Loading...
HomeMy WebLinkAbout19980260 Ver 6__External_ RE_ U-2579DEF - Permit Site 20 (Mill Creek)_Corps2_20210108 Wanucha, Dave From:Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil> Sent:Friday, January 8, 2021 3:57 PM To:Euliss, Amy; Wanucha, Dave Cc:Miller, Vickie M (Vickie.Miller@hdrinc.com); Kiser, Marcus K; Wyrick, Scott D; McLaughlin, Zachery R Subject:\[External\] RE: U-2579DEF - Permit Site 20 (Mill Creek)_Corps2 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Amy: It will be my first priority on Monday AM, and I will do my best to get it signed as soon as I can after that. Any discharge into the stream cannot be done until it is permitted. Hopefully, the timing will work out. Please reply or call if you have any questions or if I may serve you in any other way. The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. Eric Eric Alsmeyer Work Cell: 919.817.1570 Project Manager Regulatory Division Office US Army Corps of Engineers, Wilmington District 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 Office Tel: (919) 554-4884, x23 (I am working out of the office, but I try to check my voicemails daily) Regulatory Homepage: http://www.saw.usace.army.mil/Missions/RegulatoryPermitProgram.aspx From: Euliss, Amy <aeuliss@ncdot.gov> Sent: Friday, January 8, 2021 3:46 PM To: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil> Cc: Miller, Vickie M (Vickie.Miller@hdrinc.com) <Vickie.Miller@hdrinc.com>; Kiser, Marcus K <mkkiser@ncdot.gov>; Wyrick, Scott D <sdwyrick@ncdot.gov>; McLaughlin, Zachery R <zrmclaughlin@ncdot.gov> Subject: \[Non-DoD Source\] RE: \[External\] RE: U-2579DEF - Permit Site 20 (Mill Creek); DA# 2017-02112. Thanks Dave! Eric, HDR calculated the acreage, and revised the sheets. They are in the attached email. If its possible for you to proceed with the modification for only DEF, that would be greatly appreciated. The contractor is hoping to start next week. Is it possible for them to proceed while we are sorting out the permitting, or can you get it to us early next week? I know that is a big ask, but anything you could do would be greatly appreciated! 1 Amy From: Wanucha, Dave <dave.wanucha@ncdenr.gov> Sent: Friday, January 8, 2021 2:57 PM To: Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil>; Euliss, Amy <aeuliss@ncdot.gov> Cc: Miller, Vickie M (Vickie.Miller@hdrinc.com) <Vickie.Miller@hdrinc.com>; Kiser, Marcus K <mkkiser@ncdot.gov>; Wyrick, Scott D <sdwyrick@ncdot.gov>; McLaughlin, Zachery R <zrmclaughlin@ncdot.gov> Subject: RE: \[External\] RE: U-2579DEF - Permit Site 20 (Mill Creek); DA# 2017-02112. Amy, My previous email allowing the changes as described still stands. If you need anything more, let me know. Thanks. Dave W. Division of Water Resources 401 & Buffer Transportation Permitting NC Department of Environmental Quality 336-776-9703 office 336-403-5655 mobile Dave.Wanucha@ncdenr.gov NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27106 Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil> Sent: Friday, January 8, 2021 10:58 AM To: Euliss, Amy <aeuliss@ncdot.gov>; Wanucha, Dave <dave.wanucha@ncdenr.gov> Cc: Miller, Vickie M (Vickie.Miller@hdrinc.com) <Vickie.Miller@hdrinc.com>; Kiser, Marcus K <mkkiser@ncdot.gov>; Wyrick, Scott D <sdwyrick@ncdot.gov>; McLaughlin, Zachery R <zrmclaughlin@ncdot.gov> Subject: \[External\] RE: U-2579DEF - Permit Site 20 (Mill Creek); DA# 2017-02112. CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Amy: Unfortunately, I cannot authorize this without a mod, particularly since it is for a different purpose than the other temp impacts. However, I can modify it fairly easily, and maybe quickly, if you will provide me with the square footage of temporary impact from the 65’ of impacts. Dave: let us know if this changes your response. 2 There are options for how to deal with the WQC. If Dave can confirm that no formal WQC change is needed (in-field mod?), then I can go ahead with a mod for site 20. I would prefer to combine this mod and the U-2579AB mod (since they are under the same IP and DA#), if the U-2579AB mod WQC will be done soon. This would especially work well if Dave does need a formal WQC mod for Site 20, and the U-2789AB mod; and a combined mod, or 2 separate mods, would be done soon. I don’t want to make it more complicated than it has to be. If you have any questions, please give me a call. Thanks! Please reply or call if you have any questions or if I may serve you in any other way. The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. Eric Eric Alsmeyer Work Cell: 919.817.1570 Project Manager Regulatory Division Office US Army Corps of Engineers, Wilmington District 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 Office Tel: (919) 554-4884, x23 (I am working out of the office, but I try to check my voicemails daily) Regulatory Homepage: http://www.saw.usace.army.mil/Missions/RegulatoryPermitProgram.aspx From: Euliss, Amy <aeuliss@ncdot.gov> Sent: Friday, January 8, 2021 8:13 AM To: Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov> Cc: Miller, Vickie M (Vickie.Miller@hdrinc.com) <Vickie.Miller@hdrinc.com>; Kiser, Marcus K <mkkiser@ncdot.gov>; Wyrick, Scott D <sdwyrick@ncdot.gov>; McLaughlin, Zachery R <zrmclaughlin@ncdot.gov> Subject: \[Non-DoD Source\] FW: \[External\] U-2579DEF - Permit Site 20 (Mill Creek) Dave and Eric, Below is an email from Vickie Miller with HDR. They are the Design team on the U-2579DEF project. The contractor needs to install a temporary crossing to bring a crane to the site. After your review, let me know if you do or do not have any objections to us proceeding. We no longer need to do the previously permitted work pad (site 20C-165’), but instead need 60’ of temporary impacts at the same site but at a different location on the stream. The pdf labelled “RW- 21_L-STA+50 Rev.3 markup” is shows the location of the proposed site, and the pdf labelled “Site 20 Permit Sheet U2579DEF” shows the site as it was permitted. Give me a call if we need to discuss. Amy 336-671-2886 3 From: Miller, Vickie M. (Raleigh) <Vickie.Miller@hdrinc.com> Sent: Thursday, January 7, 2021 6:39 PM To: Euliss, Amy <aeuliss@ncdot.gov> Cc: Yelverton, Wyatt <Wyatt.Yelverton@hdrinc.com> Subject: \[External\] U-2579DEF - Permit Site 20 (Mill Creek) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Amy, I have attached the permit plan sheet, the summary impact table, and a marked up sheet of the location that Flatiron would like to put a temporary crossing at Mill Creek. You will notice they are not showing the need for a temporary workpad in the channel but instead a 60’ long pipe in Mill Creek for a crossing to move cranes, etc. The original permitted length of impact for the temporary work pad (Site 20C) was 165 ft. This would be less impact from that standpoint. The proposed location for the temporary pipe is in an area where we will have impacts from a ditch tie in (Site 20A). Site 20 A currently is permitted for 16 lf of permanent impact and 21 lf of temporary impact. We would need to increase the temporary impact by approximately 44 lf to cover the length requested as well as making sure we have temporary impacts for dewatering/installation of the pipe (assumed 10 ft downstream and the 11 ft upstream which was previously permitted). Please let me know if you have any questions or comments. Thank you for checking on what will be needed for this one. Thanks, Vickie Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 4