Loading...
HomeMy WebLinkAbout19980260 Ver 6_RW-21_ -L- STA 281+50 TO 295+50 Rev.3 markup_20210108DocuSign Envelope ID: 2535C876-4022-4F87-A50C-48C4D407F407 PENTABLE: NCDOT_pshpfl.tbl PLOT DRIVER: NCDOT_pdf_color_eng_50.plt 0 0 0 (71 1- 10/12/2020 Lv D REVISIONS N a_ W W COm CO I— W V- �O J zLLJ O • Z W O U. I—Q a 6-1 L• IEas zo V0_ D I a_ I O OWN O 0 N M CNI O N J0 DQ I � cL N O 0 VU a z N 30 LLJ W• V a -J E co 0 w w N Z LU 0 J V Z 0 \ / N \ 0 N W W Q J 1 -L- +03.67 175.00' LT, 190.03' LT STANDARD 'V' DITCH SEE DETAIL 21-2 DDE = 53 CY 95T 47" WW FENCE LATERAL 'V' DITCH SEE DETAIL 21-1 DDE = 206 CY iii►l !!!!! :: �z • • • ROCK P LAT I N SEE SHEET 2G-3 FOR DETAILS CLASS II RIP RAP + i TO ELEV. 857.5' JDAR� BASE DITCH I' ' 'RAP +97.51 T• S END C/A EOTEXTILE FENCE TAIL 21-11 -L- + 95.03 17 .00' RT DARYL & lvIARY G. CHA BERLAIN DB 2547 PG 1976 DB 2655 PG 3817 - L- + 79.7 192.06' RT - L- +56.5 175.00' RT -L- +55.72 222.49' RT BANK STABILIZATION CLASS 'B' RIP RAP EST 7 TONS 15 SY GEOTEXTILE SEE DETAIL 21-12 BEGIN BRIDGE -L- STA 283+97.43, 23' LT (WB) BEGIN APPROACH SLAB -L- STA 283 + 73.84, 23' LT (WB) TDE O, � r I I I I 1 1 1 1 I / I / / / / I /oN / / 7I / / CO "' -L- + 36.00 184.64' LT, 199.69' LT DETAIL 21-12 BANK STABILIZATION AT JURISDICTIONAL STREAM ( Not to Scale) NATURAL BED ELEVATION Natural Groun q11‘ Of 1.5' GEOTEXTILE Type of Liner= CL I Rip -Rap Natural Ground FROM -L- STA. 285+00 LT CHRIST RESCUE TEMPLE CHURCH DB 2182 PG 347 4' STANDARD BASE DITCH SEE DETAIL 21-3 DDE = 60 CY BANK STABILIZATION / RIP RAP AT EMBANKMENT CLASS 'B' RIP RAP EST 16 TONS 31 SY GEOTEXTILE SEE DETAIL 21-5 -L- + 92.24 200.00' LT END APPROACH SLAB -L- STA 286+48.94, 23' LT (WB) END BRIDGE -L- STA 286+25.31, 23' LT (WB) PROPOSED CHANNEL CHANGE CLASS 'I' RIP RAP EST 137 TONS 232 SY GEOTEXTILE SEE DETAIL 21-10 DETAIL 21-11 STANDARD BASE DITCH ( Not to Scale) Natural *When B is < 6.0' Min. D= 3.0Ft. Max. d= 3.0Ft. B= 5.0Ft. Type of Liner= Class 'I' Rip -Rap FROM -L- STA. 281 +50 TO STA. 281 +58 RT 4 44 milaraffiralli 15"RCP IIIPR�' SBG 7 +77, B-7. 08, B-77 + 59, B-77 +` U //AAVAKOTer r, „EX. 4.7 Li 111111111.11M6Yred7 PROP NOISEWALL -NW16- SEE STRUCTURE PLAN FOR DETAILS I .s BEGIN BRIDGE -L- STA 283+57.55, 23' RT (EB)/ BEGIN APPROACH SLAB -L- STA 283 + 33,.7923' RT (f5 / -L- + 70.53 / /<;`' 314.72' RT \L -L - P/ Sto 275+54.77 0 = 43° 50' 3/.9u (RT I D=0657'58.38 L = 4,537.58' T = 2,386.38' R = 5,930.00' e = 4X DS = 70 41PH CLASS II RIP RAP S TO ELEV. 857.5' 160 -L- + 84.46 302.73' RT / / -L-'+ 01.25 326.70' RT DARYL & MARY G. CHAMBERLAIN DB 2547 PG 1976 DB 2655 PG 3817 EIP CONC. FILLED PIE0�)0N1 -TOE PROTECTION EST 50 TON 96 SY GEO-TEXTILE SEE DETIL 1-4- DETAIL 21-10 STANDARD BASE DITCH Natural Geotextile *When B is < 6.0' ( Not to Scale) Min. D= 3.0Ft. Max. d= 3.0Ft. B= 3.0Ft. Type of Liner= Class 'I' Rip -Rap FROM -L- STA. 285+20 TO STA. 285+65 LT DETAIL 21-1 LATERAL 'V' DITCH ( Not to Scale) FROM -L- STA. 281 + 50 TO STA. 283 + 00 LT -L- +20.12 200.00' LT STONE 0 0 47" WW FENCE BANK STABILIZATION CLASS 'B' RIP RAP EST 7 TONS 15 SY GEOTEXTILE SEE DETAIL 21-12 C \�FS 2G1 I �L44 - �► 116 <.2118> 47" WW FENCE DETAIL 21-2 STANDARD 'V' DITCH ( Not to Scale) FROM -L- STA. 283 + 00 TO STA. 2 85 + 15 LT Outside Ditch Traffic Flow S— S = Ditch Slope DETAIL 21-6 FALSE SUMP ( Not to Scale) Ln o 0— 2.0'H GI etc. C Proposed Ditch +03 GREU (TL-3 SPECIAL 2' BERM BASE DITCH CLASS 'B' RIP RAP EST 235 TONS 418 SY GEOTEXTILE SEE PROFILE FOR DETAILS SEE DETAIL 21-9 REPUBLIC PROPERTIES. LLC DB 2558 PG 4448 DETAIL 21-3 STANDARD BASE DITCH ( Not to Scale) FROM -L- STA. 286+75 TO STA. 287+50 LT DETAIL 21-7 FALSE SUMP ( Not to Scale) See Chart Below) — S = Ditch Slope 20' GI etc. C Propose Ditch HDR Engineering, Inc. of the Carolinas 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 N.C.B.E.L.S. License Number: F-01 16 STV STV Engineers, Inc. 100 900 West Trade St., Suite 715 ea/e/j Charlotte, NC 28202 NC License Number F-0991 -16 REPUBLIC PROPERTIES. LLC DB 2558 PG 4448 DETAIL 21-4 TOE PROTECTION ( Not to Scale) Geotextile Type of Liner= Class 'I' Rip -Rap FROM -L- STA. 285+58 TO STA. 287+50 RT Outside Ditch Traffic Flow S S = Ditch Slope DETAIL 21-8 FALSE SUMP ( Not to Scale) 0. GI etc. C Propose Ditch PROJECT REFERENCE NO. SHEET NO. U-2579D, E & F 21 RiW SHEET NO. ROADWAY DESIGN ENGINEER 00111.11,11.2101,/ • = SEAL F. 032599 VP.seY9.1.10:* #d'id41:!:1Z.0°° 10/13/2020 HYDRAULICS ENGINEER '''‘‘4e;101***/.1:11139./12NOY:::0%.6ii DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED FLATIRON ui 175.00' RT 223.04' RT rbE -L- +42.37 185.58' RT 232.98' RT DETAIL 21-5 RIP RAP AT EMBANKMENT ( Not to Scale) Grade GEOTEXTILE 1.0' Type of Liner= 16 TONS,CL 'B' Rip -Rap Geotextile= 31sy FROM -L- STA. 286+65 TO STA. 286+75 LT DETAIL 21-9 BERM BASE DITCH ( Not to Scale) Natural Ground GEOTEXTILE B= 2.0Ft. Type of Liner= Class 'B' Rip -Rap RDWY SEE SHEETS 75 & 76 FOR —L— PROFILE