HomeMy WebLinkAbout20081809 Ver 1_Information Letter_20100818NCDENR
North Carolina Department of Environment and Natural Resources
i
Beverly Eaves Perdue
Governor
Mr. J. J. Swain, Jr., P.E.
Division 13 Engineer
N.C. Department of Transportation
Post Office Box 3279
Asheville, North Carolina 28802
Division of Water Quality
Coleen K Sullins
Director
August 18, 2010
Subject: Inspection-US Highway 221
DWQ Project 08-1809
Individual Certification No. 3784
Dee Freeman
Secretary
TIP Nos. R-2233A
Rutherford County
Dear Mr. Swain:
On August 9, 2010, 1 inspected the construction work on the US Highway 221 Project in Rutherford County.
Clearing and grubbing work continues along with grading, culvert construction and work on the Broad River
B fidge.
Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are
performed as required to protect State surface waters. Also, please refer to the attached inspection report for
any specific items noted during the inspection.
If you have questions, please call me at 828-296-4500.
Sincerely, r
Michael R. Parker
Environmental Senior Specialist
Attachment
cc? Brian C. Skeens, PE
Roger Bryan, Division 13, DEO
Ed Ingle, Roadside Environmental
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
US Highway 221 August 2010 Inspection Letter
SURFACE WATER PROTECTION SECTION -Asheville Regional Office
2090 U.S. 70 Highway, Swannanoa, NC 28778-8211
Phone: 828-296-45001 FAX : 828-299-7043
Customer Service: 1-877-623-6748
Internet: ww mwateroualiN.oro
An Equal Opportunity 1 Affirmative Action Employer
NorthCarolina
Naturally
DWO Site Visits for DOT Proiects
Field Sheet
DWQ representative: Michael R. Parker Date: August 9, 2010
County: Buncombe Region: Asheville
DOT Division: Division 13
Activity: X 401 Compliance Evaluation ? Complaint
?DWQ Follow Up Evaluation ? Other
DWQ 401 #: 20081809 NW Permit #:l IP #: 3784
Project Name:
Location of Project:
T1P No. R-2233A
The project is located on US Highway 221 approximately 3 miles south of the
intersection of US Highway 74 and US Highway 221 in Rutherford County.
Project Complete: ?Yes X No
] Bridge
] Culvert
Bottomless Culvert
Bottomless Arch
XU Riprap Inlet/Outlet Stabilization
? Spoil Pile
? Borrow Pit
? Wetland Mitigation
? Stream Restoration
? On-site Stream Relocation
? Buffer Restoration
X? Bank Stabilization
X? Other Fill
If no, estimated date of completion:
Water Ouality Concerns (DWO):
? Steam Standards Violation
X? Turbidity
? Evidence of spills
? Oil/Petroleum
? Solid Waste
? Failed E & S control measures
X? Sedimentation Impacts
? Stormwater Permit Violation
? Fill
? Buffer Impacts (see below)
? Other
Additional Wetland Impacts: ? yes ? no Estimated Acres
? Zone 1 Est Acres ? Zone 2 Est Acres
Additional Stream Impacts: ? yes X? no Est Linear feet
Estimated linear feet of impact:
Buffer Impacts: ?Neuse []Tar-Pam []Randleman []Catawba
Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ac
Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact fU ac
Buffer Designation: []Exempt []Allowable []Allowable w/mitigation []Prohibited
Name of Waterway(s):
Basin/ Subbasin:
DWO Site Visits for DOT Projects
Background Info
Broad River, Floyds Creek
CTB 030802
Wetland Type: []Isolated []Non-Isolated (Waters of US)
Stream Class: []Class B ?303d Listed ?WS-I1 ?WS-V ?SB
X[]Class C ?ORW []Trout ?WS-III []NSW
?HQW ?WS-I ?WS-fV [-ISA [ICA
Type of Authorized Impact: X[]Culvert []Bottomless Culvert
[]Bridge []Bottomless Arch
X?Riprap Inlet/Outlet Stabilization []Fill
Authorized Wetland Impacts:
0.02 acres
Authorized Stream Impacts
2,686 linear feet
X?0 - 1110th acre ? 111 Vh to 113rd acre
? 1/3 `d to 1.0 acre ?> 1.0 acre
?< 150 linear feet X?> 150 linear feet
Some clearing and grubbing work is continuing. Grading continues on both sides of the Broad River and
construction work is underway for the new Broad River Bridge. Also, work has started on culverts.
At the Broad River Bridge project it appeared that one of the.permanent casing had not been seated properly and
drill slung was escaping into the River. Please ensure that all drilling operations are in compliance with 401
Certification conditions.
Project appeared to be in good condition.
Continue to maintain erosion control devices and continue with seeding and mulching as required.
R2233A Inspection Report August 2010