Sewer Manhole ----------------- ----------------
Storm Sewer Manhole -------------------- ---------------- Q
Water Line --------------------- ------------------ --
Property Line ------------------- --------- ------ F..
Property Line Symbole ------------------- ---------------- o
Exist. Iron Pin ---------------------------- ----------------- EP
Property Monument -------------------- ------------------ a
Well ------------------------------------------ ------------------ 0
c
ro (DI t-l Lnl Lnl CDI CDI U)I rl rl NI NI rl
co
0) c
O
O N (d
? 7
? W
C '1 Q
C v A
?
LnL_
. F"
.
'O C
N O (b G CD
m U X 0 0 0 0 0 0 0 0 0 0 0 0
- t- t- t- r• t- t`
= CL M C.) l? t- t? r. t? t
C
'CU Lo ? a)
L CN
E m u) ..
c
L LU Lo U
i
C i
0O 'O t
C D
N (U CT)
>
N
CT N C?7 M CD r M M r t- a) r co V
N O r
t-
? r
rN
a)
o
O U Nr
a
)
N
(n Z
o o rn
to 0 t!)
N C C '(N L1')
N•? O (D CV N N C1J Cp N r 0 r N M M r
Mr pprr000000
0
N=* N` * O
? U
Q 8 0 0 0 0 0 0 0 0 0 0 0 0
n Q n O i O
LO M
CT
C
J 0 0 0
O` E `mJ ?(0
CA Lo r M C) CV tl- O LO
N N 1? N
Q -0N V rrCAGOgTr V• V'cr)
r r
Lc
V co
`?
F
)
.
O
O ii O C
C I
C r
)
?
Lo IT
-
C ^
O
' L
".
.o
n O N
.R
my N
n tU
x 3 v a a)
Q, 0MCO T- M'r- `MNw
a)
) C N V N M V C7 M M to r N
c
?•
a
N
L O
LO
?
)
a
N- J
?.
N
Q Ql
= tz_ 0 Q
4. Q
L
O O
.0 Lo m 0 m Lo Lo 0 to Lo Lo Ln Lo
0 Z :"3 j?olC? CVNCV CV C4 CV NNCVN
r r r
N r r r r r r r r r
C
(0 _
C
O }
?-
? 'n
O p N N N U N N N N to N N N
'Z7 * Ct) O CV CV CU N CV O [V O O O
} } } }}} } }• } } }• }•
C13
W O
U)
O
L
0
t
cr-
O
U
C) v
~
O t
L L L V L t L L V
m
0
'
N
O
p
C0
O
CT O CT 0 O m CT O m
Q
CV)
CaQ (n
LQ
CD
C)
?U
?a
v
c?
=
C
-4
MM V Lor-V•NCD0
0 00 00 r M N CO CD N V' C) t-
i + r } . + + + + + + + +
t cf) I,- T- LO CO 03 Q) O O O
L U) r r N N N N N M M M
co
CO 7 n co
0 0 0 0 0 0 0 0 0 0 0
`OOmrnr •7 LOt- Iq V'N
0 0 r CO r M N C7 CD N N V
y CU
C w v O U L
(L9 O? co ?OrMrrLO0+0COrnrnO
r r r N N N N N N M
U) 0 0 CL >
U) CL
w
U
Q
f-
CIO)
O
r
c
a)
E
cis
a)
I-
L
U
a m ma) ??
c c c c c
?
-p
.) J
J J J
E 2 C C_ N
`
-? J `
`
J J O O
E O
O
O
o. a) m n. o. a) a) Cl CL
O O O O
Ir (n U) F- i- UA U) I-
N
O
C Q)
C
C
CL
U)
Y^.LO MOOOCD co OO (9
Ur-- thco in O(DMMED Lo
N
CL) v Y
L
U a)
U
U '
N
a)
a)
)
Co oN
0) (DMLO 0
0
V
U N
1
a)
C
a)
C
O
Zn
N
a)
a)
0 0 0 0 0 0 .C
U')
r- C) N
F + + } F
--
N + + NLnLO (DtiO a)
C
Un ?.-NNNM
O
0 0 0 0 0 0 0 0 0 L
y
(U
0 0 0 0 0 0
O t n
O
O (n (o M O ti
Co .-
pe7+ ONLO (+n(+Dr+l
* C
r r r N N N
"4 «
C
CL
(1)
O
c
'N
ca
a3
X
L
c
.N
c9 p?
co t7)
X cu
Xz
c v
cb
J a
c O
N
co
X v
c r
'N r
c4 .!
m
+ tr>
n3
L co
p C
c cD
N
C13 C
ca h
X ro
L m
O 4?
O
c O
cv ?+
co
X C
L O
rn h
c O
J y
R1
c_ V
N T+
CO
O
X
c
N
c9
m
r-
0
co
U
ca
U
d
O)
O
0
U)
c
.N
c9
co
a)
rn
o a)
co rocjO O
co col 1`I t`I co
a V<cOtol "NI °°I O w r NCal Ncal rOI 'o
'm C,
r"NTI r r °- N N
m U
Oa)COMW rMMrhOr??
12 'O < ti r [! t? r 0 tD r N tD r
p Q) 4:: ?NrrNNr
cA Z
L
NI NI NI NI NI NI NI NI NI NI NI NI
O
L _
o col col col ml MI ml MI MI MI col col C,)l
v
.c
C v cal (DI c01 cal c01 COI cal (01 cal (01 Of (01
J
c
U) of 01 01 Ol Ol Cl of of of of of 01
m
f+ f++ t+ t t f t t
r
CL v NI NI NI NI NI NI NI NI NI NI NI NI
L_
col col col col col col col col col col col col
v
t
v (DI cal (01 (01 cal (01 OI cal cal (DI cal of
a)
J
C
(DI 1`I OI tnl cal cal Lol rl r l NI NI r-1
co
L
rn w
L w L L L L L L L L '' L
rnO cm cm rnrncm cm _cm cm Z rn
u..
a)
J
a0 O r ti
O N M O
OpCDrMNC'7CDN V'C71?
co + r' t t+ t t t f f.+
to r -q T- rM? N NNN N CO M C) 0
M
O 0 0 0 0 0 0 0 0 0 0 0 0
c0 OO0MMT-I Mr- V V N
O r w a- M N M 0 N N 'I7
cn O + t + + t + + + f + +
OOer-" V- NNNNNNM
j+co >r, lac., > 'y
/ l `
r ?
1
t 17 71
J
-
1
'
!
D R
\ ?-
e
1
J o
_/I I : c
?- I o
Pw ?? 7 5 e6 z'x3'X6.
t u
ill iU
?PP ?
c ?c.?
DI. ; . u
I? IS ?;.r-v L
REP- ?.CE ?Dpg-
•ti"
1
L, ? I
l i` ?1F? ? Zx3X? •
3i 3S
CF 15roz trR? ?. ftiaa
Io+oO ?'? "?" r9 `
-
- = 18 3
' I
3
F- I ? ?
Imo.
J
f
' J
I \ ?
I ryr,i,
I
I
l
? .
I Z'r3X6?
v
I Sgo
I
J
7?
I rj ?
l:J
,U
3i ?:
\II
V
v i
?I.
r c-h^,o
I !v
I
is :+33
?3+7c a? I 0 r?EF?r,cc ??'x /o .=,DF?
:I
i
I
s
Ij
i
I!
I
?II
s I
1
I Type U Zx3XG
I
I ?
4_
f
1,
3I1
oc
¢I?
I'
?I
I
I
1
/3 7 Q
v
u
u
v I
?i
U
?!J
V
?? i?ro 3 rs r
sef Z'x3it6,
YP e' Z'x3?x?
1 G
1 7_ ?U
,L
T
w
a
0
c
's v
?7rl4 _?'X ig"Cf.1P
it1
i'-00 JK r?:v •'
V
i I
i !e ? W
I
I ?I ? s
I I
I i I I
I ?/ ?"1
a e??n ?rou? ? ? I
84T?Gr STA. 24+37
y W
`
I Q ? LLD
I I
I U
I
L?v
I Cry =r
EP ?/
I ?l
•??.
5Blo Z''K
2 a
v
u
u
u
p 7YPF- & 'x x s
.?. rrPli•%c So'Y /P,•NDar
'd
w
J ` '
-
7o
7
2 ? ( I
?
0
I
^
a
CND T904T P-J=FtR o
I ®
?
o? /
zv
STA 29450 '
r
' ? '
%5"
?
'
uc
x3cc - ?3
45 a ? IU
?
PF:'l.=t% ??i
,.
'
t,
PF_F'
i r
,
I
1= Tt, fAPD
z gEG ?n? ?
-r??vcJ T ?
SrA. Z7+70 k=
!
I
I ?
r
ENO TRouT L=;
EQrFER S7A 27+00 i I r' y. i
i
ti
T; _
E!j
Z:) (` / :J 41) 1 `1
? /IG GR RD
I?
I I too, ESA
?-"?? /,?_ fir, 1?- T ?J1i..7• ? I ?? iT70 '. E%!:? .-7? ?P1?-_C1 _._-_.
- ----•----- I--- ? :rj--n =+----r? - -?5?+( 3v?? t_?'-!P F.E?LHCE
rYc
Ca'P
1 •?I ? ? 41,5?I ?!w ell X? ZS?? i5 DPF
/? i
PIPE DATA SR 1563 Huckleberry Mtn. Road
County:
Henderson WORK ORDER: 140.045068 Page 1 of 1
STATION PRESENT
SIZE PROPOSED
SIZE NOTES
0+30 20'X15" RCP 20'X18" HDPE Replace Driveway Pipe
1+14 20'X15" RCP 20'X18" HDPE Replace Driveway Pipe
1+83 23'X18" CMP 25'X18" HDPE Replace Driveway Pipe
3+44 20'X18" HDPE Proposed Driveway Pipe
6+19 30'X15"CMP 30'X18" HDPE Replace Driveway Pipe
7+68 20'X18" HDPE Proposed Driveway Pipe
8+13 25'X15" RCP 25'X18" HDPE Replace Driveway Pipe
11+10 40'X15" RCP 50'X24" HDPE Replace Crosspipe
13+76 25'X15" RCP 50'X18" HDPE Replace Crosspipe
17+08 30'X18"CMP 50'X18" HDPE Replace Crosspipe
21+19 30'X18" CMP 50'X18" HDPE Replace Crosspipe
25+08 30'X18" CMP 50'X18" HDPE Replace Crosspipe
28+47 40'X15" HDPE Proposed sleeve pipe for water supply
28+48 35'X18" RCP 45'X30" CMP Replace Crosspipe; Live water;3' stream;
build rock headwalls both sides
30+22 25'X15" CMP 25'X15" HDPE Replace Driveway Pipe for Turn-around
30+36 35'X36" CMP 40'X48" CMP Replace Crosspipe; Live Water;4' stream;
build rock headwalls both sides
POLE DATA
Project: SR 1563 Huckleberry Mtn Road
County: Henderson
Owner: Bellsouth/Duke Power/Mediacom
Station
Pole
Number Dist. From
Center Present
Road Dist. From
Center Project Dist. Center
Project After
Moving
Remarks
.
=Lt
Rt.
Lt.
Rt.
Lt.
Rt.
1+09 15 Multi-use Pole
1+38 11 Multi-use Pole
1+39 11 Cable Ped
6+10 21 Cable Ped
10+54 17 Cable Ped
19+78 12 Multi-use Pole
21+86 098140
/06147 12 Multi-use Pole
23+84 15 Multi-use Pole
25+87 15-N7 16 Multi-use Pole
27+46 16 Multi-use Pole
27+47 30T-
UNS 17 Telephone Ped
27+58 19 Guy Wire
27+67 19 Guy Wire
28+75 12 Telephone Ped
?n
0
c
a?
d
U
7
S
M
(D
r
IL
Z
U_
F-
Z
O
U
Z
O
W
0
Z
W
S
• r
co
O
w
c
Q?
d
v
ch
fo
to
r
a
Q
O
a
O
F`rL-
r
O
U
Z
O
NN
w
W
0
Z
W
2
-Zo
/Z C-
I• C a
37
is -- •?-?' ?? .'1.?'.. ? •??J f?,'?i 1- p0' y,,?;, i
- - - i' ' _-:???, .? ?• Cam... ? 2 G / ? ?? ¢f .\ \ t--?j, b?. -_ •?.
C
W c
IM
C
d O
M o