Loading...
HomeMy WebLinkAbout19970893 Ver 3_Major Variance_20070409F WATF O~0 9pG Michael F. Easley, Governor ~ .y William G. Ross Jr., Secretary > [ North Carolina Department of Environment and Natural Resources Q 'C' Alan W. Klimek, P.E. Director Division of Water Quality Apri19, 2007 Shotwell Landfill, Inc Attn: Mr. David King PO Box 576 Garner, NC 27529 DWQ # 97-0893v3 Wake County Subject Property: Shotwell Landfill Expansion, 4274 Smithfield Road, Wendell, Wake County, NC Marks Creek [030402, 27-38, C NSW] AUTHORIZATION of Neuse River Riparian Buffer Protection Rules MAJOR VARIANCE [15A NCAC 2B .0233(9)(c)] with ADDITIONAL CONDITIONS Dear Mr. King, You have our authorization, in accordance with the conditions listed below, to impact 94,090 square feet (ftZ) of Zone 1 of the protected buffers and 63,162 square feet (ftZ) of Zone 2 of the protected buffers to expand the existing landfill on the subject property as described within your major variance request dated November 27, 2006, received by the Division of Water Quality (DWQ) on November 27, 2006, and approved by the Water Quality Committee on March 7, 2007 with additional information received by DWQ on Apri15, 2007. This letter shall act as your Major Variance authorization as described within 15A NCAC 2B .0233(9)(c). In addition, you should get any other required federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control. This authorization is only valid for the purpose and design that you described in your Major Variance Request dated March 27, 2006. If you change your project, you must notify us and you may be required to send us a new request for authorization. If the property is sold, the new owner must be given a copy of this authorization and is thereby responsible for complying with all conditions. For this authorization to be valid, you must follow the conditions listed below. No impacts (except for "exempt" uses as identified within 15A NCAC 2B .0233) shall occur to Zone 1 of the protected riparian buffers. 2. Written Stormwater Management Plan (No Further Review Needed) The final, written Stormwater management plans that were included in your Major Variance request for your seven (7) dry detention basins must be implemented operational before any construction or landfill activities occur in the buffers at the subject site. The structural stormwater practices must be maintained in perpetuity. No changes to 4010versight/Express Review Permits Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-68931Intemet: htta://h2o.enr.state.nc.us/ncwetlands No°ehCarolina Jl~tatura!!r~ An Equal OpportunitylAffirmative Action Employer- 50% Recycledl10% Post Consumer Paper April 9, 2007 Shotwell Landfill Major Variance Page 2 of 3 the structural stormwater practices shall be made without written authorization from the Division of Water Quality 401 OversightBxpress Review Permits Unit. Deed Restrictions: Deed restrictions or similar mechanisms shall be placed on all retained protective buffers in order to prevent future buffer impact. These mechanisms shall be put in place prior to impacting any buffers approved for impact under this Authorization Certificate. 4. Certificate of Completion Upon completion of all work approved within this Buffer Authorization, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Mitigation: Compensatory Mitigation Using the Ecosystem Enhancement Program (EEP) Mitigation must be provided for the proposed impacts as specified in the table below. We understand that you wish to make a payment to the NC Ecosystem Enhancement Program (EEP) to meet this mitigation requirement. This has been determined by the DWQ to be a suitable method to meet the mitigation requirement. Until the EEP receives and clears your check (made payable to: DENR -Ecosystem Enhancement Program Office), no impacts specified in this Authorization Certificate shall occur. The EEP should be contacted at (919) 733-5205 if you have any questions concerning payment into a restoration. fund. You have one month from the date of this authorization to make this payment. For accounting purposes, this Authorization Certificate authorizes payment into the Buffer Restoration Fund to meet the following compensatory mitigation requirement: Compensatory Miti ation Re uired Reference Miti ation Page 3 of the narrative Zone 1 Buffers 94,090 (square feet) in the Major Variance 282,270 (square feet) Re uest acket Page 3 of the narrative Zone 2 Buffers 63,162 (square feet) in the Major Variance 94,743 (square feet) Re uest aclret If you do not accept any of the conditions of this authorization, you may ask for and adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. This authorization and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under the Neuse River Riparian April 9, 2007 Shotwell Landfill Major Variance Page 3 of 3 Buffer Protection Rules [15A NCAC 2B .0233(9)(c)]. Please call Amy Chapman at 919-715-6823 if you have any questions or require copies of our rules or procedural materials. Since , Alan W. Klimek, P.E., Director Division of Water Quality cc: Phil May; Carolina Ecosystems, Inc; 8208 Brian Court; Garner, NC 27529 Lauren Cobb, DWQ Raleigh Regional Office File Copy Central Files AWKlcbk/asc File: 970893v3 ShotwellLandfillExpansion(Wake)Maj VAR