Loading...
HomeMy WebLinkAbout20100747 Ver 1_Approval Letter_20101222NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Eaves Perdue Coleen H, Sullins m Director December 22, 2010 Dr. Greg Thorpe, PhD., Manager Project Development and Environmental Analysis North Carolina Department of Transportation 1548 Mail Service Center Raleigh, North Carolina, 27699-1548 Subject: Correction to 401 Water Quality Certification No. 3843, NCDWQ Project No. 20100747. TIP U-3326 A and B Dear Dr. Thorpe: Dee Freeman Secretary This letter is in regards to the Individual Water Quality Certification No. 3843 issued December 9, 2010. Please note the changes to site 14 in the stream impact table for the Roanoke River Basin and to condition 5. Stream Impacts in the Roanoke River Basin Site Permanent Fill in Intermittent Stream (linear ft) Temporary Fill in Intermittent Stream (linear ft Permanent Fill in Perennial Stream linear ft Temporary Fill in Perennial Stream linear ft Total Stream Impact (linear ft) Stream Impacts Requiring Mitigation linear ft 212 7 219 212 8 ( 56 31 87 0 9 117 20 137 0 10 161 56 217 161 11 75 11 86 0 12 175 33 208 175 13 194 21 215 0 14 1 165 12 177 165 15a 66 7 73 0 15b 207 17 224 207 1 5c 90 90 0 1 6 4 10 14 0 1 7 95 38 133 0 1 8 139 42 181 0 Total 575 81 1181 224 2061 920 Compensatory mitigation for 406 linear feet of impact to streams in the Cape Fear River Basin and 920 linear feet of impact to streams in the Roanoke River Basin are required. We understand that you have chosen to perform compensatory mitigation for impacts to streams through the North Carolina Ecosystem Enhancement Program (EEP), and that the EEP has agreed to implement the mitigation for the project. EEP has indicated in a letter dated May 11, 2010 that they will assume responsibility for xtation Permitting Unit ail Service Center, Raleigh, North Carolina 27699-1650 n: 2321 Crabtree Blvd„ Raleigh, North Carolina 27604 919-733-17861 FAX: 919-733-6893 http:llh2o.en r.state . no. uslnmetland sl Equal Oppormity 1 Affumalive Action Employer One ' NolfthCarolim ?lltlfl"lr??l/ satisfying the federal Clean Water Act compensatory mitigation requirements for the above-referenced project, in accordance with the Tri-Party MOA signed on July 22, 2003 and the Dual-Party MOA signed on April 12, 2004. Please keep a copy of this letter with the original certification. If we can be of further assistance, do not hesitate to contact us. Sincerely, oleen H. 4Sullins Director cc: Andy Williams, US Army Corps of Engineers, Raleigh Field Office Mike Mills, PE, Division 7 Engineer Jerry Parker, Division 7 Environmental Officer Chris Militscher, Environmental Protection Agency Travis Wilson, NC Wildlife Resources Commission Beth Harmon, Ecosystem Enhancement Program Wetlands/401-Transportation-Permitti_ng Unit File Copy