HomeMy WebLinkAbout19980260 Ver 6__External_ RE_ U-2579DEF - Permit Site 20 (Mill Creek)_Corps1_20210108
Wanucha, Dave
From:Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil>
Sent:Friday, January 8, 2021 10:58 AM
To:Euliss, Amy; Wanucha, Dave
Cc:Miller, Vickie M (Vickie.Miller@hdrinc.com); Kiser, Marcus K; Wyrick, Scott D;
McLaughlin, Zachery R
Subject:\[External\] RE: U-2579DEF - Permit Site 20 (Mill Creek)_Corps1
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Amy: Unfortunately, I cannot authorize this without a mod, particularly since it is for a different purpose than the other
temp impacts. However, I can modify it fairly easily, and maybe quickly, if you will provide me with the square footage
of temporary impact from the 65’ of impacts.
Dave: let us know if this changes your response.
There are options for how to deal with the WQC. If Dave can confirm that no formal WQC change is needed (in-field
mod?), then I can go ahead with a mod for site 20.
I would prefer to combine this mod and the U-2579AB mod (since they are under the same IP and DA#), if the U-2579AB
mod WQC will be done soon. This would especially work well if Dave does need a formal WQC mod for Site 20, and the
U-2789AB mod; and a combined mod, or 2 separate mods, would be done soon.
I don’t want to make it more complicated than it has to be. If you have any questions, please give me a call.
Thanks!
Please reply or call if you have any questions or if I may serve you in any other way.
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0.
Eric
Eric Alsmeyer
Work Cell: 919.817.1570
Project Manager
Regulatory Division Office
US Army Corps of Engineers, Wilmington District
3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587
Office Tel: (919) 554-4884, x23 (I am working out of the office, but I try to check my voicemails daily)
Regulatory Homepage: http://www.saw.usace.army.mil/Missions/RegulatoryPermitProgram.aspx
From: Euliss, Amy <aeuliss@ncdot.gov>
Sent: Friday, January 8, 2021 8:13 AM
1
To: Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil>; Wanucha, Dave
<dave.wanucha@ncdenr.gov>
Cc: Miller, Vickie M (Vickie.Miller@hdrinc.com) <Vickie.Miller@hdrinc.com>; Kiser, Marcus K <mkkiser@ncdot.gov>;
Wyrick, Scott D <sdwyrick@ncdot.gov>; McLaughlin, Zachery R <zrmclaughlin@ncdot.gov>
Subject: \[Non-DoD Source\] FW: \[External\] U-2579DEF - Permit Site 20 (Mill Creek)
Dave and Eric,
Below is an email from Vickie Miller with HDR. They are the Design team on the U-2579DEF project. The contractor
needs to install a temporary crossing to bring a crane to the site. After your review, let me know if you do or do not
have any objections to us proceeding. We no longer need to do the previously permitted work pad (site 20C-165’), but
instead need 60’ of temporary impacts at the same site but at a different location on the stream. The pdf labelled “RW-
21_L-STA+50 Rev.3 markup” is shows the location of the proposed site, and the pdf labelled “Site 20 Permit Sheet
U2579DEF” shows the site as it was permitted.
Give me a call if we need to discuss.
Amy
336-671-2886
From: Miller, Vickie M. (Raleigh) <Vickie.Miller@hdrinc.com>
Sent: Thursday, January 7, 2021 6:39 PM
To: Euliss, Amy <aeuliss@ncdot.gov>
Cc: Yelverton, Wyatt <Wyatt.Yelverton@hdrinc.com>
Subject: \[External\] U-2579DEF - Permit Site 20 (Mill Creek)
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Hi Amy,
I have attached the permit plan sheet, the summary impact table, and a marked up sheet of the location that Flatiron
would like to put a temporary crossing at Mill Creek. You will notice they are not showing the need for a temporary
workpad in the channel but instead a 60’ long pipe in Mill Creek for a crossing to move cranes, etc. The original
permitted length of impact for the temporary work pad (Site 20C) was 165 ft. This would be less impact from that
standpoint. The proposed location for the temporary pipe is in an area where we will have impacts from a ditch tie in
(Site 20A). Site 20 A currently is permitted for 16 lf of permanent impact and 21 lf of temporary impact. We would need
to increase the temporary impact by approximately 44 lf to cover the length requested as well as making sure we have
temporary impacts for dewatering/installation of the pipe (assumed 10 ft downstream and the 11 ft upstream which
was previously permitted).
Please let me know if you have any questions or comments. Thank you for checking on what will be needed for this one.
Thanks,
Vickie
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.