HomeMy WebLinkAbout20060792 Ver 1_Complete File_20060616Staff Report
Project Num: 20060792
Name: NCDOT-Sr 1503
County: Cherokee
Location: Rail Cove branch Murphy
Latitude: +35°11'25"
SW Plan Location:
Owner: NC DOT Division 14 - Andrews
Contact Person: Tippett, Lyndo
Inspection Date: 06/13/2006
Reason for Inspection: Routine
On-Site Representative(s):
Primary Inspector: Michael R Parker
Secondary Inspector(s):
Phone: 828-296-4500
Question Areas:
0 Site Visit
Inspection Summary:
DOT is proposing to grade, widen and pave NCSR 1503 (Rail Cove Road) in Cherokee County. One existing culvert will be extended
from 21 linear feet to 60 linear feet. Total impacts are 45 linear feet with 39 feet of culvert and 4 linear feet of stream loss.
It is recommended that WO Certification Nos. 3404 and 3366 be issued.
The 401 Certification was issued on June 16, 2006.
Version: 1 Status: Issued
Project Type: Pave road
Region: Asheville
Longitude: -83°29'06"
Title:
Phone:
Entry Time; 11:20 AM Exit Time: 11:37 AM
Inspection Type: Staff Report
Page: 1
Project Num: 20060792 Owner: NC DOT Division 14 - Andrews
Inspection Date: 06/13/2006 Inspection Type: Staff Report Reason for Visit: Routine
Site Visit Yes No NA NE
Do impacts described in the application differ those seen in the field? ? M ? ?
If yes, please describe differences:
Are the Intermittent/Perennial calls different in the application? ? M ? ?
If yes, please describe differences, and how mitigation ratios are affected:
Are there additional impacts not described in the application? ? E ? ?
If yes, please describe and quantify:
Were the impacts in place prior to the application for the 401 Certification? ? 0 ? ?
Additional conditions recommended for the Certification:
Recommended project modifications:
Is this a modification request to an existing Certification? ? ¦ ? ?
Are there additional stromwater conditions that should be required due to the following classifications: ? 0 ? ?
# 303(d)list, Class WS, NSW, ORW, HQW
Describe:
Is this a subdivision or otherwise part of a larger project? ? ? ¦ ?
# If yes, what phase is this?
Are there prior impacts from prior phases? ? ? ¦ ?
If yes, what are the cumulative imacts for this project?
Possible secondary impacts noted:
Comment:
Page: 2
DFWArF,?
O? QG
O 'C
Michael F. Easley, Governor
#1 % ?R ? [ ),,7/ -,
`'UN
'972 0
?'FT?Npsq ?Nre OU 44
Ob'
Mw4 RB
R'9NCy
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
June 16, 2006
Cherokee County
DWQ Project No. 060792
NCSR 1503 (Rail Cove Road)
APPROVAL of 401 Water Quality Certification with Additional Conditions
Mr. J. B. Setzer, P.E.
Division Engineer
N C Department of Transportation
253 Webster Road
Sylva, North Carolina 28779
Dear Mr. Setzer:
You have our approval, in accordance with the attached conditions and those listed below, to impact 45 linear feet in an
unnamed tributary to Rail Cove Branch at Station 11+85 (39 linear feet of new pipe, 6 linear feet of stream loss and
temporary dewatering), in order to make improvements to NCSR 1503 (Rail Cove Road) in Cherokee County. The
project should be constructed in accordance with your application dated May 3, 2006 (received May 12, 2006), including
the environmental commitments made in the application letter. After reviewing your application, we have decided that
this fill is covered by General Water Quality Certification Nos. 3404 and 3366, corresponding to'the U.S. Army Corps of
Engineers Nationwide Permit Numbers 14 and 33. In addition, you must acquire any other federal, state or local permits
before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and
Water Supply Watershed regulations. This Water Quality Certification will expire with the accompanying 404 Permit
issued by the US Army Corps of Engineers.
This approval is valid solely for the purpose and design described in your application (unless modified below). Should
your project change, you must notify the DWQ in writing and submit a new application. If the property is sold, the new
owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the
conditions. If total wetland fills for this project (now or in the future) exceed one acre, or if total impacts to streams (now
or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506
(h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any
additional conditions listed below.
Erosion and sediment control practices must be in full compliance with all specifications governing the proper design,
installation and operation and maintenance of such Best Management Practices in order to protect surface waters
standards:
a. The erosion and sediment control measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control
Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be
such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina
Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow
sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the
project.
No ehCarolina
1atura!!y
North Carolina Division of Water Quality 2090 U.S. Highway 70 Swannanoa, NC 28778 Phone (828) 296-4500 Customer Service
Internet: www.ncwaterquality.org FAX (828) 299-7043 1-877-623-6748
An Equal Opportunity/Affirmative Action Employer
Mr. J. B. Setzer, P.E.
June 16, 2006
Page Two
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual.
d. The reclamation measures and implementation must comply with the reclamation in accordance with the
requirements of the Sedimentation Pollution Control Act.
2. There shall be no excavation from or waste disposal into, jurisdictional wetlands or waters associated with this permit
without appropriate modification. Should waste or borrow sites be located in wetlands or streams, compensatory
mitigation will be required since that is a direct impact from road construction activities.
3. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this
Certification. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall
be removed and the natural grade restored upon completion of the project.
4. Placement of culverts and other structures in waters, streams and wetlands, shall be placed below the elevation of the
streambed by one foot for all culverts with a diameter greater than 48-inches, and 20 percent of the culvert diameter
for culverts having a diameter less than 48-inches, to allow low flow passage of water and aquatic life. Design and
placement of culverts and other structures including temporary erosion control measures shall not be conducted in a
manner that may result in dis-equilibrium of wetlands, streambeds or banks, adjacent to, or upstream and down stream
of the above structures. The applicant is required to provide evidence that equilibrium is being maintained, if
requested in writing by DWQ. If this condition is unable to be met due to bedrock or other limiting features
encountered during construction, please contact the NC DWQ for guidance on how to proceed and to determine
whether or not a permit modification will be required.
5. Adequate sedimentation and erosion control measures must be installed and maintained on the project site to
minimize sediment transport to downstream aquatic resources. Temporary cover (wheat, millet or similar annual
grain) or permanent herbaceous cover should be planted on all bare soil within fifteen (15) days of ground disturbing
activities to provide long-term erosion control. Erosion control mating should be used in conjunction with appropriate
seeding on disturbed soils in steep slope and riparian areas. Matting should be secured in place with staples or
wherever possible, live stakes of native trees. Straw mulch and tall fescue should not be used in riparian areas.
6. The dimension, pattern and profile of the stream, above and below the crossing, should not be modified. Disturbed
floodplains and streams should be restored to natural geomorphic conditions.
7. All stormwater runoff shall be directed as sheet flow through stream buffers at nonerosive velocities, unless otherwise
approved by this certification.
8. Native riparian vegetation (e.g. rhododendron, dog hobble, willows, alders, sycamores, dogwoods, black walnut and
red maple) must be reestablished within the construction limits of the project by the end of the growing season
following completion of construction.
9. Any riprap placed for bank stabilization should be limited to the streambank below the high water mark, and
vegetation should be used for stabilization above the high water elevation. Riprap should not be place in the active
thalweg channel or placed in the streambed in such a manner that precludes aquatic life passage. Bioengineering
boulders or structures should be properly designed, sized and installed.
10. Heavy equipment should be operated from the banks rather than in the stream channels in order to minimize
sedimentation and reduce the introduction of other pollutants into the stream.
11. All mechanized equipment operated near surface waters must be regularly inspected daily and maintained to prevent
contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials.
12. Rock check dams at culvert outlets should be removed at project completion to avoid impeding aquatic life movement.
13. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the
most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms,
cofferdams and other diversion structures should be used to prevent excavation in flowing water.
14. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is
prohibited.
15. If concrete is used during construction (e.g., headwalls), a dry work area should be maintained to prevent direct
contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete should not be
discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills.
16. No rock, sand or other materials shall be dredged from the stream channel, except where authorized by this
certification.
A,
Mr. J. B. Setzer, P.E.
June 16, 2006
Page Three
17. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality
standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other
appropriate requirements of State or Federal law. If DWQ determines that such standards or laws are not being met
(including failure to sustain a designated achieved use) or that State of Federal law if being violated, or that further
conditions are necessary to assure compliance, DWQ may reevaluate and modify this certification.
18. This certification does not authorize the discharge of waste rock and dirt into the stream or riparian zone except for
permitted areas associated with the culvert installation.
19. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or
protected riparian buffers.
20. Upon completion of the project, the NCDOT Division Engineer, shall complete and return the enclosed "Certificate of
Completion Form" to notify NCDWQ when all work included in the §401 Certification has been completed. This
form shall be returned to the Transportation Permitting Unit of the NC Division of Water Quality, 2321 Crabtree
Blvd., Suite 250, Raleigh, North Carolina 27604.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act
within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to
Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center,
Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have
any questions, please telephone Mr. Mike Parker of the Asheville Regional Office at 828.296.4500.
Sincerely,
Alan W. Klimek, P.E., Director
Division of Water Quality
Attachment
cc: Mark Davis, Division 14, DEO
Ed Ingle, Roadside Environmental
Steve Lund, USACE Asheville Field Office
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
O Rt
Mqy
4W
1P?
006
?f OS???SjORM??gC/Iy,
STATE O NOR 111 CAIM1,INA Wq?ReRVICH
I)1,.I'ARI MI:N I ( 'I RANSIX )RTA 1'1()N
MICI IA1;1, F. HASLEY LYNDO TIPPI
? GOVERNOR
SHCRI`TARY
Mr. Steve Lund, NC'DO'I• Itegulalory I'rujccl Mainager
O6 O 9
U.S. Army Corps of Fngincers
151 Patton Avenue, Room 205 ANO
Asheville, NC 28801-2714
Subject: Nationwide H 11cnnit Applicaliun
SR 1503 - Rail Cove Road, Chcrokcc County
State Project No. 14C.020031 (1)WO Minor Permit Fcc `E:200)
Dear Mr. I;end:
The North Carolina Department ol''l ranspoitatiun (N('I )O I) is proposing to widen, grade and pave SR
1503, Rail Cove Road, in Cherokee Courtly. This proposal entails widening and paving the existing
gravel road to a standard 18-foot roadway. I he proposed improvcnients ol'Rail Cove Road have been
identified as necessary for mallttenancc and safety. Funds have hcell allocated for this project, and
NCDOT would like to pcrlornt Ihcsc aclivilics;is soon as permits are ohtainccl.
I am sending a straight-line diagram with construction limits along this project. In addition, 1 ant sending-'t.
a typical section ofthc road, cross section drawing for pipe culvert rcplacentent as well as a marked
county map and USGS quad ntap. We propose to install the new culvert slightly hclow the existing
streambed elevations where bedrock is not encountered to minimize impacts to wildlife habitats and allow
the existing stream gradients to remain as unchanged as is physically possible. Also, elimination of 45
feet of stream is necessary to ohtain desll'ed typic;il of roa(Iway.
The North Carolina Natural I leritagc I )atahasc was checked fur records ol'Iedcrally threatened and
endangered species. There are no records of threatened m endangered species for the unnamed tributary.
Additionally, there are no records for Rail Cove Branch or for Ingram Branch downstream to Worm
Creek. "There is a record for the Bog Turtlc ((;lty,Ie'mrl's nncltlcnhc ljf ii) I'ront the adjacent .lunaluska Creek
watershed to the south; IIOWCVCr, thou are no wetlands that will he impacted by this project. The
unnamed tributary is small and is nut ol'sulliciew sire to provide habitat for lisp or nntssels. The impacts
from a single pipe replacement will be very ntininlal. For these reasons, this project will have "no effect"
on threatened and endangered species.
Impacts to historic or cultural resourecs are not anticipated. 11,111C State I listoric Preservation Office
(S11110) and the Office of'Statc Archaeology docrntincs that Iurther investigations are required, NCDOT
ri
r
will conduct the appropriate site investigations and obtain compliance from SFIPO prior to project
construction.
The best management practices will be used to minimize and control sedimentation and erosion on this project. The
construction foreman will review all erosion control measures daily to ensure sedimentation and erosion is being
effectively controlled. If the planned devices are not functioning as intended, they will be immediately replaced
with better devices. The erosion control devices will be in place prior to pipe culvert construction and will remain in
place until the project is stabilized.
'r-
Impacts to Waters of the United States
The unnamed tributary is not shown on the USGS topographic map. However, the stream appears to have perennial
flow. The channel is composed of sand and gravel and lacks vegetation. For these reasons, we believe this stream is
under the jurisdiction of the U.S. Army Corps of Engineers. In order to complete the above-mentioned
improvements along Rail Cove Road, it will be necessary to impact waters of the United States in the Hiwassee
River Basin. Specifically, NCDOT is requesting to replace one metal culvert in an unnamed tributary to Rail Cove
Branch (DWQ Class: C) and eliminate 45 acct of stream. Listed below is a summary of the proposed impact.
Site Station Existing Condition Proposed Condition Net Impacts
Site # 1 45' of Crock Eliminate 45' of stream 45'
Site #1 11+85 21' x 24" CMP 60'x 30" CMP 0
Total Impacts: 45 feet
Permits Requested
NCDOT is hereby requesting authorization under Section 404 of the Clean Water Act to proceed with the
construction project outlined above. By copy of this letter, I am asking Mr. David McHenry, North Carolina
Wildlife Resources Commission (NCWRC) Western Mountain Region Coordinator, to comment directly to you
concerning the 404 Nationwide Permit Request.
Also, by copy of this letter, I am requesting authorization to proceed under Section 401 of the Clean Water Act from
the North Carolina Department of Environment and Natural Resources (DENR), Division of Water Quality (DWQ).
In addition, I am asking Mr. Met-lenry and Mr. Ed Ingle, Roadside Environmental Field Operations Engineer
(NCDOT), to comment directly to me concerning this permit request.
If you have any questions or need additional information, please contact me at (828) 321-4105. Your early review
and consideration will be greatly appreciated.
Sincerely,
Michael A. Jone
County Maintenance Engineer
Copy: Mr. John Hennessy, DWQ, DFIINR ( 7 copies)
Mr. David McHenry, Western Mountain Coordinator, NCWRC
Mr. W.T. Grindstaff, District Maintenance Engineer, NCDOT
Mr. Mark Davis, Division Fnvironmental Officer, NCDOT
Mr. Mike Parker NCDOT Coordinator, DWQ, DEI INR
Mr. E. L. Ingle, Roadside Environmental Field Operations Engineer, NCDOT
Mr. J.B. Setzer, PE, Division Engineer, NCDOT
i
w
.:R
Office Use Only: Form Version May 2002
20 0 60 7 92
USACE Action ID No. DWQ No.
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
1. Processing
Check all of the approval(s) requested for this project:
® Section 404 Permit ? Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
® 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: N WP-14
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts (verify availability with NCEEP prior to submittal of PCN),
complete section VIII and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
II. Applicant Information
Owner/Applicant Information
Name: North Carolina Department of Transportation (NCDOT)
Mailing Address: PO Boy 1551
Andrews. NC 28901
Telephone Number: 828.321.4105 Fax Number: 828.321.3228
E-mail Address: :_miones?.dot.state. nc.us
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: Michael A. Jones
Company Affiliation: County Maintenance Engineer
Mailing Address: (same as above)
Telephone Number: Fax Number:
E-mail Address:
Page 1 of 8
III. Project Information
Attach "a vicinity `map "clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ, prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Rail Cove Road- SR 1503
2. T.I.P. Project Number or State Project Number (NCDOT Only): 14C.020071
3. Property Identification Number (Tax PIN): N/A
4. Location
County: Cherokee Nearest Town: Murphy
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc. From Andrews proceed East on SR
1505 for 1.6 miles. Turn left onto SR 1502 and proceed for 80 miles to SR 1503/Proiect on
m6t.
5. Site coordinates, if available (UTM or Lat/Long): 35.1902 N 83.4850 W
Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres): < 1 ac
7. Nearest body of water (stream/river/sound/ocean/lake): Rail Cove Branch. Class C
8. River Basin: Hiwassee
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Wooded. residential
Page 2 of 8
10. Describe the overall project in detail, including the type of equipment to be used:
Erosion control, drainauc, clearing and grubbing, stabilization, base, pave and stripe.
Utilize backhoe, trackhoe, dozer, dump trucks and crew cab.
11. Explain the purpose of the proposed work: Construct road to current NCDOT secondary!
road standards
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USAGE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of' previously issued pennits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). II'this is a NCDOT project,
list and describe pen-nits issued for prior segments of the same T.i.P. project, along with
construction schedules.
V. Future Project Plans
Are any future permit requests anticipated for this project'? 11'so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application. -V„
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open `water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate shect_
Page 3 of g
1. Provide a written description of the proposed impacts: N/A
2. Individually list wetland impacts below: N/A
Wetland Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres) Located within
100-year Floodplain**
(yes/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
N/A
rn• ,., -hnni7M dearinu_ grading. fill,
* List each impact separately and identify temporary impacts. impacts inciuuc, out we not 1-=- ??• -- _______a, o
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency •s (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at http: www.fema._ov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property: N/A
Total area of wetland impact proposed: N/A
3. Individually list all intermittent and perennial stream impacts below:
f
h
Wid Perennial or
Stream Impact
Site Number
(indicate on ma) Tvpe of Impact* Length of 1
Impact
(linear feet) Stream Name** o
t
Average
Stream Before
act
I7 Intermittent? 1
(please secifv)
Site I Culvert replaced 0 UT to Rail Cove Branch -2 Perennial
Site I Stream
elimination 45 UT to Rail Cove Branch Perennial
-t mi associated rin-ran_
* List each impact separately and identify temporary impacts. impacts include, oui ULU J,UL uu.,u.u ----
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names cal} be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.uses.gov. Several internet sites also allow direct download and printing of USGS maps (e.g., wwAv.topozone. corn
www.mapguest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 45 feet
Page 4 of 8
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below: N/A
Open Water Impact
Site Number
(indicate on ma)
Type of Impact* Area of
Impact
(acres)
)
Name Waterbody
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.)
N/A
List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
5. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): N/A
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.): N/A
Size of watershed draining to pond: N/A Expected pond surface area: N/A
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. 4f applicable, discuss construction
techniques to be followed during construction to reduce impacts.
Erosion and siltation control measures and BMP's will be used during construction to avoid
environmental impacts.
VIII. Mitigation
DWQ - Iii accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
Page 5 of 8
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete.
An applicant may also choose to review the current guidelines for stream restoration in DWQ's
Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/ncwetlands/strmgide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
N/A
2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement
Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at
(919) 715-0476 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCEEP, check the NCEEP website at http://w,N-w.nceep.net. If use of the NCEEP is
proposed, please check the appropriate box on page three and provide the following
information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet): N/A
Aipount of Riparian wetland mitigation requested (acres): N/A
Amount of Non-riparian wetland mitigation requested (acres): N/A
Amount of Coastal wetland mitigation requested (acres): N/A
Page 6 of 8
IX. Environmental Documentation (required by DWQ)
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes ® No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify N/A )?
Yes ? No ? If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers. -
Zone* Impact
(square feet Multiplier Required
Mitigation
1 3
2 1.5
Total
Gone 1 extends out 30 teet perpendicular trom near bank of channel; Lone 2 extends an
additional 20 feet from the edge of Zone 1.
Page 7 of 8
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
N/A
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
The existing compacted gravel roadway acts as an impervious surface Paving of the roadwav
should eliminate sedimentation from fines associated with ?_),ravel surface treatment. Stormwater
will be diverted through settling basins or grass lined buffers prior to entering streams
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
N!A
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (I 5A NCAC 2H .0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application?
Yes ? No
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
N/A
?y
Michael Jones Ma 3.2006
Applicant/Agent' ignature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 8 of 8
c? I
D,
4 ? p Ta
oa z
mod.
I?? ^ T
II \/ 1
D z
m?
rt' r Z 7- n
Lij
W Q
W _ tau-.., C, 0 ` c?
O Z Z W
O Z o o °
Ln
s o
c
g°
z
w W
M
U °
d1-X)71'L-V
?SG?
L
REVISED STRAIGHF-LINE . SHEET STR.50-5
ROAD NAME: RAIL COVE RD.
WORK ORDER NO.
C?YE R O KBE
6.9121 16
FROM STA. 0+00 CL OF SR-1502
TO: STA. 43+68 E.O.P.
ROAD NO. SR-1503
ADDITION: YES NO x
IMPROVEMENT: YES x NO
TO BE PAVED: YES x NO
G ?ff'LVIRES 5
POWER POLES TO iWOVE. YES x NO
r-nPr w RnYPcz I r:rty IvrnPC?
TF'r .Pr-rnNr' Pnr 1 C Tn nrnf/1
RIGHT OF WAY:
RIGHT OF WA Y:
SCALE:
DATE:
I" = 50'
C1 L
1 1/2: 1 slope
orflatter -------- 91
6'
SHLD.
------------------------------
YES F10 X
x '50,
45'
60'
REVISED
CJAN.28 2002
I
i ?
1:1 slope
I or flatter
9' 4
i SHLD.
DITCH '
I
PIPS
PROJECT NO.
STATION SR-1503
SIZE FLOW ROAD NAME:RAIL COVE RD.
LT. RT. REMARKS
0+30 EXIST. 18" REPLACE WITH NEW 18" CMP. RT. TO L
5+00 NO PIPE ADD 18" CMP. RT. TO LT.
15
6 15"
EXIST REPI.ACEi-.WITII NEW 18" CMP.RT.-LT.
+
11+85 ,
EXIST. 24" REPLACE WITH 36" CMP. RT. -LT.
15+75 EXIST. 18" REPLACE WITH 18" CMP. LT.-RT.
18+50 NO PIPE op ADD 18" CMP. LT. TO RT.
+
'NO PIPE bb,
ADD 18"
CMP.
I.T.
TO RT.
24+00 EXIST. 18" pp, REPLACE WITH 18" CMP. LT. -RT.
28+50 EXIST. 24 REPLACE WITH 36" CMP. LT. -RT.
30+05 EXIST. 26" REPLACE WITH 36" CMP. RT. -LT.
32+35 EXIST. 1 8" pp, REPLACE WITH 24" CMP. LT. - RT.
T.
PROJECT: SR- 1503
CHEROKEE CO.
GOIJ*
NITY,
WORK.ORDER NO.
ISIIEE'P N0. 1 of 1
?- OWNER OF POLES '
NP & L
DIST. FROM DIST FROM DIST. TO
-:. CL OF. CL OF CL OF PROJ.
POLE PRESENT RD. PROJECT AFTE MOVE
STATION... . N 0, RT. LT. RT. LT. RT. LT.
0+60 16' 16'
'4`-' 2-GW
H
8+-40 16' 12' 30'
1-GW
MOVE POLE 30' RT. OF NEW CL
24+44 21' 16' 30 MOVE POLE 30' LT. OF NEW CL
2-GW 65
36+-35 11 18' 20' 30' MOVE POLE 30' RT. OF NEW CL
51o' (4)
i' L
LILLIE MAE COINS I
149 RAIL COVE ROAD i -I-
ANDREWS, NC 28901 I
S.R. TYPES
(3) T. S. F. 8X3X2
& i I \
R.B. j
/100
. -r- I
®- CHECK DAMS
3,75 I AS REQ.
I ?
i
' I
N
ag
a
%I
( S.B. TYPE B
1,00 I_-,- 1 3X3X2
BRUCE BATTLE III & GARY 'i'UOMI'SON I MYLON & KATiiLEEN BALL
7 FERN AVE. 1 70 RAIL COVE ROAD
EAST ISLIP, NY 11730 1 ®, ANDREWS, NC 28901
2 (2)
510
CHECK DAMS
I AS RFO_ .
1•N 1 7 C0
j - I
S . R . TYPE B
I
TEMP. SILT FENCE I 13X3X2 L
& I _
ROCK BERM
i co _ I_ i co CHECK DAMS AS REQ.
Iy
? i
I
?
I j
0-50 o-so
I SILT BASIN-TYPEB
I ® --? 9X3X2
7?;I','j l REPLACE W/ 18" CMP
V
R I IV
1 v
Ot00 0+00
a 7mpU-L
I T.S.F. & R.B.I
JANE CARVER CASTEVENS
2 JUNALUSKA ROAD
ANDREWS, NC 28901
(5)
c'
O
(3)
n.S
?
?2 I IV
p,? I 9LU
I
I
I
9 00
S . R . TYPE $
I 13X3X2
i
I
8.50 I 8'50
_
_
i
? U
? -- CHECK DAMS AS REQ.
I /
I
(3M10
8-0) e'00
I
I
?
I S.R. TYPE RI
13X3X2
® 7•.a HILL & JANE CARVER
I t,. 2 .IUNALUSKA ROAD
RIIV ANDREWS, NC 28901
I (4)
I .
7 CIO I 7 C.Ij
I
I
I
i rS.B. TYPE B
I _ { 13X3X2
. In
? REPLACE W/ 18" CMP
- - - -
T
e,W a•oo
-
I
- CHECK DAMS kS REQ.
I
I ? S.B. TYPE B
1 1 X3X2
510
\ \ -RIw
$}? ? - II8"- 00 •ADD 18" CMP
t
v
510'
alw ,
S.B.TYPE B
9X3X2 ?-_--_11,50 ® _ I_ ,,.;o
SHIRLEY &.ZELL MILLER
I PO BOX 860
0 I YOUNG HARRIS, GA. 30582
11.00
CHECK DAMS AS REQ.
17-50
S. B. TYPE B
13X3X2
(5)
__ j U - 00
17. 5,)
ROCK SEDIMENT DAM
0
TYPE B 9X3X2
I; -RJ
' I I-
SEE SITE NO.1 I
II -'0
11.00
LT S.F.& R.B.
1050
10100
I
I (6)
1/-00
T.S.F. & R.B.
I
1
I 13+45
0
I
I
[LJ I-_ IJ-CIO
NOTE: FRAME CAR SHED TO
llE MOVED OFF R/W
FROM STA. 12+79
to 12+94
I
_ 17.50
510
- lzlty
T.S.F.& R.9.
I I 1 C`0
s?t
I- ? uT? REPLACE FI/ 36" CMP
I (4)
I-
CHECK DAMS AS REQ.
I ?
I
S. B. TYPE B
"'O0 9X3X2
I
I
S.R.TYPE B•
10060 9X3X2
(
i -
RIIIV NOTE: REMOVE PORCH FRO
R/W OF ABANDONED
Z O O FRAME HOUSE FROM
STA. 9+85 to 10+
TEMP. LINER R v
Q W/CHECK DAMS 1c I , ?,
o - -
I
T.S.F.& R.i
ID•00 I_ IC,?
I
I
S.B. TYPE B
1 3X3X2
ADD 18" CMP ??"° - - -
i
I
-- -- le,w _ I_ a w
CHECK DAMS AS RRO.- I
i
USJ _ I IJ'J
(L`5) slc? (U)
Rlty
I
S.B. TYPE B I T.S.F.& R.B.
13X3X2
IJPO ® I _ IJIU
I
I
0
I
/ I
16 50 I 1a-50
HECK DAMS AS REQ
.V
S . B . TYPE R Id-00 - I- 1a-00
9X3X2
REPLACE W/#18" CMP --< <`
I5r50 - I_ 15'50
' I
S 10.
,
R I W
1s+40 40 v .1 1s+-Oo
ul
25' _26'
REDUCE R/W TO 18' 510FROM STA. 24+00 1? 'IV i REDUCE R/W TO 18'
TO STA. 25+50 30' FROM STA. 24+00
FOR CAR GARAGE I TO STA. 25+00
?„so 211'_ .,2.3-.-5 '
C? ( FOR WELL
I
I .
I '
1
1;,? - - -1- - - ?` REPLACE W/ 18" CMP
I
23 :A 1J "
I
i
I
I
-CIO
I -CIO
?Y
I
I
I
CHRIS {;EST
688 RAIL COVE RD.
ANDREWS, tic 28901 510
R I t.
(7) I
I
I
I
I
I
71 ' I-
lf :J WORLEY & REBECCA SCOGIN
560 RAIL COVE ROAD
I ANDREWS, NC 28901
I
I (8)
o0 1 8r , ut ?1
_ _ ? _ ?D ADD 18" CMP
I
/ END OF PROJECT STI\.20 lblsn I // END OP PROJECT STA.20+50 OP PROJECT ST 20 I_
TEMP. LINER I
W/CH DAMS 510• T.S.F.& R.R.
?Iw.. (6)
- 2000 ? _ I_ 20f-00
??-jl ? ?:- .y_ , ? '? I ? ? - h,;? , .,--? '`•!• '• ;' r r ? ? _?? {? r ! I 1 ? ''.?` ! 1 ` l ??v'? Lr?f`?5 '•
. r...i' lF?l?_ , .111 ? th 14.?.ti? y t,?'ti? :'? •' '•ti. ? ?. II ? ? r'?' ? ?,'?? y It'tl ? ?h\_-•? ? 'ti l ? ?-?7?f; r.
1 Y'?f{ ? ? .ftSl -???,,,? ?? ?' ??•,, ? ?• ,-, ? • ? ??,'~`I ? ? ?? i t?:? .?`! +y i ? r>? `1 ?1' ?l'? ?•f'?.
Yom,,
L R v_ i t Y
FA f_ gyn.'- -f'? - }
§sl
L '
1'0 f
R'K
'•"? 'i1 -F l - 4-, it ?? ??--? t
,? - i.--
- Site Sta. - ' _
y f ?t
- It
_ :"?,?=??? ^ ? , r ' •' - / rte' `' _.?.?? .h ?? , 5. '? ? ? i ,-1, ; ?r _T?7ra .
X I _ Fes-.. 1? Y f ?r Ff 1i 1 _ _
5 „•-:'
MIS-
s s ?'' _??? +.? •,.-?` i 4?r? ?r ?? ? ' '1 -6 , } ?'•?ti4,.. ?1„ j ,'°L ^??1?'? ?? ?y 1...?`'t ?? 1 ??. I { ? ? ?
I ?-1?."?'-^-rte I ? ? ? f 1 ?. ? ,'•ti?,,?ti. i,/ ? t? I+ ti ??' ?.? ?f??°
Name: ANDREWS Location: 035' 11' 23.74" N 083'47'16.5111 W
Date: 5/2/2006 Caption: Rail Cove Road, SR 1503
Scale: 1 inch equals 870 feet Cherokee Co.
Inc.
SR. 110. 1503
cu,. M>s _ 'KH1L t Vvn bJ 4 / Ly K_
PIPE STA'. 1 1 +8S
SITE 11o . 1
OLn CL OLD F ?
NEW CL
TEMP. SILT F-NCE & R.R.
0 E-1 CHECK DAMS SPACED
1< o AS REQUIRED
NEW CL
TEMP. ROCK SEDIMENT DAMS /2' BRANCH
PROP. PIPE
X//1 60'X 30" CMP.
-, /
- cam- r` E D
?- 4
EXIST.
CHECK DAMS SPACED v 21'X 24" CMP.
AS REQUIRED
CHECK DAMS SPACED AS
REQUIRED
SILT BASIN TYPE B
8'X 3'X 2'
® NOTE: REPLACE W/ 601 X 30"CMP
I I I I I I I I I I I I I I ? ?? 1 1 1 1 I I I I I I I I I I I I I I I I I I 1 1 1 1 1 1
I I FI I 1 l l ' I I I I I I I I 1 1 1 1 1 1 1 1 1 1 1 1 1 I l t I I I I I 1 I I
1 I'Ll I I I 1 1 1 1 1 1 1 1 I I I I I I I I I I I I I I
I I I I I I I r'r 1, T ,
I
I
I
I I I I 1 1 1 1 1 1
I
I I
I I I I I I I I I I I I I I I
I I I it I 1 11 11 ,1 1 1 1 11 '1 1 1
I
11111
'
I
1 11111 I I II
I I I I I I I I I I I
I - -{ 1
I I I I I
I I I
_
I I I '
T
1
I
- I I
I I ?
I t I i
I
I I
4 -1 14
_ T
I _t H t
L
I: + FL
I
I II
1
I I I I I fr o., 3f .
I
I I
I I I I I
I I I I I I I I i
I I I I
I
I I I L L
I I I I I I
I I' I 4 T
I I
I I I
F
I
g
( I I I I I I I I I I 1 1 I I 1 l
I I I I I I I I I I I I
11 1 1? i? I I i i I 1 1 1 1 1 1 1 1 ?? i i I ? ? ? 1 1 1 1 1 1 1 1 I I 1 1 1 1 1 1?'
M ?
O
O
O ?
N +j
O