Loading...
HomeMy WebLinkAbout19980260 Ver 6_Mod 05 RE_ U-2579DEF_Corps approval_20210114 Wanucha, Dave From:Euliss, Amy Sent:Wednesday, January 13, 2021 7:40 AM To:Wanucha, Dave Subject:FW: \[External\] Mod 05 RE: U-2579DEF_Corps approval Attachments:Mod05_Site20A_U-2579DEF_W-S N. Beltway_Forsyth.pdf; 21-01-08__PD_SITE20A & Impact Summary_U2579DEF_WS N.Beltway_Forsyth.pdf We got Eric’s permit mod back. Can we proceed with the work while you work on the infield mod? Thanks! Amy From: Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil> Sent: Tuesday, January 12, 2021 4:44 PM To: Euliss, Amy <aeuliss@ncdot.gov> Subject: \[External\] Mod 05 RE: U-2579DEF - Permit Site 20 (Mill Creek); DA# 2017-02112. CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Amy: Attached to this message is your requested Section 404 permit modification (05) for the following project: U-2579DEF - Permit Site 20 (Mill Creek); DA# 2017-02112. The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. Please note that the general and special conditions must be strictly adhered to in order for this permit authorization to remain valid. This electronic copy is your official Department of the Army authorization; no paper copy will be mailed. Please reply or call if you have any questions or if I may serve you in any other way. Eric Eric Alsmeyer Project Manager Regulatory Division Office US Army Corps of Engineers, Wilmington District 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 Office Tel: (919) 554-4884, x23 (I am working out of the office, but I try to check my voicemails daily) Regulatory Homepage: http://www.saw.usace.army.mil/Missions/RegulatoryPermitProgram.aspx 1 From: Euliss, Amy <aeuliss@ncdot.gov> Sent: Friday, January 8, 2021 3:46 PM To: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil> Cc: Miller, Vickie M (Vickie.Miller@hdrinc.com) <Vickie.Miller@hdrinc.com>; Kiser, Marcus K <mkkiser@ncdot.gov>; Wyrick, Scott D <sdwyrick@ncdot.gov>; McLaughlin, Zachery R <zrmclaughlin@ncdot.gov> Subject: \[Non-DoD Source\] RE: \[External\] RE: U-2579DEF - Permit Site 20 (Mill Creek); DA# 2017-02112. Thanks Dave! Eric, HDR calculated the acreage, and revised the sheets. They are in the attached email. If its possible for you to proceed with the modification for only DEF, that would be greatly appreciated. The contractor is hoping to start next week. Is it possible for them to proceed while we are sorting out the permitting, or can you get it to us early next week? I know that is a big ask, but anything you could do would be greatly appreciated! Amy From: Wanucha, Dave <dave.wanucha@ncdenr.gov> Sent: Friday, January 8, 2021 2:57 PM To: Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil>; Euliss, Amy <aeuliss@ncdot.gov> Cc: Miller, Vickie M (Vickie.Miller@hdrinc.com) <Vickie.Miller@hdrinc.com>; Kiser, Marcus K <mkkiser@ncdot.gov>; Wyrick, Scott D <sdwyrick@ncdot.gov>; McLaughlin, Zachery R <zrmclaughlin@ncdot.gov> Subject: RE: \[External\] RE: U-2579DEF - Permit Site 20 (Mill Creek); DA# 2017-02112. Amy, My previous email allowing the changes as described still stands. If you need anything more, let me know. Thanks. Dave W. Division of Water Resources 401 & Buffer Transportation Permitting NC Department of Environmental Quality 336-776-9703 office 336-403-5655 mobile Dave.Wanucha@ncdenr.gov NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27106 Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. 2 From: Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil> Sent: Friday, January 8, 2021 10:58 AM To: Euliss, Amy <aeuliss@ncdot.gov>; Wanucha, Dave <dave.wanucha@ncdenr.gov> Cc: Miller, Vickie M (Vickie.Miller@hdrinc.com) <Vickie.Miller@hdrinc.com>; Kiser, Marcus K <mkkiser@ncdot.gov>; Wyrick, Scott D <sdwyrick@ncdot.gov>; McLaughlin, Zachery R <zrmclaughlin@ncdot.gov> Subject: \[External\] RE: U-2579DEF - Permit Site 20 (Mill Creek); DA# 2017-02112. CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Amy: Unfortunately, I cannot authorize this without a mod, particularly since it is for a different purpose than the other temp impacts. However, I can modify it fairly easily, and maybe quickly, if you will provide me with the square footage of temporary impact from the 65’ of impacts. Dave: let us know if this changes your response. There are options for how to deal with the WQC. If Dave can confirm that no formal WQC change is needed (in-field mod?), then I can go ahead with a mod for site 20. I would prefer to combine this mod and the U-2579AB mod (since they are under the same IP and DA#), if the U-2579AB mod WQC will be done soon. This would especially work well if Dave does need a formal WQC mod for Site 20, and the U-2789AB mod; and a combined mod, or 2 separate mods, would be done soon. I don’t want to make it more complicated than it has to be. If you have any questions, please give me a call. Thanks! Please reply or call if you have any questions or if I may serve you in any other way. The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. Eric Eric Alsmeyer Work Cell: 919.817.1570 Project Manager Regulatory Division Office US Army Corps of Engineers, Wilmington District 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 Office Tel: (919) 554-4884, x23 (I am working out of the office, but I try to check my voicemails daily) Regulatory Homepage: http://www.saw.usace.army.mil/Missions/RegulatoryPermitProgram.aspx From: Euliss, Amy <aeuliss@ncdot.gov> Sent: Friday, January 8, 2021 8:13 AM To: Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov> Cc: Miller, Vickie M (Vickie.Miller@hdrinc.com) <Vickie.Miller@hdrinc.com>; Kiser, Marcus K <mkkiser@ncdot.gov>; 3 Wyrick, Scott D <sdwyrick@ncdot.gov>; McLaughlin, Zachery R <zrmclaughlin@ncdot.gov> Subject: \[Non-DoD Source\] FW: \[External\] U-2579DEF - Permit Site 20 (Mill Creek) Dave and Eric, Below is an email from Vickie Miller with HDR. They are the Design team on the U-2579DEF project. The contractor needs to install a temporary crossing to bring a crane to the site. After your review, let me know if you do or do not have any objections to us proceeding. We no longer need to do the previously permitted work pad (site 20C-165’), but instead need 60’ of temporary impacts at the same site but at a different location on the stream. The pdf labelled “RW- 21_L-STA+50 Rev.3 markup” is shows the location of the proposed site, and the pdf labelled “Site 20 Permit Sheet U2579DEF” shows the site as it was permitted. Give me a call if we need to discuss. Amy 336-671-2886 From: Miller, Vickie M. (Raleigh) <Vickie.Miller@hdrinc.com> Sent: Thursday, January 7, 2021 6:39 PM To: Euliss, Amy <aeuliss@ncdot.gov> Cc: Yelverton, Wyatt <Wyatt.Yelverton@hdrinc.com> Subject: \[External\] U-2579DEF - Permit Site 20 (Mill Creek) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Amy, I have attached the permit plan sheet, the summary impact table, and a marked up sheet of the location that Flatiron would like to put a temporary crossing at Mill Creek. You will notice they are not showing the need for a temporary workpad in the channel but instead a 60’ long pipe in Mill Creek for a crossing to move cranes, etc. The original permitted length of impact for the temporary work pad (Site 20C) was 165 ft. This would be less impact from that standpoint. The proposed location for the temporary pipe is in an area where we will have impacts from a ditch tie in (Site 20A). Site 20 A currently is permitted for 16 lf of permanent impact and 21 lf of temporary impact. We would need to increase the temporary impact by approximately 44 lf to cover the length requested as well as making sure we have temporary impacts for dewatering/installation of the pipe (assumed 10 ft downstream and the 11 ft upstream which was previously permitted). Please let me know if you have any questions or comments. Thank you for checking on what will be needed for this one. Thanks, Vickie Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 4 \I DEPARTMENT OF THE ARMY WILMINGTON DISTRICT,CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON,NORTH CAROLINA 28403-1343 January 12, 2021 Regulatory Division Action ID No. SAW-201 7-021 1 2 Ms. Amy Euliss NCDOT Division 9 Environmental Officer North Carolina Department of Transportation Division 9 375 Silas Creek Parkway Winston-Salem, North Carolina 27127 Dear Ms. Amy Euliss: Reference the Department of the Army (DA) permit issued on January 22, 2018, and subsequent modifications, to the North Carolina Department of Transportation (NCDOT), for impacts associated with the new location project, TIPs U-2579 C, Phase 2 and U-2579 D, E, & F, Winston-Salem North Beltway, in Forsyth County, North Carolina. On January 8, 2021 , the U.S. Army Corps of Engineers (Corps) received a request from NCDOT to modify the standard permit for the U-2579 DEF project to include an additional 43 linear feet of temporary stream impacts (Permit Site 20A), and removal of 165 linear feet of temporary stream impacts (Permit Site 20C) that will not be needed. The additional impacts are needed for a temporary pipe culvert stream crossing for construction access for a crane. There are no changes to wetland or permanent stream impacts. The Corps has completed the evaluation of your request and has determined that it is appropriate and reasonable, and no public notice is required for this modification. Therefore, the permit is modified as requested and as shown on the enclosed revised Permit Drawings, Sheets 64 and 96 of 97, received on January 8, 2021 . Special Condition 1 is modified as follows: 1 . All work authorized by this permit shall be performed in strict compliance with the attached sets of plans, "U-2579DEF: PERMIT MODIFICATION PACKAGE" Sheets 1-97, dated December 18,2018, with revisions to Sheets 60, 61 , 72, 73, 74, 75, 96, & 97, received on November 5, 2020; Sheets 1-34, dated September 16, 2019; and Sheets 64 and 96 of 97, received on January 8, 2021 , which are part of -2- this permit. The Permittee shall ensure the construction design plans for this project do not deviate from the permit plans attached to this authorization. Any modification to the attached permit plans must be approved by the U.S. Army Corps of Engineers (Corps) prior to any active construction in waters or wetlands. All other conditions of the permit, including the mitigation requirements, and permit expiration date of December 31 , 2028, remain in effect as written. Should you have any questions, contact Mr. Eric Alsmeyer, via email at Eric.C.Alsmeyer usace.army.mil or by telephone at (919) 554-4884, extension 23. FOR THE COMMANDER /Kos Date: 2021 .01 .12 a� 07:40:35 -05-00- Monte Matthews Lead Project Manager Wilmington District Enclosures PENTABLE: NCDOT_permits_CON.tbl TIME: 3:19:49 PM 0 CO o 0) L O O 9 TJ 0 0 0 Z Z CC Q Z 3 0 Z ~ w 0 o CL = LL Flotiron_Constructron_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\PERMITS_Environmental\Drawings\U2579DEF_PRM_4C PSH.dgn Z 0 > iY -')'Iuyrfe'/ // / . �� \\ \\ \I rI J 1v //I1'Isy ) 1 / i✓ 111 11 1 in-, 1 )Y / . / 4 AV °� I I I IV i id` RECEIVED i j �� ty ' eVj�/ /// // f�%� lam/ ��/ �I III/I�/I r �� JAN0820215%�-;d� T / j- 4 / % Jm /' _.....-- / ' S 1 �% 100 STV Engineers, la. h900 West T ade SL, Suite 715 / I, / / // /� /� (J WILMINGTON REGULATORY // / CIuur:( �l�r✓/��//// �4J/ Number f f�/�// / 25_12_l_02W5 • r/%/ �/ % � j �ro . �f`—�//%t l//� (�/5� '%i1/'� :\1i / /fir/ /J h �' " ES-S2, 7f \'. / / /// l /��/lei ��� _tigo /� '/i // / / / I 1 1 / cn l / _r — if iii� / i %� �9 J r , / 1 d I / N SITE . ,. / ` _ _ __ _ mil\ / .n� / / / I 1I / / I 4' ST DARD BASE' DITCH % � �- .+ - / I �// /// % — — y FLATIRON / / 8 {AN STABILIZATION SEE WAIL 21 '\ -� �Jrr\/ // s / / p\\\1\\� / / J/ // // / / Arc/STABILIZATION jp�`,��1Pj �1► _/S� I �� �� DDE/ 60 !///f//2. � J (�J // // // ;;:;"--;5::1115:::"4\1;1 \ 22�` // / I / // /� / / /� i ''''EEEEST 7 'OfF.](T�+BANK STA91LT[d(TION / / / �'./�,` /�I �/////\ '�"'_ N\\"��(////��j/ F // ISSY IRIP RAP ATEMBANKMENT / �A /r /��-%i��Jr p'�� / / l�//// , \\\R/ // // // / `�'( II¢EEIDETAIL 27-12 1'b'T 76 TONS RAP �..�/'ll l���� ��ice .1I �/ �II //7 y:///// I aJ � /•%%/47WWFENCE // 1 '/( / //,,/ I Ii5p GEOTEXTILE,,,/�(TABI[J7JL'NOIf\ /� / �\ ��. EE yy // •/ S B RIP RAP __ / /// .� I TDEI EST 8 TONS / B�tIP _ ( (/ / / /r _ / // r/� ? / /'!i__ _ 21 SY GEOTEXTI / J JrNL� /� I I 1 �r / /I /// / / / // / \ \\ \ _ �/i F i 47e N!W FENCE PROPOSED (/ 1.6 �`is� II / ��_I ( // / / / ro ........ \�l / /�j LATERAL N' DITCH /���% �����'�'�, a �i P•'.�.. CLASSNI'LRIPRAP CHANGE% STA • \ \\Y; /1 / /�_ ( / / SEE DETAIL 21-1 �' i/_/, �q j'7 EST 137 TNS i D 1 . \1\\\ \ ) �f_ I ILi (it' 7/- �/// // /�//�// / /L / / — —� _la, /• �� �. ADE = 206 CY / //////�����— �!�,'�. :, 232 SY ��'•�'�'��� �•I' " ". A � . 1 \///f/////` '��� �.��,��F" 1 I (I I 1 z I / / / //� // _ —_�\ / �//�r"��".; ��' / / /®G� ����^��t 1 �� �� 4�� ►��!�M`n I l ► �' _ "aN -.-._—� �/Ja�r,,, / // ,'�;''''�';�^, qc..;'��5 �'•� �'►�,I''1\� \I11I���/�/// I I �/��/�NRtUR>-��� � `�(/O.°4(CNICINI-r)-1:!I ,� / / d/ ���♦����/s_�.��� z \\ i �I r IiIIiI / i / • / r �,, - \\In ~ �' / / ��►,. ►,►e� .� sir:46:00 7®�\YS\,... ////�--�E\t 7 saumermommr. jraittmzeintivavvoymt,twoltziimm a mow ....si m 0 ma akw_rlaIn_m ardramvaimmviimmear :1111141Plailitr 411111r°:"111111111.1111111111W117 411111116111111 4 OPidliMilifirroir AltlakaliF 11111 <tlintrtrilfillaff.ani r AllIOTt4til_p_ AIWA= , /14r. A . Yft.......,: M_____Aji:itfil%-gliFFINTAMI ...��E'���'.��;�:►—�it��IA �^���.A�, _,_,-�,�'°i'►��Is_y_fr��,--T�l�ippr �M�allir . b,�/<it��frinautirif���.�tom camordeArAriri���llt,���. /�!►1 �ItHlikiliript- IllememmealalliM� 2 4,410011W-- "il�ar..' iiirasvonows jeureAsinsymatuia ® '�����„������'t ��i��$��i`z'%�A tr wig/ _.,,,. ---_.1ffL � p �+ %�f spoill .rt.r.Nr ,,. @1�'�� �Pji��, 15-W/ELBO .. iiliiil...liiiiiliiil.....1 ,�•'../-^� " }ice//// �-`'r" r .uruou. _- af O� - `�IIf RC -0I` v,,,, /y :I, a'� ��� i' q� URNLT / NBD 4 r ///�/// �/ / // // // / �/ ,.�I\7g. P Z... '���►i'i� �REK�,/,�'���� ��lrtEOMON � =��,r� �-;__'/f /.//////////////// // / / � ���� _�5 H P'��^�'.A ��� O / /�� � ��s'�! - - /// I / @ a� i — — P� TO ELEV. 857.5' j®0����� / ,. / ��� TOEESTO T �E / — -// / //� ////// �� %>%� /� / a/ € // // //// / / 1/ F\\\_ R� � SEE DETL / //5'STANDARHE+I/�,�///////// // /� \ CLASS 'I'hY/`I�/' 'sueEST 11 T/ J 7 jSPC 2E \m-�\ J w \SY :EOTEXTIL-�/.�/,}`C /�J � ///J/�� � �/ � �5y��/8. R,PH/, � 'ae/ i- _�/7/////e'/I I ( ///// /// /�� .//I,- // / �/ // E 23 T1(� ._-\//.+-__(/a� % /j1 I r �/// / // ��%%', /'" �/ % /// �G '> I( \ — ( 1 I I I/�// / / / / , ( SSEE RQFILE JrOR DETgI\`'\ �_1I �I��.I I l / / // l / �/ / / //�I I//E D6fAIL,/11 9¢ I I \ \ ` f ----' /�/)// /////// ///ifs/ / / / I o _..--_ ____ 1/ I I ij 1 / il ii II /1 1 i ; C' ( \ /////// a / if! III III \ . HDR Engineering, Inc. of the Carolinas 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 N.C.B.E.L.S. License Number: F-0116 I'KOJLCI KtItKtINLt NU. U-2579D, E & F SHttl NU. 21 RAN SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED <*"1/,* III�IIIII lllll�l III�I \..\ ` ` FROM -L- STA. 285+20 TO STA. 285+65 LT \ FFF\\ DETAIL 21-2 \\\ \ STANDARD N' DITCH (Not to Scale) DETAIL 21-10 STANDARD BASE DITCH (Nolte Scab) Natural Group Grobtlile "When B is < 6.0' Natural Group Min. D- 3.0H. Max. d= 3.0Ft. B= 3.0F. Type of Liner= Class 'I' Rip -Rap DETAIL 21-11 STANDARD BASE DITCH ( Notlo Scale) Natural Group Geote,eile "When B is < 6.0' Min. D= 3.0F. Max. d= 3.0Ft. B= 5.0F. Type of Liner= Class 'I' Rip -Rap FROM -L- STA. 281+50 TO STA. 281+58 RT DETAIL 21-3 STANDARD BASE DITCH (Notre Scale) NONraI Natural �� ti. roan Min. D= 1.5F. 1.11.1 B= 4.0F. FROM -L- STA. 283+00 TO STA. 285+15 LT FROM -L- STA. 286+75 TO STA. 287+50 LT DETAIL 21-12 BANK STABILIZATION AT JURISDICTIONAL STREAM I Nolte Scale) NATURAL BED ELEVATION Gro rol Type of Liner- CL I Rip -Rap GEOTEXTILE FROM -L- STA. 285+00 LT DETAIL 21-5 RIP RAP AT EMBANKMENT ( Nolo Scale) 10'n,in. Ditch �' 1 Grade GEOTEXTILE lype of Liner- 16 IONS,CL 'B' Rip -Rap Geote.+'Ile= 31 sy FROM -L- STA. 286+65 TO STA. 286+75 LT LEGEND: fi// DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY IMPACTS IN SURFACE WATER PERMIT DRAWING SHEET OF RECEIVED JAN 08 2021 WILMINGTON REGULATORY Revised WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 11 173+80 -L- 48" RCP 0.04 615 11 A** 174+23 -L- RT 48" RCP 0.08 12 203+75 - 207+10 -L- RT ROADWAY FILL 0.02 < 0.01 410 10 12A 205+69 -L- RT FILL IN WETLAND 0.08 13 207+24 -L- 5x6 CULVERT 0.03 < 0.01 337 22 13A 209+14 -L- LT 4' BASE DITCH < 0.01 14 222+50 - 223+56 -L- RT 48" RCP 0.01 < 0.01 220 11 14A 222+65 -L- LT POND 3.06 15 242+86/244+20 -L- 5'x6' RCBC 0.05 < 0.01 520 15 15A 243+60/244+00 -L- 5'x6' RCBC 0.04 16 253+92/255+58 -L- 42" RCP AND DITCH 0.05 < 0.01 513 20 17 261+02/262+96 -L- 6'x6' RCBC 0.08 < 0.01 928 23 18 275+75/276+78 -L- 42" RCP 0.03 < 0.01 161 11 18A 277+00 RT -L- PIPE REMOVAL AND DITCH < 0.01 < 0.01 28 20 18A 277+00 RT -L- BANK STABILIZATION < 0.01 3 19 279+30/280+86 -L- 5'x7' RCBC 0.04 < 0.01 250 11 19 280+86/281+71 -L- 5' STANDARD BASE DITCH < 0.01 < 0.01 91 15 20 280+61/281+66 -L- REMOVE 2 - 72" CMP 0.02 < 0.01 35 31 20A 285+56/285+81 -L- BANK STABILIZATION/TEMP ACCESS PIPE < 0.01 0.01 16 64 20B 285+56/285+81 -L- BANK STABILIZATION < 0.01 < 0.01 20 21 21 285+19/285+65 -L- CHANNEL CHANGE < 0.01 133 21 285+19 -L- BANK STABILIZATION < 0.01 < 0.01 10 10 22 303+57/304+09 -L- 30" RCP/ 36" RCP < 0.01 < 0.01 97 7 TOTALS SHEET 2*: 0.20 < 0.01 3.47 0.04 4387 291 0 *Rounded totals are sum of actual impacts NOTES: **Wetland ES-W33 is total take -Site 24 is a Channel Relocation 2013 10 24 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 01/08/2021 FORSYTH U-2579D, E & F 34839.3.GV7 SHEET OF