Loading...
HomeMy WebLinkAbout19980260 Ver 6_RE_ _External_ U-2579DEF - Permit Site 20_DWR approval_20210108 Wanucha, Dave From:Wanucha, Dave Sent:Friday, January 8, 2021 10:49 AM To:Euliss, Amy; Alsmeyer, Eric C CIV USARMY CESAW (USA) Cc:Miller, Vickie M (Vickie.Miller@hdrinc.com); Kiser, Marcus K; Wyrick, Scott D; McLaughlin, Zachery R Subject:RE: \[External\] U-2579DEF - Permit Site 20_DWR approval Hi Amy, Barring any concerns/objections of the proposed changes by the Corps, DWR will allow the temporary crossing as described since the proposed work is within the permitted construction right-of-way. If you do proceed, please ensure that field crews follow all approved BMP measures as outlined in NCDOT’s Construction and Maintenance Activities manual and other 401 Certification conditions. Thanks for the notification of proposed changes. Dave W. Division of Water Resources 401 & Buffer Transportation Permitting NC Department of Environmental Quality 336-776-9703 office 336-403-5655 mobile Dave.Wanucha@ncdenr.gov NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27106 Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Euliss, Amy <aeuliss@ncdot.gov> Sent: Friday, January 8, 2021 8:13 AM To: Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov> Cc: Miller, Vickie M (Vickie.Miller@hdrinc.com) <Vickie.Miller@hdrinc.com>; Kiser, Marcus K <mkkiser@ncdot.gov>; Wyrick, Scott D <sdwyrick@ncdot.gov>; McLaughlin, Zachery R <zrmclaughlin@ncdot.gov> Subject: FW: \[External\] U-2579DEF - Permit Site 20 (Mill Creek) Dave and Eric, 1 Below is an email from Vickie Miller with HDR. They are the Design team on the U-2579DEF project. The contractor needs to install a temporary crossing to bring a crane to the site. After your review, let me know if you do or do not have any objections to us proceeding. We no longer need to do the previously permitted work pad (site 20C-165’), but instead need 60’ of temporary impacts at the same site but at a different location on the stream. The pdf labelled “RW- 21_L-STA+50 Rev.3 markup” is shows the location of the proposed site, and the pdf labelled “Site 20 Permit Sheet U2579DEF” shows the site as it was permitted. Give me a call if we need to discuss. Amy 336-671-2886 From: Miller, Vickie M. (Raleigh) <Vickie.Miller@hdrinc.com> Sent: Thursday, January 7, 2021 6:39 PM To: Euliss, Amy <aeuliss@ncdot.gov> Cc: Yelverton, Wyatt <Wyatt.Yelverton@hdrinc.com> Subject: \[External\] U-2579DEF - Permit Site 20 (Mill Creek) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Amy, I have attached the permit plan sheet, the summary impact table, and a marked up sheet of the location that Flatiron would like to put a temporary crossing at Mill Creek. You will notice they are not showing the need for a temporary workpad in the channel but instead a 60’ long pipe in Mill Creek for a crossing to move cranes, etc. The original permitted length of impact for the temporary work pad (Site 20C) was 165 ft. This would be less impact from that standpoint. The proposed location for the temporary pipe is in an area where we will have impacts from a ditch tie in (Site 20A). Site 20 A currently is permitted for 16 lf of permanent impact and 21 lf of temporary impact. We would need to increase the temporary impact by approximately 44 lf to cover the length requested as well as making sure we have temporary impacts for dewatering/installation of the pipe (assumed 10 ft downstream and the 11 ft upstream which was previously permitted). Please let me know if you have any questions or comments. Thank you for checking on what will be needed for this one. Thanks, Vickie Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2