Loading...
HomeMy WebLinkAbout19970093 Ver 1_Email_20081208 (24)RE GTP Buffer Letter 0 ., 4 L I?eKd , Subject: RE GTP Buffer Letter From: "Geratz, Jens" <JGeratz@pbsj com> Date: Mon, 8 Dec 2008 07 44 43 -0500 To: "David Wainwright" <David Wainwright@ncmail net> ra , / lop e David, The Corps has claimed the ditches within the southern portion of the study area as linear jurisdictional wetlands, including the feature shown on the maps (sheet 1 and 2) as BL25/S32 We therefore have a connection between the stream (fix, sheet 2) and features below Jens Geratz Sensor Scientist EcoScsence a Subsidiary of PBS&J 1101 Haynes Street, Suite 101 Raleigh, NC 27604 Telephone 919 828 3433 Facsimile 919 828 3518 E-mail 3geratzCpbsi_com -----Original Message----- From David Wainwright [maslto David Wainwright@ncmasl net] Sent Monday, December 08, 2008 7 12 AM To Geratz, Jens Subject Re GTP Buffer Letter Jens, Have you heard back from the Corps on their decision regarding this issue on the GTP rail access yet9 Thanks David Wainwright NCDENR, Division of Water Quality Transportation Permitting Unit Raleigh, NC David wainwright@ncmail net 919-715-3415 Geratz, Jens wrote David, I have attached the buffer letter with comments as we discussed on phone This should clarify any discrepancies in the table I will notify you as soon as we meet with the Corps and have their final approval of the delineation We can then proceed to finalize your call of feature BL25/S32 Thanks Jens Geratz Senior Scientist EcoScsence a Division of PBS&J 1101 Haynes Street, Suite 101 Raleigh, NC 27604 Telephone 919 828 3433 the 1 of 2 12/8/2008 9 18 AM RE GTP Buffer Letter Facsimile 919 828 3518 E-mail -tgeratz@pbsj com -----Original Message----- From David Wainwright [mailto David Wainwright@ncmail net] Sent Monday, September 29, 2008 11 44 AM To Geratz, Jens Subject GTP Buffer Letter Jens, I have completed a draft buffer applicability letter for the Global TransPark rail extension project When you get time, please review the letter and if you see anything that does not appear to be as we discussed, please let me know and we can it discuss further Also, I spoke to John Dorney about the ephemeral portion of BL25/S32 with regard to the ponded area under the railroad tracks near where the rail siding is located He indicated that he would not consider it perennial but ephemeral based on the characteristics of the feature morphology upstream and downstream, and since it was most likely due to the railroad crossing itself Therefore, none of this portion of BL25/S32 is buffered If you have any further questions please let me know Thank you David Wainwright NCDENR, Division of Water Quality Transportation Permitting Unit Raleigh, NC David wainwright@ncmail net 919-715-3415 2 of 2 12/8/2008 9 18 AM