Loading...
HomeMy WebLinkAbout19980260 Ver 6_Modifications_20201105 Project Submittal Interim Form NORTH CAROLINA Ererfronentnte Quality Updated September 4,2020 Please note:fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type:* r For the Record Only(Courtesy Copy) ✓ New Project C' Modification/New Project with Existing ID ✓ More Information Response ✓ Other Agency Comments ✓ Pre-Application Submittal ✓ Re-Issuance\Renewal Request ✓ Stream or Buffer Appeal Pre-Filing Meeting Information Before submitting this form please ensure you have submitted the Pre-Filing Meeting Request Form as we will not be able to accept your application without this important first step.The Pre-Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a)"At least 30 days prior to submitting a certification request,the project proponent shall request a pre-filing meeting with the certifying agency"and in accordance with 40 C.F.R. Section 121.5(b)(7),and (c)(5)all certification requests shall include documentation that a pre-filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request.Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of Pre-Filing Meeting Request here:* RE U2579DEF potential 185.5.. mitigation site.msg Date for Meeting Request* 6/4/2019 ID# 19980260 Version 6 Project Contact Information ....................................................................................................................................................................................................................................................................................................................................................................................................... Name: Kristi Lynn Carpenter for Amy Euliss VNio is subnitting the information? Email Address:* aeuliss@ncdot.gov Project Information ................................................................................................................................................................................................................................................................................................................................................................................................... Existing ID#:* Existing Version:* 19980260 6 20170001(no dashes) 1 Project Name:* Winston-Salem Northern Beltway Phase 2 (R-2247/U-2579) Is this a public transportation project?* (' Yes C No Is this a DOT project?* (7 Yes C No Is the project located within a NC DCM Area of Environmental Concern (AEC)?* C Yes C° No r Unknown TIP#: WBS#: R-2247/U-2579 34839.3.GV7 (Applies to DOT projects only) County(ies)* Gaston Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach docurrent U-2579DEF permit modification 11.4.20.pdf 8.59MB 19980260version6 application email.pdf 147.62KB Only pdf or lere files are accepted. Describe the attachments or add comments: Original submission via email. * I By checking the box and signing box below, I certify that: • I,the project proponent, hereby certifies that all information contained herein is true,accurate, and complete to the best of my knowledge and belief. • I,the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I agree that submission of this online form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the online form. Signature: Submittal Date: Is filled in autocratically once subrritted. --n sra�rea'•, STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J.ERIC BOYETTE GOVERNOR SECRETARY November 04,2020 U.S. Army Corps of Engineers Asheville Regulatory Field Office 151 Patton Avenue,Room 208 Asheville,NC 28801-5006 ATTN: Mr. Eric Alsmeyer NCDOT Regulatory Coordinator Subject: Request for Modification to Individual Section 404 and Section 401Water Quality Certification for the Winston-Salem Northern Beltway from US 52 to US 311 (New Walkertown Road),Forsyth County. Federal Aid Project No.NHP-0074(213), TIP Nos. U-2579D,E&F. Division 9. Reference: Section 404 and 401 Individual Permit Application requested October 2,2017 for Winston Salem Northern Beltway from I-40 to US 52(R-2247B Phase 2, CA, CB, CD,D,EA,EB, and EC), from US 52 to US 311 north (U-2579C Phase 2, D, E, and F) and from I-40 Business to US 311 South(U-2579AA and AB) - Modification Application for U-2579D,E,F/U-2579C Phase 2,dated January 7,2019. - Modification Application for R-2247EB,dated June 26,2019. - Modification Application for U-2579D,E,F, dated October 17,2019. Section 404 Individual Permit issued for Winston Salem Northern Beltway from 1-40 to US 52(R-2247B Phase 2, CA, CB, CD,D,EA,EB, and EC),from US 52 to US 311 north(U-2579C Phase 2,D,E, and F)and from I-40 Business to US 311 South(U- 2579AA and AB)January 22,2018 (SAW-2017-02112) - Permit Modification for U-2579D,E,F/U-2579C Phase 2,dated March 4, 2019. - Permit Modification for R-2247EB, dated August 13,2019. - Permit Modification for U-2579D, E, F, dated January 29,2020. Section 401 Water Quality Certification issued November 14,2017 (WQC004131); for Winston Salem Northern Beltway from 1-40 to US 52(R- 2247B Phase 2, CA, CB, CD, D,EA,EB,and EC),from US 52 to US 311 north (U-2579C Phase 2,D,E, and F) and from I-40 Business to US 311 South(U- 2579AA and AB); Revision 1 dated November 27, 2017,Revision 2 dated December 21,2017 ,Revision 3 dated February 7, 2019,Revision 4 dated August 13, 2019,Revision 5 dated November 14,2019. Mailing Address: Location: NC DEPARTMENT OF TRANSPORTATION Telephone:(336)896-2330 375 SILAS CREEK PARKWAY DIVISION 9 Customer Service: 1-877-368-4968 WINSTON SALEM,NC 27127 375 SILAS CREEK PARKWAY WINSTON SALEM,NC 27127 Website.www.ncdot.gov Dear Sir: The North Carolina Department of Transportation(NCDOT)requests modification to the existing Section 404 Individual Permit and Section 401 Water Quality Certification for the proposed Winston Salem Northern Beltway from US 52 to US 311 (TIP U-2759 D,E, and F)in Forsyth County. This project is currently under construction. This modification will result in no changes to wetland impacts previous documented. It will result in 31 linear feet of additional permanent stream fill impacts and 20 linear feet of additional temporary stream impacts. The total project impacts for U-2579D,E, and F include 12,111 linear feet of permanent stream impacts of which 405 linear feet is bank stabilization, 615 linear feet of temporary stream impacts, 1.66 acres of permanent wetland impacts,no temporary wetland impacts,and no hand clearing in wetlands. Please see the enclosed revised permit drawings and updated impact summary sheets which reflect the changes in impacts. Permit Impact Site Modification Site 18A(Roadway Plan Sheet 20): Site 18A impacts changed as a result of the decision to remove a 24" reinforced concrete pipe(RCP)located to the south of the Winston Salem Northern Beltway roadway alignment and to the west of Phelps Drive(Y6C). The parcels(5 total)where Stream ES-S68 (UT to Mill Creek)and the existing 24"RCP are located were obtained by NCDOT during the right of way process. Access to the parcel is being removed along with the homes and sheds that occurred on the parcel(s). This site was reviewed for onsite mitigation potential;however,due to a number of constraints,it was determined that the best solution was to remove the 24"RCP and replace it with a standard base ditch with embedded rip rap. The main constraint and reason to use the standard base ditch is due to the steep slope of the channel. There will be 20 linear feet of temporary impacts at this location in order to dewater the existing stream around during construction. Removal of the 24"RCP will result in 141 linear feet of channel being daylighted. There will be 7 linear feet of permanent bank stabilization impacts to the channel beyond the pipe to tie the channel in at the inlet location and 24 linear feet of permanent impact to correct the existing scour and tie at the pipe outlet. No additional impacts will occur at this site. Site 26 (Roadway Plan Sheets 24/25): Site 26 impacts have not changed from the modification dated January 2020;however,the design has changed due to the noise walls. A ditch is required along the toe of fill that will tie to the existing bank stabilization at the inlet of ES-524. The updated plan sheets are attached. Compensatory Mitigation At site 18A, compensatory mitigation is proposed for the 24' of new linear feet of permanent impacts to correct the existing scour and tie at the pipe outlet. No compensatory mitigation is proposed for the 7' of permanent bank stabilization impacts. Table 1 below illustrates the current summary of stream impacts requiring mitigation which has changed since the last permit modification request dated October 17, 2019. Table 1. Summary of Stream Impacts by Project TIP Requiring Mitigation Stream Impacts Difference in Requiring Final Stream Impacts Section Design Stage Mitigation from Impacts Requiring Requiring Phased IP Mitigation(101 Mitigation Application(lf) (10 R-2247EC Permitted 814 814 0 R-2247CD Permitted 611 611 0 U-2579C Phase 2 (U-2579D,E Permitted 3,409 3,178 -231 &F Sites 29& 30) U-2579AA Preliminary 3,019 3,019 0 U-2579AB Preliminary 10,351 10,351 0 U-2579D Permitted 5,043 4345+* - 698 U-2579E Permitted 4,864 4,817 -47 U-2579F Permitted 2,544 2,502 -42 R-2247EA Preliminary 0 774+ 774+ R-2247EB Final 5,819+ 5,323 + -496 Totals 36,474+ 35,710 2 -764 1 Final impacts for each section in the preliminary design stage will be updated with future modifications. 2 Assumes the preliminary impacts for future sections. +Revised,per Permit Modification for R-2247EB[NCDOT's R-2247EB Modification application,dated June 26,2019;USACE's R- 2247EB Phased Modification(Action ID SAW-20 1 7-02 1 12),dated August 13,2019]and Permit Modification for U-2579DEF[NCDOT's U-2579DEF Modification application,dated October 17,2019;USACE'sU-2579DEF Modification(Action ID SAW-2017-02112),dated January 29,2020]. *Revised,per the current permit modification for U-2579DEF,dated November 4,2020. Thank you for your assistance with this project. If you have any questions or need additional information, please contact me at either aeuliss@ncdot.gov or(336) 747-7800. Sincerely, Amy Euliss NCDOT Division 9 Environmental Officer cc: Bill Barrett,Environmental Analysis Unit Michael Shumsky,PE,Project Manager,NCDOT Design Build Unit Marcus Kiser,PE,NCDOT Division 9 Resident Engineer Phil Suggs,NCDOT Division 9 and 10 Roadside Environmental Filed Operations Engineer Beth Harmon,Division of Mitigation Services Amy Chapman,NCDENR-DWR Dave Wanucha,NCDENR-DWR North Carolina Department of Transportation Environmental Analysis Unit(EAU) Raleigh,North Carolina UT to Mill Creek and Mill Creek On-site Stream Mitigation Feasibility Report for Winston-Salem Northern Beltway Forsyth County, North Carolina T.I.P. Number U-2579 D, E, and F WBS No. 34839.3.GV7 May 22, 2020 1.0 BASELINE INFORMATION The project is located within USGS Hydrologic Cataloging Unit 03040101, and NC Division of Water Resources (NCDWR) sub-basin 03-07-04 of the Yadkin Pee-Dee River Basin, and is part of the of the South Atlantic-Gulf region. The potential mitigation site is located along and to the west of Phelps Drive approximately 0.35 mile east of Baux Mountain Road in Forsyth County on the north side of Winston-Salem, on land that was purchased by the North Carolina Department of Transportation(NCDOT). The project is within the Piedmont physiographic province, specifically near the line between the Northern Inner Piedmont and the Southern Outer Piedmont Ecoregions. Land use within the watershed is primarily residential development, forested areas, and agricultural. The existing stream length, drainage area, and jurisdictional status are summarized in Table 1. Table 1. Summary of Existing Stream Length and Drainage Area. Stream Reach Existing Length Drainage Area Intermittent/Perennial Status (LF) UT to Mill Stream reach considered intermittent by Creek 419 17.7 ac agencies during impact assessments. Status=Intermittent Stream reach considered perennial by agencies Mill Creek 285 3.45 sq.mi. during impact assessments. Status=Perennial The project includes analyzing the feasibility of restoration, enhancement, and preservation of an unnamed tributary(UT) to Mill Creek as well as enhancement and restoration to areas along Mill Creek. Mill Creek has been assigned Stream Index Number12-94-7 (NCDWR 2020) and is designated a warm water stream with a classification of C. Class C waters are protected for secondary recreation, fishing, and aquatic life. Page 1 of 7 Most of the native plant communities have been removed from the site as the area has been mowed and maintained for the nearby residence and outbuildings which have now been removed through NCDOTs acquisition of the property. NCDOT is analyzing the potential for on-site mitigation for jurisdictional stream impacts associated with Transportation Improvement Program(TIP) U-2579DEF as part of the construction of the Winston-Salem Northern Beltway. The project would serve as on-site mitigation through the restoration, enhancement, and preservation of 705 linear feet of streams if deemed feasible. 2.0 SITE SELECTION TIP U-2579 DEF involves construction of the Winston-Salem Northern Beltway from US 52 to US 311 (New Walkertown Road). The stream restoration, enhancement and preservation site was selected due to its location within the U-2579DEF corridor and NCDOTs purchase of the property related to the project. The potential mitigation area includes approximately 1.5 acres within a Right of Way held by NCDOT. Within this area,the NCDOT reviewed the potential for restoration of the UT to Mill Creek,restoration of Mill Creek at the crossing of Phelps Dr, and enhancement along Mill Creek. These options are referred to as options 1, 2 and 3, respectfully. These options are summarized in table 2. 3.0 OPTIONS REVIEWED Option 1: Restoration of Unnamed Tributary to Mill Creek The existing UT to Mill Creek begins immediately downstream of a 24"pipe within the footprint of the U-2579DEF road construction project. The UT extends over 6001f from this point to where it ties to Mill Creek. The far upstream extent of the UT is marked by severe channel and floodplain incision immediately downstream of the 24"pipe where the channel begins. From this point, moving downstream, the floodplain begins to widen allowing the channel some meander pattern progressing south toward Mill Creek. Around the midway point along the UT, the channel proceeds through another 24"reinforced concrete pipe for 141 lf. Approximately 180 lf of the upper portion of the UT will be filled in by the new roadway facility (permit site 18). Extensive Class I Rip Rap outlet protection is called for in the construction plans to address stability concerns due to a 42" cross pipe and 18"pipe system outlet at this location. This mitigation feasibility analysis reviewed restoring the UT to a natural channel design from the terminus of the existing impact at permit site 18 to the tie in with Mill Creek. The feasibility analysis reviewed three options for the Unnamed Tributary to Mill Creek. These are referred to as Options 1 a, lb, and 1 c below. • Option la proposes to remove 141 ft of existing 24"pipe and Provide full restoration of the UT to Mill Creek by grading a new floodplain, installing a number of grade control structures and steps to stabilize the channel, and plantings. See Figures 1 thru 3. Page 2 of 7 • Option lb incorporates restoration, enhancement, and preservation of UT to Mill Creek. This option attempts to strike a balance between the costs of full restoration and obtaining mitigation credits. See Figures 4 thru 6. • Option lc, is based on removing 141 linear feet of existing 24"pipe and replacing it with a standard base ditch with embedded riprap for stability. This option does not propose mitigation credits for this work. Instead, it avoids a potential issue with the existing pipe in the future by removing it prior to access being removed or restricted. See Figures 7 and 8. Issues Discovered with Options la and lb The feasibility analysis has several constraints which would make options 1a and lb appear cost prohibitive on the UT to Mill Creek. These challenges include long term stability, grade control, cost associated with necessary cut to achieve adequate floodplain, and buffer limitations due to utility easements. Stability and Grade Control Concerns: First and foremost was the channel slope which is 3.8% or more specifically the UT to Mill Creek drops 19 feet in elevation over 500 feet in length. In order to address that slope and provide full restoration on the UT to Mill Creek would take significant grading and a significant number of structures in order to stabilize the channel. Because of the slope of the channel, there is also a high potential for head cutting if any proposed structures were to fail within the restored channel. There is an approximately 8 foot drop to get from the UT elevation in the floodplain to the elevation of Mill Creek which poses a challenge for stability and would require a substantial structure and some grading if you left the channel at existing grade and simply tried to tie it in at Mill Creek. Even by doing that there is still a steep grade on the channel which would require a number of structures to stabilize the channel. The existing 24"pipe to be removed has a slope of 2.5%. As shown in the profile drawing (Figure 6), there is notable drop-down in channel elevation as water enters the inlet side of the pipe. At the outlet end there is a 2' drop from pipe outlet to channel bottom. This outlet drop is stabilized by a small concrete pad. Grade control structures would be needed for stability of the channel and prevention of potential head-cutting in the channel. In addition, the new channel will need to be steeper than existing pipe to avoid drastic elevation changes at the upstream and downstream ends. As seen in profile drawings for Options la and lb (Figures 3 and 6) the longitudinal slopes would need to be 3.5- 4%to better tie with the channel upstream and limit amount of grade change at the downstream end. Grade control needs to be achieved through the use of rock cross vanes. These have been shown on the mitigation plan drawings for Options la and lb (Figures 1 and 4). With the amount of grade change in this section, as well as the overall site, trying to achieve any riffle-pool sequence would be problematic as the riffle sections would need to be very short in Page 3 of 7 length and severely steep. Therefore a typical section resembling that of a constructed riffle with adequately sized stone to be embedded to channel depth would be required. At the locations noted on Figures 4 and 7, the existing channel braids with some channel flow accessing the floodplain of Mill Creek. If we were to take this channel offline we would face challenges with grade change and tying a new channel into Mill Creek in a stable fashion. Floodplain Concerns: In addition to the slope and stability issues noted above, another item that is of concern creating and maintaining the floodplain. In the full restoration option (Option 1 a) floodplain would need to be created due to channel elevations and topography. For studying the feasibility of this option we set the longitudinal grade by mirroring the existing channel grade for the UT and then stepping the proposed channel down after reaching the top of bank for Mill Creek(See Figure 3,profile). Proceeding in this fashion kept the longitudinal grade as low as possible (aided by drop structures near pipe removal) and limited the amount of floodplain excavation needed. Even still,we estimated approximately 1060 CY of grading. Another concern is with potential backwater impacts to the channel that could occur due to high flows in Mill Creek. As mentioned above about stepping a new channel down to tie back in with Mill Creek, we would need to accomplish this with grade controls structures. There would be potential for these to degrade or fail due to effects of higher flows in Mill Creek. Other unanticipated impacts that could occur include potentially impacting wetlands that exist in the floodplain of Mill Creek that were not previously mapped as jurisdictional to the west of the existing tributary. Option 2: Restoration to Mill Creek at Phelps Drive The two options reviewed at the crossing of Phelps Drive included restoration using natural channel design(option 2a) and stabilizing with conventional means as approved in the permit application(option 2b). Option 2a: Option 2a includes restoration along Mill Creek where the existing culvert will be removed using natural channel design methods. The intent would be to lay back the slopes and remove the existing roadbed/fill to accomplish this. The slopes would be matted and planted with livestakes. The existing scour hole would be filled in and banks repaired to tie in with the new opening from removal of the culvert and the existing channel downstream. The goal would be to install a minimum of two structures to assist in stabilizing the channel grade where the culvert is removed and scour hole is repaired. There would not be any relocation of the channel with this option. Option 2b: Option 2b includes removal of the existing culvert and stabilizing the area with riprap as detailed and illustrated in the permitted plans. Page 4 of 7 Issues Discovered with Options 2a The main issue discovered when analyzing the options of restoration along Mill Creek include the potential to increase instability along the reach and the existing utility easement along the left bank of the channel. There is a potential to impact the utility easement by laying back the channel to a stable slope depending on the final designed slope. In addition, when laying back the slopes in just a short section of the channel there would be additional stress added to those banks when the flow necks back down to the existing channel and could create a potential area of erosion or scour. The channel has a large drainage area and storms or other events could significantly impact the stability of the reach during the time it takes to stabilize the plantings. This could lead to future maintenance issues and/or additional sedimentation into Mill Creek in the interim. Option 3: Enhancements Along Mill Creek Option 3 includes enhancing the riparian buffer along Mill Creek. This option includes planting of native bareroot tree and shrub species. The goal would be to plant a minimum 50-foot buffer if possible; however, there is an existing utility easement that would not allow that width to the south or along the left bank of Mill Creek. The minimum width of buffer along Mill Creek would be 35 feet along the utility easement. Table 2. Summary of Restoration and/or Enhancement Options 1,2 and 3 and Proposed Mitigation Amounts. Mitigation Option Existing Area Length Potential Credits Restoration Approach UT to Mill 420 Restoration of entire UT to Mill Creek using Creek la 420 LF (1:1) natural channel design. UT to Mill 22 Preservation will consist of maintaining the lb 87 LF stream reach and existing stream riparian buffer Creek (4:1 ratio) as it currently is in the upper section of UT. Restoration will consist of removing the UT to Mill lb 156 LF 156 existing 24"RCP and replacing it with a stable Creek (1:1 ratio) 3'wide base channel and building a 10'wide floodplain bench on each side. Enhancement will consist removing the existing trees which are growing in portions of UT to Mill 44 the channel and planting a native riparian Creek lb 177 LF (4:1 ratio) species typical of a bottomland hardwood forest. Any invasive tree/shrub species noted will be cut and treated with herbicide. Restoration of the channel in the area of an Mill Creek 2a 89 LF 89 existing culvert and repair of adjacent scour (1:1 ratio) hole utilizing natural channel design. Page 5 of 7 Removal of existing culvert and install rip rap Mill Creek 2b 89 LF 0 channel per permitted plans. Enhancement will consist of planting a native riparian buffer with species typical of a Mill Creek 3 196 LF 49 bottomland hardwood forest.Any invasive (4:1 ratio) tree/shrub species noted will be cut and treated with herbicide. Full 50 ft wide buffer is not possible due to existing utility easement. 4.0 PROJECT COST ESTIMATES FOR UT TO MILL CREEK Three cost estimates are provided below based on the three options that have been reviewed for the potential mitigation site (Table 3). The first cost estimate provided is based on providing a full restoration of the UT to Mill Creek by grading a new floodplain, installing a number of grade control structures and steps to stabilize the channel, and plantings. In the table below this is Option 1 a. Option lb below is based on the proposed plan detailed in the previous sections of this document which incorporate restoration, enhancement, and preservation of UT to Mill Creek. This option attempts to strike a balance between the costs of full restoration and obtaining mitigation credits. The Table below illustrates the cost estimate for Option 2. The final option, Option 1 c, is based on removing 141 linear feet of existing 24"pipe and replacing it with a standard base ditch. This option does not propose mitigation credits for this work. Instead, it avoids a potential issue with the existing pipe in the future by removing it prior to access being removed or restricted. Table 3. Cost Estimates of Potential Options for UT to Mill Creek. Potential Estimated Cost of Option Description Mitigation 1 Credits Construction Option la Full Restoration of UT to Mill Creek 420 $180,000 Combination of Restoration, Option lb Enhancement,and Preservation to UT 222 $111,000 to Mill Creek Option lc No Restoration—Pipe Removal on UT 0 $41,000 2 to Mill Creek Option 2a Full Restoration—Mill Creek 89 $110,500 No Restoration—Pipe Removal on Included in the cost of Option 2b Mill Creek 0 the D-B contract Page 6 of 7 Option 3 Enhancement—Mill Creek 49 $7,700 ' Please note: This is a preliminary Rough Oder of Magnitude Price only and final pricing would need to be submitted following issuance of RFC plans for the selected option. 2 Assumes work would be completed by the D-B contractor rather than an approved mitigation contractor. Recommendations Based on the above description of options regarding mitigation at the UT to Mill Creek and Mill Creek at Phelps Drive,NCDOT has determined the best path forward as Option 1c which is to remove the pipe on the UT to Mill Creek and stabilize the area and 2b which is removing the pipe on Mill Creek and proceeding with the permitted plans for stabilizing the channel. The decision to move in this direction was based on a number of factors such as cost of construction when weighed against the potential mitigation credits, long term monitoring and maintenance of the site, and utility encroachments. The overall benefit of doing full restoration would not provide significant ecological uplift on either reach and could introduce instability of either reach following construction. Page 7 of 7 /___ ,/, ' ' \ \ \ + \ I I �� \ --� \ 1 PROJECT REFERENCE NO. SHEET NO. _ i - / ,/ �_. I I I \) `\ I I \�\\0 \ \ \ \ \ \ I \ \ `\ `\ `� i— \� I\ ^ I \ \ \ \ 1 �� \ \ \ \ I _ ___ I 7 \\ \\\ \ \ \ \ I I I \ \ 1 I \ el �\ \ \, \ \ \ \\ \ \ ■ HDR Engineering, Inc. of the Carolinas �,---/�� / I /' / 5�1� \ \\ \ \ I I I I 1 \ \ \ \ 1 \, \ ` ` / I \I\ `\ \ \ \ ,.\I 11 \ \ I \ \ \ \ U-2579D E & F ———a , �,3� \ N \ \ \ \ , \ \. \\ \\ \ I \ \ \ \\ \, ) `\ / \\ \ / \ _ \ I \ \ \ \ \ 555 Fayetteville St, Suite 900 Raleigh, N.C.27601 „ / /C'` L //%''' \ 1 \ I 1 1 \ 1 \` \�' ` \ N.C.B.E.L.S. License Number: F-0116 PM SHEET NO. / i \vim'%' \ 1 1 1 I 1 \ 1 1 \ 1\1\ \ �� \ \ \ \\ \ \ I \ / \ \� \ \ -- I \ \ \ Y ` \••:\ 4 6\c()\ ` �\ Y `\ ROADWAY DESIGN HYDRAULICS ; / �� \ \ 1 1I1I \ \ \ \ \ \ 9 \ 1 \ \ \ — \\ I \ \\ \ �$, \\ 1 , , 1 I 1 1 I , I 1 ! _ 9 ��- VI 1 r STV Engineers, Inc. co _ 100 900 West Trade St. Suite 715 __ 7 .,_ .....__7 I I •\ o \�\ \ 8> `\ \ \\ \ / 875 \ , // •\ \—\\ T�\ -_ -- / - \ \ `\ \ T , Charlotte, NC 28202 �� \ \ \ \ \ NC License Number F 0991 _� , I \ —t I 1 1 I \ \ \ I I I \ \II11 1 ' 1' Ems/ I 1 \ \ p CD ,I \ \ \ \ V A A \ \ I I I I I 1 VIVAIII ✓ A A v� A AV A A , ^ \ v / A V v �� -�/ / �, v � ���: C68 -- / / \ \ \ 1 I \ v \ R .. \ \ N. \ / \ •\ .N / \ _ my / \\ � I V A\ \V A \ \FS V I I I 1� 11� v �� v A v\ \\ �/ ' ���4- vv v_�^ // A\ /i v ` ����-_ir. \�\ �18�� . \ 1 e\,, / -\-- / t•---. gip �.� RCPItir ,,,/ / co , \ 116 i 1 11 : ' ----\\IN ----------- \ ill 0 \ I \ \ ,,,____.__ \ \ F 1 \ \\ \\ \ , \ �- / . _ I \\ \\ / / \ \ < _ �// , \ \ \ \ I I I \ cp // \ , a I I I ' \ \ I -f —�— I"\� �� \ I / • if- I / L D A / —_ /� \jilt\ lI I 1 1 \I `\ / I II �i'r�-L ��� 1 I ' � • � \ \`- _�--------- -I �2 , �\,/�^� \ , ``, /'- \� �� \` I :II, I l \61 !A � \`\\ / /� I T I II I �\ \ \ \\ \ \ � (� I I l���' ` ��� \ `\ //�\\ I //� \ \ ' / �� `6 V �41: \ \\: \I) I \\ \ 19. \l -, l/ I -r I l \ \ \ I I \J \ \ \ \ \ I / \ \ \ 'I�ri�ii8� I \\ I / \// / _/� I1ICI 1 II �� \ \ \ \\ \ \ 1 \ ` \ \ 1 �\\ \ --- �\ I \\ / , // \\ \ / 013> '� 1i�ii� \ �I I �N© / ��- - - >- - - � / ) I I 1I \ \ \ \ \ \ \ II 1 I ) `" T I �� \�— `� �/ ` / \ \ ����\ ���►,���,L� �-��. ` /\� I IGII / E/ \ ` (/ Q__--- / / / / 11 1 l V 1 I A \ \ A 1 1 I / �. I 1 I r �Il .� �� �� \\\ � _- /B r__/7 ��\V� �� �1�7��� I � / ( \ 9�:U /' , V I I I A V \ \ \ 1 I / � O I 1 11111rAWO 11 I A \ / / p!'CV'���� �i� / A N / , / I I I I \ \ \ 1 r I I / \ 1 I ♦ `,,, II �\ N\ \ / /.\ \ / � � / ` \ `�\�,/� �.� \ / ` �• INC/ I \ _LL 1 O� Ili I I I / \ \ \� ` \ ��► I � s '�h ) \ \ik \/// -__� I 1 I 1 \ \ \ I \ / \ I \ \\ IL I1111 � � \ 870�/ \�� /' 869�\ / \ \\�� _ `iii, `\ "`�1�`� 'I ��'���� �� ) `� \ \ I 1 8 \\ ID II • / \ \ ___-- /,�' / / ��I I/ �o I / 1 / \ \ '1 o s. / \-- N \ \l1\\ \\ '1���� �� \_\ �\\ \ , \� (`l �_ �_ 1 \ / \��1400147 'I�'��il r I � 1 /VP FENCE TBi the ''' Y 0 C �— I �J1 i i �1' Veii\r I t f- � ' \ //\, ' \ \1 \J( \ k i11�/� \\� �' \ \\-- F \\ /' // \ \ \ \� /\�� _ `� 1vaimievit,„"rititairs � ����"— � V� C _——' ——— I I I° ,„,,. I I i 1 \° I I 1 \ 4,� \o*e�.� -6 ` ��_ \ i68 __— '1 1 — ,/ / \ / g6,\ \\co//, -, iI �''rt� — V / /0\ j/ 1 (-)1 1 A 1 1 1 !A1 \ I , \ \ \- \\ , \\\ \ -it,_. \ ,� \\ - i� � _ -"liarree.-7-17).A...IV_ FLATIRON ---,__j- - _ oiCb I I I ( , \ \ \ \ ( 1 \ s'\ N ,\ vlik \ _ ) / ii\N\ ,,,. ...--------7---,7",,,---,\,7 /\-- v IVIPPr' <0 / I I llikrY1416 i 7\ //Ca' irma FENCE \ \ \ 1 \s• �� ��\ . -- ONID,141i►n1 i - ,\ C1 1 _ Ni i ,�� !�\� C GRAPHIC SCALE 10 ___-- , 1 1 1 1 1 \ - \ \ \ \ \ . \ \\\ In, . ,\ \ ....- 0) ,6,40r" - r:,/ ir 1, InI _ _ I I I ( \ \ \ \ \ \\ / lii 1 1\ / ' ems, \ / -ry / , r— / /1�. ' 1 25 0 50 OUTLET CHANNEL PROTECT! N I I I �: , I \\ /' / ��- /ND �� /\ \ o /,a;2- ,/ __/ -4 `\ O T - I I A \ \ \ \ \ \\\ r I l V / / �� A _ A\V \ /' /' /' /' it I �� .. v v 10) I. d11,� . �L�S r-RIP SAP I ► \ I , \\ ell I / e, ,'''` \\ �' k7\\------ /' ,� / ,' ' �'� . � � \\ PLANS „ , , , 1 lip , EST 82 TONS ► Iirip* -c9::____,_ / , _ 1 kV VPV L \ 139 SY �EO1'EATIL� / \ \ \ 1 I I I I 1 \�'� 4.., ,_ _:- \ / \ I / /..„- „ „ i , 1 \ _1 / ----_/ / , \ A \ \ I 1 ' I- A / icb A s-- 4 w SEE DETAIL 20—ti0--�� I I It ' s \/ BUDDING D M J� \\ a • , \ I 1111, NN CANOPIES H - € \�\ __ .4P1,01/ iire , 1 / / I I 1 /\ I �/ / / \ \ \ \ \ 1__ go= \ I 1L):2)) // ,' REMOVED \�1 11 1 1 , .--, rc--0 /// / / tillt. N co r ,'8.4. \ 6 \gad'_—� ----------------\\ \ \ \\ \ / / , , ft / MTL _ __---- / / / , / / I 1 / �� --878-- �,\ \ �._\ \ \� `\ W REr ,,elt ' / f ACP /' /_ if\ / ) \ C / /' \ �\ \ \ \ \ \ / \ \l \s�\�\ + \\\\�w 877-- -- • \ \\ \ \ \\ \ �/ / 1 , , // / ) _/ / �� y� \ o\\ /\ \ \ / \_ / �� JJ \\\ \\ ` ` _/I v v --. --- / / \ 4k49\s \\\\\\\\ \, / p� -876------� \ \;\; \ / / III / /� /' // I / �7'� /' �/ `\ `\ \\ \ I / , / \ ) I / �`-- --__-_ \ \ / / / 1 I `� / /, , I I I / 1�/TA Itit Q�� �/ -// ,/ N. N. ` �1` / I \ \ \_`_ I 11 \I 74, , , o, ... , co _ __ [ .,, , , • o u _____ \-- 875 _ - '/�'//I I 1/' /'/I 1U�L� 1 IAVi \ \? /' W Ill / �/ ��/ / \ •\ �a \\ \ -�, \ \ I i ; 1 1 I I / yyI // - _ -,_ / , , \ '$E RE OV 1 '� ' \ iii / - /-' / \ \ , \ I I `-----851-- I ` I ' III ' ' 11III , ...--(6/7- __ 7 7 _ - - _ ___4 - ,, \ raii Z _ — _ _ , 1., ,�,g� „,_ / __ g�0ii ; \ I �„ PROPOSED/ CHANIyEL REST a C�P�Ikl, , -- --- \ \ �\ \\�/ _ , , III I 11�ti, SEE DETAIL 20=}2 --- \ I ,' �' / / / / \\se\\\\ Cc1L \ 1 / /I ‹,,,, V�► / ' / / \Mr, z / ��^> \\ \ \ / N � /III EL o - 1 / / Ili 11, ,- . ....- 7 ' / / / lid / / /....„ I \ \ \ \ \ / ) //\ 1 Je i ------ \ \ \ - ° \\:-.; 0 _ CR 6b it Iklip ! ci 1 7 - IF - / ci U DETAIL 2 0 12 J /' , ��� I‘----"" // / \ \ \ \ \ \ ��/i��' /-- ,/ �� ' ' /'' �� ° I / ' �V\\\ Aiiiii464:itili __ _ l -� �. \���/i''' �—' 8CC PROPOSED CHANNEL RESTORATION _� 1 Via;,, PROPOSED ROCK CROSS VANE (TYP.) `, \ v — g5� g !�� / �,� _\\ T ( Not to Scale) ---� _ �� ��,, \ \,N \ ,=° / \ ....-1: ii' � �/J/� ' ' ,; 1 / -0 / / 11 / _- \ /Natural Natural - 1111 857--- ��° / \\ \ �� _ //,/,/ ! /r, \.O c Ground ?'I10 10 �'• Ground �i \ \ ` \\ �� \ �i /' /, J 85��, N Ln 2• 1,� g _ _ ___ i mil _ FLOODPLAIN � �� \ \\ .Coir Fiber __-- _/ �.►,► - - / x XCAVATION ° s� v \ , �� �, ,\_/ -854------ /' -1 I // ' i \ \ / / H Matting Stone Embedded to -- _ `� ` -- oo'l \\ � �4,,at i ' �" ` - 846� ' ' 3 ____853---^�' ,-- , I v,� vv ,�� __ '� -� SEE DETAIL 20-11 v, �- v v � v � �� � ,;,, --oi 7 N < > Channel Bottom / ��i \ \ - \ W , 8 \4,/- _/ - -- / PIPE VREMOVAL AND a� �d � lis ill * I w /------ _ ~ � -----' HA EL RESTORAT ON50— /� � c \ : =' �-� - ------- \ ,v'v � /'PER NSTIU-CTTON \PLANF111411itill ."11LAikYk111:11111‘. \7114116‘41116" �' ��/� ! \° ��� \ /' 11. x \ - \ iii z " (---) -\n_s_ 10,_ -Y6C - --PC Sta. P:11-86001 , .....- w $1Lt /DETAIL 2 -11hil �� OM 6 v t i,,,a:-t.r.0 -lir �¢ ifr o �v ;/ FLOODPLAIN EXCAVATION , REMOVE /IJI /�/ �, �.. ,�►�li `� / /— �� N N PIPE REMOVAL e\ tdI ' ,/yy,r/�//�„ \ / ;One c,_ raN/ / / / ' /// \ \ \LOOKING \ - -- :;:=- _--• / c-` -' Existing M CULVERT INLET gp; I �� /-,;/ --;-,�_ �5 / -_ - \ \\\\ \\ � ;\ —�g5m� -) O Ground \\ I ''-_ -- \\� '�',.,4��ji„' / /,/,��iii' C /I 1 j \S\ \\\ �/ ' / �_ � ' w ( N• ot to Scale) a0 \ �iYY'i'/ / ''/'�Q/iii' \ 85�/ '\ / /G. Q / Existing j SA:till \ I —%% ij� �- J _- �l \ \ \ / ,' P/ Q - - -- , Ili/ / / /� / / \ \ I .�. �i N �O Ground ,,11'�. \\ - --7 /'�\\\ I L ///'%/ / ////////''\ —/ \ �S 1 \ / \ \\ 1 '\ \\ - / co o ►ti,, rl �y EXCAVATE TO \,-- ,, /% ''�' _ !� ` \ /I \ ` \\\ \ \ ' CLASS I '.' / / 2.0 .� J , ///, /� , , \ I I <\ \ \ % ,\� \ NATURAL \�!Twit�1 , /�%'� , ,/ /,,/ i / \/ I \\* •�A \ RIP RAP ' i — // % - / \1 aa a a a // / // \ \FLOODPLAIN ..� „/,,/�„/ ,/, !// �'' / ' \ 1 `�► \ \ Q NATURAL STREAM ELEVATION , ��' '%' /' /' 'g/_g /° \ :Ci o BED ELEVATION VARIES' \ ';"► ,- ' ` '�','/" ,' '"' ' �� \ \ C� IIPI , /jam/i/ �/ /' /�, / \ \\ \ P 0. z STA. 24 + 34 -Y6C- LT ���\ ,1 P`'I'i►� - %- /' , I \ \ \ (9 / _/ \ / / / / /i/�/ // / \ \ \ �\ r� \ \ ,ii1/4 / -2-7 7 / / _ 00*-1-q5 / � � � ) Y� ' ' 7" q PROJECT REFERENCE NO. SHEET NO. Q \- \ 1 �/� \ \ \- \ \ i 7-'-1 i\ III HDR Engineering,Inc.of the Carolinas • 7 �7 \ \ \ \ F \ _ \ \\� / / i 0 555Fa ettevilleSl,Smle900 Raleigh,N.C.27601 U-2579D,E & F / ik 7 \ I I I L1��,QQQ�_,� \� — f`'8 3 I \/ /\ / ��\ �, � B _ O F)� N.C.B.E.L.S. License Numer:F-0116 RAH SHEET NO. \\ �/ I \ / I— "rl I\` • ` �\ __—— I \/ \ 73 e\��\ \/ /— \ Y�. ROADNGIN DESIGN ER ENGINEERS \ / \ \ \ \ /^\ ^ \ '� •' STV Engineers,Inc. \ / / —— 900 west Trade St.,suite 715 I r C\ II \\ \ \ I\ �\ / �\� �013 / ��� i� ® 100 _.- L \ \ 1 1 \ ~ \ — \ \ / L�%l�ice. _ STv \ \\ \ Yr \ \ ��~ ,••♦l _ � 4' NC LmenseNNumberr2F-0991 \\ / /// �L ��C 1 � \ \4 I �, \\ \\ \87e -' ,/ /^-gs9 ' ` ��� /a�( ``� ����h��7�.,tavi►"`��i�1_�`►�► _ V r1 v_�_^ i __// =YeEi ! OCI tfao /., -" off' , \ \ , \ _F6P-__ \\ � s .� '�� ���,�? ;• �_� /�� / / a 12� I A 111 I I 1 V ) A 1 A v ———— �/ /A\� s'� __ � ���L� �\����SI � --_ _.6am _ _ / J I • / \\\ \ \` / , ,r� , \ - � '—\ / — — I00 / /_vim 9 as / / \ \ �� ��mow'V / V A�]Av`,�. / / i / / _ 7' VWW—FENCE/ 71'� \ \ \ \ \ \ \ t - drib: o` _ Tyikorf / —— 7 / / I I I I I ` \ \ \ \ \ \ \.- // V�`Y/' -11,4. \ \ , / gem / /r/ / Cpt�e -887--OlJTLET CH�AIVNEI� ROyECTJ'♦� 1 I I 1 \ \ \ \ \ \ \ +et \ \,,/ �, / �`� / _� - o 4- i� / 4 �'� ' -aa�- ��g '1'-RIP-RAFi / / , I I \ \ \ \ I / may/ �\ ��, /,/// , J -� EST 82� � _/ // ,�,,,' I ; r� \ \ \ \ \ \ \ ) 1 / \ o�`, J 6 /\ /\� _ \`' /� / / FLATIRON \139`SY GEOTEXTILE/ // // / \\ \ \ \ \ \ \ I I I irf + \ \--l _J / /l\� 1 �/ / l _____-__SEE DETA)r20-1A--�' // ,/ \ \ \ \ \ 1 I I ( ��� V \ b" /-- BUIL9(�IG/ a � \ , y // / / r-�/ GRAPHIC SCALE / /- , \ \ \ I I I �� \ -CANOPIES H E : \ h / / ----- 1\---- __J - 1 I \80-_, // \I I I II II II- I E \ \ 'ti/,\ x/�,e� r / yam/ 25 0 50 �/ I ` ` _ -RfMOVEb / / \ a0— --0-_� \���`�'' � •,,,, � '�' ," �� t j MTV ` \ __ \\� 0,,, / J/ PLANS .i.—,. % "0 k , ,------_, \ \\N ., biyr,- ,= /// / \ ——877———_—_878 \ \\ S \\ RE_ I / /RCP / \ek / / CCi—/ / N `'r 71-J. / /-----—— '7--7----- ,. '!P1 \. \l \\\�(^\\`0 o / \—� \ SV-- ` — _ --------_ '', \lillJi/ // _� III/ Sit h/ _' �_/ / \� \ / N — s7 _ ��j%/I I //�I�8L1L �i AVE /� / 1�\ /� / �� �/ 5 �\ \ ya \ \ \ _ H —_„b, — —�--�\----��i%/I 1 %//11 / ) i / ` /,� /�,a5� �i a / \\\e \\ rp\\\ \ / h---as1— .--_� I ` \ 1 $ � V / v \ v1 v1 --� \�_� e/'� �\ �.��/ _ co / \II PROPOSED,-C�HANNEk'REST 119N --- _\� VL- a/o� \ . \Lt -_-_---__- ---\\ �\7�/�' \i, i__ /i'/ S; 11/ SEE DETAIL 20�1f / / /— \\\ ';' \\\\ �� \ \\... .. , , ,,i, _________ __,,,, _- ______ ___ ,..... \._, i ..._ . . , c ,--- /0 / \,,,\,„ —865—— J lit C ....--- ca,,-- / \\\ .cc. ..--- ___ PROPOSED CHANNEL RESTORATION \:!!.' PROP05F.CS ROCK CROSS VANE TY \ \`�\ �� �\ e % �� %;,% PLANTING PLAN � f \ / E S�—�` ' — N�` i //// -- / \\\ ANst...,12: _, \n ,. „jm �fi// m Iy \ (Not to Scale) _ — \ `_ \� -� \�` ,.Fay ---y� ♦ ♦ �\-%// / I2�o \ \— Zone 2 Zone 1c. Zone 2 -` - ' ` }:�, / ,,,/ �\ 0\ jj , , / / i /\ FCOODPLAIN �F / .n, �' __ _ ? 'tin - \ i ` \ /' EXCAVATION ON A s/ --mil*-1, / r 1 — ti/ ` 052' /SEE DETAIL 20-11 P°O�°\- �� ,10. 846% ' I 9 n -- --- -) / ✓- --PIPE t MOVAL AND •�'ti� ` � ►Al. `' , 7 --_ � -- BHA EL RESTORATION �, ��r.� .� z *Provide Zone 2 Plantings in Floodplain ,——————`__ - PER INSTRUCTION PLANS � '!j- `� � 'E,\/ \ \— of MiII Creek as Shown ———— v / f \V\ 11\\ —Y6C' C Sta. 23f86.07 �'� �\���� r �3 ,/ w PLANTING SPECIES LIST _ _ _ r' //i°2 \ v 11\\Ilk / 7 / % � ����1�°. o / ���, + m a Ilk REMOVE ,, o o \ \ N o ZONE 1 - LIVE STAKES ZONE 2 - BARE ROOT \ a\ . ' ` / ��� �! \ \\\\' �, ,� U �o - Vigar LIJ r, Black willow (Salix ni i*, ..--m gra) Wild cherry (Prunus serotina) e99, LEGEND \ // oe —ii/� '��_ IS =�bg \ /�� Silkydogwood (Cornus amonum) Sycamore (Platanus occidentalis) \ � ' �— < �� \ \ \ zLL, Silkywillow Salix sericea Willow oak Quercus hellos �� \ / �' / " �� \ w \ Nine bark (Physocarpus opulifolius) River birch (Betula nigra) ZONE 1 •, \` \ \ JJ%,/<-ii/i��. \\\ �' 9 —\ Elderberry (Sambucus canadensis) Persimmon (Diospyros virginiana) 1 v, ` �,�i%,�' , ,� 6�'\ ��50-� \ \\ r o \ Buttonbush (Cephalanthus occidentalis) Sugarberry (Celtis laevigata) ., 1 /j°�i, /��//�i \ \/1 \ \ \,q \\ ZONE 2 Tel 1�� „"�, ,/,� � /m / \� I. • ° *Substitutions due to lack of availabili ma occur with en Ineer a royal. , '� tg ��� 0 //�ii�'g eaa^ / \ \ I\� ` \ \ ma ° 1 I', \� '_mil' j/ i // ,/J _// // / / \� \\ \ \ \ \\ \ \ ,/ / --7 _x_____< ilin, ;:6 \ \- \ \ •.\ A n + \ - �� — —age a l / v //' /I , / / / \ \. / / ,cy .1 ' ,t / / ,,,/ // ...,..,/' l \B,5„ k \ I \ \ L,FE L _ --i%/�/� ��I / ,j�i — �/ I \\ 8'9� �a / /// rti�� / I /. '� y,. / 1 I I I r _ '/ -- `�� /i� / \'i\\ �'iS �// l % �/ / \ \ `� 1, ` �— \ I �\ \I PROJECT REFERENCE NO. SHEET NO. IIII I F ■ HDR Engineering, Inc. of the Carolinas 555 Fayetteville St, Suite 900 Raleigh, N.C.27601 U-2 579 D, E & F ■ N.C.B.E.L.S. License Number: F-0116 RAW SHEET NO. 910 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER S'T' \T r100STV Engineers, Inc. 900 West Trade St., Suite 715 ///J eei Charlotte, NC 28202 — NC License Number F-0991 905 1!_ l , 900 11 II IIII 1H 895 i A.... ji3tptbe I I I I I I FLATIRON 890 - n III , — III P .- II 885 , , , , , - 885 , l O 0_ O QQ = 880 880 C2 z w J z z z 8751 875 PROF I/ F' hF GINNING Al 4P" RCP GUI I F l PHOPOSF I) w CHANNEL RE Si OHAI ION u, 870 - - 870 w e w 0 h_ Ln N z 0 865 865 0 N EL ° 860 EX/ST/l✓o G/700N2 — ,_ —— _ _ _ _ —- - _ 1 860 N 1 PROPOSE D _ __ �\ CHAN 'EL RESIOR ^ O 855 J o = 843o5I' 855 EX/STING 24" CC L TO BE REMOVED DoOFTCE� _ ��= 850 u_ - F — 850 (SLOPE VARIES) —— _ O CI o H- i� a) N 845 - N\ t 845 O H \_1 L i -H N C9 I z Lu m 840 840 O 0 u a z hn o PROFILE ENDING AT wo CD —1I. 835 CHANNEL TIE WITH 835 II ILL LL CREEK z . 1 w H � H 111 I I N CV 830 830 O 1 N \ I 71- E N 0 M O o o 825 825 00 o N 0 1 (, L 1 O C O O O 1H 820 820 i 0 O P z Es w 815 < 815 o ,HE zI w „ 0 0 + 00 0 + 50 1 + 00 1 + 50 2 + 00 2 + 50 3 + 00 3 + 50 4 + 00 4 + 50 5 + 00 0 HE LE, w J 00 H 0_ z w y�— ,/�'�.r_7�l ( 1 \ \ \'� ���ot� meig \ I ��~aTY — \ 1 PROJECT REFERENCE NO. SHEET NO. �`� git \ \ \ ` v Engineering,Inc.Rf the Carolinas i--7�/ e \\ \ 1 I F I I 1 ( I ..� \\\\ �1 I \\ I� ►Al►� 1 1 \ I \ I") U-2579D,E & F � L� �``� `$.ltit�\\ \\ I \\\ \ \\I \ \\ \ �j��� .��— 0 1 \ � \ \ 555FayettevllleSl,Smle900 Raleigh,N.C.27601 �1/ ��� _ � \ \ N.C.B.E.L.S. License Number:F-0116 RNJ SHEET NO. �� m I m 1 " \ 1 _ I \\ `\ \ ROADWAY DESIGN HYDRAULICS ������ � / 1 II 1 m I• I \ \ '� 11A\ g�j►�,, ENGINEER ENGINEER I I 1 I \ \ (�I_ 1 STV Engineers,Inc. ����_ ���__�R�ac_ \ \ 1 9a �- J 1ST - o t Suite 715 L i• m -- \ \ ,�_J \ v \ \ - /}/�, Charlotte,NCd28202 Su o 1 m I \ \A 1 I 1II \V . v A V \ —_—, A �� Av v --�� _  � l I 11 a \ �\\\_ eba- \ \ \ \ I I I 11 �� \ \ / a \ a _- \ _ - NC License Number F-os� / NIU7 \ \ \ \ \ / `mow _ / \ / ���1 S \ \ \ / I i \ \\ \ \ \ \ /. , — / � II .- ` 78' RCP i . \ 1 / + I \ \ \ \ I 1 \N\ \ �\ 1 I I\.\\J / / l \ / O \ \ - i= � � 'NW- Imo, �/ I I 1 I I 1 \ 1 =� 1 IJ 1-1 � ����I�"�► \\ �\\ / / �\ i n �E�B A ci � _ O \ \ I I IRT-164, \ \ / 1 �:. 71E1iL �'OtECW f�l<I R / ,� /r � I I I 11 �� TOr / I I v ' i �� v \ TLT' ' �O LA'f t .G �— �-. . I vW9.1471 vv� -- ,/ / / 1 1V , I A \ V A I / 4-4!mil Alty`"� , �� v- v v - N. -� a /�� �� ?���� ��dl�:iiiw l I F�F E� +/9. . . n� /� eb — .�ti�titi' / I / I 1 \ j11I r� \ 111 �\\ �\ \\ \ ��\ ^'gs ( ``�� �� � ,'IN n� I I t'\\ s7 / s \ _ {� C \� 1 / /_-l _ .lC Dol \ 4 1t a\ •\� 11(I! �� \ \ m \ \ A �NC-4,074.,_-_,,,1 .4 T I Z\\ 1 F= CE _ _l 1 ��� I J �o l./ y.. 04, 1 1 1 1 \'!\ \ �. \ esa.__ \ _ ss\ /\ _ \\ ��,�`" � 71/�/a w94\ 1 — / Jl ► °� I I �/i11 I I 1 I A \\tl°r. ���- v -�/ /A\� �V ` ����'�T ����=wit „�, �, FLATIRON / / \\ _ /,�, -- I `'to�'� GRAPHIC SCALE t/-FENCE T \ \ \ \ 1 \ \ \ - 1 / / / / / / 1 .� �� ---/-/ // /1 1 \ I \ 11\ \ \ \\ \ ass\ , �, ��, �_ / �� a i. / / / / / / / 0 / I 1 I 1 I I \ \ \ \ \\ \ \\\) \\\ / , '�' •, wV1 \ / • o / - /� 6/ / / / ��%tl: 25 0 50 OUTLET�HANNERO CT •� 1 I 1 I \ \ \ \ \ \ \ �� \`\,�' �i! / —_/' //j�� ��' 1�� v \ v \ 1 ' v / 1 RAC �R¢SS�/'.�`E ��-� k -- ` ,/ J !`�� , J� f RIP RAP / / ! I ! \ \ \ \ \\ I I \� / �� .� •• ROL \ / -- \� /// . \ / -- \T \ /// _-, / . PLANS EST 8�ON _/ / 1 \ \ I / \ N. 1,�9SY GEO�€XIILE// // / \ \ \ \ \ \ I I I I I \ '��'�� \ \ \— _J / /\� / ter/ / �/, / , , \ \ \ I I J p� ‘..\ \\ / ' / / / / \ \4 '- \ \ __SEE DETAIL 20-y0 --/ , , i \ \ \ I ( � 1 . � _ __ s /-- BUILDING D 4a \ , / / / �t•--- , /--,/ �/ / A V A V II I /.Q il':.I:. ` �vv v�!r+�' i�- C,�NOPIE�H Ei A /'_7Svm,, / l // /l �iw'� � vv�N��\\---- / / /-\eae \ rl II // / ea5.i\ _RfMO�Eb / �/ �\\j / / // / \ \ \ a57-7---- / ,RET�CIN E I H�4MMEIL_ P//r // \���aati/ I B \ I // 0,,,/ \\ \ \ \ --_--- e0 \�� ID FrOOD I / / / iv - / • IS w . \ \ Sa \ / B77_--_ \s , , , &E a� 21 RCP / ) G / \ \ , \ / \ \m \. 676—_- __ ---'\\\\zsy�\�..1r - _ A•I , �/ \ ,/ �RO\POSED CH /�� // � �\ \' •��C\�\ ' ) / \1 \ \`--� /i '''' ,_ � _ ------_�/�11/ //IIJ/ / y/ _� I Ill / / a6 \� / 1 \ 411 \ \-� 1j , -__ RESTORATI _/ / \ \ 1\875� // 1I / \ / __ /l,L }ti,, 1 \\ - -_ --'�i/ /i116 � 'AV / / iti a '� J")a�/ \\\\n \ \ �\ \ / - I Ls 1ll1;i`il + _ --- — s --' ''1 I��/ 1$ ,, I{ OW/ *� // \ /' // /�' � / / \� / \ \ I / \\I I 1 111I i lk, / , , , ---- 7- /-- \ \ eo, \ ,, \ I 4 o / 0 `A. vy / / / \a \ \ \ /t \\pip. / / v7// ///7/ PROPOSED CHANNEL RESTORATION ,// �a5 / N \\\`\ \\\� �1s2 � ,l / �R9CK CRf �VKNE \ \\ �� \\ c a5�/� %�� o TYPICAL SECTION / -, C'�ADE eC�KITROL \ \\ \\ s� /m �\ // L LOOKING DOWNSTREAM _ __/ _ / /// \\\\ \ \ •;0 \n /r ' \/. r/��� (/�' _ (Not to Scale) - - \\ e5 \ \ \ ° / I z v✓iii ExistingExisting \ ` // / a' // ' N \ • O� \\ \\1\` \p �� \l`�1/ , L �v_ -57--, / ,/ 1 \� /'�A I�� V A, V v, - �r/�/ //�-�//e �ae� `Ground Ground �56_-_ __ -_ / ,��\ TRIM ,,HARDWOOD VEGETATION IN CHANNEL ,p 4"-('\\ \ \ \\ \ i /%/ / ( / -l� ?. io' io' �55— — / , /\ FLOODPLAIN sc / \ S,'. \ / / / / )/ e / z I% _ \ --B54-__ / TO, LEVEL _/ Ohs N v _ �o A� i�� s° / 1 ° ' ' /� Av la2 - Iv yz fzXCAVATION/-_v��� v �..��j �. �' I / - -a /SEE DETAIL 20-11 c\ .�. - a' ,,__853_---'__ �,' - � - PI PE R MOV AND �'� �! �4 ` %:ik �: % v Stone Embedded to / _ F Off ' w H COIR FIBER Channel Bottom _----_- \�\ !--/ /' / {BHA L. RESTORATION j1.��►� ` ., MATTING - RETAIN, EXISTING \ ����► \ 1 z m EMBEDDED STONE -TYPE TBD --_- -_ \ CHANNEL /PEf NSTR1dC'TION Pb4N �!° ���fl� ♦ \ \ / w o EXISTING EL--ssJ,�� ,, -,r ��� v � ��r.����� ��. Imo, �/ / m H 85m� . BRAIDING AT TH \ /� // // , / 7/,_ `® \ �\ '�li �` I ;:��\ \\ / - / LOCATION _ . / / /i / '��!` ��b" �1 r. A \ / / DETAIL 2 0-11 ^, , / / / ,\ ////// ; � �t!I�.rw' o �r \ 7 ,/ , , FLOODPLAIN EXCAVATION\ `a 1 /r / // _/ 1� E/ �/ '/ Ji\/ j "0 \ \ i'-°��' o N PIPE REMOVAL aV a v/ / / // ^��,�/7 %% %%� �1°� \ \ N\ ice �� <--' LOOKING DOWNSTREAM / / ��„ /� ;,; = � �,. J �� N ` @ CULVERT INLET Existing -\ I / e^ /-ii/7' - 2B0 � v-` \\\ 1 , �� J8 jam/ .. o Ground \ / _ r, / %ice/ /i �% /I \ \ \ ' / i��' / o (Not to Scale) \ �� , \�_// �i�/ 850 ♦ ! ,0/ oa Existin 5' ,\ --- \ I \ JJ�"//< ''�/ k.--- /�\ \\\\\ 'J— //��i , ii .//ice mac._ \ \\\----- ` '/ji/j�i %0�' \\ �5H-� /l�\\ \ \� . \/��/;i/ „/ i//// me \J \ 1 \\�\ z NATURAL \ / //// ° RIP RAP FLOODPLAIN 1 \,1 /��� / %0 / / / I\� \` \ \ r �/ I NATURAL STREAM P / �/ �" _ ELEVATION 1 � / / j�/ -g4 !- \\\ \ \�\U BED ELEVATION VARIES' \\ I/ /\ / �'�/ �/> , / \\\wSTA. 24+34 -YbC- LT �� / / 1 ---, / -/� // / - \ \ \ \\\\ I \ Cr / -- / \ h / / / ` \ , \ .•,ce,-� , \ " — ,' / ��j'� =SI � ����•��1� -��~aTY — \ PROJECT REFERENCE NO. SHEET NO. _ 'r-� • "\ o \ \ I ' \ \ I HDR En ineerin Inc.of the Carolinas eLONategIMI I I \ \ ♦J1l 9 9. U-2579D,E & F � i/�``� ---_ �1 _. 1 I \ \ \ �♦ ` N.C.B.E.L.S. Licenses um e:F1 -1 � 1 di��� � ��--_ o \. \ \ \\ N.C.B.E.L.S. Number:F-0116 RAH SHEET NO. � �� \ , \ \ I \\ 4 \ \ ROADWAY DESIGN HYDRAULICS \ ENGINEER ENGINEER I_ \\\\\. ����.�-�� _ � \ se 6I 1 STV Engineers,Inc. I STV 100 soo West Trade st..s to ,5 I 1 ; A d s \ V "'�' 0T5 V— m \ v-,a AM I V v \ �/ - , Charlotte,NC 28202 p / I m I \ \\ 1 I I \ I 1111 \\ ,, e\ \ \ \\ —— \_, �� \\\�.� —_ \— N - \ Nc u e se N meer F-oss, -se_ / \v•I U 7 \ \\ \� \ , I 1 1�11 ' �: \\ / s�4 / \ \ \ i9 ------ ��pv_ RCPIlltif 1 \ S \ \ 1 I I I I \ \\ \ \ \ /. / �— • / m � v ., r- 18" N '\\ 1 I 1 I -4/ \ \ \ IFI I I 'i \\\ ``' \\ \ - y 1 I` \/ \ ' / I \ �� �'�V' 0 �O \ �� \ �,5� - --�_ �/ I 1 I I I , \ \ _ \ IJ 1-I �\�� _ �► \\ �\\ J / � / �� i,n . /E�B A•i1 _ O \ \ I I IRT-�y \ V ( I I „..1-1 v �?`*"'� � Y`. �l7TLET �'OtECW OW R z / a\r v V/ '� I I 1 I I " v/" - I / / I I , V ° • , P `, N \ NSTRLT' A IO L,e NSv .G �/� •-. , I v 169.1471 vv� -r, ) A �I I� I N. A A S \ �,�� `' v __ �v \� rp 13 � �1l' r I v •N r I ,/ _i -�-f , 1 1 \ \ V \ , A r � i � , --,A v v / ' ' a 0 -��1�1'�-�� �� I / A i / / 1 A v \ VA� VI \ T.,-,T. �L.""� �� „' v�� as �_������titih�c�► I B CAE / //' ,_' — m I 1,-),1I I \ \\\ \ 1 \ r \„ 1111�' ���\..., , a . \ // /� .68. \�\� / ```` .���� �14 l�ti lai�� +�(C (\� , Z\ F� •C l L IBC iao, \ ___ 6 (��] % f �ti��alb ��'�I �� - WIptly \/EC� ..b L a. /, y.: o�� , \ 1 \ d\� :.� � ��,t ,.,�,: apt\{ s I ,�.,I I I I I A vv� ` —�' /A\\ v� L`���� O�4111Vi, FLATIRON - - av�/ \ J / ' 121 .�1. I V A / A\ vv \ - G -�� ��►\�r�=`` �' - I I A V v v vv • - / ✓ 0,1 c� v \ v• , _ \S, / � 866,_— / / / J 1 V � ,� Vt/—FENCE T \ \ \ \ 1 \ \ \\ _ - j ev - \ _ — I / / / / /' ��, .*__1.! p / . \ \ \ \ — , L- •, % / •7 r" GRAPHIC SCALE _----__/- i A I I I I \ v \ V A \ \ assvv / ii I • \ I ��Nlb�aC. i / / / / / ' ��.��Z i Idl�� OWLET�11ANNEI� RO CT o I III \ \ v \ v \ , v� v v, i / — -' - / / / ��`��� - 25 0 50 �f' RIP RAP / /' / \ \ \ \ \ / • ' \ R40C R¢SS/V*E ., \k\�-- // i 0 <_ \\\\ v v v I r �• • ROL , /A\\, / v `° // / -s,. . d �1�11�� I pSC I I I , \ \ \ I . \\ __ <9— / / / .� EST 82�ONS,_/ I1 \� / PLANS / , / \ V \ \ \ I I l r � . v `_�' I i�/ � � / / ///, / ��ivr���av - N-129SY GEOW€XII LE,/ // / \ \ \ \ \ \ \ I 1 I 1 I \ l.� Z* `— _ / /\� / �'/ / r SEE DETAIL 20— 0 --/ ,' ,' \ \ \ \ I I 11 I rJ / ( ,"11, ` /—� BUIL9�NG/ a \ / / / / N \V. f' \ -- / /--_/ / \ V A \ 1 ® !r��/ — C,�NOPIES H E� A ,%AmS�' / 1 // // �w� ��� \ ----- / / �f \ -- / I---\ E \I Fi MMCL" m„�/�///� ( �v��/1�ti//v �I-REMOVEb ,e ' \�/, � A ,// 0�it �� \yv v\ a� 7 -- --_—_--_ \��� ID PLOODP• l /^J l J %�i //,/ 1 ___� /'�% Imo_— \'"'' / �/ QQ ��\\ ✓��\ ^// , m _ J \\ 1\N ,' / a.- / / /�/ \ / ` / MTI_J, \ \\ y\� ,/ // -----`\_ \\ \\ \\�Sse\ \\^ _ _ / / / /��-- �\ 8▪ — a \ --c--- �\\\\\\�/ $� / / / /^ti%�'i,� / ' CA �ab0�� \ \/ l� \ /\ V `c& \�\ � a _ Q \\ \ ���\\�\\\ ' �/ / / /// 0a5/' // i-' / '— ' •a a' /5��� sb �\ 1 / /e. ' \\\\ �\\\\ \NSeas i --_ \ ��\ &E eft RCP / ) �\G / \\ x\�\ ,, \ I \' \\ 4 \— s ---->\-----. y�,l\1\/ I((/ /r/ 0 / ,PRO POSED—CH EL),." — /' \\— °O- \ / \ \``— // —_ �___ -----' ."-\ /�\\/ //II Ji/ // J11111� / �� RESTORAT! /� // /' \ \ / ! \1 \\;I \I\� o ��__ \� - --_- %/I 1�\//11161'LU �7 �AV , / if i ' a�//// // `lTa��� �\\\\p \ \ -j�\ \ / h---851— .—__� I `s I "'ll ;i��l 5 \\ \ \ r \ i ----- �s - %�'1 I�// 1ST';"" '� /�� �, / � �\ _/ \\ \ 1 / I \\\ ItIIII _ \ \ °O \ \ \\ III m --- -e`^\�\- /\N --- \_-1 !--� -- /�'/ / % I a56'� /�/ /'/ -\\\\\� \\\ \ \ / \\ III} ��/i , /�—— ,Y I-/.- - 1 / ( y / _ \ \ < // //I a r/J \ S T•', ,// / // -- — \\S•\ \\ \ \\\ ,`'t(4/• 1llll l$��Ji PROPOSED CHANNEL RESTORATION ,/ O C '/ \ \\ \\ \\\ s, /%% _ _- ROCK CR��VKNE \� \ \\ \ \! '2c - . a5›%%/ ' -'6 PLANTING PLAN \ \ �- \ /• ��� (Not to Scale) _ , I GRADE"CONTROL \\\,..\ � \ �• •)o /se\n /( ' \\3 r/j%\ / Zone 2 Zone 1� Zone 2 �`— =57 —TRIM HARDWOOD GETATION IN CHANNEL Al �' , . �/ / /% /'��/S z 85� p v /,:'ii// / �r x — 1_ - \ — / TO GROUND LEVEL ,,tt A+s <'` ` ' / ,1/� e \ 1� ��--a5a--_ — — A , lid pp..: a+i / I / / EXCAVATION T �, ' la2N /�--853--�\,_— j / \ PIPE REMOVAL AND 20-11\\°OS2� s` � r�:40:7%106,-,„: \��,� w _— / �' /— A . L RESTORATION S`j U si "TIP. *Provide Zone 2 Plantings in Flood lain RETAIN EXISTING♦ ► \ g p __ \— /PER- NSTRUCTION PLANS - .0� ,�.' of Mill Creek as Shown _ iD • \ ' _ __ CHANNEL �j F / / w o EXISTING EL Y6C 7 � StO. 23+86.07 �� ,`� _! �^.11,\ .� 'ri tJ /' / BRAIDING AT TH '' ,.,'yA. -�`�Y s ' ` .t \�/ / / LOCATION i �I '�� �t���.�r�1 v / / o PLANTING SPECIES LIST —� f/. // /� / 01 `: 6 Ng/1 , o ar '' ' v / mi /''' a. m� o ZONE 1 — LIVE STAKES ZONE 2 — BARE ROOT ase •' \//// // REMOVE , ,j/ ° o � \ ' / o \ / / / 2 x 72" CMPT \'�,�.: fv` \ \\\� \ ;� ,� — o Black willow (Salix nigra) Wild cherry (Prunus serotina) / _ \) c / o' ° Silky dogwood (Corms amonum) Sycamore (Platanus occidentalis) / / 9K\_ — ��- �� - ,�`, \\\ 1\ .. /.G J�� LEGEND I _ I %-- 007S - oSilky willow (Salix sericea) Willow oak (Quercus phellos) /_�6 /, .i-Nine bark (Physocarpus opulifolius) River birch (Betula nigra) m/ / \ - j� i _c \ ♦ m o d Elderberry (Sambucus canadensis) Persimmon (Diospyros virginiana) mh \ „,..,---7-- '// <�i.2„ „� �\ \\ a o ( PY 9 ) ZONE 1 // �i / iii/%ice �_ \ \ \ �,(�'\\� j Buttonbush (Cephalanthus occidentalis) Sugarberry (Celtis laevigata) �\ ' �/ i ��%-�� \ �se-� \�\\ \ \' \\ / v 1 v l,vv8\ °, ZONE 2 \\ \ �, ) J //,//,'// -'ii�i�' m� / `1 ` \ I ,. \ a *Substitutions due to lack of availability may occur with engineer approval. I \ l „��!/0' /'ji 0e ' b // / - I�r ,\,,';\ \,,, ', �/ V I(=. r v���i/i i��' �/' \ j 1 \ �\ \VAS' �V P w o \ �\ 11 -1 JI �/\ ��i%- //'/�V-r i / // / �N y \ \\ \ \ \ \\ \ o // lam // °\ 11 \\ 7// '/'ii / //� �/ j / \\� `\ \ \\ \ .\�v \ o - _ �- 1 /-�' / ii/i / \ o \ / —�- If/ /� i /� J \ \ a -\ ——--�/ '/ // / , ir' // %`'�� i / L7� ,_. L.\"\\ \ �\\ \ r\.`. \\1 y q� l■■■■■■■■11111111 a� 1■■■ R �� 11111111� aao / �� I I / / ) \ \ \ \\ram\\\• ''� I \ \ \ \ --- \ \ \�\ \ +• \ , I \ �� \ \ \ , PROJECT REFERENCE NO. SHEET NO. ' I I I ' ' \ I � `��•` 11 I �� \ `\ ` `, \ , \ \ \ \ ■ HDR Engineering Inc. of the Carolinas ,---�� / i --- /, / �,� \ \\ \ \ I I \ \" \ ) 1, / I \l\ \� ` \ \ 1 1 \ ` I \ \ ` U-2579D E & F I 1 \ Mb\ \\\\\ / iii•" NN I \ \ \ l \ ` ■ N.C.B.E.L.S. License Number: F-0116 R/w SHEET NO. K� \ \\•• �� \ \\ �\ \ \ \ \ \ ROADWAY DESIGN HYDRAULICS / J /,� \ \ \ 1 1 \ 1 1 I 1 \ , 1 \ \ ,,, ,\1,\, V \ , \ 1\ ,� \ \ N� / \ \ \ ( \ - - _ \ \'�� '— /' 1 \ '\ \` ` \ ` \ ` \ .\ 1 11I1 \ I1 \ , 98 \ �� 1 STY r �oo Engineers, 900 West Trade St., Suite 715 _ ITS / co \ 1 \ I \ \ I r \ I I \\ • \ \> \\ \\ \ / 875 \ /' ` \ 7 / - \ \ \ �� \ \ o \ ' rt \ \ ��\,_`__ �__ \ \ Charlotte, NC 28202 \ �� \ \ \ \ \r. NC License Number F-0991 _/ /� /O /I II —t\ II II \ \ 1LN\ \ \\ \\ \ II II \, 1, I 1 \I \I 1\\,\\1111 \\\ \\ ��\ \ \ \\\ \ \ `�\ \ \\\\\ \\ / ��� �� \`� \ , Efl///Ji \ � I A V A A A \ , I I 1 11\ v \ / / 4- v __111) f / / A i v v „�� — � �\ 8�I \ \ \ \ FS \ I \\\� , _ — —1-- — T4 ,� � • -- RCP11( -,��. \\� ,��,, \ \ _�—/ I , / / \ , _ / / \ / ° I I I 1 �a \ I \ \ \ \ \ \ F I I i )_ .;..\._\ \ .\\\ \ \ y \ �__/ e I -1 , \� ' / , \ -, <` _ - __ / /' 6 \\ \ \ \ I I \ r 1 \1� —_ .o/� \ I I I I I I `► \ \ \ \ �\ —I 1 1 1 \`��`� 6,\\\ `,_ �� \ \\ \ //( I / l� \ \ ` / / \ \ \ \ 1 I I I I a \I o I 1 \ \ \ t—-� \ 6 \\ \ - - - I \ \ IT I /—— \ I R cP \t i j// cc_ \ \ 1 I I I d rt—�— \�\\\ \ \ \ �� / \ \ ♦ — — \ , I 1 \ III \ /11 I ► LI \ , 1 ,' �-iskip� � \ ` , -O CJTLET ii OTE IONP 2 g \��� �, —— `r \\ / II 1 �i� I , i \ \ E\ LB� I I 1 1 f `� Alp , \\, \ , i� \\ y\ / / \V i ► \ — \\\ I I 1� \619.4� \\\ V1� I \ // —-r T I n(� I I` �\ \\ \ \ \ \ , \ \S \ I\ \ �� lk, if& �\ -C,ON S �, J O N� LA, , S _\ \ Q \ \ - i nir— � 8\ �� `� \ ) I \ 1 I ciA, \/,, ,.,,_,, , / I , ,vl I I ` \ \ \ \ \ \ I \ \ \ \ I �i Alp mrili ,WAT* -, \ \ --- — \\ ,� ��x,,„/\,-' \\\ \ / 013 „soii / �I 1 ` @ND / r:(„imp_ ——— / / / , 1 I A \ \ A \ I \ / �� I I �� `� �� V A �� -0 r__,� �I\VI � '��7���� I A/\ ' r CI IN4 ( \ �,� + 9 6:8 /' I \ 1 ti `, II I A V \ , \I , / - I II 1 A \ / hV� / ��C� ���� I�i�� / AVN/ I I I \ \ \ 1 I 1 i / \ , \ I I I \ // \ / 86 / \ \ / ` \ \ l\►"�_ imp I', � O�h J \ ( \_- I , \ 1 \ \ Twitj \ \ \\\\ \ ,,\,„ , III �cc\ �� \� \� 870� \ / / 9, / \ 1 _- ` \ 1�i,( N r' , \ , ������ !���.�� � �� ,�\ \� \ \ , .. /' / c I �/ U/ o '1 1 l o / `v A V\ I I / v V�\V v / ��►\id� ���� ���r ��f�p!!"r \ �A FENCE —' -- YeoC7—,/ t),Loto V lift,, , S Vo� 1 \ A, , ., ..FT , 1 \ � � 6 �_ v 868 --_ ,- / / V A\ �/ , ��������� 1 �� �4111101r \ , A — .1 1 1 ' Qi I ai.. Hi 1 1 ,„.,,, , \ \ I / , ) \ \ \� �' A \\ 10. _________ �: � ; r FLATIRON i / / ( \ \ \ \ \ ( / // ill\N\- ,,,:: ...-,--,.--------7,,7-,,\,..,, /\- ----N\\\ FENCE' v - gV \ C' !�� GRAPHIC SCALE 141: _ ' J � l \ \ I 1 \ \ \ `\ \\ `\ \ \ \\ �R\\ \�86 \\ // , / I',` i' � \ � \� ' \\ - —/� �i , /' /' /' / /' / ' �i�� 25 / 0 50 / I i I i i I \ \\ \\ \\ \\ \\ \\ \ \\ \\\ \ \\` �N // /�� /,/� 1 / �� /// �Ch ;� \\\\\ \ ��/'- e, Vh �Ly ///' ° /��� /, // // // 714-111-116:4111111;t711:1) ��1`�' �`41"111:10:9 ����,OUTLET C1-IANNEL PROTECTI o N I I I \ \ I \\ \ 1,4c:\: iiiiill iii _.....iiiiiiiiiiiiiiiiiiiiiiii4 / �- 1O°/ND ,\ \\ o ,,;2- ' ,' ' _ 1� $ r RIP-RAP 11 I v v v ,'�► v `� i , ,-- Alb*- L� r - .�. PLANS EST 82 TONS / \ I � _ \ -� ��.� / I \ v 1 v y I / , J v V 139 SY cEO1'EXTI LE / , // / \ \ \ \ \ \ \ , 1 I I I \ ir �I \ \ / / \ / I or, / // / 1 N 1 \**Allik \, \ '" \ \ SEE DETAIL 20-10--- 1 t � \/ BUDDING , D \M J� -- / �, \••_-,,-.-., ;\ \ // , / \ V A V \ I I I I I I I / ��4.�� �__—ramv -_- v �, / / / / / �A v v A \ I ► /�' ��� CANOPIES H E- € \ ��' , \'�;�� 1 11 88—\RET,4I N EX-1 N \I Hlik i N EIL ///' - ,/ coy r REMOVED g. � \ �, i 6 �, \ \ \ �� e) l AND ,FLOODPk, i1 / i / / ' •' / \ - 411 \ , / MTV �) v ____ . ,, / / // / , / i / / \ (4 IF / 1,, CC N N h- \ IN N N / / /- / --__ * - \ ,-' 0 h5- 'N. , _ -- 878-�� ��\\ \��\\ \ \\ `\ / ,,61 / /4f ACP ' O ��, / / \ �___ C / /' �`� �� \ \ \ \ l \ \\ s\�\ + \\ �' W _-- \\ \ \ ^ \(9j \ \\\\,// / ,/ /,/ I f / / / / -� wlk / / / CO�/ / / U -N, o(� \ ' \ \ - J / 876------ \\ \ \ �971\ ) i I / ,/ /'— I / ��� ifcW // otik or „..- ///'� ,' `\ \\\ \\ \ / , u \i 1!� \ I ' / _----_ _— li \\>/ \ 1 / / I I `� ,/ 1 I , ��1 / Jam- , �� \ \ / 1 CV ,,, — ___. [ ..... , , , — co C ----� �875--- -- - // II II // I g / / \ J \\ \1\ / ' ►�� // ,�'� ,�' /� — \ \\\ \ \ \� l\ 1 \ III 1 ' I/ III O --_ __,'';//' / / /I \ �3UILmn -FIAVE0 \ � i / \ a , \ • I - Alp, II / 1 a --- �'�/ I A-' // 'BE RE OV 1� A A �� / �� // �_i / \ vv \'� V A V I I --851-- - 1 �v I I 1 iI cCr\ „-`6:- -- ---- / , -- \ \ \ \ ,o, v- v- ,- „- 7- N., N , \ II Z EL 0 _ _ _ _ _ 1 g�\- ,/ \ _ a��— , \ STANDARD/-BASE DITCH \ \�,, °\ 11� N — - / ------ / ,- I NI4 ,' / -/ - / / / `,--- f^_� \ \ \ �Q \ \ / \ III ' _ 1 LASS I RI P RAP \ \ 1 I --'' ' `'�� ' EST 115 TOMS /� ___ \ \),\,\ \ \\ I % ;�I �/ - �5 SY,'GEO—TF -TILE // \`\�� \\\ \\\\ i//// //'Ji �;,, .„i, , 6d : � SEE,/DETAIL-2�12 , ,-- -,- v �. v �v )�� �� // /� U D ETAS 2 0 2 /'' I ifq, I I '''' /' A\\ \\ \`�vA �� ���77 ii' / — /v—��� STANDARD BASE DITCH _� --' ���v 00 -- g5� g !'� ��8 Not to Scale --= _ __ ��� /� �� __ v \ v `� v��°° o _�/ N ;;'nv =;,)ice �i ,-.-, /O = _��� \ —/— � \ rat\ / / �� � -_ / \ \ \ 1 � v \ \�///// I� —_/ \ �( q(,----=-_--:-_-5-. ��_�— Natural Naturalim I \ / \ '%' i_ \ a 5 _ o cn Ground Ground - / 4 \\ /' / �\ \ \\ `\\ - 7 ) 4. \\ ``\ /�i /' /j , , , u) Lc) 31 D 3�1 , , 55- - -- /, '',�' %=' �� FLOODPLAIN ` \�,.• \ `\\ \;'- - �;,% ,� ; / Embedded Class I ,/ \� — \ zn — \ \ \ /' / \ - J \ ' \`�/'' , XCAVATION O V\ �\\\\\ \�- \`` � �/ f� �,' //' �� /-( / ,) —854----_ -- 1 \ I Rip-Rap (1 min.) \ -- _ / ' - _ /' • SEE DETAIL 20-11 °°� \\`\ ��� �,` - 840, '' \ C Geotextile -N-_ PIPE REMOVAL AND %�% \\ .�..''C„3".m.\ -� �d�� v � :.�. �4,;;,/ Min. D = 2Ft. --- --- `v vv - BHA EL RESTOR,AT�ON 85�� � ' �� ��,:,Awiiifi "\ RETAIN EXISTINGMax. d = 1 .5 Ft. 1 �- �� //'PEA NSTIUCTTON PLAN � �•% • vv\ CHANNEL l �� vw EXISTING -L___ v -Y6c ,/-FC Sta . P5-+8600/ � ' � : � , ,�� �. �� �., /, BRAIDING AT TH • /,;, ! � �'t�'7 1 w LOCATION s //'% -��'� � �WI A 1 '� vv v vv vv / w DETAIL 2 —11 - ,' ��1�.•�,• o �, \ 11 J // / / L.'' vv �'' III / �I �I \\ '\ \" AV \ ��� , ''' FLOODPLAIN EXCAVATION\ �s \ vv ,/ // EMovE ;_;=; � 'Yd41 ' ' G 0 vv v� vv '' , _- /77 N „ , N PIPE REMOVAL0 Lc) \ \ y A = - a ` / / / j/ / ',/ Ham _ - ,-i/ •% �� I 1 \ \ \, , \ - i' ,,i LOOKING DOWNSTREAM _-' ••' ' / / c M CULVERT INLET Existing \\\ �� /- //', J� /i / _ \ \\ \\ \\,\ \ 5...,_ _---8 Ground >' \ / _ \� - -��✓ - / !; C /I 1 \ 41_4 //' / ( Not to Scale) \ � ,;‘- 85� / aa Existing 5' I - - -- \ Ir-_ % / ' '' - ��V�' ..- _J \ ` \ /'- ` ' N Ground ,��1'?. � � �' —_'—/—, / \_�� \ �s6 \ ��/''%� ' /' i�'�iii�--\ —/ \�/S 1 \ \\ 1 '\ \� — ,' o !` , EXCAVATE TO \, ` J Q \ �� /�' !�/' �� \ /I \ ` �\ \\° ° CLASS 'I' 'i'• � / /� 2.O NATURAL \\ \\ I \ ///,/ , J e \J \ Is \ < \ \ LHI 0 RIP RAP FLOODPLAIN I \, / /.,,,''i,/' / // //,/i� � ,, / / 11�F1 \�►� \ \ / Q NATURAL STREAM ELEVATION ' / -/ /%'%��' ,' /'/%yi'g,_8487 /`° /� / \ \\ \\\\\\\, \\ \ \ �\\\ \ 579 OE BED ELEVATION VARIES'fl \ \ \ I ' i �/' in -i% ,/��/ / , \ \ \ \ \\ \ ` P z0. w STA. 24 + 34 -Y6C- LT \ I- ;%�' ,' ,,--% ,-' // \ \ \ I I Q / 1 ,/ /\J III \\ W j%/ / ,- --- �- ,/ —' C // ,/ / I \ \ \\ \\\ = \ '� PROJECT REFERENCE NO. SHEET NO. F. HDR Engineering, Inc. of the Carolinas IIII I 555 Fayetteville St, Suite 900 Raleigh, N.C.27601 U-2 579 D, E & F ■ N.C.B.E.L.S. License Number: F-0116 RAW SHEET NO. 910 ROADWAY DESIGN HYDRAULICS S rTj T r STV Engineers, Inc. ENGINEER ENGINEER 1 �/ 100 900 West Trade St., Suite 715 ee///J Charlotte, NC 28202 1 1 IIII NC License Number F-0991 I 905 q 1 1 900 11 II IIII 1H _ /` � 895 �Ypthe I I I I I I FLATIRON 890 - I - H III 1 H _ .—. 885 IIII — T 885 , I STANDARD 880 BASE DITCH 880 EL. = d60055' 875 STANDARD 875 '_ B S`PROF II F' hF G(NNING - w AI 4P" RCP GUI IF l EL. - 853.90' CL H 870 870 w 0 h- N 865 EXISTING GROUND 865 0 cn Z EL ° 860 -- -- _ _ _ __ __ --�___\` 860 � 5 - - 0 -— 855 — — 855 / EXISTING 24'� RCP- ,- ,_ PROFILE ENDING AT TO BE REMOVED I I CHANCEL TIE WITH CC U TXF� / _ 85013 PROPOSED GRADE — __, a l/�I L L CREEK 0850 ° 10E9 FT/FT ---1 U) W U) o N O 0, ��,_,...� � * e • N 845 — 845 F V O H N L I * N V C9 I z Lu Q 1-1 m 840 840 0 0 z C) o0I w — J 0 o (o w C 835 835 z C) I W I -I L_ CI_ 1- I w a 9 N N Ln 830 830 O i N I M E N O M 825 I 825 co o N O 1 (, L 1 O E O O • H 820 820 73 U) a + I U) 0 ° z CLI 0 815 l l . 815 w ° Cc z L w CD V < a 0 + 00 0 + 50 1 + 00 1 + 50 2 + 00 2 + 50 3 + 00 3 + 50 4 + 00 4 + 50 5 + 00 o 0 H HE w 0 W J J (n H CC Lu Lu PROJECT REFERENCE NO. SHEET NO. _Y6MATCHLINE �```� no • ® �1� HDR Engineering,Inc.of the Carolinas U-2579D,E & F 20 V` l� J 555 Fayetteville St,Suite 900 Raleigh,N.C.27601 k b N.C.B.E.L.S. License Number:F-0116 RNV SHEET NO. STA 3 + �G �� ti9 \, ROADWAY DESIGN HYDRAULICS _ ET STV Eriglde St'I to ENGINEER ENGINEER at SEE HE 00 �`�' 5����,P ^ STV ioo 900 West Trade st.aide 715 .� ,'yp �jd, Charlotte,NC 28202 / /p .(� ` / NC License Number F-0991 rs, --' ,A\\,,, \,... a �_` c; m / P. c` — \ O \ \\\ 1�.. DOCUMENT NOT CONSIDERED FINAL / / ii / —_ \P •. : \ \. • UNLESS ALL SIGNATURES COMPLETED o ' /! 15 RCP C�/ ` GR = \ a GS \ ES ���\\\if \.• 3Lijvt��l. 41 ' t. C C1QEs—V1I SY GEOT \ ` LATERAL'V'DITC > \ , \ :CLASS'B'RIPRAP �152 SY GEO-TEXTILE x C� \ ///4y \ 1 p SEE DETAIL 20.9 `© ��� ` \Alk R TE V'DITCH '\ N _ j�{-1 ��� \ it \I� SEE = IL -9 / ��_ `,. •H DETAIL 20� �/ �.y / = 47"WW F, CE _ A4 1 I{►7 130 CY ��j BERM - moo _ -� - - +� 1I 6 47"WW FENCE �' IF , / BED CH sew*�_ a����`�_�_ CL455'I'RIP RAP �y\ �"sik SE A E AIL 20Ni. i 1i" �� EST 25 TONS �1111_At ��� \�F\ �� .! ili s,` y^y'''/�/��r 11- 42 SY GEOTEXTILE i '�'ON,-' -y� \ Q\ BANK STABILIZATION L \�\� 'BDO. 'AN/.r��'////� .�•._ / HW T� \\� \�\ 0 EST 62 ITONS�P °, C z�•��"� ����/�/� / 3 / F \-". \\ \ r SE $Y GEL 20-8LE -° `v' ��_��./ -C\ / `•���\� \ \ $EE DETAIL 20-8 ��A\ •". o wreieo' 'F ® \ Fps c� .:; \\ \(\ ; 0 4��\+.�Zy�������� \ O {'� �@►' y2Gl / 2GI 4►' ,*/ \\ \ ,��� n I ~iiii\� �������1 �� -wokeik: co w -± _.i:� J V ..GN-� ���/ �,`.I::s� OZ� F J 43 _ r7` t4101=1 ���ff• ;�1� hic, N r > 11reallAIME �� Eni - 1'BURIED! ��{a W L P L L L L L L L �� �._FS ` !—tr)I L , 1111&7117:115121kNikiiklirkT:s � L , , ' 1 {,VLow W ` '. .................................. il! ! J cn �' Ltl PC V ��a - - - _ _ _ _ - _. _ _ _ _ _ _ _ _ _ _ _ _ _ / � 24 RCP-III .n iFG" W W T NW 6 �P 2GI `,� —s:_ _ :11 J cn + war•„•�G £ \ ,6w OUTLET P pTE 110N PER \ \ p, r ••••p r.uw �: tiik m U r\ ,,,, F C __——_— \ / _' 18'W/FLBO '������w��•� CONSTRU 'ION LANS \ \� BRAS S ��' F • a ir� . s I �' ••+� . V �� a�`� �••;LO! _ \�4 o �p .. CLASS B RIP _ „7if ar/ ` ����� ��������Yt ��I Q EST.S TONS F NO RIP RAP IN.r C \\ �`s�y?��lr, 5 p FIRST •. • �frd\ Cyr� 0 lutl 14 SY GEO-TEXTILE _ - •yyW FENCE •�� • \�.n 5 y: Nir z t. o CHORD 11 \ OUTLET CHANNEL PROTECTION b'LAT L • ` •' « _ ili/�,��t o CLASS'I'RIP RAP A F \ / I�° 43 z d / - �39 SY GEOTEXTILE a`' 118 TONS VA I W� �� ES—S6: ' ' 1. 210 SY r 0-,!TEXTILE to + SEE DETAIL 20-10 fr BUILDING y \ DDE D 72 CY HE W'R E \ 5'STANDARD B�� SITE 18 \ CLAS I'RIPRAP DETAIL BASE DI p12 , G-./ EST 0�TONS 1- , m� \l 205 SY G` TEXTILE o a 1 STANDARD BASE DITCH A \ `r ~ SEE DEC- 20.2 a INol to Scale) RE:; 24"RCP f- N� r / z v �' \ Natural Natural •, 1 O III-- 1� /OUTLET CHAN L• Li] r\i O Grpand Ground 1 U m ^ BUILD G '� \ PROTIO p d. VE •4 \ CLA$$'I 9q Rp-Rap 11 min) BE REMOV R EST 4A ONS z � #1 Geete,d l• 8 Y GEOTEXTILE Lu 1, LL Min D=2F. , ` STANDARD BASE DITCH S 15 TONS I 1P Ld Max.d=1.5F. C , �C1A55'I'RIPRAP Lrr�0. .�{S n' B=SF SITE T E 18 A ` 6 345EST 1SY GEO-TEXTILE ` S N SEC DETAIL 20 12 ',.' a DETAIL 20-8 DETAIL 20-10 DETAIL 20-11 ? PIPE REMOVAL y OUTLET CHANNEL PROTECTION FLOODPLAIN EXCAVATION\ SEE DETAIL 20-11 /, ,p p BANK STABILIZATION AT \\ ti. CV INatro Scale) N t PIPE REMOVAL v JURISDICTIONAL STREAM a er,e R MILL CREEK .; c INotto Scale) El.r«aa LOOKING DOWNSTREAM SEEP r ° NATURAL BED @ CULVERT INLET Ground C� a -� ELEVATION &rsnn (Nat to Scalel--!` C C/�/ FL0L2UPAI �\ l�, LN o Nrounl al Ground 15 �� ti -tea 2l r 1 vl I2. CES�S2 O,�XE ADETAlIOL 2011 vv (9� :.tea 1. H ..... EXCAVATE TO •O �;' �T }P'� ¢ G.ab,d 1. cuss•r �r0' NATURAL PIPMOVAL AND ��.� .yry t�Ra���i. m o n <nana.le.a RIP RAP FLOODPLAIN EXISTING CHANNEL A EL RESTORATION "!ice ♦ Q�iF IVanaBlel RETAIN EXISTING 'N ty �� ` GEOTEXTILE NATURAL STREAM F-1 ELEVATION BRAIDING AT THIS CHANNEL PER NSTRUCTION PLANS ��. U Type of Liner CL'RIP RAP BED ELEVATION VARIES' LOCATION / Q irtr''�V\ � L Type of Uner= CL RipJtop o c STA.271+50-L-RT STA.24+34-Y6C-LT IV, o ° STA.279+50-L-LT STA.280+78-L-RT MILL CREE / Aas � -0 DETAIL 20-2 DETAIL 20-3 DETAIL 20 4 (ES—S2E \ SITE E E �'4.�� aA w �O n } STANDARD BASE DITCH LATERAL'V'DITCHLATERAL BASE DITCH t7 ]513.5 0 ]5 50lNotto Scale) !Natto Scalel7 CMPo INatro saaiel rural b15�OC GRAPHIC SCALEGnu� yD ,L.1Groun� bNaturolI-- LEGEND: 'S `,7CI\A\N(1-1)' > r + G'"" Fill Ground ?') D • 1°>R. Slope `"- ' Groan D 11R. Slope d \ / �G N Gemealleill Min.D= 3.OH. DENOTES IMPACTS IN �/ g/ MID.D= 1.5H. ♦A w wcr Max.d= 3.oFt. GEOTEXTILE Min.D= 1.5F. $// $�/, SURFACE WATER 717 / ,G S ° PERMIT DRAWING B= 5.0Ft. 6= S.OFt. Max.d= 1.SFf. // // SHEET OF o B= 6.0Ft. DENOTES TEMPORARY Lri Type of liner= Class'P Rip-Rap FROM -L-STA.269+00 TO STA.276+50 LT Type of liner= Class'!'Rip-Rap 6= S.oFt. /1'//� IMPACTS IN SURFACE WATER SV o w FROM -L-STA.280+78 TO STA.281+50 RT FROM -L-STA.279+50 TO STA.281+50 LT - FROM -L-STA.279+00 TO STA.280+80 RT u 1 PROJECT REFERENCE NO. SHEET NO. M fff��� 1 HDR Engineering,Inc.of the Carolinas U-2579D,E & F 20 ��" "�T CHL'LINE C ���`��))'\ O � l I I�1�1I I�� FJ� 555 Fayetteville St,Suite 900 Raleigh,N.C.27601 AST 1�J C (/J N.C.B.E.L.S. License Number:F-0116 RW SHEET NO. SEE SHE 7.13 -�-Op `�P�SAP ��y I \\\�jI�11�111��1I\\ O I \\ /: S 1 T 1OO ROADWAY DESIGN HYDRAULICS ✓I^ J �/. 90o wesEtD�Lie St,Suite to 715 ENGINEER ENGINEER / 7,,,e, '< \\\%1 Charlotte,NC 28202 NC License Number F-0991 . rci_ \,r\ it �rl � \ �� ( III \1 \\\ >/� > \\ \'�9 ., � �(� I) \l /� )j �/�� � , J `6S4 I w0 LA 4/r41/ ,i ' GR \�c� /-� 1 \ / / i \1 I ^\ \\ \ '• �OIJ ( \ / \�/T/TYle � \�\t �•� C J / I I 1 1p v`�\ \\ \" ,� 1 I `\ T� 111 II l I1 \ \ DOCUMENT NOT CONSIDERED FINAL //� � \ �� \ EL�� 1 I 1 UNLESS ALL SIGNATURES COMPLETED . ,--/4/ / - \-' `a\_ / I l �. - o \\ A,. \\..vim' / \l I l \I . I4 k 1 Kok )�/// T� GI \0. � � . � � v \ �j.E� v - � � �"v. ��,7 il I- v����\�\\ll , �r�/ /// / itte �� \ \$\B ,F I�._ Aga° \�\\ \ I (/ \\O\ gillM\ \ \\\\ ) FLATIRON /il/ll , \il \,_ 2�TON5 . \i AI\ \\\\\r� I I I 1 /#)�1\\ Z, w - ,,, � ��A�� A �) A�\ \\ \ YEL�'�1 �V \ �I���\ \ 1�� f'�LAsrEF V A \ qj �� ��' ♦� /fir 1 \ wa \ / !/ \1 \ \\\\\\ >V6 I �� �:� \\ \ \ \\ \\\\\\\\\\ ` \.. DR TA�12 l'/i \:�K 'j iJ !iS �rta �lOOO1r \\ 47^ i F CE r 1 1 1 ��� \\\) I � �. \ \ ( _.,.- y/ riv amg ,.„,,, 1 �c� � � ���� .�►���® / I WP 111 ' I • \ 4�� aA* \\ \\`\ \ .4\ 1 S\v> F�r�k. / � �(65sV�\ 42 1 ( ,BANK$TABILIZATIO `,, WO E` .,�5.w�v�;00.�AIA'^ \ _�...., �� \\ )\\-11 Il,.\\\\\ .,\\\ � ti11� \� \\ \ / Y ('l•I / EE T�62 IT RIP ONS�P �� ,., \ ^\ ySt �� ✓\ _ C ":'*'�"�righE`=,00.* *". \\'\\\\ \ / / / 1 I I \ \ \\\ o F \� \ \\ I� / / / \ 81 9Q SY1 GEOTEXTILE\\\ \ � U- o ��/0 n �` .�T tir �'� i \ V \ �S 1D �pl 20-e A'$ V A " ' A Ln fir' 4 \\�\VA\ \\\ � �1/ / I A A \'' _ V \ \ \ \ �.."a �:`��` �i�\\\\V o / B• " I�\��\\���\��\�� \ / ( />/ 1 \I( (2��\1 .'- \\,\\\� 4:4'14t4t.. \;�� � \ \ 11�-1�-f\ X -.:..................... "`� o 104i -alitIIItallRata' aillifflEMOWORWm. AK' AWL' ' ' • 1'►�1_ I� eiAFl �p�l7 ,.� �7e \- Lotill iw vik _ie �7 ��j, lil�l� 1t.�fE V � /°/�(rl`w1�1! 1.`'�i\M� N W 11 �_ «atmerurr� �si L R Ist14;7r+*.►r nnnwr�.�.� , vi- 1— Lb 9 W �NS _ 1Y� � wl \YiV�n� � �;] ��a e L E 1E �Lw\Ltiy Lit JAB ` :::::,..",...i.:4411rk.::-:, L 7 W W tn H WIG_ _ _ _ _ _ — — -- \ w 1 I�1: ............................................................... NNI IIIIIIYYII 1 11..111 1 1 1111 �� oU \ \ 1 .V✓iFG r^' �- \\\\\_=J\ - \ � \ . 9040,4�r ul CONSTRUCTION PLANS ER ,\: 7,40,-:;,3144.41:\_,,,,�/ uT uo ei \ \\\\\\\\\ • tote, - N '-'L.,_ ,/ ...)\\ A`_'',2 , -,...Vkiette.Sie9-440.- \\*0 1.--- \\\\ ) \k, ..,- \ ,, \-s-‘ ..,m, 1 V i\ ._\----2---..—----------1_,'\\----7::,--- -- \__ "------ tiv-- --------- ,, ___I / , , . -, - \ \ , lik ,,,, ,,, . \0\i',.-:-. "‘--(/_, - /1(c -__-_-,-z------- 0, ....__________ \\ ---,__,„ _. ____________z ____. ,, ,„ 4 ,„ . , . „„.,, ,..;,,. . \ % �r \ — _ ' _ ��Iiiirerk„ - NO RIP RAP IN BED G ` r°\/ . �� 8�1IL '' f� • reit ii \ \ \ IL `..�\ J,,, , ___.,,,..,____:. ... ....., _ , ...___ ���Nmilrifr- ww FEKrCE ► RST 7 FT of DITcice \ e5 n ,, N 0. �C!' \\��� -_' \\ \\\ 1 \:,..,,,,,,,,,,,,,..: �\ '.:°Oi�OLLTLET CHANNEL/PROJECT). , \\ 1 6'LkT L BASE D O. ,I� •��' �' ,� `6 1 ' \\\\\\ I \\ \ �s1�LA55'I'RIP RAP F `►t � - .\ f ) \ 16 CLASS'I'RIPRA• o ? / / / / \l \\ \. l �'0\\\ 1 \ ".L i\ EST�82 TONS -/ C' 6\�(QJ� c T lla TON / •. U d bb\N* ^� \ \\_�_ j"��," ��\ \ _/ �J3Q SY GEOTEXI1LE�j/ \T �0 SY O TEXTILE '\, fl� / f ' ,�� / \ - SEE DET 20. BUILDING R , �,/ 2iQ 1y, � / / I/ r / �A\ �� ��\ . � :� A `W 'Y. 4\�A �� ASEPR AIL 20� �'-C7CNOPIE H� �'�PTO / �,��il��.•E `� / \\ne -�� -4 e J \ \ RETAIN \ DDE 572 CV / 4 a' "4I ` /.y� ,REMOV +r �• r 5'ST �ARD B. E DITCH ■ya / / // 7 I / // 1\ 1 �� � �,�' ' , Ni\\\\� r.i- .. ,1 v CHANNEL A FLOODPLAIN t '\ J .� / a / CLAS I RIPRAP 4/ / \\\ 1 DETAIL 20-12 / a��r ';v'./ a`) ..� /— • T� h o d m / //�// / / \\ �\ STANDARD BASE DITCH �` \ �� /j� �. �/ /.- s l ,d05 SY G'n TEXTILE �J 1 \ //� �_�' s>e,\ \ �� �.� /,/ \\ -� j/ \�.j1 a SEE DET z v ////////�// - // / / /1 I \\� INof to Scale) en_,-_ ��V� :t�j` /RCP- 1 p � / ) ) C00�% ` / w // / / / _ \�a -,`` L\(�R/. 10 /O/�t`/ //��TR•Imo'.Tl..a '�, 9 `sID!i 20.2 Q .(/ / /) Natuml ` J Naro r I J 1 -. Lfl / / f /// / / /// \ Grwnd d—�.... D �..:Embedded Clcss•I. L �I •. \. CLP�S' \ •. z H I // _ R_p-Rap 0 mnl R ' / ESTo}�ONS � ^' j GeeM,dL �� -%._�. �/ r STANDARgiBASE JTfH 8,. �, TEXTILE �I d L� / / / / / �. Min D=2Fr. .1� ��•.+' % y // ' 55 'RIPp`eq I 1 1 L • j' . B=3F1. 1.SF \ \iI / �d, .6> TC#7S '� I•,C1ll ' 345 SY GEO-TEXTILE \\ DETAIL 20-10 DETAIL 20-11 � ';1 r/ PIPE REM VA .v o \J / I DETAIL 20-8 / SEE DETAIL,20-11 p _/ / / BANK STABILIZATION AT OUTLET CHANNEL PROTECTION FLOODPLAIN EXCAVATION\ \'f'. \ INafro s�alel N 1 PIPE REMOVAL - p JURISDICTIONAL STREAM carol Rea C \\ Li..a;an LOOKING DOWNSTREAM EnznnR 1 •/j ) Not. / I --CREEK ° \\�- NATURAL BED Grou^ @ CULVERT INLET Graand CL + --✓/ ELEVATION au &istin Naf fa 5calel 5• • P� C C 1�P&XC( UPLAI/ \ �\ ��_ 0o w o N fro) al lv �' �n v II2' �E V-V� .�// EADV TTIO 20 17 .w / w ro n EXGVATE TO A \'�a 7'>`,;4 Q n G.oand G,a,N;l, <nann.l e.a cuss•r �0' NATURAL EXISTING CHAN EL / /PIP MOV/1%-A N � ��� �� RIP RAP FLOODPLAIN ! �"�pH € i�� C 1.5' GEOTEXTILE IVadobleI NATURAL STREAM CHANNEL IN yd ' � U Type of Liner CL TRIP RAP BED ELEVATION VARIES' ELEVATION BRAIDING AT 7 S - E T jUETION PCANC$ -EESSk Ofkl� ® \ , Type of Liner- CL I Rip-Rop o STA.271+50-L-RT STA.24+34-Y6C-LT `\G ° STA.279+50-L-LT STA.280+78-L-RT MILL CREE / AO � �! 1�-`", I G' g:. DETAIL 20-2 DETAIL 20-3 DETAIL 20 4 (Es-s2 0) , SITE ?E E — . 1��° ��G fp n } STANDARD BASE DITCH LATERAL'V'DITCH LATERAL BASE DITCH FF ra ]5 13.5 0 ]5 0 I Nolte Scale) (Not to SRalel 7 GMP INalro Scale) �e,rol b )S� O GRAPHIC SCALE Grau�1 dl y D ,L.1 Groun" Nowml b Fill Ground ?" Imo— Fill LEGEND: /'a� ` \ .. N p "..." Groan 11F Slope d D 1°Ft. Slope / N,:CS Geolei;le Min.D= 3.0H. \ : tr L b= 5. 1.5H. GEOTEMILE DENOTES IMPACTS IN �/ \g/ w LT': PERMIT DRAWING 6= S.oFr. ���/" SURFACE WATER /¢ / > r + Max.d= 3.OFt. Min.D= 1.5H. Cl U SHEET OF B- S.OFI. Max.d= 1.SFf. o 8= 6.OFr. DENOTES TEMPORARY Type of Liner= Class'P Rip-Rap FROM -L-STA.269+00 TO STA.276+50 LT Type of Liner= Class'I'Rip-Rap 6= 6.0Ft. S S o w FROM -L-STA.280+78 TO STA.281+50 RT FROM -L-STA.279+50 TO STA.281+50 LT - /�� IMPACTS IN SURFACE WATER / V a FROM -L-STA.279+00 TO STA.280+80 RT /.,/ 25 12.5 0 05 50 �.i 11 PROJECT REFERENCE NO. SHEET NO. �♦ ` HDR Engineering,Inc.of the Carolinas U-2579D,E & F 24 DETAIL 24-1 GRAPHIC SCALE J 555 Fayetteville St,Suite 900 Raleigh,N.C.27601 LATERAL BASE to s EIDITCH .\SS/� _ yt I \ . N.C.B.E.L.S. License Number:F-0116 rim SHEET NO. b S� \ ROADWAY DESIGN HYDRAULICS H°lur°I I-,-- \ /�S/' ENGINEER ENGINEER Ground z 1 . 15Ft. Fill �� ///` /7,/ _____ ..:�,t, T STV Engineers,Inc. d 5( :j :: ®S 1 v 100 900 West Trode St.,Suite 715 �///�� Charlotte,NC 28202 GEGTBCILE id �. \ 11 - / � NC License Number F-0991 Min.D= 2.0Ft. \\ J ee// Max.d= 2.0Ft. .'r--- 'When B= 2.0Ft. Type of Liner- Class'I'Rip-Rap 6= S.OH. ��(� f[' /X _/ �,- ' FROM -L-STA.335+73 TO STA.337+50 LT -� LEGEND: 191A DETAIL 24-6 �// DENOTES IMPACTS IN '�� OUTLET CHANNEL PROTECTION /�/J/ SURFACE WATER 8, "°"°S`°I°1 NW°ro1Bed / 9s DOCUMENT NOT CONSIDERED FINAL EI°..lo V/X DENOTES TEMPORARY /SF ES— 49 UNLESS ALL SIGNATURES COMPLETED °�°I /' IMPACTS IN SURFACE WATER Groan round \ . 2.., ., (R. 1.5• . • Gw1°atile Gh°°.I R.d V E S—S 5 0 a� N°del°I 8 ES— . 2 tpthe n obe /�y�7 OO Il C y. E Typo Wlinv= CL'll'RIP RAP } \ J�J�r``�J��/ j5�� '-� LC1 STA.335+81-L-LT ,, Y�� FLATIRON Y �I ,0 0 0 p \ Q _--'/ 0% Q CJ Q Q f3 : �S 5'�j✓ pp gQ A _ _ _ �a --- ---CLASS AL BASE DITCH /_ _ _. L WIN_STON-SA_LEM CITY LIMN` -�-.� NNN EST 159I0 SY GEOS �7— ��bLLj 2�E,Sp��T 159 TONS ' O O © �� O_ _ O- - 47"WW FENCE e - © '. ES—S24.. �S "DEDET 3E0 CXTIL a JIS23 6Q� E3 CL'T RIP RAP �` CHORD ® 1 V c Q - - EST 7 TONS ,,, 1 .= iva�ik,`` IWI o, 15 SY GEOTEXTILE OUTLET CHANNEL - SITE 2 6 PROTECTION •• w R - CII% CLASS PROTECTION RIP RAP \,`\�,te.: � .iTi Tr.TAi-L ....An 0 / EST 59 TONS 1 ♦„, /1 �. N F / ,� \ 101 SY GEOTEXTILE �i` F J °i - /�=� s SEE DETAIL 24-6 F�✓s + sowsNi. —� / — c I °sue°' ��ft oG� M, k_______ __„.., •� 24"RCP-III FS M %` \ �► 2GI .• R ' R r. R dR dR(- Mti NN � \\ 2GI-A _�7(♦ RR i i '' „, u., M M \\ 2G2S1 5"•RCP-Ill'_ �.. „�1�� trl^1 (Y) Ile 1.4M.111`. 41FAI 11- N. M. N Yllllll` XI=Iiii .1111111Z - � NOT BURIEDoi r T ___ NS _ ____ _ ___ • m In J 2 r r r r2GIA r r r r r� 'i;._ -���T.� r� ��� �����E 2 I _ "cL Z - m -I _ �� _ a — - - - U d = BEGI %GI-A G ---''''. FS \ �F FS Art ' LBOWS FS C (� 2GI -'1{`]� �\ j�///', ;--�'��.r % r.r,`.• �� �1 / / W .ITCH /// - //� /�.� �, ,� �/ -tea► r��\ LASS'I'.PRAP _ '1 '0;" �' .. / / • EST 116 Ts NS i���_�a Ilt, 4 O / •.; / 196 SY 'EOTEXTILE + ��� ":` BDO r+I',''f+� \���i�+, / /�r� �\ / .. SEED AIL 24� 9�' i La `S��/� al BE'1, DITCH 2'BE CH Q W �I i 4• \`� `��a\�- +�'i• 40. :4��� - zo \ i �. .• _ CLASS 'R RAP C3 `A _'►-:w_\�\_—�`J���®� -.. / /���eD0'�•'-� � ` =p k-�Wi / . �n, EST 454 ONS �� �► \� �- ` �i► " `� g li,.- o > � ._ EST 157 OR � .,Y � • -- � � - R W " z � .. G T ,n768 SY GEOTEXTILE ' ''' �!.i '��/ ' ( yz �. � ef.EE DETAIL 24-2 —— EE DETAIL 24-5 '/�--- ` 3prrArdrAW10"' _• �, Q ����� �� ���°� BERM DITCH hm ► _ -tea.. _ <.- '.FENCE 11 DITCH •E "! �'� WW FENCE / - __ - rn, SEE DETAIL 24�^� �i ___ --CHORD• •~GY'-_47 ON CLASSMB'RIPRAP as H �J TR�R T ———— / ._ �. :z- j��—� EST 58 TONS ,..4 oc, / / 4 _ == ;w;.��-_; � �— 100 SY GEOTEXTILE • a m' / // 0°CHL ' I / ' . °�R BDO WY SEE DBERM,1 4-9 BRM DITCH TRIPRAP SEE DETAIL 24-12 a v a A Molly il�,y,�" / / EST CLASS TONS z o �' =z - `k / / -- w "\----„, 107 SY GEOTEXTILE R' D / 2'BERM DITCH 2'LATERAL BASE DITCH 7Q r?,DSEE DETAIL 24-11 NS - N �O W r +560°DETAIL 24 10 [ CLASS'EST 60 T RIPRAP t1 — E4/�___ EXISTING R/w-a / a_ I /mac", SPECIALc25 BE DITCH wy, rrrnnn,,, 101 S G�OTEXTILE z H ) .jam, ——— _Roa,uNE / j _ z V`'s / SEE PROPILE OR DETAILS k\i;i/ W SEE DETAIL 24-1 F " /Air F -�—��� �,�n ___ _ z I , SEEI HTAI_ 4-10 \/\ ^GINS DDE = 206 CY o "' ,G �r, — /�� 1 i SPECIAL BERM DITCH k / ) �NtN\ p <; _ 1��__ • / SEE PROFILE FOR MAILS \ \J / 6 Q -6� —_ / / / SEE DETAI�Ln24-9 O o N . 0%80 ----- INV_g 2.01� _ _ _ - C; ,/ 1 \J c �- _.�"LL"�3 �.,_. �' `�= �= TIN Raw A // / / . // ELef / .\ Q Q .. o ci - : — ''?c) -\ / // / '?i p w � F Rely --- / 7 8**,,c07.1 \ 1` / Sliv 0 o W rS \\\ \� /// � /k� 6Owiv} • U o c / kk o ° p z• k z c CC• U o / PERMIT DRAWING o w Li; 3� SHEET OF a _ — 25 12.5 0 25 SO —�� �.i /,./ PROJECT REFERENCE NO. SHEET NO. ��—�_ / HDR Engineering,Inc.of the Carolinas ��^/� //�/'��= DETAIL 24-1 GRAPHIC SCALE ��� . SuiteU-2579D,E & F 24 /--/-"'-----;---''— / %/� LATERAL BASE DITCH 555 Fayetteville St, Raleigh,N.C.27601 � �j/.'2 / _ (Novo Scale) b �5/' / 'V 1 \\'' ' ' N.C.B.E.L.S. License Number:F-0116 RAN SHEET NO. / / SI«:; R, \� � ROADWAY DESIGN HYDRAULICS ,«+ ENGINEER ENGINEER /,,, ��/j j �i�/� GNro�e . T° > , srio �s //� �:�..:..........-.. .r),,.., / // ` 8 _ - t STV Engineers,Inc. / 7 ///� - d V Slone \\ ;/ �. / / \4\`a \ STV 900 West Trade SL,Suite 715 ,,. / 4✓ NC License Number F0991 / j j� r./� ill // �\ \ Charlotte,NC 2e / GEOTEATLE R.� ////�(// /}�/��/7 �� I Mir o= s.oFl. St� \\' \ , � `\1 / // //�j/ 1/ // 'When B is< 6.0' Max.d= 2.OFt. '.�sr \... \ //j^P' � j/ ,r 11\\\.,. / / Type of Liner= Class'I'Rip-Rap 6= S.OH. \ \v. // // //Pi; II/ ////// I r / FROM -L-STA.335+73TO STA.337+50 LT §'(� ��".U „� // \ /�.�j 44464//�111, (l \\\\� �� j /<� \ � `\\\\\ 1 /� /, //ram_ '/ j � 4LEGEND: - \ "� J \`�\� ` : f(�l I J° \\ \ \\` ////�/ / DETAIL24-6 ` �� J \ \\ \ � / I / / �// DENOTES IMPACTS IN \ /// //, ^, OUTLET CHANNEL PROTECTION �/J/ SURFACE WATER �_ \ /// J //F INwro Scale) E1e� DENOTES TEMPORARY w-_ �r "\\\\ \` _ 1+ \ \\\ DOCUMENT NOT \ . �/ UNLESS ALL SIGNATURES COMPLETED NSIDERED FINAL u,e IMPACTS IN SURFACE WATER 1 I \ /////l�j///�� //. </// Gran /��' vv_ vim���` E — , s���=�/ �" �1�\\\ mow V A l // /� / I // Ge Lml. �hen��d = ve vwvvv;_; ���� ''� -v „ ,ES140 / A t\\\ U I // /f� V ) // .. I Type W Lncr CL'll'RIP RAP � \*\N \\ \. ^ �\\\\\ \\ - c ,-�i ( _\ �� �\ F L AT I R O N /ii(1 I I STA.335+81-L-LT \ \\\\�\ \ `— \. .n/\ Il . Jg _ \ �Y\,.�y �,� \ I ( III � e :I I \ \a4 �, �• �,�_�— _„ \ ,,\\ \\\\� \\\�__ 1 ,V^ l' \ti �� ��_ \�s\\A\ i \\ \ I \ \ ,AQ \ \\\ ''— _ _ \N\\\�\� � ���) i�iii �=_ \\\\�\ . , \ ,t \\°\�\\\\ \\\\�\ 1j \ \ MEM { -� \ \ \�1\ \� 2 CV,i�� /'� I _ JS . , CLAS$ I'RI RA °, \\\\\®\ \ \ \ \ 1 \�,q a \\ `�-� \� T _—�\ �� ��� J��\\\ \\ \ ` EST y5Y . \N \\ 0101t Illr \ \ \ \ \\ \\.' ,, , ��/�/ `�� \\\ SEE YGEO/0k, \\ \\ \�1�� '�.6. \ \ \ /, \,\\\\ \� ;fir �.: � \ \� \ ` \ '\� \ — \ \\a\ \ r— i' ��\ ,•, 1\( //'//!� ,r�•\ \\\\ \\� .t+1�1 \ '�+ : �\\ • 111 1 (8 \ \ \\ \ •.0 \ \ r \\\�ro\ro *,\�� \�D _Ir Tn `__ \,- \ a ,, \\\\\ 1 r��) I / I� `` � a , ���, B \ \ �J � \ �.——---. \\\\\\ \�� � \\ \\\�snz:roN��\\..� '� w �� \\\\\\\ \\\ � \\\ \ `\\\\ F I JAI( ((I \ VA\ ' \ _� y_� vv� vvvv �� ^ vw\VA v�=_ v ' �J III ///� �w v � .�` :, ._�tft � \.\\�\ \��\I�\�"f� j \ ` \ \\ `\ ( \ \ �- \ t'�' —`^� air i ,- "�\ \\\\\ `� ' k 4, ,iI�IIIIIIIII�I / r -�\ / lt '"H�RIP \\N it�2 ,��v��i:ir[G�Ir i _-�.�`Q En N�° wF/e F ��,�V A `� \ \ A v — AAA \ V \ \, ���� I(IIII�IIrII��I�� \\V "-SEE-Q., T44 V ����� �F�Js. �� • ce +cl_ y"+� °ws v V 'i—, V \\\\ ' \ V\\ \ \Vv ��Fs \V \V V \ � I� s Ci — `.:-� � . :q��A �� �� �O�s 1� � � 2GI-A \� � c 2GI-A EMENr� �- \ � — M ��� W1 ialLt lV\NQ1V10►\�I VIiSI/l�Yi�/J��liy0 , '\`�� , N \al11it�—�� ` Lil 1��y l�ENFTP/V<//�/t.'1 WJIML�.-. M�I�m-6'X 6'RCS �* L— Q N X -- IIL11WAMB ui W -_�., `� yM NOT BU RI E no e 4!•t� L ~ I�\'.���� W� • O� , SIN-AIWI i./3✓, ale ►�M N�N W i N W, w ��I�m ', \ '_ a` , IL`�A11�SI1��1lt!° -_ - ��>,i�r '.>,v W ���Vy INL\V1�'�`�s�s1�M�111 �'�Elilr��n7�.'�i .�1► t1►i1►►1V►�1P-�f�///Al/ifY// � _ ��� I��!�7 Nz,1�� N E J I v s �m��w���P ►�_��� --�� ras� rra���a�ati� s�urtu�Iri�i� �lrriii�i _ o I t,/)' \1IIII�11R��_ 1h�!f I/7/1.ff -1 1�� �' W W c \-- M7���i/ �ii` RWAI EVRNMil��1<..�_ M � jay lillilO W Z N ��a , " �su�\l'7 r �1 INIM�!' /l�Yl MILE ��� 1�1a1' , J A Mite.. _ �l1=11��� _ >♦1IN1111�6'GiYN h��.. - - - , _ U \ I�\\� BEGIN ��` � +!� � _� �, �;c,,,� //\ I / /gl �\ \\ \ :y► f('-- — ___ ___ I 1 I I \��� \� # (////// U •� \ . WS— O,q-_F�C A ow� �- / /,�A V 1,� 2 G I / //z , / �_ AA VA / I� / 1i! �E. 10,4 - • ...It'''� ... ;� . �i�� � ./.., 1 �/�! n l • ;0 `° \ R\\Y�`A \� \ /A - . -SEE r .AIL 24 y4 \ \ \ \\ 1 0: �. al s�e`' ,..I l- azat , _Y ma 1 s rr ,/j i` `4014 yA, e`Y - ., ' / \4\\ t,1I�V-@ 1\, l/ _ X'� \ \ �. ' '' r. ( •~ '/yam.\V�tealt�timak s 'a .. . 'IDI -' ",. � v =p _ .. } \ lb\ \ \ ,/�!]1► zo d A e p-7 f t- � EST-45 lC3 � `,I ��#A-'�,ay.�,,��AO AO' ' - .. " R"�� `-t- " �''` /(',D' \\\`\ \ :i:.iS"('aa"„ p/ , �� ♦ \ _SEE- AI-* _w_____,_,..,,,_________,____________,.,_,,,,,r_, .,..,.„, ___,_ fA7G743 __ '�'I J .���Air,:'7 ���/,%/%wiiiir+a�`� \.,/ �18-074 -�/, __ -` \ \\*\ \ 9,_ ` _� '� �� 9( \ /l �, „� ui �, TL'x_f .1_ \�� t TR FENCE r % _ »��,.. Mie / / £i�'P_ �� /—\\ \€ I ��_� a /*�j��►� -. 'a , E-_ \\\ \ \\\\\\\ \\ 8 / TY L _ r �r-n, -� / / ) ■V, �� i , _ \ iw.���1_ -ii i�� \ ` E"��� A N\ \\ 7 100 GEO�T Li �'o a m \�.'(` ■ ��� 4— 6 ,,--- �� /{ (j� / 1 / _i/ i / _ _ G \1.\PS BDO �� % J\ \ D ., 9 \ ` 4 OVA \\ \ \ \ (� EE-- '/ � _R u ll +1 g y —. / ( / ) s \ °' , I / �\, \ S PlS ? \\ ` 1I \ o �r /-- / 0 2' RM DI C LAT1 L 8 D CH /-- N 4 'is _ I J E3� \—- - /„✓ \ / ( / i / �i .- N \` yL- BE�/ DITCH +56E TA 11\\ \\\ \ea i i\ \�\\ \_, \ \CL 60 gaffs, f/ /// 7- �1 4so z � � � ..--�' .. ♦�' —. �� �-- � � i LNE I / a I 1 � � I� \/ ` SEE R OR�r(1ETAIL ('�� �` � � \ {gy DETAI 4-1 7��� +� �-- --_=_-x _ ;3 �_� ( 1 / rf _ 4R r h _iE IL 4-10/ "'1 \\ \�\ \\,, \ \ \( 1^1�\ � � // ,+ F o \ /, © F �`T — _ i � / .1 ,�, // \/� SPECIA RM� C�i-F I \ <A.^�yS\\ \\\ \\ \ \1\\\�tUlNl \DD 206�CY/� // / o \ 411111V \ -� ` % 1!�__./ (�' \_ < I \ \� / r� \St DETAILS F¢1t AILS r / �/I A \ \ \\ \ \ \ \ \ \+i * ( �C( \M\,��°°' / j/ o —\\ \ . ' 6 £3 80,E ` '"vN'�L:or_— --\=_=[_�_ \\\ \ I\ f/ ,'� \ J'2/4- l . ,-/ -- ( \ Ll_ 1\ \1 / \ ` I`\J` ;/ `°ti "-f J /P/ ,, k\ •---N .410446V, ';.1 J ,0---/--- . -----------=------. . — � o `\ \ \\ \�\\ \s\\ J ��I I I • ~ .. \ \\ �\ /// �'4 \`SZk \ \ \\ L\ \ \so•k \ -� .. ,✓� \f \ U / P \ rn, ' \\\ \`-' \''' I A \ 1 \ l - - - \',,' ,,/ <� / W/„/ , \ \ \\\ \\ \ \� -/� —\�`- •LI \ r CI O U .----- \\ \ \ \ _ > \\\ PERMIT DRAWING Li; \\\ \�— \\ SHEET OF O w \\\ ,,,_ \\\\ 3 • .-' °\ ,,' \ %\s7 J`%/ -3 PROJECT REFERENCE NO. SHEET NO. / F2os \ �♦ ` HDR Engineering,Inc.of the CarolinasU-2579D,E & F25 \ \ y Pce \ �6jJ555 Fayetteville St,Suite 900 Raleigh,N.C.27601 �� O 2\ ti �\ :it N.C.B.E.L.S. License Number:F-0116 WW SHEET NO.,,. -` / �'\ ROADWAY DESIGN HYDRAULICS _ _ / J� ENGINEER ENGINEER i o STV Engineers,Inc. / j__GFo \ ✓✓ r\( a �J it Q//\ O ��. / J STV 1Qo 900 West Trade SL,Suite 715 A , /\✓i �/\ ��, N0 / tea, Cha lone,NC 28202 // QJ \\ \\ .'^�\ �� /-1-. � NC License Number F-0991 / # „,„,wp�l �,pq \\ Jd,l_ L� e° / • GRAPH GF e \ o\/ L;� .\c° �\ / + o� DOCUMENT NOT CONSIDERED FINAL 1.- Y ,,.i,/ /0 .\Z /\\ \\\\\c .s /\�z\O /// / - UNLESS ALL SIGNATURES COMPLETED / Z G 2\\ Q U d . 2Y \+ ,_ _ / ,i;� A� �; \ •3°\217* Nor ..„. ,,,,:, / �:".\ / p �� FLATIRON ''N - �Nr, \\\ 8 Z c3\ ,gZ-'"" E' \7 + +/ �oC A F '`�ry \28. F * �1 4to . / . 4 �\ j \\..1: \\ 2'LATERAL BASE DITCH �' ✓� 1Tit /CLASS'I'RIPRAPiA ( S 3�.Y1 C r�/ I EST 180 TONS , '\ R, 1 �1\t,7s ii,,,---_,,,„, 305 SY GEOTEXTILE p _ \N4. \ SEE DETAIL 25-3 //,/ / �\� / ° '-DDE = 3002 CY / 9� / / •.� \\ A F ° 't� / + OHO \F9s / :�►,.� F /00.1411AC .• ............� 1 er` ..2 BERM DITCH ,.h W' /• •� �.� VI VIA _ _.J SEE DETAIL 25-10 I� BZ� t` �01 - - C I------ \‘‘. Ti i ri z\H \s„ w , ��' �� - _ GRADEJ.: T �r,rz.�'66 2GI s, + 2GI ® �„ cl mzizi. % DITCH _ p-�- 0��" =GCy� /(p0' S (;� c�1 ^`i J �� ,�®����'�( � �ETAIL=5-= _ - 'y�__. I-/__ C i _SI k�1�`\, GI, GI -- d Q)0Q Q DOD 0�' - V!u ............................ — 0Nitik �� 2GI-A 3AcHH ,y rm R A` V+, -- 2GI -4T� ,011111111111111111 'l {i . �� 18"RCP-III A,1 �/ E'7 ' FS 'V, 2 �j1411111111111111111111111V1111r111111111 �_ 2GIo v "Air ••. "' ithls 1 1..."11‘. -...'I.e..fob i 1 i:- ''"--.I 6 1 I I I I I I 4 I I I I I I 1 I I I I I Isill I I I I I I L___,,.;,.4,I I I.... H — i.h.,-.1NL.V:iiipl .1 Illr, 'h" ' ' 1 I , ,1 11 I •1 ammim1 I I 1 1 1 -*if VIA 41. C '''''' . ,,:1111111L'.. wo �,�Sir -'� 10 OT BURIED 2GI FP si' II, {;'� o+o /�j/ C `` ` 1 / 4y FS `9�^J/ / BERM DITCH a °0' RCP-III SEE DETAIL 75 GI* 1� ♦ TOE PROTECTION �'1 ���' SEE DETAIL 25-7 0c cc��1 C1/ CO yr BE DIT��MM C Pk z �,li / 2GI W'W' / 4Y fN � � SEEAIL`Y$�T. . , /���-`/�� ro \ e "' /A®����� ��� W s r FEN , , O .,- A . , LATERAL'V'DITCH O a EST 69 THI S ® - OA - - _ .E. TQ� �i�, ���� SEE DETAIL 2`,-2 117 SV GE4TEXTILE w _ - - ' z o' SEE DETAIL 5-3 rF� 47"WW FENCE -� 175'1.00 L-+71.5•JL1• �� ��'�� ♦ 'DE = 92 C '� DDE = 30 CY ✓ L �c1 M, 214.35'RT-•{{``''�� N.A , m ti B. TABILIZWA�IIT�I• � —��1y/ ® 6U / \ p O SEE LATEDETAIL 25-2 DITCH s�� O Q' S I4S S 'OTEIIFYE� O. ® p / \ �� DDE = 47 CY-(, AGF \ �♦� v`� xO CFF DFTAI WSJ! OLc, / \ O �i o ti �l `"� LATERAL'V'DITC . O SEE DETAIL 25-2 ` ��'(\ BEGIN \ DDE 9 CY r` P CD'`P j" SiCV 0 BEJSIN JS S o .. o o Q / Q coo o ' C>�p�pC> DETAIL 25-7 DETAIL 25-8 p BANK STABILIZATION AT TOE PROTECTION a (Nor to style) JURISDICTIONAL STREAM t.J (Nor r°Scalel 1 O U �O.A4p Flu NATURAL ,, OU rvA1uRu 1'�� SLOPE ELEVATION z GROUND d F °tyro, , I LEGEND: ce K OL GEOTERTILE Groun Gr°un d= 1.oH. /,.// DENOTES IMPACTS IN > 1.5, GEOTEXTILE 1/ / SURFACE WATER PERMIT DRAWING o Type ofLiner= Class'I'Rip-Rap Type of Liner= CLIRip-Rap S DENOTES TEMPORARY SHEET OF + ce f//7, IMPACTS IN SURFACE WATER — — o FROM -L-STA.337+50 TO STA.338+52 RT STA.338+75-L-RT FROM -L-STA.338+53 TO STA.340+50 RT ri I I I I I / / / / /.6. • \\ �-\ , t I I N \ � ,\\ \ ��'/� ffu, I I I (/J) I I I I I PROJECT REFERENCE NO. SHEET NO. / / f , / \\ HDR Engineering,Inc.of the Carolinas ( I \ c Q Ij. / ��j 1) 555 Fayetteville St,Smle900 Raleigh,N.C.27601 U-2579D,E & F 25 I0�/ (a \' ��� ✓ n (// l( I I \\ r +� N.C.B.E.L.S. License Number:F-0116WW SHEET NO.\I ( II1 / / I \ I '� // -�'/ � 1 �J' / ROADWAY DESIGNHYDRAULICS I I / II � lk I\I ✓ ,6 c/o/p)\,7„1/ I 1 ENGINEER ENGINEER \ I ` `iSTVngineers,Inc./r( I v v I 1 ,i �Q _�R � �� r"���' e I( � y I y� I / STV moo�` 900WetTrade SL,Suite 715 /\ i �� 0 Charlote,NC 28202\ \ / / J \ \ \ \ \ \ \ --'. NC License Number F-0991 14111 ! \ 1 1l1 \ ,„ �\ ' Yi' \ 4. I \ \\\ \ ,) `( 1 \ i 4 ,\ y / - L \\ _ GRAPHIC SCALE \\\ \ s A V A �', ��F\ VV A * 7 \\\ \VA \VA°„*44, _ _ i7 p/// 6 / '% � \ \ \h\ \ \__-- / DOCUMENT NOT \\ \ \ \ \ ` \ \ C \'' / ` k61, \ \\ S\ \ \ \\7�� \� \ ✓ :____— - �/ /� ��/ UNLESS ALL SIGNATURES COMPLETED \\\\c ., , , \ \g----.-- \— ,,,, -- ..,-. a� \Z \\ \ L ' . \ �/ s Aa F' p'bb,iii F: _ . ��\\\ .— //, FLATIRON L\ �\\ N '\ N. �\� °��_ �_`W 1 + \9 '` Ott\ \ 1\ \ .,\ \ FA�.a 4ry e.(a* a ;� �� ,✓��/k5 //�/ \ �� V\ ^fir\ �— \�� \ A �� � A �� �� * � �,� � %/ / \ '1' �\ \\\\\�uTERxi2�e d cli-�j�A.,- — \ \\,� \\\ \�. \ 3 5'l3 �4' 5' r m\ * —�/ ��/\� ��9 AIL,. \ \ \e3r.t&o TorTs -- ��— \ \ \\ \\ \\ OL�\ \\\ ) • ^ m \ (\ \ e•*\ _ -- — %i j `r \� 33EE S TAIL o-9,7_. -�.��.i//1_5/ \� r N '\ \ \� J \� \\ \ / I •�� .\ vii, \' \ 6 v�'xYA't�\ �' -i -� �i ,, ,,N Alt!ittirt l.,-F �� / i- . - J!�.(/ J� l �\ �\ .\ a \ 'N \ \.. __\__. / / : e.g. / — — O r ,;! / �// _-- —�� 1 \ .. . Cam, / �_lao ,-)- 17‘ 41141#1-tt., 1141 ttiklift ' /z -.3---l_f,i• r ` r� - ':. � � � — \ = X3t' a� r/ ems.r * 4 V'- i3r u . .1% .r—c� -- �_ .����_. ter, o ,� Lij' _ '�. 2a o� %GRADE °' /' r I s A zGl �� v °Iv,' ((� �O INi ' ,.� ii '/I LiBE AIL / ��- _- _ + 0 1 \l�/ :/ y.`W/FGC ?�� c ,�,c0• —� c� - \ M �(/ DF To, ✓ zG Z4l // /�/`f 5 \ — N \ry� / ‘�'��\, rt 3%��_�B �i ai Oill . _ / / r __ __ �� \\ �* o / ter— r �('� Ox tl. 18 RCP-1 �." �m i- �= Ste' ^ \f �1\ '/ XI __2GI PS / 0004 V, V lam _. IMAM \ \� 1 / '� \A• � J= Z _ ii �w ��i =—ram' . 000,00, — itiltt1� Z v� H Jtaillipmpamtim 1Aer �11 � 'it 1 1 1,' 1 I 1 1 1 1 1 - � / ! _ a ' Mia� MM. Sri / �' � mr 1 ' \ ` \ \ifillk\\\ Iiir„...„...__ _ mixdrA...1111111ftmoratimmerniamomw —all allr ___, _.....- i ik I `.�-�i �' NOT BU E / :.✓�/`,��`� 2GI J J `, / w \\ v � I ` / 1' �M r� IF do \ s /- // / .� / ✓ BEIUA DITC�i- -.� r I I 1 I I / I 1 1 I 1 \ / "RCPN. / // ,\ �\ SEE D�E�41 ' A� tl` , \\ \\,\\ Z;sV� 111;,� / // 'TOE PROTECTION 9 , ,�i {�, J � �` • l // /// E ICJ T IE PROTECTION \ \ \\ }\I GI� , r \,E �n ..._// 93 1 1�✓v p /� ,- _7 I �!�//,�� o �� \ ` r_' � �� / llll//////II II��I �� II " \�\ �\ \\ \ \ � I •1 � ��J �� /// - ''� DA'36.� ��� �`� ��`` 1 \ \ �•\a\a\\ \\� : \ COY � � - l' l///I IIII ��\\.\ \ \ \ \ \ /� BDeY ���____ s���y��_ \ m \\\, I,yL I,•t"4 '` i \\ 1 IIII4�v(� / \ \\� \ I I Ip \ \ �^ / �s_ • A 14•�: �. ` ! LATERAL'V'DITCH .� U a \� I \ \ I / i-\ \ ,, dr'���__ \ - - ��� _ T — "\� 1F G�, \ ,An it SEE DETAIL 25-2 BE SDKE� \\ L[ ,_, „I I I 11 ai1 I I I / \I - n_ �. �' z lv c� N\ \\ \\ I `, \ \I I\1 I ���� �\� \\\AA�\\\ \rP spy _- �� R' L +V-V- �` ♦ . 'DE - 92 C/ w .. y I 1 C \�\ \\ \Q ` ,l \ \\ \\ / / �. / \ \�-1 \\ \ \ \ L 470 FENCE • / 14 35'RT '�`�'�� `� a \ BANK STABILIZATION ION \ ''S\ \t III ��// \ C \ \ :6�/ \ \ Q� . LAT L'KS) r` _I �♦ z �\ RIP \ -/-/7� \\�w\y\ /�/ �\ \ \ \ L� \ \ \ Q SEE DETAIL 2Y-2 `` m i \\ ES 2 ONS \ `\).,.... /t 66 lY //c //� / \ v \ \ ' \\ `J l \ ® V o d F Ld N_ \\ SIET2F26\ \),/7v' �/�� ��,��/, 1 .. \\\ \��\\ l I `. \ \ , / \ \ \ °� � �►�® ��� xo SFF r1FTA11 25-R \ �� 9 ' \\\ i A \ \ '' \ \ \ \ LP, ;TAM, AT' DIT2r o �\ ff• BEGIN . \ \ —. \ .._ /-\ v �S ETA 25-2 CD' ( G'` BEGIN JS — S Js _.._ \ —,�— __\ \ * y �� \ .-- op�s Qom\ DETAIL 25-7 DETAIL 25-8 / ` — —— �� } TOE PROTECTION BANK STABILIZATION AT "---.:\v� -- /\ ,\y a INor to scale) JURISDICTIONAL STREAM \ .. \ — / t.J ( or r° c°el - . � O U ‘O.A4Q, Flu NATURAL BED '-,—i 1 .+.� O 1 „- SLOPE ELEVATION z GROUND d F� °carol LEGEND: �_�\ G' K GEOTEMILE Groun Gr°un > i d= 1.DH. I/,.// DENOTES IMPACTS IN \ �\ 0 1.5' GEOTEXTILE rj' SURFACE WATER �+s\, -- /�- PERMIT DRAWING o `l 7ypeofLiner= Class'I'Rip-Rap Type of Liner= CLIRip-R°p '�/,(� DENOTES TEMPORARY \\\\ • SHEET OF + w /'/ /' IMPACTS IN SURFACE WATER o, \ — — o FROM -L-STA.337+50 TO STA.338+52 RT STA.338+75�-RT \� FROM -L-STA.338+53 TO STA.340+50 RT - WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure I Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design I (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 11 173+80 -L- 48" RCP I 0.04 615 11 A** 174+23 -L- RT 48" RCP 0.08 12 203+75 - 207+10 -L- RT ROADWAY FILL 0.02 < 0.01 410 10 12A 205+69 -L- RT FILL IN WETLAND 0.08 13 207+24 -L- 5x6 CULVERT 0.03 < 0.01 337 22 13A 209+14 -L- LT 4' BASE DITCH < 0.01 14 222+50 - 223+56 -L- RT 48" RCP 0.01 < 0.01 220 11 14A 222+65 -L- LT POND 3.06 15 242+86/244+20 -L- 5'x6' RCBC 0.05 < 0.01 520 15 15A 243+60/244+00 -L- 5'x6' RCBC 0.04 16 253+92/255+58 -L- 42" RCP AND DITCH 0.05 < 0.01 513 20 17 261+02/262+96 -L- 6'x6' RCBC 0.08 < 0.01 928 23 18 275+75/276+78 -L- 42" RCP 0.03 < 0.01 161 11 18A 277+00 RT -L- PIPE REMOVAL AND DITCH < 0.01 < 0.01 24 20 18A 277+00 RT-L- BANK STABILIZATION < 0.01 7 19 279+30/280+86 -L- 5'x7' RCBC 0.04 < 0.01 250 11 19 280+86/281+71 -L- 5' STANDARD BASE DITCH < 0.01 < 0.01 91 15 20 280+61/281+66 -L- REMOVE 2 - 72" CMP 0.02 < 0.01 35 31 20A 285+56/285+81 -L- BANK STABILIZATION < 0.01 < 0.01 16 21 20B 285+56/285+81 -L- BANK STABILIZATION I < 0.01 < 0.01 20 21 20C 284+44/285+33 -L- TEMPORARY WORK PAD 0.06 165 21 285+19/285+65 -L- CHANNEL CHANGE < 0.01 133 21 285+19 -L- BANK STABILIZATION < 0.01 < 0.01 10 10 22 303+57/304+09 -L- 30" RCP/36" RCP < 0.01 < 0.01 97 7 TOTALS SHEET 2*: 0.20 < 0.01 3.47 0.09 4387 413 0 *Rounded totals are sum of actual impacts NOTES: -**Wetland ES-W33 is total take NC DEPARTMENT OF TRANSPORTATION -Site 24 is a Channel Relocation DIVISION OF HIGHWAYS 11/03/2020 FORSYTH U-2579D, E & F 34839.3.GV7 Revised 2013 10 24 SHEET OF WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand 1 Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) 1 (ft) (ft) (ft) 23 316+25/317+41 -L- 6'x6' RCBC 0.04 363 23 317+40/317+49 -L- BANK STABILIZATION < 0.01 < 0.01 28 10 24 316+84/317+01 -L- CHANNEL CHANGE < 0.01 < 0.01 120 10 25 323+23/325+22 -L- 24" RCP 0.02 < 0.01 294 10 26 335+66/338+74 -L- 6'x6' RCBC 0.05 < 0.01 523 10 26 338+82 -L- BANK STABILIZATION < 0.01 < 0.01 29 8 27 356+07/357+64 -L- 7'x7' RCBC 0.05 328 27 356+07 -L- LT BANK STABILIZATION < 0.01 < 0.01 I 35 8 27 357+63 -L- RT BANK STABILIZATION < 0.01 < 0.01 37 12 28** 397+37/400+85 -L- ROADWAY FILL 0.26 29** 398+61/405+73 -L- ROADWAY FILL/ 5' BASE DITCH 0.06 906 29** 398+61/405+73 -L- BANK STABILIZATION < 0.01 < 0.01 40 10 29A** 401+96 -L- ROADWAY FILL < 0.01 29B** 402+33/405+59 -L- ROADWAY FILL/ 5' BASE DITCH 0.26 0.03 0.01 30*** 409+52/411+61 -L- 54" RCP 0.05 < 0.01 563 14 30*** 409+53 -L- BANK STABILIZATION < 0.01 < 0.01 15 10 31 49+59 - 50+28 -Y3- LT 2' BASE DITCH < 0.01 57 32 35+68/37+32 -Y6- BANK STABILIZATION 0.03 < 0.01 172 19 33 173+50 -L- LT CHANNEL IMPROVEMENT TIE-IN < 0.01 < 0.01 20 21 34 357+38/357+49 -L- BANK STABILIZATION < 0.01 < 0.01 24 11 TOTAL SHEET 1 0.87 < 0.01 0.01 0.49 < 0.01 5694 49 TOTAL SHEET 2 0.20 < 0.01 3.47 0.09 1 4387 413 TOTAL SHEET 3 0.53 0.03 0.01 0.34 0.02 3554 153 TOTALS ALL SHEETS*: 1.60 0.00 0.03 0.03 0.00 4.31 0.11 13635 615 *Rounded totals are sum of actual impacts ** SITE 28, 29, 29A, AND 29B - SITE 1 IN U-2579C PHASE 2 PERMIT *** SITE 30 - SITE 2 IN U-2579C PHASE 2 PERMIT NC DEPARTMENT OF TRANSPORTATION NOTES DIVISION OF HIGHWAYS - ISOLATED WETLANDS SITE 11/03/2020 - SITE 24 IS A CHANNEL RELOCATION FORSYTH U-2579D, E & F 34839.3.GV7 Revised 2013 10 24 SHEET OF 1 Carpenter,Kristi From:Euliss, Amy Sent:Thursday, November 05, 2020 3:17 PM To:Alsmeyer, Eric C CIV USARMY CESAW (USA); Wanucha, Dave Cc:Turchy, Michael A; Barrett, William A; Shumsky, Michael J; Kiser, Marcus K; McLaughlin, Zachery R; Harmon, Beth; Suggs, Phillip H; Carpenter,Kristi; Miller, Vickie M (Vickie.Miller@hdrinc.com); Yelverton, Wyatt; Edelberg, Kristofer Subject:U-2579DEF Permit modification Attachments:U-2579DEF permit modification 11.4.20.pdf; RE: U2579DEF potential mitigation site Follow Up Flag:Follow up Flag Status:Flagged Eric and Dave,  Attached is a permit modification request for U‐2579DEF.  Let me know if you have any questions or need additional  information to process.    Dave and Kristi,  Please use the meeting held January 10, 2019 to review the site as our preapplication meeting.  I’ve included an email  chain that documents our discussion at the site as well as some additional mitigation questions.  As you will see in the  application, we determined that onsite mitigation was not feasible.    Michael Turchy,  Please add to the permit application website for the WSNB.      Amy Euliss Division 9 Environmental Officer  North Carolina Department of Transportation     336 747 7802 office aeuliss@ncdot.gov     375 Silas Creek Parkway  Winston Salem, NC 27127-7167          Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.