Loading...
HomeMy WebLinkAbout20060894 Ver 1_Complete File_20060616,It OFWATF9 ?Ot ?G Mr. Mike Holder, P.E. NCDOT Division 12 P.O. Box 47 Shelby, NC 28151 Michael P. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, 11.1:. Director Division of Water Quality U JL/lV 2 0 2006 ANDs"R WATER ANDST?MWAT1FRe4,1VDM APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Mr. Holder: June 16, 2006 DWQ# 06-0894 Gaston County You have our approval, in accordance with the attached conditions and those listed below, to permanently impact 20 linear feet (If) (for culvert extension and riprap inlet and outlet stabilization) and to temporarily impact 25 If (for a temporary cofferdam) of an unnamed tributary* to Dutchmans Creek to replace an existing, deteriorating culvert as described in your application received by the Division of Water Quality (DWQ) on June 6, 2006. The location of the project is State Road 3223 (Walk-A-Long Way) in Gaston County. After reviewing your application, we have determined that this project is covered by Water Quality General Certification Number 3404. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. This approval is valid solely for the purpose and design that you described in your application (unless modified below) and will expire with the associated USACE 404 permit unless otherwise specified in the Water Quality Certification. Should your project change, you must notify the DWQ in writing and you may be required to submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, or if total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h)(6) and (7). For this approval to remain valid, you must adhere to the conditions in the attached certification and those listed below: Placement of culverts and other structures in waters, streams and wetlands must be below the elevation of the streambed by one (1) foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diamete"r less than 48 inches, to allow for low flow passage of water and aquatic life, as well as prevent headcutting of the streams. If bedrock is encountered in the stream channel at the location of the culvert installation, DWQ will not require the burial of the culvert. However, design and placement of culverts and other structures including temporary erosion control measures shall be installed in such a manner that the original stream profiles are not altered (i.e., the depth of the channel must not be reduced by a widening of the streambed). Existing stream dimensions (including pattern and profile) are to be maintained above and below locations of each culvert. The applicant may be required to provide evidence that the equilibrium has been maintained, if requested in writing by the DWQ. 2. Riprap must not interfere with thalweg performance and aquatic life passage during low flow conditions. Riprap placed for bank stabilization should be limited to the stream bank below the high water mark and vegetation should be used for stabilization above the high water mark. One stream determination performed. N thCara ina aturally North Carolina Division of Water Quality 610 Fast Center Avenue, Suite 301 Internet: w%y vv? newatcr<Fuality,org Mooresville, NC: 28115 Phone(704)663-1699 PAX (704) 663-6040 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper 11?. Page 2 3. Heavy equipment must be operated from the banks rather than in the stream channel, when possible, in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into the stream. 4. Temporary dewatering sites must be restored to pre-existing conditions unless more natural geomorphic conditions can be provided. 5. No live or fresh concrete shall come into contact with waters of the state until the concrete has hardened. 6. The dimension, pattern and profile of the stream above and below the crossing should not be modified. Disturbed floodplains and streams should be restored to natural geomorphic conditions. 7. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 8. All work shall be performed during low or normal flow conditions. 9. Discharging hydroseeding mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is strictly prohibited. 10. Erosion and sediment control practices must utilize Best Management Practices (BMP) and be in full compliance with all specifications governing the proper design, installation, and operation and maintenance of such BMP in order to protect surface water standards: a. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow pit sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. b. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. c. The reclamation measures and implementation of these measures must be in accordance with the requirements of the Sedimentation Pollution Control Act. 11. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within 30 days after the Division of Land Resources has released the project. 12. The North Carolina Department of Transportation (NCDOT) and its contractors and/or agents shall not excavate, fill or perform mechanized land clearing at any time in the construction or maintenance of this project within waters and/or wetlands, except as authorized by this Certification, or any modification to this Certification (e.g., no work shall occur outside of the footprint of the plans provided). In addition, there shall be no excavation from or waste disposal into jurisdictional wetlands or waters associated with this Certification without appropriate modification. If this occurs, compensatory mitigation may be required since it is a direct impact from road construction activities. 13. Upon completion of the project, the applicant shall complete and return the enclosed "Certificate of Completion" form to notify DWQ when all work included in the 401 Certification has been completed. Please include photographs upstream and downstream of the structure to document correct installation. Page 3 14. Continuing Compliance. NCDOT shall conduct its activities in a manner so as not to contravene any state water quality standard [including any requirements for compliance with section 303(d) of the Clean Water Act] and any other appropriate requirements of state and federal law. If DWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that state or federal law is being violated, or that further conditions are necessary to assure compliance, DWQ may reevaluate and modify this certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15 A NCAC 2H.0507(d). Before codifying the certification, DWQ shall notify NCDOT and the USACE, 'provide public notice in accordance with 15A NCAC 2H.0503, and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to NCDOT in writing, shall be provided to the USACE for reference in any permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Polly Lespinasse in the Mooresville Regional Office at 704-663- 1699. Sincerely, for Alan W. Klimek, P.E. Attachments cc: Steve Lund, USACE Asheville Field Office Sonia Gregory, DWQ Wetlands Unit File Copy 0 C `-F C 06 1? North Carolina Wildlife Resources Commission Richard B. Hamilton, Executive Director TO: Steve Lund, USACOE C ???Qd(3 D Asheville Field Office 11 V LL55 FROM: Ron Linville, Regional Coordinator IWW JUN _ 9 2006 Habitat Conservation Program DENR - WATER QUALITY WETLANDS AND STORMWATER BRANCH DATE: June 5, 2006 SUBJECT: North Carolina Department of Transportation (NCDOT), SR3223, Walk-A-Long Way, Unnamed Tributary Taylors Creek (WS-IV), Gaston County NCDOT proposes to remove and replace a deteriorating pipe that was previously incorrectly installed. Biologists with the North Carolina Wildlife Resources Commission are familiar with habitat values in the area. These comments are provided in accordance with the provisions of the Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661-667d) and the North Carolina Environmental Policy Act (G.S. 113A-1 through 113A-10; NCAC 25). Removal of the existing bridge will not impact waters. The project will replace an existing 40-foot, double 60" CMP with a 50-foot, 112" x 75" CMPA with an inlet headwall and ten (10) feet of riprap. The new pipe will be buried approximately a foot. Temporary dewatering will be necessary. Based on our review of the submittal, we will not object to project as proposed provided the following conditions are implemented: 1. Culverts 48" or larger should be buried a foot into the streambed. Culverts less than 48 inches in diameter should be buried to a depth equal to or greater than 20% their size to allow for aquatic life passage. These measurements must be based on natural thalweg depths to the extent practicable. 2. The dimension, pattern, and profile of the stream above and below the crossing should not be modified by widening the stream channel or reducing the depth of the stream. Natural channel dimensions should be provided upon work completion. 3. Any riprap used must not interfere with aquatic life passage during low flow or drought conditions. Mailing Address: Division of Inland Fisherics • 1721 Mail Service Ccntcr - Ralcigh, NC 27699-1721 Telephone: (919) 707-0220 - Fax: (919) 707-0028 SR3223, Walk-A-Long Way -Page 2 - Junc 5, 2006 4. If concrete will be used, work must be accomplished so that wet concrete does not contact stream water. 5. Heavy equipment should be operated from the bank rather than in the stream channel in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into the stream. 6. Stringent erosion control measures should be installed where soil is disturbed and maintained until project completion. 7. Temporary or permanent herbaceous vegetation should be planted on all bare soil within ten (10) days of ground disturbing activities to provide long-term erosion control. We encourage NCDOT to utilize onsite vegetation and materials for streambank stabilization when practicable. Thank you for the opportunity to review and comment on this project during the early planning stages. If you have any questions regarding these comments, please contact me at 336/769-9453. Cc: Polly Lospinase, DWQ Marella Buncick, USFWS Trish Simon, DOT Marla Chambers, WRC ?swswE°? '?RMw???B??`rh STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY DIVISION OF HIGHWAYS LYNDO TIPPETT GOVERNOR SECRETARY June 1, 2006 Mr. Steve Lund 06o894 US Army Corp of Engineers Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, N. C. 28801-5006 SUBJECT: Pipe replacement on SR 3223 (Walk-A-Long Way), Gaston County Dear Mr. Lund: The North Carolina Department of Transportation proposes to replace a deteriorating, incorrectly installed pipe on SR 3223 (Walk-A-Long Way) in Gaston County. An existing 40-foot, double 60" CMP will be replaced with a 50-foot, 112" x 75" CMPA with inlet headwall and 10 feet of associated riprap for structure protection. NCDOT proposes to bury the pipe at least one foot below the existing streambed elevation as show on the enclosed thalweg profile. Bedrock is visible in the stream downstream of the existing pipe; therefore, proper pipe burial may become an issue once construction begins. The scope of the work will result in a 20 feet of permanent impacts and 25 feet of temporary to an unnamed tributary to Taylors Creek, which is classified as a WS-IV Watershed by the Division of Water Quality. The pipe is located on a dead-end road; therefore, it will be necessary to construct the pipe in a phased construction. Temporary cofferdams and bypass piping will be utilized for stream management during the pipe replacement. Upon project completion, the area impacted by the temporary cofferdam will be restored to pre-project conditions. The project is not located within '/s mile of any critical watershed area nor is SR 3223 a rural or urban arterial; therefore, hazardous spill basins are not required. Enclosed is the hazardous spill basin checklist. This office has conducted a GIS and field survey for the project and is recommending a finding of "no effect" for T&E species and historical structures. I have enclosed a pre-construction notification for a NW#14, sketches of planned activities, and location maps relative to the project. Project information for the 401 Automated Payment Procedure is as follows: 0 Work order number: 150464-55120005-12B.203611-3855 • TIP #: NA • Project Category: $200.00 Fee SR 3223, Walk-A-Long Way Page 2 June 1, 2006 If you have any questions or concerns, please feel free to contact me at (704) 480-9044. Thank you for your time and consideration to this matter Respectfully yours, M.L. Holder, P.E. Division Engineer Twelfth Division BY: 1AAW Trish Simon Division 12 Environmental Supervisor Enclosures Cc: John Hennessy, DWQ, 40] /Transportation Permitting Unit Polly Lespinasse, DWQ, Mooresville Regional Office Ron Linville, Wildlife Resources Commission (Courtesy Copy) III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Pipe replacement on SR 3223, Walk-A-Long Way. 2. T.I.P. Project Number or State Project Number (NCDOT Only): 1213.203611 3. Property Identification Number (Tax PIN): NA 4. Location County: Gaston Nearest Town: Mt. Holly Subdivision name (include phase/lot number): NA Directions to site (include road numbers, landmarks, etc.): From Mt. Holly , west on Hwv 27, left on SR 1924, left onto SR 2085, left on SR 2181 and riwht onto SR 3223 to site. 5. Site coordinates, if available (UTM or Lat/Long): 35"18'42"N/081'03'13"W (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): 0.10 acres (NCDOT right of wa ). 7. Nearest body of water (stream/river/sound/ocean/lake): UT to Taylors Creek, WS-IV Watershed (from source to Dutchmans Creek). 8. River Basin: Catawba (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application:Existing Conditions -pipe crossing on paved secondm road. General Land Use- wooded, residential. Page 2 of 8 Office Use Only: Form Version May 2002 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: NWP 14 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: Mike Holder, N.C. Department of Transportation Mailing Address: P.O. Box 47 Shelby, orth Carolina 28151 Telephone Number: 704-480-9020 E-mail Address: 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Trish Simon Company Affiliation: N.C. Department of Transportation Mailing Address: P.O. Box 47 _Shelby North Carolina 28151 Telephone Number: 704-480-9044 Fax Number: 704-480-5401 E-mail Address: tsimon@dot state nc us Fax Number: 704-480-5401 Page 1 of 8 10. Describe the overall project in detail, including the type of equipment to be used: NCDOT proposes to replace a failing 40 foot double 60" CMP with a 50-foot 112"x 75" CMPA with inlet headwall and associated riprap at inlet and outlet for structure protection. Installation is to be accomplished with the use of trackhoe and front-end-loader. 11. Explain the purpose of the proposed work: The purpose of the proposed work is to replace a failing pipe. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. None Anticipated VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: There will be minor increase in pipe length and minor riprap impacts for structure stabilization. 2. Individuall list wetlan d impacts below: NO WETLAND IMPACTS Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** es/no Distance to Nearest Stream linear feet Type of Wetland*** Page 3 of 8 * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://www.fema.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: 0 Total area of wetland impact proposed: 0 3. Individually list all intermittent and erennial stream impacts below: Stream Impact Average Width Perennial or Site Number Type of Length of Impact Stream Name** of Stream Intermittent? (indicate on Impact* (linear feet) Before Impact (please specify) map) 1 Increase in 10 feet Unnamed Tributary to 11 feet l i P pipe length Dutchmans Creek erenn a 1 Riprap at 10 feet inlet & outlet 1 Temporary 25 ft " Cofferdams * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usgs.Qov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.mapguest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: Permanent Impacts = 20 feet, Temporya Impacts = 25 feet. 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and anv other water of the U.S.) below: 0 Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean etc. • List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 5. Pond Creation: NO POND IMPACTS If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Page 4 of 8 Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. There will be only minor increase in pipe length. The minimum amount of rock necessar?to protect the structure will be used. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strmgide.htm1. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) watering, irrigation, aesthetic, trout pond, Page 5 of 8 of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. MITIGATION NOT ANTICIPATED 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Page 6 of 8 Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 213 .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? XI. XII. Yes ? No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. mitigation is required calculate the required amount of mitigation by applying multipliers. Zone* Impact (square feet Multiplier Required Mitigation 1 3 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer the buffer If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. NA Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. No additional impervious surface is proposed. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. NA XII1. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No Page 7 of 8 XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). NA Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 8 of 8 V 7, Q '- ?'i 'tip 1 ? r •,?i '1 r N a J _ •« • I ? '" ? "H (?? k er i r"te r Iwo ad 5? yiyy4J y 1? ?y "J'. ftu n It __ ? I M. ?+ / M...,. `•`-,ti., '`t ?..,2.-.. ?'?-.: ? 1. ?' + ate" / ` • 5 _ ? /'. Ww'v .M ?,; .. 14w.1r? ~'? , ? ? '?'Ip ,x,,, ?w? ? .. , tip. ++ • :ti. I• ?SG r - .-?, , ?,.J . • ,1', fit, 1, 45 10 Pipe Replacement t.r '?.. ... _ ? 4' 'A,' r of jl•t? ?' ,?' .. _? ? ' . r h (y r ?• ; 41 '•., M,:II ?....?H '? I'I ?- ? I 5 ?S .L .. r ' 1. I s. I r ?'r, J r 1 ? ., _ ... S?^`f ?', .. % rr? , l 1 I Name: MT HOLLY Location: 035018'41.80" N 081° 03' 13.21" W Date: 6/1/2006 Caption: Pipe Replacement, SR 3223 (Walk-A-Long Way), UT to Taylors Scale: 1 inch equals 1000 feet Creek, WS-IV Waters, Catawba River Basin (C) 1998, C" _ KEY TO MAP i00-Year Flood Boundary---- ZONE B 100-Year Flood Boundary !one Designations* With )ate of Identification /74 Flood Boundary----- ZONE B: l Flood Boundary---- )d Elevation Line 513 fation In Feet** )d Elevation in Feet (EL 987) tiform Within Zone** Reference Mark RM7x e • M1.5 need to the National Geodetic Vertical Datum of 1929 'LANATION OF ZONE DESIGNATIONS EXPLANATION Areas of 100-year flood; base flood elevations and flood hazard factors not determined. Area( of 100-year shallow flooding where depths are between one (1) and three (3) feet; average depths of inundation are shown, but no flood hazard factors are determined. Areas of 100-year shallow flooding where depths are between one (1) and three (3) feet; base flood elevations are shown, but no flood hazard factors are determined. Areas of 100-year flood; base flood elevations and flood hazard factors determined. Areas of 100-year flood to be protected by flood protection system under construction; base flood elevations and flood hazard factors not determined. Areas between limits of the 100-year Ilood and 500- year flood; or certain areas subject to 100-year flood- ing with average depths less than one ( I ) foot or where the contributing drainage area is less than one square mile; or areas protected by levees from the base flood. (Medium shading) Areas of minimal flooding. (No shading) Areas of undetermined, but possible, flood hazards. Areas of 100-year coastal flood with velocity (wave action); base flood elevations and flood hazard factors not determined. Areas of 100-year coastal flood with velocity (wave action); base flood elevations and flood hazard factors determined. (401 LS TO USER leas not in the special flood hazard areas (zones A and V) ofected by flood control structures. is for flood insurance purposes only; it does not neces- ,w all areas subject to flooding in the community or Metric features outside special flood hazard areas. ning map panels, see separately printed Inclex To Map IN 11IAL IDLN"F IFICATION: NOVEMBER 29,1974 LOOD HAZARD BOUNDARY MAP REVISIONS: .JULY 14.1978 Pz?j \I Q,rcj goods Proposed Closs-m cocc?arg .y? R;,p POP ak\ At Propobc(4 Concre?e. Oa 06Wa1I Tem tiJail Se,? ?N 1z" Sweet Cum N ?? `lard E ? kloods 0 v t_Xig? iv,4 ?Ipl (pd,CMP J (40' L I_ C..InnarneCl Tr;bufzr/? proposed 112?c ?5?x 5L? .?-? -rQ tor; y C M PA Cree,l< Woods P\- A, VJ scalp-, I 2c SR 3223 -500 - 4qs 4qn Shif+ Propo sec?? RPQ up sirc4 Q?proxlrna4elj Nc-lUOT DIV, I2 - 'Br;d9z I"ck,rl e-nanc.G SR, 3223 C-sion Co. io to l ° -- ?--• 13' 1 Cvcig?'?? V-0I60"cmp \\ (?opa sect 112 5" 50' C m P?4 Sec ?Orl 1 Stit I of - 1?ral;rr,;hary trnSioh Cor,A,.l SY-J6, © Place. Z"d Co-?fe'rdarn w/CPP asd\velrs\ah f'??'t ?JelwN?r. phase. z ?' ? _ Cor,S?Uc?lrn,,pe(viovs O2 R., rr p tR??tc? (Aea a ?nd eXc,cvr?'?ior, (P+'pe ?-o be eCa 5?d`fhr?+ ®(?e,placa ?-h e Por-Et'or, rnc.e(?oI J?' of renwvc.dr?c wil?? c-?c.,? 1l=`x[`17"GMUW O5 ?e5+r ha`k?l\?r9 ?t.,ene? pips, OEr??.t 51 If -Fehce Q? necclcd. N ,gym ?? 3Q Rcmc?ue. ex?s?n pipe-s ?° ?? ? aPpt?v., Ihc eeh?r of-It,? ?J fOC? 6e? i nnins C: OU'F (C Chd, OC,?,nS-Iruct Im(?ervious 0,4e Darn rr---- = phase T t3 Place 5'114 ?ence 4S necded 2 qcr / O Remote Co Clam ?.-- ? deer won pipe. \ ?- - U RemuJe. Im?eM"ous darn) ? ?Co f1C„(?te. O Cor, j,j,?L,J?.+ ?wa11 / O c.e.?hc rc°r-,a?••?r,q 112"+c '1S??CMP? Pump d S{uObed wa*r( 5+1+bag a? 11 Remove Impervious darn ®?cr,?ovc rcmct?ni nJ por?or 1/1 Pralim?har? Erosion Con?YA Sve+ck k\C,DG>T Phase 7E -DtIq, IZ 'V?r\-dge Ma\r\+CnQhce SP-, 322 3 Co. 11, Zn, P,p< ?=pl?cemen* 5'o(n place- Cln6c, Z Rip Rc 4-o 'Rv4GGt Necawcol 1 -- CI-Cnmet nlacc CI455 Z back-4v r3 5`4ream w?d+4- RAP ?? z s,,j e Mu Ick Q0 c'l S4-u r be.-f AreA S Pha s e. =[ Pro3e,& Corr,plm, e S?,+4of5 ? Prelim-,irAr? l res?o?--i Con?ol SKI+c.?, Nco?T DIV 12 - Lrid?e Mc in4ei ancti SR. 3ZZ3 On,s,iov, Go. P?pe Rnplac.crnen?' ?LS N Q' a?- ?? r +- 003 fl ?} 9 p c L w /X\ a \ S 44? ? I -?- ? ? V' ? s o c I C CIO 03 N ? ? I cr ? D ? afJ dJ G tl;, N I 1 6?? , ¢?$ ? Quo v? I O Lt ? v ? / \ O I'N ? N M O ?\ 62S 'i'_ r 68? M C\ 0 n V1 O _ O N J c? s vl N N S S L ? o s f D ? N N a ? 06 > a N Cf Elevation 00 co co w w co co m N CT W cn A. Cr 0 CT CA -1 M O ?F T?-T--i-r ? i r J N W CJ? O co CO J O J J N W O ? O J co CO N O N N N N W N N CT N CA N 4 N co N CO W O C w 1 rn C c V M m 3 M I 1 O 0 ?D O n? OD cn -\ O 3 e? y ?D rh CA) UI V, w w CA) N W W O N (.N Cb N v N W N CJ1 N A N W N N N O ?+ CO Cb W ? O -' 3 v J CT A W N J O (0 00 CA CT w N W LU IY 1 N C i fA p1 3 X <D n f? Ly'. O \V O 3 y? ,^_w W+ Y• W O C O ? OD 00 0 COO O O N N W W CO cD UOi cn a -4 Cn Cn Cn to 0 0 fJ1 0 CA Elevation NCDOT HAZARDOUS SPILL BASIN CHECKLIST Division: I? County: _Gnstnn Project ID: River Basin: Catawba Bridge No: Pipe Replacement Route: SR 3223, Walk-A-Long Way Stream: UT to Taylors Creek, WS- IV Waters Water Quality Criteria: Yes No Stream Crossing Blue Line On USGS P F ORW r R WSI r rJ WS 11,111 OR IV, Crossing Within 0.5mi of W.S. Critical Area r fi Roadway Criteria: Route Designation- Yes No Arterial Urban F P Arterial Rural F F Additional Site Information: Yes No Is a Hazardous Spill Basin Required? F pr Criteria Based Upon NCDOT "Best Management Practices for the Protection of Surface Waters" (March, 1997).