Loading...
HomeMy WebLinkAbout19980260 Ver 6_Wetland Impact Summary Sheet 2_20210108Revised WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 11 173+80 -L- 48" RCP 0.04 615 11A** 174+23 -L- RT 48" RCP 0.08 12 203+75 - 207+10 -L- RT ROADWAY FILL 0.02 < 0.01 410 10 12A 205+69 -L- RT FILL IN WETLAND 0.08 13 207+24 -L- 5x6 CULVERT 0.03 < 0.01 337 22 13A 209+14 -L- LT 4' BASE DITCH < 0.01 14 222+50 - 223+56 -L- RT 48" RCP 0.01 < 0.01 220 11 14A 222+65 -L- LT POND 3.06 15 242+86/244+20 -L- 5'x6' RCBC 0.05 < 0.01 520 15 15A 243+60/244+00 -L- 5'x6' RCBC 0.04 16 253+92/255+58 -L- 42" RCP AND DITCH 0.05 < 0.01 513 20 17 261+02/262+96 -L- 6'x6' RCBC 0.08 < 0.01 928 23 18 275+75/276+78 -L- 42" RCP 0.03 < 0.01 161 11 18A 277+00 RT -L- PIPE REMOVAL AND DITCH < 0.01 < 0.01 28 20 18A 277+00 RT -L- BANK STABILIZATION < 0.01 3 19 279+30/280+86 -L- 5'x7' RCBC 0.04 < 0.01 250 11 19 280+86/281+71 -L- 5' STANDARD BASE DITCH < 0.01 < 0.01 91 15 20 280+61/281+66 -L- REMOVE 2 - 72" CMP 0.02 < 0.01 35 31 20A 285+56/285+81 -L- BANK STABILIZATION/TEMP ACCESS PIPE < 0.01 0.01 16 64 20B 285+56/285+81 -L- BANK STABILIZATION < 0.01 < 0.01 20 21 21 285+19/285+65 -L- CHANNEL CHANGE < 0.01 133 21 285+19 -L- BANK STABILIZATION < 0.01 < 0.01 10 10 22 303+57/304+09 -L- 30" RCP/ 36" RCP < 0.01 < 0.01 97 7 TOTALS SHEET 2*: 0.20 < 0.01 3.47 0.04 4387 291 0 *Rounded totals are sum of actual impacts NOTES: -**Wetland ES-W33 is total take -Site 24 is a Channel Relocation 2013 10 24 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 01/08/2021 FORSYTH U-2579D, E & F 34839.3.GV7 SHEET OF