Loading...
HomeMy WebLinkAbout19980260 Ver 6_FW_ _External_ U-2579DEF - Permit Site 20 (Mill Creek)_Original_20210108 Wanucha, Dave From:Euliss, Amy Sent:Friday, January 8, 2021 8:13 AM To:Alsmeyer, Eric C CIV USARMY CESAW (USA); Wanucha, Dave Cc:Miller, Vickie M (Vickie.Miller@hdrinc.com); Kiser, Marcus K; Wyrick, Scott D; McLaughlin, Zachery R Subject:FW: \[External\] U-2579DEF - Permit Site 20 (Mill Creek)_Original Attachments:RW-21_ -L- STA 281+50 TO 295+50 Rev.3 markup.pdf; Summary impact table U2579DEF.pdf; Site 20 Permit Sheet U2579DEF.pdf Dave and Eric, Below is an email from Vickie Miller with HDR. They are the Design team on the U-2579DEF project. The contractor needs to install a temporary crossing to bring a crane to the site. After your review, let me know if you do or do not have any objections to us proceeding. We no longer need to do the previously permitted work pad (site 20C-165’), but instead need 60’ of temporary impacts at the same site but at a different location on the stream. The pdf labelled “RW- 21_L-STA+50 Rev.3 markup” is shows the location of the proposed site, and the pdf labelled “Site 20 Permit Sheet U2579DEF” shows the site as it was permitted. Give me a call if we need to discuss. Amy 336-671-2886 From: Miller, Vickie M. (Raleigh) <Vickie.Miller@hdrinc.com> Sent: Thursday, January 7, 2021 6:39 PM To: Euliss, Amy <aeuliss@ncdot.gov> Cc: Yelverton, Wyatt <Wyatt.Yelverton@hdrinc.com> Subject: \[External\] U-2579DEF - Permit Site 20 (Mill Creek) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Amy, I have attached the permit plan sheet, the summary impact table, and a marked up sheet of the location that Flatiron would like to put a temporary crossing at Mill Creek. You will notice they are not showing the need for a temporary workpad in the channel but instead a 60’ long pipe in Mill Creek for a crossing to move cranes, etc. The original permitted length of impact for the temporary work pad (Site 20C) was 165 ft. This would be less impact from that standpoint. The proposed location for the temporary pipe is in an area where we will have impacts from a ditch tie in (Site 20A). Site 20 A currently is permitted for 16 lf of permanent impact and 21 lf of temporary impact. We would need to increase the temporary impact by approximately 44 lf to cover the length requested as well as making sure we have temporary impacts for dewatering/installation of the pipe (assumed 10 ft downstream and the 11 ft upstream which was previously permitted). Please let me know if you have any questions or comments. Thank you for checking on what will be needed for this one. 1 Thanks, Vickie Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2