Loading...
HomeMy WebLinkAbout20100414 Ver 1_Application_20100527 STATE OF NORTH CAROLINA DEPARTMNT OF TRANSPORTATION BEVERLY EAVES PERDUE GOVERNOR k4 y 2- v41 yam, 20/0 EUGENE A. CONTI, JR. SECRETARY . May 24, 2010 U.S. Army Corps of Engineers Wilmington Regulatory Field Office 69 Darlington Avenue Wilmington, North Carolina 28403 100414 ATTENTION: Mr. Brad Shaver NCDOT Coordinator SUBJECT: Nationwide 14 Permit Application for Secondary Road Improvement, SR 1422 (Blue Banks Rd.), Brunswick County, WBS # 3C.010060 Dear Mr. Shaver: Please find enclosed a PCN application from the North Carolina Department of Transportation for a Nationwide 14 permit for the secondary road improvement project on SR 1422 (Blue Banks Rd) in Brunswick County. The scope of the project will be to widen, grade, drain and base the 2.0 mile of existing unpaved road to current NCDOT secondary road standards of 20 feet of travel lanes and 6 feet of earthen shoulders to improve the roadway safety and stability. Also enclosed are wetland data forms and maps for the issuance of a jurisdictional determination based on our field review on February 17, 2010. As discussed, the jurisdictional determination form will be supplied to you electronically. By copy of this letter and enclosures, we are also requesting issuance of 401 Water Quality Certification 3820, from the Division of Water Quality (DWQ). We have provided a method of debiting $240 to process the WQC permit request, as noted in the subject line of this application. If you have any questions or need any additional information, please feel free to contact me at (910) 251-5724. Sincerely, Mason Herndon Division 3 DEO Enclosures cc: w/ attachments Mr. David Wainwright, DWQ Raleigh (7 copies) 124 DIVISION DRIVE, WILMINGTON, NC 28401 PHONE: (910)251-5724 FAx:(910)251-5727 O?off W?A TE?9OG Olqii? T Office Use Only: Corps action ID no. DWQ project no. Forth Version 1.3 Dec 10 2008 Pre-Construction Notification C Form A. A Hcant Information 1. Processing la. Type(s) of approval sought from the Corps: ® Section 404 Permit ? Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number. 14 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ® Yes ? No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ® No For the record only for Corps Permit: ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ® Yes ? No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ®No 2. Project Information 2a. Name of project: Blue Banks Loop Rd (SR 1422) 2b. County: Brunswick 2c. Nearest municipality / town: Northwest 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: 3.010060 3. Owner Information 3a. Name(s) on Recorded Deed: North Carolina Department of Transportation 3b. Deed Book and Page No. N/A 3c. Responsible Party (for LLC if applicable): WA 3d. Street address: N/A 3e. City, state, zip: N/A 3f. Telephone no.: N/A 3g. Fax no.: N/A 3h. Email address: N/A Page 1 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ® Other, specify: NCDOT Division 3 Engineer 4b. Name: H. Allen Pope 4c. Business name (if applicable): North Carolina Department of Transportation 4d. Street address: 124 Division Dr. 4e. City, state, zip: Wilmington, NC 28401 4f. Telephone no.: 910-251-5724 " 4g. Fax no.., 910-251-5727 4h. Email address: N/A 5. Agent/Consultant Information (if applicable) 5a. Name: Mason Hemdon 5b. Business name (if applicable): North Carolina Department of Transportation 5c. Street address: 124 Division Dr. 5d. City, state, zip: Wilmington, NC 28401 5e. Telephone no.: 910-251-5724 5f. Fax no.: 910-251-5727 5g. Email address: mhemdon@ncdot.gov Page 2 of 10 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification la. Property identification no. (tax PIN or parcel ID): N/A 1b. Site coordinates (in decimal degrees): Latitude: 34.34190 Longitude: - 78.13287 (DD.DDDDDD) - --(-DD.DDDDDD) 1c. Property size: N/A acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Grist Mill Branch proposed project: 2b. Water Quality Classification of nearest receiving water: CSw 2c. River basin: Cape Fear 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Site is currently unpaved secondary road. General land use is agriculture, residence and forestry 3b. List the total estimated acreage of all existing wetlands on the property: N/A 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: N/A 3d. Explain the purpose of the proposed project: To improve the existing roadway by bringing it up to NCDOT standards to provide a better and safer roadway for residents and school buses that utilize this facilty. 3e. Describe the overall project in detail, including the type of equipment to be used: To widen, grade, drain, add base and stabilize the existing road to NCDOT secondary road standards to 20 ft. travel lanes & 6 ft shoulders using standard road construction equipment. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ® Yes ? No ? Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type El Preliminary ®Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Mason Herndon Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Field verification: 2/17/10 5. Project History 5a. Have permits or certifications been requested or obtained for ? Yes ? No ® Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.3 December 10,' 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number- Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non404, other) (acres) Temporary W1 ®P ? T shoulder fill headwater forest ® Yes ? No ® Corps ? DWQ 0.07 W2 ®P ? T shoulder fill riverine swamp forest ® Yes ? No ® Corps ? DWQ 0.01 W3 ? PEI T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? PEI T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 0.08 2h. Comments: Impacts will occur at Site 1 8 2 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ? P ®T pipe removal/coffer Grist Mill Branch ® PER ?INT ® Corps ®pWQ 9 10 dams S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWO S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? PC] T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 10 3i. Comments: Site 1 proposed pipe is 5.5 ft shorter than existing, temp impacts are for pipe removal and coffer dams for dewatering, if required at time of construction. Page 4 of 10 PCN Form -Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number- (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes . ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ?Tor-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Tem ora T impact required? B1 ?P?T ?Yes ? No B2 ?P?T ?Yes ? No B3 ?P?T El ?Yes No 6h. Total buffer impacts 6i. Comments: Page 5 of 10 PCN Form - Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Side slopes designed at 3:1 or less. Headwalls included at stream crossing to reduce pipe length and stream impacts. No new ditching in wetland area is proposed. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Strict implementation of sediment and erosion control BMP's will be utilized to protect waters of the US. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ® No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete If Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-Ileu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a pennittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 61h. Comments: Page 7 of 10 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a . Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b . If yes, then is a diffuse flow plan included? If no, explain why. ? Yes ? No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? N/A % 2b. Does this project require a Stormwater Management Plan? ® Yes ? No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, na rrative description of the plan: NCDOT's BMP's for Construction and Maintenance Activities will be utilized to manage stormwater runoff during construction. Grass swales or alternative design will be used to the maximum extent possible in compliance with NCDOT's NPDES permit No. 000250 Post Construction Stormwater Program. ? Cert ifled Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ® DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? N/A ? Phase 11 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): N/A ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? N/A 4. DWQ Stormwater Program Review ® Coastal counties ? HQW 4a. Which of the following state-implemented stormwater management programs apply ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? Per letter from DWQ dated 7/23/06, approval not required for this project. ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? N/A ? Yes ? No 51b. Have all of the 401 Unit submittal requirements been met? N/A ? Yes ? No Page 8 of 10 PCN Form -Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la . Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ®No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 9 of 10 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ®No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act El Yes ®.No impacts? El Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Natural Heritage GIS data 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NC GIS data 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Project reviewed and cleared by NCDOT Human Environment Unit in coordination with State Historic Preservation office. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? FEMA GIS data Mason Herndon / .ate- ?? 5/17110 Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is rovided. Page 10 of 10 PCN Form - Version 1.3 December 10, 2008 Version / I . -- J " I / I ' I / I r I L 1422 jj2j 422 I ? ? d 3 , 1 /. _ ° ? 1131 H00.111WF51 qV ? Klr.lG / ?_ \ ' ? ? NbY 1121 a r i I I / r \/ pia \\ 1424 I i\ L / I / 1 \ J? wo aex ?- ror. avo 3 1LS HIS / 1.14 / / / Hi9 a ?? ' \ O I n ? [ ON 133HS tc , I I I I 1 ? W IL m Ih U a J I i I I .--i LO I----I v 'F ,- Ih 1 I I c n N N In cn I j , I .. ?pg I W O 9 / W X N X pU 'g A.? ? 1 P1' A - O O X I I rr) rn , I I 1 W - J X I 1 I Q U K1 I In N O O Z W I I I I ' N ~ o a_ -M I p21 ?2 i I X O w a 1 3 5 92 ? ' I p'12 'S? IS 1 , O 4 T - -+ - p 53 -? 5. I IS O IS 1 I ' O 71 1 p\ l I ?}. O 3 4 " 1 1 p 5 ?' 1 I O ? \ 1 I I 1 , ' I I I I i i . O PA q l2 I I I 1 I p\AAA WOP? A rpA42 I I 1 I I U 1 1 I 1 1 1 1 ? 1 I 1 I ' 1 J J 1 1 pa5\ 1 1 i ?' LL 1 1 1 1 1 , , , , ? , , O , W v? '" 33 ` O O ` N ?? ?? \ 9 ?` ` Ln % , iaA d9 ?`? 0 ? / /j X/\/ 00 ,6 .10 ?ew,5a d ? Q 8 2.56 O O J N _J W ?' C m O d ? ? O O O ZCn0 M F•' rnd ? m Q mm° ° 0 ° n a m v W U E O F- __o LLJ M O N Q 0: LO 3 R L) c 41 " N m 0 0 ° <rZ°Y W F- xtoE =D co z¢ WU a a N 02 eZ m w LL a v•• V LL U~: 0 E m 0) CL ° O ° z w ?m? Z F- 0 W U y Z N N fn Q J -W O 5; cc Lu - IX F- m d a m ° ° Q m W E Z cm N a U) C N C 0 N ca O O O = a) ? m= 0 U) U m 0 t d O O 0 U U d Z > E -N V a 0 0 O V ? Z g d) ? 0 F- m W ti_ a ° E m ° ° T F C N a c m U = m E lL N m p O p O O O a 0, - d tl U) (L m w ti v v > L > L (A co cn O N ~ C n + F E + I O O r LL O C O N j + + Ch I co r fN O fA Z H CNI DRIVE\RDY\blue banks\20100205_Blue_Banks\20100406_blue_banks_PLNl.agn ?RUNS WICK CO UN7 Y: "S NUMBER: ? z Z ; I / k / I 1 ? µ ? I I µ ? I I I I I I 1 1 µ I I I I 1 1 II I I 11' I I iµ µ It I I I µ µ I I IN µ I II µ II I 1 c I I m I I I 3 I 1 \? / ? E ? I I r I I I 13 / I I I 1 I I 3°m3c9 I I I La I I / I nip as Bm4 88 p =Qt 8 010 14:50 nents antl Set±InQs\crobbins\Desktop\D DRIVE\RDY\blue banks\20100205_Blue_Banks\20100406_blue_banks_PLN2.dgn ?UNl Y: BRUNSWICK WBS NUMBER ; ;?? g m? 1 P .. N C1 ?a? Ipl v ? =O z n A O u c y I I Zi ? ? g ? ? I I ??11 m r h ? aC 1 -? 1 0 0 0 R ?? I I I I I I gm I BBC 1 ? ? a-I?oDv : 1 F qq? 1 1 y I I I 1 I al QI o? I o, m I R 5a I ? BA p?+ I I S ??F 1 Ntl p ' I I I gm? QI B$ Q I Q I I I gm< ? 1 F m I I R BA? I ??? IQ I 1 I Q I I Rol ' 1 I Rq ' 1 i ' I I g < I I Rol I p8 ? ? I 1 G ?• $ I N L? g m? p {?y y = C' lM1 ) 14:57 nts and Settinggs\crobbins\DesktoD\D DRIVE\RDY\blue banks\20100205_Blue_Banks\20100406_blue_banks_PLN3.dgn AT DMAD248192 I INTRACT: "S 111U1 m I o P bi R8 i A Z ? ? I Z i I r ? I 1 ? m I ? a ? I I SAS QI L? ? ? 88 I I ?I I 8m , .a l I ? ?p l ? ? g m 4 I n E I I ? I a I I I R?g ?I I E 1 I ?Q I ml E I QI I I. ?1 I 1 gm? I ?a? IQI ? 8 I 4? I Q I -??-oD? 1 ??Ib I ). ) a-n-oD_ II R b4? I I \ ? x ? I II i 1 10 15:08 ants and Settingqs\crobbins\Desktop\D DRIVE\RDY\blue banks\20100205_Blue_Banks\20100406_blue_bonks_PLN4.dgn AT 03CAD248192 )NTRACT: "S NUMBER: ???; P O T r n = i 0 A N (n O y D y 88 i ?g \ ZS m ? A? 6 ?- h 10 15:29 ants and Settingas\crobbtns\Desktop\D DRIVE\RDY\blue bonks\20100205_Blue_Banks\201DO406_blue_banks_PLN5.dgn AT D3CAD24BI92 )NTIMACT: WBS NUMBER-.... f I I ati?pD? ? ? BK I i I tirpD? alp I - C3 I ? I ¢ Oro I I Z 4 co o y x?? b g q O Y 3c?u? z ?Z O ob4 a ? ny w tuY a?j 8 e? 0 C7 DRIVE\RDY\blue banks\20100205_Blue_Banks\20100406_Dlue_banks_PLN6.dgn )NTRACT.• "S NUMBER h6 0 m 3 0 P O c y D r o n Ln g I , :I 1 , ? I 1 I 1 I I u IT I , I I 1 I I I , 1 , I I :I 1 ' .I g I 1 I I B 1 I 1 I I I I '1 I , I I I , I I I" 'I I I 1 , I I :I I I I I , I I I , I 1 I I I I I 1 I I 1 I I I I I I II II I I 1 , I I I I I I I , I 1 PC SkL avacw I I I I I g I I I I a I ? A 1 , I I 1 I a-I oDp 1 1 w I I III, 1I ??k?? I 1 1 II I ?? 1 1 I 1 I I 85+00 I , I , 1 I1 I I 1 III 111 1 nts and Settin s\crobbins\Desktop\D DRIVE\RDY\blue banks\20100205_Blue_Banks\20100406_blue_banks_PLN7.dgn AT 03CAD248, LINTY : BRUNSWICK WBS NUMBER: ???? N N \ A u a a +?oD? m \ Ali o z Oi \ ti D r H \ SYa. SDf? 6g o O III at a? \i v ?p P 8 I m 1 a A ? RR?C 1 o? s o :b I? Dzv 5 ?010 15:55 ments a s AT 1 9. T: DRIVE\RDY\blue banks\20100205_Blua_Banks\2010D406_blue_bonks_PLNB.dgn ? N : p O ?^ T n O i p N J Q O n z D a o o . "S NUMBER ?? F R ? \ 111 I 3 awpD? 1 a ? a \ 1 pro, ?1"/ 1 p {a, 8 ? I 1 f a° 1 t` I 1 1 - -- I I 81 a 1 1 I f 1 1 I ? 1 I 1 1 ' I I f 1 1 a ? ? I Oil 9 1 ?I ? 1°; 1 1 ' 1 o I. 1 a 1 1 I f ' t?g I 1 1 1 1 I 1 1 1 I I 1 1 1 1 1 ? PC Sid pgI$QJI I 5 ? 1 p a? 1 1 ? a I1 1 I ?I 1 aY?pD? I 1 f 1 pppro I pSaQa I 1 1: W ig? 1 1 I I ? ? f '; ?1 1 + 1 \J 1 1I y7s l; % I I ? ca. i O / 1 I l pp/011