HomeMy WebLinkAbout19970093 Ver 4_Approval Letter_20101013? PA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Eaves Perdue Coleen H. Sullins Ir Director October 13, 2010 Darlene Waddell :h Carolina Global TransPark Authority ) Jetport Road, Suite A ;ton. NC 28504 Dee Freeman Secretary Modification to the 401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act and Neuse Buffer Rules with ADDITIONAL CONDITIONS for the railroad spur extension from existing NCRR main line to the Spirit Aerosystems building location within the North Carolina Global TransPark in Lenoir County, TIP U-2928. NCDWQ Project No. 19970093 v.4 it Ms. Waddell: I ached hereto is a modification of Certification No. 3184 issued to The Global TransPark Authority initially issued ril 7, 1998 and subsequent modifications issued November 12, 2009 and August 13, 2010. If we can be of further assistance, do not hesitate to contact us. Attachments Director Tracey Wheeler, US Army Corps of Engineers, Washington Field Office Ron Ferrell, PBS&J-EcoScience, Raleigh Neil Lassiter, PE, Division 2 Engineer Jay B. Johnson, Division 2 Environmental Officer Robert Belvin, NC Division of Land Quality, Washington Regional Office Marc Hamel, NCDOT Rail Division Garcy Ward, NCDWQ Washington Regional Office File Copy S' cerely, olee Sullins Permitting Unit ice Center, Raleigh, North Carolina 27699-1650 Crabtree Blvd., Raleigh, North Carolina 27604 1-1786 \ FAX: 919-733-6893 North Carolina Naturally An Equal Op? ommlty \ Arfrmabve Acton Employer Modification to the 401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act and Neuse Buffer Rules with ADDITIONAL CONDITIONS HIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92-500 and 95-217 the United States and subject to the North Carolina Division of Water Quality (NCDWQ) Regulations in 15 NCAC 2H i00 and 15A NCAC 213 .0233 . This certification authorized the NCDOT to impact an additional 0.04 acres of rmanent impacts to jurisdictional wetlands. Due to a modification in construction techniques, a decrease of 0.1 1 acres of nporary impacts will occur for a net decrease of 0.07 acres resulting in a project total of 6.86acres. An additional 2,904 uare feet of Neuse Riparian Buffer (2,854 square feet in Zone 1 and 50 square feet in Zone 2) and an additional 29 feet stream impacts area also approved. The project shall be constricted pursuant to the modification dated received ptember 27, 2010. The authorized impacts are as described below: Wetland Impacts in the Neuse River Basin Site Fill ( ac) Fill (temporary) (ac) Excavation Mechanized (ac) Clearing (ac) IlandClearing - (ac) Impac ts Total Wetland requiring Impact (ac) Mitigation I 1 0.01 0 0 0.01 0 0.02 0.02 2 0.01 0 0 0.01 0 0.02 0.02 3 0.01 0.02 0 0 0 0.03 0.01 4 0.01 0 0 0.01 0 0.02 0.02 5 0.01 0 0 0.01 0 0.02 0.02 6 0.03 0 0.01 0.01 0 0.05 0.05 7A 0.46 0 0 0.22 0 0.68 0.68 7B 0 0 0.12 0.04 0 0.16 0.16 8 0.92 0 0 0.38 0 1.3 1.3 9 0.24 0 0 0.1 0 0.34 0.34 10 0.07 0 0 0.04 0 0.11 0.11 11 0.3 0.12 0 0 0.14 2 0.56 0.44 12 1.1 0 0.31 0.69 0 2.1 2.1 1 13 0.08 0 0 0.01 0 0.09 0.09 14A 0 0 0.01 0.01 0 0.02 0.02 14B 0 0 0.03 0.02 0 0.05 0.05 15 0.34 0 0.54 0.26 0 1.14 1.14 161 0 0 0 0 0 0 0 17 0 0 0.04 0.02 0 0.06 0.06 18 0.01 0 0 0.01 0 0.02 0.02 19 0 0 0.01 0.01 0 0.02 0.02 TOTAL: AM'415?k"r. illu;'1m vi< TOTAL: vt 3`' k 3.60 9?hY8fal°''r" .i'rl`r u., ,' 0.02 810 ft' 0.14 j,uSv?+f,FRVIP;:e 0.00 1.07 ?C:TS,SY. M 0.00 1.86 1TTID, A.`I4GUS 0.00 PA(;?fS AP 0.14 y1S?1`3",??201'On s c'j:yi 0.10 4,150 f? ,P.ROV-FDt?:il?.r 6.81 §?-??''., ?"'!eS?'.*,.?n vt+lR.w'' 0.12 4,960 It) . 6.67 (.'f'a,.'{3+ •rz 7 ? .ynC 0.02(8 1 0 ft2 TOTAL: =4 1F, x e? i, 3.62 mi . ;a h h ,n? ." 0.14 1.07 1.86 vt IlVIPAGTS APPR"O,VFD4W,1TIf' C1II5i1 0.10 VIODIFTCATTOPI 6.93 ?. t ??:' ^ ,o„ 6.69 ?+ Rk ,r rf : s 11 0 -0.11 0 0 0 -0.11 0 13 0.04 0 0 0 A 0.04 0.04 TOTAL: kit fns A ? TOTAL: 0.04 Kkw m' O.l 3.66 -0.11 0 0 d d 5?;TOTAY IlVIP2iCIS?APPRO. FA)HC 0.03 1.07 1.86 0 )?t(PR©JFIfnT t 0.24 -0.07 ` §rK- ,? 6.86 0.04 MM.`MiMis 6.73 Total Wetland Impact for Project: 6.86acres (a decrease of 0.07 acres) 'Subsequent to receiving the permit application, Site 16 was re-verified by the USACE and determined not to be a wetland. Therefore, no wetland impacts occurred and no mitigation will be required for this site. 'Although area under bridge will be hand cleared, GTP requested DWQ consider this a permanent impact per USACE (total temporary impacts based on this are 0.13 acre). Stream Impacts in the Neuse River Basin Permanent Fill Site in Intermittent Stream (linear Temporary Fill in Intermittent Stream (linear Permanent Fill in Perennial Stream (linear Temporary Fill in Perennial Stream (linear W, Total Stream Impact fffi-04-1 Stream Impacts Requiring Mitigation (linea r 01% I, T,I..A?r,V Xi t p~ 101 • li 1 F Tf41A%?, ii ??_r?:'?s3 `??/ ?^' r. ,?._ IXf 'r.W 4 mm •?? ? P R]?lIfTT,tiT I? r ^F _ _ LSiA `. TMPt,1';C;TS?,? `?a?+.?? ? 1 „ l[°? . ',°.?r.?? IS:'1111i w MFrvF nE YMIIaF 6 0 0 201 0 201 201 11 0 0 0 0 0 0 13 0 0 193 0 193 193 TOTAL: 0 0 394 0 394 394 ? V ? a ]. •- * •ra•-z,p r ? r r v r s's,=IIV)CPACTS - '? r. ?URMIT,TED AU r - - S < r G.,TJST?13,?2010, I n •S•,5 NI • ry. 4+. . M^' ?+•,_ a•, ,?; . r .•. ?a`1.rei3?iir M TOTAL: 0 0 0 0 0 0 w +rr, ?a a -- ?r e y wars _' TQSI h•r f.,? .F•?M} ?• 1 t..^^l .e?...w_it-- w=t+l r_L?S7Y.,•..L?.aC.,..? v o a "- - ? . 'ALiIMPAGTSLA?PPR'OOPEb I}HR ?r. I _ .• _. ... .. _.-' __ __.. _.--- __- _--.._-. U7FG AUGUST r .._-_ 'r . +n era .., . ,• r r ? r1'31 03U:` ? l?s(1j?1X.?1t.?Jf? ..J.r?._7 TOTAL: 0 0 394 0 394 394 { x x, ,,t9uY J'"pYis??xa 'il?F 1 {? A :,;Usks,w?;.w'?r t:?rY...atuar"..'W r ry Pw ?•, IMP¢C',TSAPR ro OiD,myVITI3,T ISAMOD?FICAT ,? b w.e • Y011TgL.:r+tl.sa€a? ..y.?7'*a,irxi 6 0 0 27 0 27 27 11 0 0 0 0 0 0 13 0 0 2 0 2 2 TOTAL: 0 0 29 0 29 29 ;4 '"z`y" ' =?F?y- ?,?`r.TOTAL"IMPAGTS}APPROVE 7 ?-., a .•. .. _. IL D [ _ FO PROJEC TS ; •°, ?? t'f s? TT TOTAL: 0 0 423 0 423 423 Total Stream Impact for Project: 423 linear feet Neuse River Basin Riparian Buffer Impacts Zone 2 Zone 1 Total Total ' Zone 1 Buffers Zone 2 Buffers Buffer Zone 1 Wetland Buffer Zone 2 Wetlands Impact Mitigatio Impact (not in (not in Mitigation Impact sin Zone Mitigation Impact in Zone 2 = (ft) (Z1 n site wetlands} wetlands) Required (ft') 1 (fta) Required (112) UP) +Z2 total Required (ft) (ft=) (1.5:1 ' (3:1ratio) impacts) (ft=) ratio 4:Hx-12J !,Y,nV tl', vl.':f?' +? WW,h{f.r_n4 iFl,. '.n1 fwF.},mil;, F'M1ddStll,hH' . ,,CL4..,.. .. ? x ...- ,r. _....-. TAE N iL{{.kl s°4 r "A; INi FIAL PERMv?TED a?MPACTS „I 5 RI 151 , = 4..Sy,i ?n5 lhi'a. f??? f' W. {ii lrl•R'1?917f "A.. ry , . t _ . , ..: , r , 16 11,230 0 11,230 33,690 6,622 0 6,622 9,933 17,852 43,623 11 2,677 1)810 867 NIA 2,838 1,386 1,452 NIA 5,515 0 13 ' 7,853 4,187 3,666 NIA 4,782 0 4,782 NIA 12,635 0 TOTAL: 21,760 5,997 15,763 33 690 i4 242 19386 12 856 9 933 36 002 43,623 ? TMPt"r ° ??r?W ? Ir ? Y? /I ar?t ]F "'T,?x rtj x? I11 Y 4 ? C j ?fT RMITTEI) A' GUST E IPACTS}P T r' 201'0rcx r-. Y;.s ? - F E r..,, F f S X13 ' C .l ...t.?,r?u -?i`?.]?.r? ?Y?n?•.. .e.. !i_, • -.. _ _ _ YJ? ...? -_.. .-,?.. 1. 1'... T.?.. . Cwul. ? :n ,.es. Lf:7L?Cl:JS Y J 7. 4!, d _.. ?.__. LI O'TAL 0 0 0 0 0 0 0 0 0 0 KL t' ??Mg 11,, G°'e thffe}b, ?:f# .: : #? + ?I'OT?A1L IMP ? ? F?, q., .__....w .; .ti.,... ... ? r"` E CTS PItO v•D THROUGH ' ? ` r ;"' S. ?34?Z010 ?P A?CTGU ??^;4 i w? ?? a ? f ?'? i ?? ? ? Y . ?,W ewsa41 } rta= . _ . •k ---... _ [ , ..r, ._ . .t__ t ,- _ : , .,..?,.? ... r:.,_. ?., ? - - s ? ?v .?..? aJ;nc 07 AL 21,760 5 997 15 763 33 690 14 242 1 386 12,856 9,933 36,002 43,623 a!:n :?krr. ?wrs•.rs-? ?;,?,1aer 1 Y y?f/ 1 mr ?r. r ?.x 1k M .?,.•'.err? a S- ?yYY .?ryEe ,? I1VI1pAC .. ,..-. _t....._^ •; - TwS'R P vED W P 9 T M O07Fi TIDN + C F> ,r,, r , . , '? [ .» W h,ei RIO ? un f.6iJ 1._i. _ ...1. W... ._..._,1 • . . .__.. .M. S- ._ lr 4 . C k!'C:I4 i1 L] Yr ?.Y?): •,4.?1 •.J 16 -110 0 -110 -330 0 0 0 0 -110 -330 1] 1,113 843 270 NIA 0 0 0 NIA 1,113 0 1!3 1,851 1,851 0 0 50 0 50 50 12901 0 TOTAL- 2,854 2 694 160 -330 50 0 50 50 2 904 -330 ,? s s n 4 li ? y,g,.. [ • ray„ r ; ?+r . • F ? ..r r 16 11,120 0 11,120 0 6,622 9,933 17 742 43,293 11 1 3,790 2,653 1 137 1 386 1 452 2 178 6 628 0 113 9,704 6,038 3,666 mi 0 4,832 7,248 14,536 18,246 OTAL 24 614 IS 923 l 1386 12 905 9 983 7s 906 61 539 al impacts at Site 13 didn't exceed 113 acre or require mitigation; however, this modification requests impacts exceeding 113 acre and therefore re( NIA = Total impact for Site is less than 113 acre and 150 linear feet of impact, no mitigation required Total Permanent Buffer Impact for Project: 38,906 square feet. The application provides adequate assurance that the discharge of fill material into the waters of the Neuse River Basin in conjunction with the proposed development will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application and conditions hereinafter set forth. This approval is only valid for the purpose and design that you submitted in your modified application dated received September 24, 2010. All the authorized activities and conditions of certification associated with the original Water Quality Certification dated April 7, 1998 and subsequent modifications issued November 12, 2009 and August 13, 2010 still apply except where superceded by this certification. Should your project change, you are required to notify NCDWQ and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If any additional wetland impacts, or stream impacts, for this project (now or in the future) exceed one acre or 150 linear feet, respectively, additional compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h) (6) and (7). Additional buffer impacts may require compensatory mitigation as described in 15A NCAC. For this approval to remain valid, you are required to comply with all the conditions listed below. In addition, you should obtain all other federal, state or local permits before proceeding with your project including (but not limited to) Sediment and Erosion control, Coastal Stormwater, Non- discharge and Water Supply watershed regulations. This Certification shall expire on the same day as the expiration date of the corresponding Corps of Engineers Permit. Condition(s) of Certification: 1. All other conditions written into previous Water Quality Certifications dated April 7, 1998, November 12, 2009, and August 13, 2010 for this project still apply. 2. This modification is applicable only to the additional proposed activities. 3. The initial 401 Water Quality Certification (WQC) application for this project is dated July 10, 1997 and was approved April 7, 1998. During the permitting negotiations in 1998 it was decided that the GTP would offer all mitigation for the potential loss of 871 wetland acres without a provision for functional basis as part of the credit/debit process. The initial 401 WQC has remained active and an extension was granted on October 13, 2008. Therefore, in keeping with the April 7, 1998 and the October 13, 2008 401 WQC, no mitigation ratios are proposed as part of this certification. Instead, credits (at a 1:1 ratio) will be deducted from the remaining credits available to the Global TransPark in the Stonyton Creek, Dover Bay, and Frog Hollow Mitigations Sites as outlined below: a. Additional compensatory mitigation for impacts to 0.04 acres riverine wetlands is required for a total of 6.73 acres. We understand that you have chosen to debit credits from the Stonyton Creek Conservation Area. According to the NCDWQ's records, this site has gone through the final NCDWQ approval process to determine the amount of credits that will ultimately be available. Nonetheless, based in information provided to the NCDWQ, it appears at this time that there will be sufficient credits once final approval is given to meet the required mitigation for impacts approved with this WQC. However, should there be insufficient credits upon final approval of the sites the GTP will be required to obtain the necessary credits by other means. b.. Additional compensatory mitigation for impacts to 29 linear feet of stream is required for a total of 423 linear feet. We understand that you have chosen to debit credits from the Stonyton Creek Conservation Area. According to the NCDWQ's records, this site has gone through the final NCDWQ approval process to determine the amount of credits that will ultimately be available. Nonetheless, based in information provided to the NCDWQ it appears at this time that there will be sufficient credits once final approval is given to meet the required mitigation for impacts approved with this WQC. However, should there be insufficient credits upon final approval of the sites the GTP will be required to obtain the necessary credits by other means. c. Additional compensatory mitigation for impacts to 17,916 square feet of riparian buffers is required for a total of 61,539 square feet. We understand that you have chosen to debit credits from the Stonyton Creek Conservation Area. According to the NCDWQ's records, this site has gone through the final NCDWQ approval process to determine the amount of credits that will ultimately be available. Nonetheless, based in information provided to the NCDWQ it appears at this time that there will be sufficient credits once final approval is given to meet the required mitigation for impacts approved with this WQC. However, should there be insufficient credits upon final approval of the sites the GTP will be required to obtain the necessary credits by other means. Remaining anticipated wetland credits available to the Global TransPark after considering all previous requests for impacts/mitigation, including impacts associated with this modification, is shown below: Wetland Impact Summaryt Activity' Riverine Non-Riverine Total Credits Allowed in April 7, 1998 W QC 106.40 764.50 870.90 Runway Extension/Access Taxiway (1021/1998 ? 22.70 000 22.70 Crescent Road -2719BA 10/21/1998 -- 5.91 5.91 ALSF 1o/21/1998 12.40 12.40 Hardstand(7/10/1999 8.60 8.60 Caro Building (5/1/2001 0.42 0.42 Utility Line Construction (9118/2001 2.17 2.17 Ston on Creek Restoration Site3 (8/212002) -- 0.00 Runway (clearing/grubbing) 9/4/2002 13.50 13.50 John Mewborne Road Relocation 5/15/2003 3.00 3.00 Glideslo a Grading and ALSF Road (10/15/2003 -- 53.00 53.00 Access Taxiway 7/30/2004 0.24 -- 0.24 Institute Road° (2/282005 -- 0.00 Spirit Aeros stems Roads 9/16/2008 & 3/122009 0.04 -- 0.04 Airport Secrui Fence no date provided) -- 1.40 1.40 John Mewbome Road Culvert no date provided) 0.003 0.003 Caro Apron/Access Road no date provided) 0.23 -- 0.23 Rail Spur -2928 Impacts 11/12/2009 0.89 5 5.78 5.6 6.67 Rail Spur (U-2928) Impacts (8/13/2010) 0.02 0.00 0.02 Total of Previous) Permitted Impacts 24.12 106.18 130.30 TOTAL IMPACTS FOR THIS W QC MODIFICAT 0.04 0.00 0.02 Total'Impacts through this WQC) 24.16 106.18 130.32 REMAINING CREDITS 82.24 658.32 740.56 'The table has been updated based on verification of information and information provided to DWQ on August 5, 2010. As such, this table differs from that presented in the November 12, 2009 WQC. `Dates shown are the date of application r Impacts to 1.1 acres of wetlands were mitigated through creation of the SCRS, resulting in no net impacts ? Institute Road, although pemtitted, was never built and no impacts occurred ' Impacts were adjusted based on ertor in initial calculation olations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or it penalties. This Certification shall become null and void unless the above conditions are made conditions of the feral 404 and/or Coastal Area Management Act Permit. This Certification shall expire upon the expiration of the 404 CAMA permit. s Certification is unacceptable to you have the right to an adjudicatory hearing upon written request within sixty (60) following receipt of this Certification. This request must be in the form of a written petition conforming to Chapter of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service er, Raleigh, N.C. 27699-6714. If modifications are made to an original Certification, you have the right to an licatory hearing on the modifications upon written request within sixty (60) days following receipt of the ffcation. Unless such demands are made, this Certification shall be final and binding. This the 13th day of October 2010 DIVISI WATER QUALITY lee H. Sullins SV Director No. 3184