Loading...
HomeMy WebLinkAbout19980260 Ver 6_Modification Request_20201106 Staff Review Form • NORFH CA.,i0:INA En vironmenfrr!QvoGry Updated September 4,2020 Staff Review Does this application have all the attachments needed to accept it into the review process?* 6* Yes r No ID#* Version* 6 19980260 Is this project a public transportation project?* (' Yes r No Is this a DOT ( Yes C No project?* Reviewer List:* Dave Wanucha:eads\djwanucha Select Reviewing Office:* Winston-Salem Regional Office-(336)776-9800 Does this project require a request for payment to be sent?* Yes r No Project Submittal Form Please note:fields marked with a red asterisk *below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type:* r For the Record Only(Courtesy Copy) ✓ New Project ✓ Modification/New Project with Existing ID ✓ More Information Response ✓ Other Agency Comments ✓ Pre-Application Submittal ✓ Re-Issuance\Renewal Request ✓ Stream or Buffer Appeal Pre-Filing Meeting Information Pre-Filing meeting request information is not needed for this project. Project Contact Information ....................................................................................................................................................................................................................................................................................................................................................................................................... Name: Kristi Lynn Carpenter for Amy Euliss Who is submitting the information? Email Address: aeuliss@ncdot.gov Project Information ............................................................................................................................................................................................................................................................................................................ Existing ID#: Existing Version: 19980260 6 20170001(no dashes) 1 Project Name: Winston-Salem Northern Beltway Phase 2(R-2247/U-2579) Is this a public transportation project? a Yes ✓ No Is the project located within a NC DCM Area of Environmental Concern (AEC)? ✓ Yes r No a Unknown TIP#: WBS#: R-2247/U-2579 34839.3.GV7 (Applies to DOT projects only) County(ies) Gaston Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach docurrent U-2579DEF permit modification 11.4.20.pdf 8.59MB 19980260version6 application email.pdf 147.62KB Only pdf or krrz files are accepted. Describe the attachments or comments: Original submission via email. Sign and Submit ....................................................................................................................................................................................................................................................................................................................................................................................................... fJ By checking the box and signing box below, I certify that: • I,the project proponent, hereby certifies that all information contained herein is true,accurate, and complete to the best of my knowledge and belief. • I,the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I agree that submission of this online form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the online form. Signature: & rcfce',.eier. L:d,,c4n er?%t Submittal Date: Is filled in autorretically. STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J. ERIC BOYETTE GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION DIVISION 9 375 SILAS CREEK PARKWAY WINSTON SALEM, NC 27127 Telephone: (336) 896-2330 Customer Service: 1-877-368-4968 Website: www.ncdot.gov Location: 375 SILAS CREEK PARKWAY WINSTON SALEM, NC 27127 November 04, 2020 U.S. Army Corps of Engineers Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 ATTN: Mr. Eric Alsmeyer NCDOT Regulatory Coordinator Subject: Request for Modification to Individual Section 404 and Section 401Water Quality Certification for the Winston-Salem Northern Beltway from US 52 to US 311 (New Walkertown Road), Forsyth County. Federal Aid Project No. NHP-0074(213), TIP Nos. U-2579D, E& F. Division 9. Reference: Section 404 and 401 Individual Permit Application requested October 2, 2017 for Winston Salem Northern Beltway from I-40 to US 52 (R-2247B Phase 2, CA, CB, CD, D, EA, EB, and EC), from US 52 to US 311 north (U-2579C Phase 2, D, E, and F) and from I-40 Business to US 311 South (U-2579AA and AB) - Modification Application for U-2579D, E, F / U-2579C Phase 2, dated January 7, 2019. - Modification Application for R-2247EB, dated June 26, 2019. - Modification Application for U-2579D, E, F, dated October 17, 2019. Section 404 Individual Permit issued for Winston Salem Northern Beltway from I-40 to US 52 (R-2247B Phase 2, CA, CB, CD, D, EA, EB, and EC), from US 52 to US 311 north (U-2579C Phase 2, D, E, and F) and from I-40 Business to US 311 South (U- 2579AA and AB) January 22, 2018 (SAW-2017-02112) - Permit Modification for U-2579D, E, F / U-2579C Phase 2, dated March 4, 2019. - Permit Modification for R-2247EB, dated August 13, 2019. - Permit Modification for U-2579D, E, F, dated January 29, 2020. Section 401 Water Quality Certification issued November 14, 2017 (WQC004131); for Winston Salem Northern Beltway from I-40 to US 52 (R- 2247B Phase 2, CA, CB, CD, D, EA, EB, and EC), from US 52 to US 311 north (U-2579C Phase 2, D, E, and F) and from I-40 Business to US 311 South (U- 2579AA and AB); Revision 1 dated November 27, 2017, Revision 2 dated December 21, 2017 , Revision 3 dated February 7, 2019, Revision 4 dated August 13, 2019, Revision 5 dated November 14, 2019. Dear Sir: The North Carolina Department of Transportation (NCDOT) requests modification to the existing Section 404 Individual Permit and Section 401 Water Quality Certification for the proposed Winston Salem Northern Beltway from US 52 to US 311 (TIP U-2759 D, E, and F) in Forsyth County. This project is currently under construction. This modification will result in no changes to wetland impacts previous documented. It will result in 31 linear feet of additional permanent stream fill impacts and 20 linear feet of additional temporary stream impacts. The total project impacts for U-2579D, E, and F include 12,111 linear feet of permanent stream impacts of which 405 linear feet is bank stabilization, 615 linear feet of temporary stream impacts, 1.66 acres of permanent wetland impacts, no temporary wetland impacts, and no hand clearing in wetlands. Please see the enclosed revised permit drawings and updated impact summary sheets which reflect the changes in impacts. Permit Impact Site Modification Site 18A (Roadway Plan Sheet 20): Site 18A impacts changed as a result of the decision to remove a 24” reinforced concrete pipe (RCP) located to the south of the Winston Salem Northern Beltway roadway alignment and to the west of Phelps Drive (Y6C). The parcels (5 total) where Stream ES-S68 (UT to Mill Creek) and the existing 24” RCP are located were obtained by NCDOT during the right of way process. Access to the parcel is being removed along with the homes and sheds that occurred on the parcel(s). This site was reviewed for onsite mitigation potential; however, due to a number of constraints, it was determined that the best solution was to remove the 24” RCP and replace it with a standard base ditch with embedded rip rap. The main constraint and reason to use the standard base ditch is due to the steep slope of the channel. There will be 20 linear feet of temporary impacts at this location in order to dewater the existing stream around during construction. Removal of the 24” RCP will result in 141 linear feet of channel being daylighted. There will be 7 linear feet of permanent bank stabilization impacts to the channel beyond the pipe to tie the channel in at the inlet location and 24 linear feet of permanent impact to correct the existing scour and tie at the pipe outlet. No additional impacts will occur at this site. Site 26 (Roadway Plan Sheets 24/25): Site 26 impacts have not changed from the modification dated January 2020; however, the design has changed due to the noise walls. A ditch is required along the toe of fill that will tie to the existing bank stabilization at the inlet of ES-S24. The updated plan sheets are attached. Compensatory Mitigation At site 18A, compensatory mitigation is proposed for the 24’ of new linear feet of permanent impacts to correct the existing scour and tie at the pipe outlet. No compensatory mitigation is proposed for the 7’ of permanent bank stabilization impacts. Table 1 below illustrates the current summary of stream impacts requiring mitigation which has changed since the last permit modification request dated October 17, 2019. Table 1. Summary of Stream Impacts by Project TIP Requiring Mitigation Section Design Stage Stream Impacts Requiring Mitigation from Phased IP Application (lf) Final Stream Impacts Requiring Mitigation (lf) 1 Difference in Impacts Requiring Mitigation (lf) R-2247EC Permitted 814 814 0 R-2247CD Permitted 611 611 0 U-2579C Phase 2 (U-2579D, E &F Sites 29 & 30) Permitted 3,409 3,178 - 231 U-2579AA Preliminary 3,019 3,019 0 U-2579AB Preliminary 10,351 10,351 0 U-2579D Permitted 5,043 4345+* - 698 U-2579E Permitted 4,864 4,817 - 47 U-2579F Permitted 2,544 2,502 - 42 R-2247EA Preliminary 0 774 + 774 + R-2247EB Final 5,819 + 5,323 + - 496 Totals 36,474 + 35,710 2 - 764 1 Final impacts for each section in the preliminary design stage will be updated with future modifications. 2 Assumes the preliminary impacts for future sections. + Revised, per Permit Modification for R-2247EB [NCDOT’s R-2247EB Modification application, dated June 26, 2019; USACE’s R- 2247EB Phased Modification (Action ID SAW-2017-02112), dated August 13, 2019] and Permit Modification for U-2579DEF [NCDOT’s U-2579DEF Modification application, dated October 17, 2019; USACE’sU-2579DEF Modification (Action ID SAW-2017-02112), dated January 29, 2020]. *Revised, per the current permit modification for U-2579DEF, dated November 4, 2020. Thank you for your assistance with this project. If you have any questions or need additional information, please contact me at either aeuliss@ncdot.gov or (336) 747-7800. Sincerely, Amy Euliss NCDOT Division 9 Environmental Officer cc: Bill Barrett, Environmental Analysis Unit Michael Shumsky, PE, Project Manager, NCDOT Design Build Unit Marcus Kiser, PE, NCDOT Division 9 Resident Engineer Phil Suggs, NCDOT Division 9 and 10 Roadside Environmental Filed Operations Engineer Beth Harmon, Division of Mitigation Services Amy Chapman, NCDENR-DWR Dave Wanucha, NCDENR-DWR Page 1 of 7 North Carolina Department of Transportation Environmental Analysis Unit (EAU) Raleigh, North Carolina UT to Mill Creek and Mill Creek On-site Stream Mitigation Feasibility Report for Winston-Salem Northern Beltway Forsyth County, North Carolina T.I.P. Number U-2579 D, E, and F WBS No. 34839.3.GV7 May 22, 2020 1.0 BASELINE INFORMATION The project is located within USGS Hydrologic Cataloging Unit 03040101, and NC Division of Water Resources (NCDWR) sub-basin 03-07-04 of the Yadkin Pee-Dee River Basin, and is part of the of the South Atlantic-Gulf region. The potential mitigation site is located along and to the west of Phelps Drive approximately 0.35 mile east of Baux Mountain Road in Forsyth County on the north side of Winston-Salem, on land that was purchased by the North Carolina Department of Transportation (NCDOT). The project is within the Piedmont physiographic province, specifically near the line between the Northern Inner Piedmont and the Southern Outer Piedmont Ecoregions. Land use within the watershed is primarily residential development, forested areas, and agricultural. The existing stream length, drainage area, and jurisdictional status are summarized in Table 1. Table 1. Summary of Existing Stream Length and Drainage Area. Stream Reach Existing Length (LF) Drainage Area Intermittent/Perennial Status UT to Mill Creek 419 17.7 ac Stream reach considered intermittent by agencies during impact assessments. Status = Intermittent Mill Creek 285 3.45 sq. mi. Stream reach considered perennial by agencies during impact assessments. Status = Perennial The project includes analyzing the feasibility of restoration, enhancement, and preservation of an unnamed tributary (UT) to Mill Creek as well as enhancement and restoration to areas along Mill Creek. Mill Creek has been assigned Stream Index Number12-94-7 (NCDWR 2020) and is designated a warm water stream with a classification of C. Class C waters are protected for secondary recreation, fishing, and aquatic life. Page 2 of 7 Most of the native plant communities have been removed from the site as the area has been mowed and maintained for the nearby residence and outbuildings which have now been removed through NCDOTs acquisition of the property. NCDOT is analyzing the potential for on-site mitigation for jurisdictional stream impacts associated with Transportation Improvement Program (TIP) U-2579DEF as part of the construction of the Winston-Salem Northern Beltway. The project would serve as on-site mitigation through the restoration, enhancement, and preservation of 705 linear feet of streams if deemed feasible. 2.0 SITE SELECTION TIP U-2579 DEF involves construction of the Winston-Salem Northern Beltway from US 52 to US 311 (New Walkertown Road). The stream restoration, enhancement and preservation site was selected due to its location within the U-2579DEF corridor and NCDOTs purchase of the property related to the project. The potential mitigation area includes approximately 1.5 acres within a Right of Way held by NCDOT. Within this area, the NCDOT reviewed the potential for restoration of the UT to Mill Creek, restoration of Mill Creek at the crossing of Phelps Dr, and enhancement along Mill Creek. These options are referred to as options 1, 2 and 3, respectfully. These options are summarized in table 2. 3.0 OPTIONS REVIEWED Option 1: Restoration of Unnamed Tributary to Mill Creek The existing UT to Mill Creek begins immediately downstream of a 24” pipe within the footprint of the U-2579DEF road construction project. The UT extends over 600 lf from this point to where it ties to Mill Creek. The far upstream extent of the UT is marked by severe channel and floodplain incision immediately downstream of the 24” pipe where the channel begins. From this point, moving downstream, the floodplain begins to widen allowing the channel some meander pattern progressing south toward Mill Creek. Around the midway point along the UT, the channel proceeds through another 24” reinforced concrete pipe for 141 lf. Approximately 180 lf of the upper portion of the UT will be filled in by the new roadway facility (permit site 18). Extensive Class I Rip Rap outlet protection is called for in the construction plans to address stability concerns due to a 42” cross pipe and 18” pipe system outlet at this location. This mitigation feasibility analysis reviewed restoring the UT to a natural channel design from the terminus of the existing impact at permit site 18 to the tie in with Mill Creek. The feasibility analysis reviewed three options for the Unnamed Tributary to Mill Creek. These are referred to as Options 1a, 1b, and 1c below. • Option 1a proposes to remove 141 ft of existing 24” pipe and Provide full restoration of the UT to Mill Creek by grading a new floodplain, installing a number of grade control structures and steps to stabilize the channel, and plantings. See Figures 1 thru 3. Page 3 of 7 • Option 1b incorporates restoration, enhancement, and preservation of UT to Mill Creek. This option attempts to strike a balance between the costs of full restoration and obtaining mitigation credits. See Figures 4 thru 6. • Option 1c, is based on removing 141 linear feet of existing 24” pipe and replacing it with a standard base ditch with embedded riprap for stability. This option does not propose mitigation credits for this work. Instead, it avoids a potential issue with the existing pipe in the future by removing it prior to access being removed or restricted. See Figures 7 and 8. Issues Discovered with Options 1a and 1b The feasibility analysis has several constraints which would make options 1a and 1b appear cost prohibitive on the UT to Mill Creek. These challenges include long term stability, grade control, cost associated with necessary cut to achieve adequate floodplain, and buffer limitations due to utility easements. Stability and Grade Control Concerns: First and foremost was the channel slope which is 3.8% or more specifically the UT to Mill Creek drops 19 feet in elevation over 500 feet in length. In order to address that slope and provide full restoration on the UT to Mill Creek would take significant grading and a significant number of structures in order to stabilize the channel. Because of the slope of the channel, there is also a high potential for head cutting if any proposed structures were to fail within the restored channel. There is an approximately 8 foot drop to get from the UT elevation in the floodplain to the elevation of Mill Creek which poses a challenge for stability and would require a substantial structure and some grading if you left the channel at existing grade and simply tried to tie it in at Mill Creek. Even by doing that there is still a steep grade on the channel which would require a number of structures to stabilize the channel. The existing 24” pipe to be removed has a slope of 2.5%. As shown in the profile drawing (Figure 6), there is notable drop-down in channel elevation as water enters the inlet side of the pipe. At the outlet end there is a 2’ drop from pipe outlet to channel bottom. This outlet drop is stabilized by a small concrete pad. Grade control structures would be needed for stability of the channel and prevention of potential head-cutting in the channel. In addition, the new channel will need to be steeper than existing pipe to avoid drastic elevation changes at the upstream and downstream ends. As seen in profile drawings for Options 1a and 1b (Figures 3 and 6) the longitudinal slopes would need to be 3.5- 4% to better tie with the channel upstream and limit amount of grade change at the downstream end. Grade control needs to be achieved through the use of rock cross vanes. These have been shown on the mitigation plan drawings for Options 1a and 1b (Figures 1 and 4). With the amount of grade change in this section, as well as the overall site, trying to achieve any riffle-pool sequence would be problematic as the riffle sections would need to be very short in Page 4 of 7 length and severely steep. Therefore a typical section resembling that of a constructed riffle with adequately sized stone to be embedded to channel depth would be required. At the locations noted on Figures 4 and 7, the existing channel braids with some channel flow accessing the floodplain of Mill Creek. If we were to take this channel offline we would face challenges with grade change and tying a new channel into Mill Creek in a stable fashion. Floodplain Concerns: In addition to the slope and stability issues noted above, another item that is of concern creating and maintaining the floodplain. In the full restoration option (Option 1a) floodplain would need to be created due to channel elevations and topography. For studying the feasibility of this option we set the longitudinal grade by mirroring the existing channel grade for the UT and then stepping the proposed channel down after reaching the top of bank for Mill Creek (See Figure 3, profile). Proceeding in this fashion kept the longitudinal grade as low as possible (aided by drop structures near pipe removal) and limited the amount of floodplain excavation needed. Even still, we estimated approximately 1060 CY of grading. Another concern is with potential backwater impacts to the channel that could occur due to high flows in Mill Creek. As mentioned above about stepping a new channel down to tie back in with Mill Creek, we would need to accomplish this with grade controls structures. There would be potential for these to degrade or fail due to effects of higher flows in Mill Creek. Other unanticipated impacts that could occur include potentially impacting wetlands that exist in the floodplain of Mill Creek that were not previously mapped as jurisdictional to the west of the existing tributary. Option 2: Restoration to Mill Creek at Phelps Drive The two options reviewed at the crossing of Phelps Drive included restoration using natural channel design (option 2a) and stabilizing with conventional means as approved in the permit application (option 2b). Option 2a: Option 2a includes restoration along Mill Creek where the existing culvert will be removed using natural channel design methods. The intent would be to lay back the slopes and remove the existing roadbed/fill to accomplish this. The slopes would be matted and planted with livestakes. The existing scour hole would be filled in and banks repaired to tie in with the new opening from removal of the culvert and the existing channel downstream. The goal would be to install a minimum of two structures to assist in stabilizing the channel grade where the culvert is removed and scour hole is repaired. There would not be any relocation of the channel with this option. Option 2b: Option 2b includes removal of the existing culvert and stabilizing the area with riprap as detailed and illustrated in the permitted plans. Page 5 of 7 Issues Discovered with Options 2a The main issue discovered when analyzing the options of restoration along Mill Creek include the potential to increase instability along the reach and the existing utility easement along the left bank of the channel. There is a potential to impact the utility easement by laying back the channel to a stable slope depending on the final designed slope. In addition, when laying back the slopes in just a short section of the channel there would be additional stress added to those banks when the flow necks back down to the existing channel and could create a potential area of erosion or scour. The channel has a large drainage area and storms or other events could significantly impact the stability of the reach during the time it takes to stabilize the plantings. This could lead to future maintenance issues and/or additional sedimentation into Mill Creek in the interim. Option 3: Enhancements Along Mill Creek Option 3 includes enhancing the riparian buffer along Mill Creek. This option includes planting of native bareroot tree and shrub species. The goal would be to plant a minimum 50-foot buffer if possible; however, there is an existing utility easement that would not allow that width to the south or along the left bank of Mill Creek. The minimum width of buffer along Mill Creek would be 35 feet along the utility easement. Table 2. Summary of Restoration and/or Enhancement Options 1, 2 and 3 and Proposed Mitigation Amounts. Mitigation Area Option Existing Length Potential Credits Restoration Approach UT to Mill Creek 1a 420 LF 420 (1:1) Restoration of entire UT to Mill Creek using natural channel design. UT to Mill Creek 1b 87 LF 22 (4:1 ratio) Preservation will consist of maintaining the stream reach and existing stream riparian buffer as it currently is in the upper section of UT. UT to Mill Creek 1b 156 LF 156 (1:1 ratio) Restoration will consist of removing the existing 24” RCP and replacing it with a stable 3’ wide base channel and building a 10’ wide floodplain bench on each side. UT to Mill Creek 1b 177 LF 44 (4:1 ratio) Enhancement will consist removing the existing trees which are growing in portions of the channel and planting a native riparian species typical of a bottomland hardwood forest. Any invasive tree/shrub species noted will be cut and treated with herbicide. Mill Creek 2a 89 LF 89 (1:1 ratio) Restoration of the channel in the area of an existing culvert and repair of adjacent scour hole utilizing natural channel design. Page 6 of 7 Mill Creek 2b 89 LF 0 Removal of existing culvert and install rip rap channel per permitted plans. Mill Creek 3 196 LF 49 (4:1 ratio) Enhancement will consist of planting a native riparian buffer with species typical of a bottomland hardwood forest. Any invasive tree/shrub species noted will be cut and treated with herbicide. Full 50 ft wide buffer is not possible due to existing utility easement. 4.0 PROJECT COST ESTIMATES FOR UT TO MILL CREEK Three cost estimates are provided below based on the three options that have been reviewed for the potential mitigation site (Table 3). The first cost estimate provided is based on providing a full restoration of the UT to Mill Creek by grading a new floodplain, installing a number of grade control structures and steps to stabilize the channel, and plantings. In the table below this is Option 1a. Option 1b below is based on the proposed plan detailed in the previous sections of this document which incorporate restoration, enhancement, and preservation of UT to Mill Creek. This option attempts to strike a balance between the costs of full restoration and obtaining mitigation credits. The Table below illustrates the cost estimate for Option 2. The final option, Option 1c, is based on removing 141 linear feet of existing 24” pipe and replacing it with a standard base ditch. This option does not propose mitigation credits for this work. Instead, it avoids a potential issue with the existing pipe in the future by removing it prior to access being removed or restricted. Table 3. Cost Estimates of Potential Options for UT to Mill Creek. Option Description Potential Mitigation Credits Estimated Cost of Construction 1 Option 1a Full Restoration of UT to Mill Creek 420 $180,000 Option 1b Combination of Restoration, Enhancement, and Preservation to UT to Mill Creek 222 $111,000 Option 1c No Restoration – Pipe Removal on UT to Mill Creek 0 $41,000 2 Option 2a Full Restoration – Mill Creek 89 $110,500 Option 2b No Restoration – Pipe Removal on Mill Creek 0 Included in the cost of the D-B contract Page 7 of 7 Option 3 Enhancement – Mill Creek 49 $7,700 1 Please note: This is a preliminary Rough Oder of Magnitude Price only and final pricing would need to be submitted following issuance of RFC plans for the selected option. 2 Assumes work would be completed by the D-B contractor rather than an approved mitigation contractor. Recommendations Based on the above description of options regarding mitigation at the UT to Mill Creek and Mill Creek at Phelps Drive, NCDOT has determined the best path forward as Option 1c which is to remove the pipe on the UT to Mill Creek and stabilize the area and 2b which is removing the pipe on Mill Creek and proceeding with the permitted plans for stabilizing the channel. The decision to move in this direction was based on a number of factors such as cost of construction when weighed against the potential mitigation credits, long term monitoring and maintenance of the site, and utility encroachments. The overall benefit of doing full restoration would not provide significant ecological uplift on either reach and could introduce instability of either reach following construction. 837838839 840841841841 842842 842843 843843844844 84484484484 4 844845 845 845 84 5 845845845845 84 5 845 846846 846 846 846 84 6 846 847847 847847 847847 84784 8 8 4 8 848 848 848848 848848848848848 848849849849 8498 4 9 849849849 849849 8498 4 9 849 849 850 85 0 85085 0 850 850 850 8 5 0 850850 850 85 0 850 850850 850850850850 850 850 8 5 0 85 1 851 851851851 85185 1 851851851851 851 8518 5 2 852 8 5 2852 85285285285 2 8 5 2 852 853 853 853 8 5 3 853853853853 853853 853854 854 854854 854854 854854854 855855855 855 85 5855 8 55 855855856 856 856856856 857 857 857 857858858 858859859859860 860 860 860 860860 860860861 861 861861862 862 86 2 863863 863 8638648648 6 4 86 4 864 865 8658658 6 5 86 5 865865 865 8658658668668 6 6 866866 866866 867 8678 6 7 8 6 7 867867868 868868868 868 868869 8698698 6 9 869869869870 870 870870870870 870 870870 871 871871871 871872872872 872 872873 873873 873 874 874874874875 875875875875875 875876 876876876877 877877 878 878879 879880 8 8 0 880880881881882883883884885885885886887888889890890891892893 856 854 853+00F F C F F F F F 47" WW FENCE FENCE END C/A +69.47 FENCE BEGIN C/A +96.84 175 .00' R T-L - + 9 5 .0 3 -Y6C- 2GI 18" RCP-III 24" RCP-III 2GI 2007 2008 2011 2013 2014 2016 2018 FS W/FG 2GI-A 1 8 " RCP- I I I W/FG 2GI-A 18" RCP-III 18" RCP-III 872 RCP-III 18" 18 " W / EL BOW S 24" W/ ELBOWS TO ELE V . 8 5 7 .5' C LA SS II R IP RA POOO 2 4" C MP 1S B K D S S S S S CONC CONC CANO PY MTL BST BSTS SWD D K 155 156 W/LT157 W/LT WD RAILW/LT CANO PY MTL W/LT WD R AIL INV=855.32 INV=854.72 EXISTIN G R/W=PROP.LINE60.00' T T 6" DIP6" DIP6" DIPR/W=PROP.LINE EXISTIN G 1 5 8 W LT 1SBKD WALL BK HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. REVISIONS PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\CADD\Stream Restoration\U2579DEF_STREAM_PSH_20_FULL LENGTH OPTION.dgnUSER:DWAGNERDATE:3/24/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:12:25:30 PMTIME:NCDOT_EC_Stream Restoration_DRW.tblBlythe U-2579D, E & F HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 NC License Number F-0991 Charlotte, NC 28202 900 West Trade St., Suite 715 STV Engineers, Inc. N A D 83/ 95 N A D 83/ 95 0 PLANS GRAPHIC SCALE 5025 72" RCP72" RCP 15" RCP 15" R C P 12" R C P 12" R CP 18" R CP 24" RCP24" RCPOUTLET CHANNEL PROTECTION SEE DETAIL 20-10 139 SY GEOTEXTILE EST 82 TONS CLASS 'I' RIP RAP SEE DETAIL 20-11 EXCAVATION FLOODPLAIN 2 x 72" CMP REMOVE -L- POC Sta. 277+41.55 = -Y6C- POC Sta. 18+92.14 -L- POC Sta. 277+41.55 = D -Y6C- POC Sta. 18+92.14 -Y6C- PC Sta. 23+86.07 REMOVE 24" RCP PER CONSTRUCTION PLANS CHANNEL RESTORATION PIPE REMOVAL AND REMOVED CANOPIES HAVE BEEN BUILDING AND METAL BEEN REMOVED BUILDINGS HAVE SEE DETAIL 20-12 PROPOSED CHANNEL RESTORATION PROPOSED ROCK CROSS VANE (TYP.) DETAIL 20-11 ELEVATION FLOODPLAIN NATURAL EXCAVATE TO Ground Existing@ CULVERT INLET LOOKING DOWNSTREAM PIPE REMOVAL FLOODPLAIN EXCAVATION\ ( Not to Scale) 5'2:12:1 2.0' VARIES'BED ELEVATION NATURAL STREAM 2:1Ground Existing RIP RAP CLASS 'I' STA. 24+34 -Y6C- LT ( Not to Scale) PROPOSED CHANNEL RESTORATION Ground Natural Ground Natural DETAIL 20-12 2:12:11' 3' 10'10'2:1 2:1 Channel Bottom Stone Embedded toMatting Coir Fiber 8378 38839 840841841841 842842842 842842843 843 843 843843843844844 844844844844844845 845845845 845 845 845 84 5 845845845845845845 845 8 4 6 846846 846 846846846 84 6 846 847847847 847847 847 847847 84784 8 8 4 8 848 848 848848848848848848848 848849849849 8498 49 849849849849 8498 4 9 849 850 850 8508 50 850 850 850 8 5 0 850850850 850850 850850850850 8 5 0 8 51 851 851851851851 851851851851851 8518 5 2 852 8 5 2 85285285285285285 2 8 5 2 852852 853 853 853 853 853853853853854 854 85 4854 854854854855 855855 855 855855 855 855856 856 856856856 857 857 857 858858 858859 859859860 860 860 860 860 860860861 861 861861862 862 862 863863 863 8638648648 6 4 864 864 865 865 86586586 5 865865 865 8658668 66 866866 866 867 8678 6 7 8 6 7 867 868 868868868 868 868869 86986 9 869870 870 870 870870870 870870 871 871871872872 872 873 873 873873 873 874 874 874874 875 875875875876 876877 877 878 878879 879880 880 880881882883884885885886886887 888 889 890 891893895856 854 853 +97 GREU (TL-3)+00+48F F C F F 47" WW FENCE FENCE END C/A +69.47 -Y6C- 2GI 24" RCP-III 2007 2008 2011 2013 2014FS 872 18 " W / EL BOW S 24" W/ ELBOWS 1S B K D S S S S S CONC CONC CANO PY MTL BST BSTSWD D KGR 155 156 161 W/LT157 W/LT WD RAILW/LT CANO PY MTL WD R AIL EXISTIN G R/W=PROP.LINE60.00' T T 6" DIP6" DIPR/W=PROP.LINE EXISTING 15 8 W LT 1SBKD WALL BK HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. REVISIONS PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\CADD\Stream Restoration\U2579DEF_PLANTING_PSH_20.dgnUSER:WYELVERTDATE:3/24/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:1:24:26 PMTIME:NCDOT_EC_Stream Restoration_DRW.tblBlythe U-2579D, E & FHDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 NC License Number F-0991 Charlotte, NC 28202 900 West Trade St., Suite 715 STV Engineers, Inc. N A D 83/ 95 0 PLANS GRAPHIC SCALE 5025 72" RCP72" RCP 15" R CP 15" R CP 12" R C P 12" R CP 18" R CP 24" RCP24" RCPOUTLET CHANNEL PROTECTION SEE DETAIL 20-10 139 SY GEOTEXTILE EST 82 TONS CLASS 'I' RIP RAP SEE DETAIL 20-11 EXCAVATION FLOODPLAIN 2 x 72" CMP REMOVE -L- POC Sta. 277+41.55 = -Y6C- POC Sta. 18+92.14 -L- POC Sta. 277+41.55 = D -Y6C- POC Sta. 18+92.14 -Y6C- PC Sta. 23+86.07 REMOVE 24" RCP PER CONSTRUCTION PLANS CHANNEL RESTORATION PIPE REMOVAL AND REMOVED CANOPIES HAVE BEEN BUILDING AND METAL BEEN REMOVED BUILDINGS HAVE SEE DETAIL 20-12 PROPOSED CHANNEL RESTORATION PROPOSED ROCK CROSS VANE (TYP.) LEGEND ZONE 1 ZONE 2 ( Not to Scale) 2:12:1 PROPOSED CHANNEL RESTORATION 2:12:1 PLANTING PLAN Zone 1 50' Zone 2 50' Zone 2 of Mill Creek as Shown *Provide Zone 2 Plantings in Floodplain PLANTING SPECIES LIST ZONE 1 - LIVE STAKES ZONE 2 - BARE ROOT *Substitutions due to lack of availability may occur with engineer approval. )Cephalanthus occidentalisButtonbush ( )Sambucus canadensisElderberry ( )Physocarpus opulifoliusNine bark ( )Salix sericeaSilky willow ( )Cornus amonumSilky dogwood ( )Salix nigraBlack willow ( )Celtis laevigataSugarberry ( )Diospyros virginianaPersimmon ( )Betula nigraRiver birch ( )Quercus phellosWillow oak ( )Platanus occidentalisSycamore ( )Prunus serotinaWild cherry ( HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\CADD\Stream Restoration\U2579DEF_STREAM_PFL_FULL LENGTH OPTION.dgnUSER:DWAGNERDATE:3/24/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:1:09:34 PMTIME:NCDOT_EC_Stream Restoration_DRW.tblBlythe U-2579D, E & F HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 NC License Number F-0991 Charlotte, NC 28202 900 West Trade St., Suite 715 STV Engineers, Inc. 1+00 2+00 3+00 4+00 5+000+00 890 845 850 855 860 865 870 875 880 885 895 REVISIONS 900 905 910 840 835 830 825 820 815 0+50 1+50 2+50 3+50 4+50 845 850 855 860 865 870 875 880 885 840 835 830 825 820 815 EXISTING GROUND 0.025 FT/FT TO BE REMOVED EXISTING 24" RCP AT 42" RCP OUTLET PROFILE BEGINNING MILL CREEK CHANNEL TIE WITH PROFILE ENDING AT (SLOPE VARIES) PROPOSED GRADE EL. = 862.52' CHANNEL RESTORATION PROPOSED EL. = 843.51' CHANNEL RESTORATION PROPOSED 8378 38839 840841841841 842842 842843 843843844844 844844844844 844845 845 845 845 845845845845 845 845 846846 846 846 846 846 846 847847 847847 847847 847848 8 4 8 848 848 848848 848848848848848 848849849849 8498 4 9 849849849 849849 8498 4 9 849 849 85 0 850 850850 850 850 850 8 5 0 850850 850 850 850 850850 850850850850 850 850 850 8 5 1 851 851851851 851851 851851851851 851 8518 5 2 852 8 5 2852 852852852852 852 852 853 853 853 853 853853853853 853853 853854 854 854854 854854 854854854 855855855 855 855855 8 5 5 855855856 856 856856856 857 857 857 857858858 858859859859860 860 860 860 860860 860860861 861 861861862 862 862 863863 863 863864864864 8 6 4 864 865 8658658 6 5 865 865865 865 8658658668668 6 6 866866 866866 867 8678 6 7 867 867867868 868868868 868 868869 869869869 86 9869869870 870 870870870870 870 870870 871 871871871 871872872872 872 872873 873873 873 874 874874 874875 875875875875875 875876 876876876877 877877 878 878879 879880 8 80 88088088188188288388388488 5 885885886887888889890 890891892893856 854 853+00F F C F F F F F 47" WW FENCE FENCE END C/A +69.47 FENCE BEGIN C/A +96.84 1 7 5 .0 0' RT-L - + 9 5 . 0 3 -Y6C- 2GI 18" RCP-III 24" RCP-III 2GI 2007 2008 2011 2013 2014 2016 2018 FS W/FG 2GI-A 1 8 " RCP-III W/FG 2GI-A 18" RCP-III 18" RCP-III 872 RCP-III 18" 18 " W / ELBOW S 24" W/ ELBOWS TO ELEV . 8 5 7 .5' C LA S S II R IP RA P 24" C MP 1S B K D S S S SS CONC CONC CANOPY MTL BST BSTS SWD DK 155 156 W/LT157 W/LT WD RAILW/LT CANOPY MTL W/LT WD R AIL INV=855.32 INV=854.72 EXISTING R/W=PROP.LINE60.00' T T 6" DIP6" DIP6" DIPR/W=PROP.LINE EXISTING 15 8 W L T 1SBKD WALL BK HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. REVISIONS PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\CADD\Stream Restoration\U2579DEF_STREAM_PSH_20.dgnUSER:WYELVERTDATE:2/20/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:10:03:17 AMTIME:NCDOT_EC_Stream Restoration_DRW.tblBlythe U-2579D, E & FHDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 NC License Number F-0991 Charlotte, NC 28202 900 West Trade St., Suite 715 STV Engineers, Inc. N A D 83/ 95 N A D 83/ 95 0 PLANS GRAPHIC SCALE 5025 OUTLET CHANNEL PROTECTION SEE DETAIL 20-10 139 SY GEOTEXTILE EST 82 TONS CLASS 'I' RIP RAP SEE DETAIL 20-11 EXCAVATION FLOODPLAIN 2 x 72" CMP REMOVE -L- POC Sta. 277+41.55 = -Y6C- POC Sta. 18+92.14 -L- POC Sta. 277+41.55 = D -Y6C- POC Sta. 18+92.14 -Y6C- PC Sta. 23+86.07 AND FLOODPLAIN RETAIN EXISTING CHANNEL CONSTRUCTION PLANS OUTLET PROTECTION PER RESTORATION PROPOSED CHANNEL REMOVE 24" RCP CHANNEL RETAIN EXISTING GRADE CONTROL ROCK CROSS VANE PER CONSTRUCTION PLANS CHANNEL RESTORATION PIPE REMOVAL AND GRADE CONTROL ROCK CROSS VANE LOCATION BRAIDING AT THIS EXISTING CHANNEL TO GROUND LEVEL TRIM HARDWOOD VEGETATION IN CHANNEL REMOVED CANOPIES HAVE BEEN BUILDING AND METAL BEEN REMOVED BUILDINGS HAVE 72" RCP72" RCP 15" RCP 15" RCP 12" RCP 12" RCP 18" RCP 24" RCP24" RCPDETAIL 20-11 ELEVATION FLOODPLAIN NATURAL EXCAVATE TO Ground Existing@ CULVERT INLET LOOKING DOWNSTREAM PIPE REMOVAL FLOODPLAIN EXCAVATION\ ( Not to Scale) 5'2:12:1 2.0' VARIES'BED ELEVATION NATURAL STREAM 2:1Ground Existing RIP RAP CLASS 'I' STA. 24+34 -Y6C- LT Ground Existing ( Not to Scale) 2:12:1 PROPOSED CHANNEL RESTORATION 2:12:1 Ground Existing 3' 10'10' LOOKING DOWNSTREAM TYPICAL SECTION 1' MATTING COIR FIBER EMBEDDED STONE - TYPE TBD Channel Bottom Stone Embedded to 8378 38839 840841841841 842842 842843 843843844844 844844844844 844845 845 845 845 845845845845 845 845 846846 846 846 846 846 846 847847 847847 847847 847848 8 4 8 848 848 848848 848848848848848 848849849849 8498 4 9 849849849 849849 8498 4 9 849 849 85 0 850 850850 850 850 850 8 5 0 850850 850 850 850 850850 850850850850 850 850 850 8 5 1 851 851851851 851851 851851851851 851 8518 5 2 852 8 5 2852 852852852852 852 852 853 853 853 853 853853853853 853853 853854 854 854854 854854 854854854 855855855 855 855855 8 5 5 855855856 856 856856856 857 857 857 857858858 858859859859860 860 860 860 860860 860860861 861 861861862 862 862 863863 863 863864864864 8 6 4 864 865 8658658 6 5 865 865865 865 8658658668668 6 6 866866 866866 867 8678 6 7 867 867867868 868868868 868 868869 869869869 86 9869869870 870 870870870870 870 870870 871 871871871 871872872872 872 872873 873873 873 874 874874 874875 875875875875875 875876 876876876877 877877 878 878879 879880 8 80 88088088188188288388388488 5 885885886887888889890 890891892893856 854 853+00F F C F F F F F 47" WW FENCE FENCE END C/A +69.47 FENCE BEGIN C/A +96.84 1 7 5 .0 0' RT-L - + 9 5 . 0 3 -Y6C- 2GI 18" RCP-III 24" RCP-III 2GI 2007 2008 2011 2013 2014 2016 2018 FS W/FG 2GI-A 1 8 " RCP-III W/FG 2GI-A 18" RCP-III 18" RCP-III 872 RCP-III 18" 18 " W / ELBOW S 24" W/ ELBOWS TO ELEV . 8 5 7 .5' C LA S S II R IP RA P 24" C MP 1S B K D S S S SS CONC CONC CANOPY MTL BST BSTS SWD DK 155 156 W/LT157 W/LT WD RAILW/LT CANOPY MTL W/LT WD R AIL INV=855.32 INV=854.72 EXISTING R/W=PROP.LINE60.00' T T 6" DIP6" DIP6" DIPR/W=PROP.LINE EXISTING 15 8 W L T 1SBKD WALL BK HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. REVISIONS PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\CADD\Stream Restoration\U2579DEF_PLANTING_PSH_20.dgnUSER:WYELVERTDATE:2/20/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:10:01:13 AMTIME:NCDOT_EC_Stream Restoration_DRW.tblBlythe U-2579D, E & FHDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 NC License Number F-0991 Charlotte, NC 28202 900 West Trade St., Suite 715 STV Engineers, Inc. N A D 83/ 95 0 PLANS GRAPHIC SCALE 5025OUTLET CHANNEL PROTECTION SEE DETAIL 20-10 139 SY GEOTEXTILE EST 82 TONS CLASS 'I' RIP RAP SEE DETAIL 20-11 EXCAVATION FLOODPLAIN 2 x 72" CMP REMOVE -L- POC Sta. 277+41.55 = -Y6C- POC Sta. 18+92.14 -L- POC Sta. 277+41.55 = D -Y6C- POC Sta. 18+92.14 -Y6C- PC Sta. 23+86.07 AND FLOODPLAIN RETAIN EXISTING CHANNEL CONSTRUCTION PLANS OUTLET PROTECTION PER RESTORATION PROPOSED CHANNEL REMOVE 24" RCP CHANNEL RETAIN EXISTING GRADE CONTROL ROCK CROSS VANE PER CONSTRUCTION PLANS CHANNEL RESTORATION PIPE REMOVAL AND GRADE CONTROL ROCK CROSS VANE LOCATION BRAIDING AT THIS EXISTING CHANNEL TO GROUND LEVEL TRIM HARDWOOD VEGETATION IN CHANNEL REMOVED CANOPIES HAVE BEEN BUILDING AND METAL BEEN REMOVED BUILDINGS HAVE 72" RCP72" RCP 15" RCP 15" RCP 12" RCP 12" RCP 18" RCP 24" RCP24" RCPLEGEND ZONE 1 ZONE 2 ( Not to Scale) 2:12:1 PROPOSED CHANNEL RESTORATION 2:12:1 PLANTING PLAN Zone 1 50' Zone 2 50' Zone 2 of Mill Creek as Shown *Provide Zone 2 Plantings in Floodplain PLANTING SPECIES LIST ZONE 1 - LIVE STAKES ZONE 2 - BARE ROOT *Substitutions due to lack of availability may occur with engineer approval. )Cephalanthus occidentalisButtonbush ( )Sambucus canadensisElderberry ( )Physocarpus opulifoliusNine bark ( )Salix sericeaSilky willow ( )Cornus amonumSilky dogwood ( )Salix nigraBlack willow ( )Celtis laevigataSugarberry ( )Diospyros virginianaPersimmon ( )Betula nigraRiver birch ( )Quercus phellosWillow oak ( )Platanus occidentalisSycamore ( )Prunus serotinaWild cherry ( U-2579D, E & F 890 845 850 855 860 865 870 875 880 885 895 900 905 910 840 835 830 825 820 815 845 850 855 860 865 870 875 880 885 840 835 830 825 820 815 Blythe HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.PENTABLE:FILE:U2579DEF_STREAM_PFL.dgnUSER:_USERNAME_DATE:2/20/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:10:07:51 AMTIME:NCDOT_PFL_XSC.tblNC License Number F-0991 Charlotte, NC 28202 900 West Trade St., Suite 715 STV Engineers, Inc. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 1+00 2+00 3+00 4+00 5+000+00REVISIONS 0+50 1+50 2+50 3+50 4+50 EXISTING GROUND EL. = 860.55' RESTORATION BEGIN CHANNEL EL. = 854.29' RESTORATION END CHANNEL 0.025 FT/FT TO BE REMOVED EXISTING 24" RCP 0.040 FT/FT PROPOSED GRADE AT 42" RCP OUTLET PROFILE BEGINNING PROPERTY LINE CHANNEL TIE WITH PROFILE ENDING AT 8378 38839 840841841841 842842 842843 843843844844 844844844844 844845 845 845 845 845845845845 8 4 5 845 846846 846 846 846 846 846 847847 847847 847847 847848 8 4 8 848 848 848848 848848848848848 848849849849 8498 4 9 849849849 849849 8498 4 9 849 849 8 5 0 850 850850 850 850 850 8 5 0 850850 850 850 850 850850 850850850850 850 850 850 8 5 1 851 851851851 851851 851851851851 851 8518 5 2 852 8 5 2852 852852852852 852 852 853 853 853 853 853853853853 853853 853854 854 854854 854854 854854854 855855855 855 855855 8 5 5 855855856 856 856856856 857 857 857 857858858 858859859859860 860 860 860 860860 860860861 861 861861862 862 862 863863 863 863864864864 8 6 4 864 865 8658658 6 5 865 865865 865 8658658668668 6 6 866866 866866 867 8678 6 7 867 867867868 868868868 868 868869 869869869 869869869870 870 870870870870 870 870870 871 871871871 871872872872 872 872873 873873 873 874 874874874875 875875875875875 875876 876876876877 877877 878 878879 879880 8 8 0 8808808818818828838838848 8 5 885885886887888889890 890891892893856 854 853+00F F C F F F F F 47" WW FENCE FENCE END C/A +69.47 FENCE BEGIN C/A +96.84 1 7 5 .0 0' R T-L - + 9 5 .0 3 -Y6C- 2GI 18" RCP-III 24" RCP-III 2GI 2007 2008 2011 2013 2014 2016 2018 FS W/FG 2GI-A 1 8 " RCP-III W/FG 2GI-A 18" RCP-III 18" RCP-III 872 RCP-III 18" 1 8 " W / ELBOW S 24" W/ ELBOWS TO E LEV . 8 5 7 .5' C LA S S II R IP RA POOO 24" C MP 1S B K D S S S S S CONC CONC CANO PY MTL BST BSTS SWD DK 155 156 W/LT157 W/LT WD RAILW/LT CANOPY MTL W/LT WD R AIL INV=855.32 INV=854.72 EXISTING R/W=PROP.LINE60.00' T T 6" DIP6" DIP6" DIPR/W=PROP.LINE EXISTING 1 5 8 W L T 1SBKD WALL BK HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. REVISIONS PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\CADD\Stream Restoration\U2579DEF_STREAM_PSH_20.dgnUSER:DWAGNERDATE:3/23/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:12:17:07 PMTIME:NCDOT_EC_Stream Restoration_DRW.tblBlythe U-2579D, E & F HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 NC License Number F-0991 Charlotte, NC 28202 900 West Trade St., Suite 715 STV Engineers, Inc. N A D 83/ 95 N A D 83/ 95 0 PLANS GRAPHIC SCALE 5025 OUTLET CHANNEL PROTECTION SEE DETAIL 20-10 139 SY GEOTEXTILE EST 82 TONS CLASS 'I' RIP RAP SEE DETAIL 20-11 EXCAVATION FLOODPLAIN 2 x 72" CMP REMOVE -L- POC Sta. 277+41.55 = -Y6C- POC Sta. 18+92.14 -L- POC Sta. 277+41.55 = D -Y6C- POC Sta. 18+92.14 -Y6C- PC Sta. 23+86.07 AND FLOODPLAIN RETAIN EXISTING CHANNEL CONSTRUCTION PLANS OUTLET PROTECTION PER REMOVE 24" RCP CHANNEL RETAIN EXISTING PER CONSTRUCTION PLANS CHANNEL RESTORATION PIPE REMOVAL AND LOCATION BRAIDING AT THIS EXISTING CHANNEL REMOVED CANOPIES HAVE BEEN BUILDING AND METAL BEEN REMOVED BUILDINGS HAVE SEE DETAIL 20-12 345 SY GEO-TEXTILE EST 115 TONS CLASS 'I' RIPRAP STANDARD BASE DITCH 72" RCP72" RCP 15" RCP 15" RCP 12" RCP 12" RCP 18" RCP 24" RCP24" RCPDETAIL 20-11 ELEVATION FLOODPLAIN NATURAL EXCAVATE TO Ground Existing@ CULVERT INLET LOOKING DOWNSTREAM PIPE REMOVAL FLOODPLAIN EXCAVATION\ ( Not to Scale) 5'2:12:1 2.0' VARIES'BED ELEVATION NATURAL STREAM 2:1Ground Existing RIP RAP CLASS 'I' STA. 24+34 -Y6C- LT D ( Not to Scale) STANDARD BASE DITCH B d Ground Natural Ground Natural Geotextile DETAIL 20-12 3:13:1 B=3Ft. Max. d=1.5Ft. Min. D=2Ft. Rip-Rap (1' min.) Embedded Class 'I' HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\CADD\Stream Restoration\U2579DEF_STREAM_PFL.dgnUSER:DWAGNERDATE:3/23/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:10:18:46 AMTIME:NCDOT_EC_Stream Restoration_DRW.tblBlythe U-2579D, E & F HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 NC License Number F-0991 Charlotte, NC 28202 900 West Trade St., Suite 715 STV Engineers, Inc. 1+00 2+00 3+00 4+00 5+000+00 890 845 850 855 860 865 870 875 880 885 895 REVISIONS 900 905 910 840 835 830 825 820 815 0+50 1+50 2+50 3+50 4+50 845 850 855 860 865 870 875 880 885 840 835 830 825 820 815 EXISTING GROUND 0.025 FT/FT TO BE REMOVED EXISTING 24" RCP 0.039 FT/FT PROPOSED GRADE AT 42" RCP OUTLET PROFILE BEGINNING EL. = 860.55' BASE DITCH STANDARD EL. = 853.90' BASE DITCH STANDARD MILL CREEK CHANNEL TIE WITH PROFILE ENDING AT HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. REVISIONS PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\PERMITS_Environmental\Drawings\U2579DEF_PRM_4C PSH.dgnUSER:CMYERSDATE:11/4/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:1:12:49 PMTIME:NCDOT_permits_NOCON.tblBlythe U-2579D, E & FHDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 NC License Number F-0991 Charlotte, NC 28202 900 West Trade St., Suite 715 STV Engineers, Inc. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NW1620 25SEE SHEET 19MATCHLINE -L- STA 269+00SEE SHEET 21MATCHLINE -L- STA 281+50SEE SHEET 51 -Y6C- STA 14+20 MATCHLINE SEE SHEET 51 -Y6A- STA 13+00 MATCHLINE N A D 83/ 95 SEE SHEET 51 -Y6C- STA 24+50 MATCHLINE 24" C MP 24" R C P 72" RCP72" RCPPOOL36" CONC 15" RCPSO IL W 48" CHL48" CHL 36" CONC GR GR18" RCP15" RCPCONC15" RCPB S T 7 2" W D CONC CONC 15" RCP 15" RCP 12" RCP BST BST 12" RCP 18" RCPWD DK 7 2" WDGRGR GATE 72"WD 7 2 "WD72"WD 7 2 "WD12 " RCP CONC BST 2 4" CONC3 6 " WDBST 48" CHL 48" CHL 60" C H LSR 2513 LYMAN RD BST WD RAILWD R AIL 24" R CP72" WDINV=855.60 INV=855.32 INV=854.72 24" R CP INV=855.35 INV=854.61 24" RCPINV=859.15 18 " RCP INV=880.32 TOP=887.77 BOTTOM OF BOX=882.11 INV=880.41 INV=882.83 INV=844.26'INV=843.77' INV=843.17'EXISTING R/W=PROP.LINEEXISTING R/W=PROP.LINE6 0.0 0' E XIS TI NG R/W= P R OP. LI NE EXISTING R/W=PROP.LINE60.00'-EY5--EY5- T T T T METERELECTRICT T T 6" DIP6" DIP6" DIP6" DIPBST POOL FES R/W=PROP.LINE EXISTING F F F C F C F C C C F F F C F F F F F F 0404080706050404040404040404-Y6 C- -Y6C-275+00280+0020+00 10+00270+00SHEET __ OF __ PERMIT DRAWING U-2579D, E & F 20 GRAPHIC SCALE 0 252512.5 50 47" WW FENCE 47" WW FENCE 47" WW FENCE CHORD 605 604 606 180 181 182 183 184 185 186 187 188 185 604 604 655 SEE SHEET 20A 865 864 863 862 861 860 859 858 857 856 855 854 853 852 851 850 845849 848 847 846 845 18" R C P-III BDO 2GI HW 2GI 2GI 18" RCP-III 2GI 2GI 2GI15" RCP-III 15"7 SY GEOTEXTILE EST 2 TONS CLASS 'B' RIP RAP FS FS FS FS 18" RCP-III GR ADE T O DR AI NW/FG 2GI-A 2GI 1 8 " RCP-III 18" RCP-III W/FG 2GI-A 18" RCP-III 18" RCP-III 42" R C P-I V SEE DETAIL 20-8 90 SY GEOTEXTILE EST 62 TONS CLASS 'I' RIP RAP BANK STABILIZATION 5' X 7' RCBC (1' BURIED) 42 SY GEOTEXTILE EST 25 TONS CLASS 'I' RIP RAP 872 OUTLET CHANNEL PROTECTION SEE DETAIL 20-10 139 SY GEOTEXTILE EST 82 TONS CLASS 'I' RIP RAP III 15" RCP- SEE DETAIL 20-1 BASE DITCH 2' BERM SEE DETAIL 20-2 205 SY GEOTEXTILE EST 209 TONS CLASS 'I' RIPRAP 5' STANDARD BASE DITCH SEE DETAIL 20-10 86 SY GEOTEXTILE EST 40 TONS CLASS 'I' RIP RAP PROTECTION OUTLET CHANNEL W/ ELBOWS 24" DDE = 106 CY SEE DETAIL 20-9 152 SY GEO-TEXTILE EST 69 TONS CLASS 'B' RIPRAP LATERAL 'V' DITCH DDE = 130 CY SEE DETAIL 20-3 LATERAL 'V' DITCH FS 2GI 2 4 " RCP-III RCP-III 18" 24" RCP-III W/ ELBOWS 24" 15" RCP-IIIW/FG 2GI 18" W / ELBOWS FS 2GI EST. 5 TONS CLASS 'B' RIP RAP 14 SY GEO-TEXTILE W/ ELBOWS24 " W/FG 2GI 15" RCP-III W/FG 2GI 2 4 " RCP-III DDE = 572 CY SEE DETAIL 20-4 210 SY GEO-TEXTILE EST 118 TONS CLASS 'I' RIPRAP 6' LATERAL BASE DITCH SEE DETAIL 20-11 EXCAVATION FLOODPLAIN 2 x 72" CMP REMOVE CONSTRUCTION PLANS OUTLET PROTECTION PER REMOVE 24" RCP CHANNEL RETAIN EXISTING PER CONSTRUCTION PLANS CHANNEL RESTORATION PIPE REMOVAL AND LOCATION BRAIDING AT THIS EXISTING CHANNEL REMOVED CANOPIES HAVE BEEN BUILDING AND METAL BEEN REMOVED BUILDINGS HAVE SEE DETAIL 20-12 345 SY GEO-TEXTILE EST 115 TONS CLASS 'I' RIPRAP STANDARD BASE DITCH AND FLOODPLAINCHANNEL RETAIN EXISTING FIRST 7 FT OF DITCH NO RIP RAP IN BED SITE 18A ES-S68 SITE 18 ES-S19 SITE 19 SITE 20(ES-S20) MILL CREEK (ES-S20) MILL CREEK S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY LEGEND: JS BEGIN SEE DETAIL 20-11 PIPE REMOVALDETAIL 20-11 BED ELEVATION NATURAL STREAM 5' 2.0' RIP RAP CLASS 'I' Ground Existing Ground Existing ELEVATION FLOODPLAIN NATURAL EXCAVATE TO @ CULVERT INLET LOOKING DOWNSTREAM PIPE REMOVAL FLOODPLAIN EXCAVATION\2:12:1( Not to Scale) Geotextile Elevation Natural Bed STA. 280+78 -L- RT STA. 271+50 -L- RT Ground Natural Ground Natural (Variable) Channel Bed OUTLET CHANNEL PROTECTION DETAIL 20-10 1.5' Type of Liner= CL 'I' RIP RAP ( Not to Scale) DETAIL 20-8 JURISDICTIONAL STREAM BANK STABILIZATION AT Type of Liner= CL I Rip-Rap STA. 279+50 -L- LT GEOTEXTILE1.5' ELEVATION NATURAL BED Ground Natural Ground Natural ( Not to Scale) 2:1 2:1 2:1 STA. 24+34 -Y6C- LT VARIES' 2:12:1D ( Not to Scale) STANDARD BASE DITCH B d FROM -L- STA. 280+78 TO STA. 281+50 RT DETAIL 20-2 B= 5.0Ft. Max. d= 3.0Ft. Min. D= 3.0Ft. Ground Natural Ground Natural *When B is < 6.0' Type of Liner= Class 'I' Rip-Rap Geotextile LATERAL 'V' DITCH ( Not to Scale) D 2:12:1 b 1"/Ft. FROM -L- STA. 279+50 TO STA. 281+50 LT FROM -L- STA. 269+00 TO STA. 276+50 LT b= 5.0Ft. Min. D= 1.5Ft. DETAIL 20-3 Ground Natural Slope Fill ( Not to Scale) LATERAL BASE DITCH 2: 1 D B b d 2:1 1"/Ft. FROM -L- STA. 279+00 TO STA. 280+80 RT DETAIL 20-4 b= 5.0Ft. B= 6.0Ft. Max. d= 1.5Ft. Min. D= 1.5Ft. *When B is < 6.0' Type of Liner= Class 'I' Rip-Rap Ground Natural Slope Fill GEOTEXTILE D ( Not to Scale) STANDARD BASE DITCH B d Ground Natural Ground Natural Geotextile DETAIL 20-12 3:13:1 B=3Ft. Max. d=1.5Ft. Min. D=2Ft. Rip-Rap (1' min.) Embedded Class 'I' HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. REVISIONS PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\PERMITS_Environmental\Drawings\U2579DEF_PRM_4C PSH.dgnUSER:CMYERSDATE:11/4/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:1:11:44 PMTIME:NCDOT_permits_CON.tblBlythe U-2579D, E & FHDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 NC License Number F-0991 Charlotte, NC 28202 900 West Trade St., Suite 715 STV Engineers, Inc. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NW1620 25SEE SHEET 19MATCHLINE -L- STA 269+00SEE SHEET 21MATCHLINE -L- STA 281+50SEE SHEET 51 -Y6C- STA 14+20 MATCHLINE SEE SHEET 51 -Y6A- STA 13+00 MATCHLINE N A D 83/ 95 SEE SHEET 51 -Y6C- STA 24+50 MATCHLINE837838839840841841 842842842 843 843844 844844844845 845 845 845 845845845845 845 845 846846 846 846 846 847847 847847 847847848 848 8 4 8 848 848 8 4 8 848 848 8488488 48848 848849849849 849 849849849 849849 849849 849 849 850 850 850 850 850850 850850 850 850 850850 850 850 850 850850 850 850850850 851 851851 8518 51 851 851851 851 851 852 852 8 5 2852 852 8 5 2 852 8 5 2852 852852 852 852 85 3853 8 5 3 853 853 853 853 853853853 853 853853854 854854854854 854 854854 8548 5 4 854 854854854 855 855 855855 855 855 855 855 8 55 855855 855 855855 8 5 5 855855855 855856 856 856 856 856 856 856856856856856 857 857857857 857 857 857 857 8578 5 7 857 857 858 858 858858858 858858 858858858858859 859859859 859 859 8598598598598 598598 59 860 860860 860 860860860 860860 86 0860 860 860 860 860 860860860860 860 860860860860 8 6 0 860860860860 861 86186186186 1 861861 861 861 861861861 8 6 1 8618 6 1 861862 862 862862 862862 862 862 862862862862862 862 862 862 862 863 863 863863 863 863 863 863863 863 863863863863863 863 863 863 864 864864864864864 864 864864864 864 8648648648648648 6 4 864 864 864865 865 865865 865865865865865 865 8 6 5 865 865 865 865 8658658658 6 5 865 865865 865 8658658658658658658658658 6 5 8 6 5 8 6 5 865 865 865 866 866866866 866866 866 8 668668 6 6 866866 866866866866866866 8 66 866 867867867867867 8 67867 8678678 6 7 867 86 7867867867867867 867 868 8688688 6 8 868 868868 868868868 868 868 868868868868868 8 6 8 868 869 869869869869 869869 869 869869869 8 6 9869869869869 869 869870 870 8708708708708708 7 0 870 8708708 7 0 870 870 870 870 8708708708 7 0 870 870 870870870870870870870870870 870 870 870871871 871871 871 871871871 871871 871 871871871 871871871871872 872 872 872 8728728728 72 872 8 72872872872 872872872872872873 8 7 3 873 873873873873 87 3 873 873 873 873873 873 873873873873 874 87 4874874874874 874 874 8 74 874 874874 8 74 874874874874874875 875 875 875 875875 875875875875875 87587 5 875875875 875 875875875875875 8 7 5 875 875875875875875875875875 876 876876876876 876 876 876 8768768 7 6 876876876876877 877877877877 877 877 877 877877 8 7 7 877877877877 878 878878878878 8 78 878 878 878878 8 7 8 8788 7 8878 878 879 879879879879 879 879 879 879879879879879879879880 88 08808808808808808 8 0 880 8808 8 0 880880 880 880 880880880 880 880 880 880880880880880880880 880881 8818818818 8 1 881881 881881881 881881881881881 881881882 8828828 8 2 882 8828 8 2 882882882 882 882882882 882 882882882 883 883883883883 883 883 883883883883883 88 3883 883883883884 884884884 884884 884 884884884884884 884 8848848 8 5 8858858858858858 8 5 885 885 885885 885885 885885885885885885885 885 885 885 885885885885885 8 8 6 886886886886 886886 886886886 886 886 886 886886887887887 887 887 887 887887887887 887 887887887 8888888 8 8 888 888 888 888888888888888 888 888888889889889889889 889 8898898898 8 9 8898898898908908908908908 9 0 890 890 890 890 890 890 890890890890890890890 890 890890 8908908918918 9 1 891 891 891891891891 891 891891 892892892892 892 892892892892 892 892893893893 8 9 3 8 9 3 893 893893893893 893 893894894894 894 894 8 9 4 894894894894 894894895 895895895895 895895 895 895 895 895 895895895895895895895 895 895 895 896896896 8 9 6 896896 896896896 896897897 89789789789789 7 897897897897898898898898 898898 898 898898898899899 8 99899 899899900900900 9 0 0 900 900 900900900900900900901901 90 1 901901901902902 902 902902902903903903 903903903903904904904 904 904904905 905 9 0 5 905 905905 905905905905905 905906906 906 906906907907 907 907907907 908 908 908 908908909 909 9 0 9909909910910 9 1 0 910910 910 910910910911 9 1 1 911911911912 9 12 912912913913913913914914914914915915 915 9 1 5 915915915915916916 9 1 6916916917917 9 1 7 9 17918918 918 918919919 919 920920920 920922923 924 925 24" C MP 24" R C P 72" RCP72" RCPPOOL36" CONC 15" RCPSO IL W 48" CHL48" CHL 36" CONC GR GR18" RCP15" RCPCONC15" RCPB S T 7 2" W D CONC CONC 15" RCP 15" RCP 12" RCP BST BST 12" RCP 18" RCPWD DK 7 2" WDGRGR GATE 72"WD 7 2 "WD72"WD 7 2 "WD12 " RCP CONC BST 2 4" CONC3 6 " WDBST 48" CHL 48" CHL 60" C H LSR 2513 LYMAN RD BST WD RAILWD R AIL 24" R CP72" WDINV=855.60 INV=855.32 INV=854.72 24" R CP INV=855.35 INV=854.61 24" RCPINV=859.15 18 " RCP INV=880.32 TOP=887.77 BOTTOM OF BOX=882.11 INV=880.41 INV=882.83 INV=844.26'INV=843.77' INV=843.17'EXISTING R/W=PROP.LINEEXISTING R/W=PROP.LINE6 0.0 0' E XIS TI NG R/W= P R OP. LI NE EXISTING R/W=PROP.LINE60.00'-EY5--EY5- T T T T METERELECTRICT T T 6" DIP6" DIP6" DIP6" DIPBST POOL FES R/W=PROP.LINE EXISTING F F F C F C F C C C F F F C F F F F F F 0404080706050404040404040404-Y6 C- -Y6C-275+00280+0020+00 10+00270+00SHEET __ OF __ PERMIT DRAWING U-2579D, E & F 20 GRAPHIC SCALE 0 252512.5 50 47" WW FENCE 47" WW FENCE 47" WW FENCE CHORD 605 604 606 180 181 182 183 184 185 186 187 188 185 604 604 655 SEE SHEET 20A 865 864 863 862 861 860 859 858 857 856 855 854 853 852 851 850 845849 848 847 846 845 18" R C P-III BDO 2GI HW 2GI 2GI 18" RCP-III 2GI 2GI 2GI15" RCP-III 15"7 SY GEOTEXTILE EST 2 TONS CLASS 'B' RIP RAP FS FS FS FS 18" RCP-III GR ADE T O DR AI NW/FG 2GI-A 2GI 1 8 " RCP-III 18" RCP-III W/FG 2GI-A 18" RCP-III 18" RCP-III 42" R C P-I V SEE DETAIL 20-8 90 SY GEOTEXTILE EST 62 TONS CLASS 'I' RIP RAP BANK STABILIZATION 5' X 7' RCBC (1' BURIED) 42 SY GEOTEXTILE EST 25 TONS CLASS 'I' RIP RAP 872 OUTLET CHANNEL PROTECTION SEE DETAIL 20-10 139 SY GEOTEXTILE EST 82 TONS CLASS 'I' RIP RAP III 15" RCP- SEE DETAIL 20-1 BASE DITCH 2' BERM SEE DETAIL 20-2 205 SY GEOTEXTILE EST 209 TONS CLASS 'I' RIPRAP 5' STANDARD BASE DITCH SEE DETAIL 20-10 86 SY GEOTEXTILE EST 40 TONS CLASS 'I' RIP RAP PROTECTION OUTLET CHANNEL W/ ELBOWS 24" DDE = 106 CY SEE DETAIL 20-9 152 SY GEO-TEXTILE EST 69 TONS CLASS 'B' RIPRAP LATERAL 'V' DITCH DDE = 130 CY SEE DETAIL 20-3 LATERAL 'V' DITCH FS 2GI 2 4 " RCP-III RCP-III 18" 24" RCP-III W/ ELBOWS 24" 15" RCP-IIIW/FG 2GI 18" W / ELBOWS FS 2GI EST. 5 TONS CLASS 'B' RIP RAP 14 SY GEO-TEXTILE W/ ELBOWS24 " W/FG 2GI 15" RCP-III W/FG 2GI 2 4 " RCP-III DDE = 572 CY SEE DETAIL 20-4 210 SY GEO-TEXTILE EST 118 TONS CLASS 'I' RIPRAP 6' LATERAL BASE DITCH SEE DETAIL 20-11 EXCAVATION FLOODPLAIN 2 x 72" CMP REMOVE CONSTRUCTION PLANS OUTLET PROTECTION PER REMOVE 24" RCP CHANNEL RETAIN EXISTING PER CONSTRUCTION PLANS CHANNEL RESTORATION PIPE REMOVAL AND LOCATION BRAIDING AT THIS EXISTING CHANNEL REMOVED CANOPIES HAVE BEEN BUILDING AND METAL BEEN REMOVED BUILDINGS HAVE SEE DETAIL 20-12 345 SY GEO-TEXTILE EST 115 TONS CLASS 'I' RIPRAP STANDARD BASE DITCH AND FLOODPLAINCHANNEL RETAIN EXISTING FIRST 7 FT OF DITCH NO RIP RAP IN BED SITE 18A ES-S68 SITE 18 ES-S19 SITE 19 SITE 20(ES-S20) MILL CREEK (ES-S20) MILL CREEK S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY LEGEND: JS BEGIN SEE DETAIL 20-11 PIPE REMOVALDETAIL 20-11 BED ELEVATION NATURAL STREAM 5' 2.0' RIP RAP CLASS 'I' Ground Existing Ground Existing ELEVATION FLOODPLAIN NATURAL EXCAVATE TO @ CULVERT INLET LOOKING DOWNSTREAM PIPE REMOVAL FLOODPLAIN EXCAVATION\2:12:1( Not to Scale) Geotextile Elevation Natural Bed STA. 280+78 -L- RT STA. 271+50 -L- RT Ground Natural Ground Natural (Variable) Channel Bed OUTLET CHANNEL PROTECTION DETAIL 20-10 1.5' Type of Liner= CL 'I' RIP RAP ( Not to Scale) DETAIL 20-8 JURISDICTIONAL STREAM BANK STABILIZATION AT Type of Liner= CL I Rip-Rap STA. 279+50 -L- LT GEOTEXTILE1.5' ELEVATION NATURAL BED Ground Natural Ground Natural ( Not to Scale) 2:1 2:1 2:1 STA. 24+34 -Y6C- LT VARIES' 2:12:1D ( Not to Scale) STANDARD BASE DITCH B d FROM -L- STA. 280+78 TO STA. 281+50 RT DETAIL 20-2 B= 5.0Ft. Max. d= 3.0Ft. Min. D= 3.0Ft. Ground Natural Ground Natural *When B is < 6.0' Type of Liner= Class 'I' Rip-Rap Geotextile LATERAL 'V' DITCH ( Not to Scale) D 2:12:1 b 1"/Ft. FROM -L- STA. 279+50 TO STA. 281+50 LT FROM -L- STA. 269+00 TO STA. 276+50 LT b= 5.0Ft. Min. D= 1.5Ft. DETAIL 20-3 Ground Natural Slope Fill ( Not to Scale) LATERAL BASE DITCH 2: 1 D B b d 2:1 1"/Ft. FROM -L- STA. 279+00 TO STA. 280+80 RT DETAIL 20-4 b= 5.0Ft. B= 6.0Ft. Max. d= 1.5Ft. Min. D= 1.5Ft. *When B is < 6.0' Type of Liner= Class 'I' Rip-Rap Ground Natural Slope Fill GEOTEXTILE D ( Not to Scale) STANDARD BASE DITCH B d Ground Natural Ground Natural Geotextile DETAIL 20-12 3:13:1 B=3Ft. Max. d=1.5Ft. Min. D=2Ft. Rip-Rap (1' min.) Embedded Class 'I' SHEET __ OF __ PERMIT DRAWING U-2579D, E & F 24GRAPHIC SCALE 0 252512.5 50 60" WW72" WD60" WW60" WW60" WW 15" RCP 60" WWW60" WW6 0" WW60" WWGRGR12" RCPS OIL SOILBLKSCONCSR 2215 NORTH WEST DR GR 72" WD60" WWWD DK36" WDRUI NSR U IN S RAI LWW & WD60" WW36" CONCW D DK6 0 " CH L 15" RCPINV=962 .01'INV=961.21'EX IS T ING R /W EX IST ING R /W30.00'EXISTING R/W=PROP .LINE WINSTON-SALEM CITY LIMITS ECM -EY6-TTTMETER ELECTRICCONC GRF F F C C C F F C C C C C F C C F F F F C C C F 020100025010203040506070304050607025025025025325+00330+00335+00898.7 W.E. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. REVISIONS PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\PERMITS_Environmental\Drawings\U2579DEF_PRM_4C PSH.dgnUSER:CMYERSDATE:10/19/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:11:30:43 AMTIME:NCDOT_permits_NOCON.tblBlythe U-2579D, E & FHDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 NC License Number F-0991 Charlotte, NC 28202 900 West Trade St., Suite 715 STV Engineers, Inc. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SEE SHEET 23MATCHLINE -L- STA 323+50SEE SHEET 25MATCHLINE -L- STA 337+50NAD 8 3/ 9 5 CHORD 47" WW FENCE 47" WW FENCE CHORD 47" WW FENCE 189 190 191 190 192 704 704 704 704 191A P OOL FSFS FS FS FS FS FS FS FS FS 15" RCP-III 18" RCP-III 18" RCP-III 2 4" R C P-III 2 4" R C P-III 2GI 2GI BDO 2GI 2GI2GI 2GI BDO 2GI 2GI-A2GI-A SEE DETAIL 24-2 196 SY GEOTEXTILE EST 116 TONS CLASS 'I' RIPRAP BERM DITCH SEE DETAIL 24-3 BERM DITCH w/ELBOWS18"w/ELBOWS15"w/ELBOWS 24" W/FG 2GI SEE DETAIL 24-2 266 SY GEOTEXTILE EST 157 TONS CLASS 'I' RIPRAP BERM DITCH SEE DETAIL 24-5 768 SY GEOTEXTILE EST 454 TONS CLASS 'I' RIPRAP 2' BERM DITCH FS SEE DETAIL 24-6 101 SY GEOTEXTILE EST 59 TONS CLASS 'II' RIP RAP PROTECTION OUTLET CHANNEL 18" RCP-III 15" RCP-III 15" 2GI-A 18" RCP-III 18" RCP-III 15" 2GI NOT BURIED 6' X 6' RCBC 2GI-A 15 SY GEOTEXTILE EST 7 TONS CL 'I' RIP RAP 24" W/ ELBOWS24" RCP-III ELBOWS24" W/DDE = 393 CY SEE DETAIL 24-1 270 SY GEOTEXTILE EST 159 TONS CLASS 'I' RIPRAP 2' LATERAL BASE DITCH W/FG 2GI W/FG 2GI BDO 15" RCP-III W/ ELBO WS15"15"JBw/MH W/FG 2GI w/ELBOWS15"DDE = 206 CY SEE DETAIL 24-1 101 SY GEOTEXTILE EST 60 TONS CLASS 'I' RIPRAP 2' LATERAL BASE DITCH SEE DETAIL 24-10 2' BERM DITCH SEE DETAIL 24-12 100 SY GEOTEXTILE EST 58 TONS CLASS 'B' RIPRAP 2' BERM DITCH SEE DETAIL 24-11 107 SY GEOTEXTILE EST 64 TONS CLASS 'B' RIPRAP BERM DITCH SEE DETAIL 24-9 SEE PROFILE FOR DETAILS SPECIAL BERM DITCH SEE DETAIL 24-10 SEE PROFILE FOR DETAILS SPECIAL 2' BERM DITCH SEE DETAIL 24-9 BERM DITCH ES-S24 ES-S50 ES-S49 ES-W23 SITE 26 ES-S23 S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SITE 25 JS BEGIN LEGEND: ( Not to Scale) LATERAL BASE DITCH 2:1D B b d 2:1 1"/Ft. FROM -L- STA. 335+73 TO STA. 337+50 LT DETAIL 24-1 b= 5.0Ft. B= 2.0Ft. Max. d= 2.0Ft. Min. D= 2.0Ft. *When B is < 6.0' Type of Liner= Class 'I' Rip-Rap Ground Natural Slope Fill GEOTEXTILE 2:12:1( Not to Scale) Geotextile Elevation Natural Bed STA. 335+81 -L- LT Ground Natural Ground Natural (Variable) Channel Bed OUTLET CHANNEL PROTECTION DETAIL 24-6 1.5' Type of Liner= CL 'II' RIP RAP SHEET __ OF __ PERMIT DRAWING U-2579D, E & F 24GRAPHIC SCALE 0 252512.5 50 8938938938948958958 9 5 895 8 9 5895 8968968 96 897897897897897898898898898898898898899899 899899899 899899899899899900900900900900900900900900900 900 900 900900900900900900900901901901901901901 901901 901902902902902902902902902 902902903903903903 9 0 3 903 903903 903 9039039049049049049049 0 4 904 904 904 904905905905905905905905905905905905 905 9 0 590590 5 905 905905 905906906906906906906906906 906 906 906 9 0 7907 907907907907907907907 9 0 7907907 907 907 908908908908908908908908908908908 908 908908909 909909909909909909909 909 909 909 909909 910 910910910910910910910910910910910910910 9109109109 1 0910910910910 910 910 910 910 9119119119119119119119119119 11911911911911911 9129129129129129129129129129 1 2912912912912 912 912 9 1 3913 9139139139139139139139139139 1 3913 9139139 13 913913914 9149149149149149149149 14 9 1 4914914914 914 914 915915915915 915915915915915915915915915915915915915915915915 91591 5 915915915915915 915915915915 9 15 9 1 6916916 9169169169169169169169169 16916916916 9 1 6 916917917917 9179179179179179179179179 17 917917917917917 917918918918 9189189189 1 8 918918918918 9 1 8918918 918 919919919 9199199199199 19 919919919919 919919919 919919 920920920 920920920 9209209209209209209209209209 20920920920920920920920 920920920920920 9 2 0 9 20920 920921921 921 92192192192192192192192192 1 921921921921 9 21 922922 922 922922922922922922922922922922 9 2 2 922 922 9 2 2 922923923 9 2 3 923923923923923923923923923923923923923923 9239249 2 4 9 2 4 924924924924924924924924924924 924 924 9 2 4 9259259259 2 5 925 9 2 5925 925925925925925925925925925925925925925925925925925925 9 2 5 9 2 5925925 9 25 9 2 5 925926926926926 926926926926926926926926926 9 2 6 9 2 6 926 927927927927927 927927927927927927927927927927 927 927 928928928928 9289289289289289289289289289 2 8 9 2 8 928 928 9 2 9 929 929 929929929929929929929929929929929 9 2 9929 9 3 0 9 3 0 9 3 0 930 930930930930930930930930930930930930930930930930930930930930 9 3 0 930930 9309309309 3 1 93 1931 931931931931931931931931931931 931 9319319 3 2 9 3 2 932 9329329329329329329329329329329 3 2 9329329 3 3 933 9339339339339339339339339339 3 3 933 933933934934934934934934934934934934934 934 9349349 3 5 935 935 935935935935935935935935935935935935935935935935935935935935935 9 3 5 935 935935935935936 936936936936936936936936936936936 936 936936937 937937937937937937937937937937937937 937937937938 93893893893893893893893893893893 8938 938938938939 939939939939939939939939939939939939939939940 9409409409409409409409409409409409409409409409409409409409409 4 0 940940 940940940940941 941941941941941941941941941941941 941 941941941942 9429429429429429429429429429429 4 2 942942942942 943 943943943943943943943943943943943943943944944944944944944944944944944944 944944944945945945945945945945945945945945945945945945945945945945 9 4 5 9 4 5 945 945945945945945945 94 5 9469469469469469469469469469 4 6 946 946946946946 9479479479479479479479479479 4 7 947 9479479479479489489489489489489489489489 4 8 948 9 48 948948948948949949949949949949949949949949949 9499499499 4 9 949 9 4 9 9509509509509509509509509509509509509509509509509509509 5 0 9509 5 0 950 950950950950950950950950950 950 951951951951951951951951951951951 951951951951 951 95195295295295295295295295295295295295295295295 2952 95295395395395395395395395395395 3953 953953953953953 9539549549549549549549549549 549 5 4 954 954954954 954 9559559559559559559559559559559559559559559559559559 5 5 955 955 955955955955955955955 9559 5 5 955 956956956956956956956956956956 956956956956956 956 956 9569579579579579579579579579579 5 7 957957957957 957 957 957957957957 9589589589589589589589589589 5 8 9 5 8 9589589589589589589 5 8 9599599599599599599599599599 5 9 959959959959 9 5 9 959959959959 959 959959960960960960960960960960960960960960960960960960960960 960 9 6 0 9609609609609609 60 960960 960960960960 9619619619619619619619619619 6 1 961961961 961 961961 9619619629629629629629629629629 6 2 962962962 962962962962 9639639639639639639639639639639639 6 3 9639639649649649649649649649649649649649649659659659659659659659659659659659659659 6 5 9659659659 6 5 9659659 6 5 96696696696696696696696696 6 966966 967967967967967967967967967967 968968968968968968968968968 969969969969969969969969 970970970970970970970970 970970970970970970970970 970971971971971971971971 971 971972972972972972972972972 9739739739739739739739749749749749749749 7 4974 974 975975975975975975975975975975975 975 975 975 9769769769769769769 7 6976976 977977977 977977 977 978978978978978 9789789799799 79 979979980980980980980980980981981982982983983 98398460" WW72" WD60" WW60" WW60" WW 15" RCP 60" WWW60" WW6 0" WW60" WWGRGR12" RCPS OIL SOILBLKSCONCSR 2215 NORTH WEST DR GR 72" WD60" WWWD DK36" WDRUI NSR U IN S RAI LWW & WD60" WW36" CONCW D DK6 0 " CH L 15" RCPINV=962 .01'INV=961.21'EX IS T ING R /W EX IST ING R /W30.00'EXISTING R/W=PROP .LINE WINSTON-SALEM CITY LIMITS ECM -EY6-TTTMETER ELECTRICCONC GRF F F C C C F F C C C C C F C C F F F F C C C F 020100025010203040506070304050607025025025025325+00330+00335+00898.7 W.E. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. REVISIONS PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\PERMITS_Environmental\Drawings\U2579DEF_PRM_4C PSH.dgnUSER:CMYERSDATE:10/19/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:11:25:38 AMTIME:NCDOT_permits_CON.tblBlythe U-2579D, E & FHDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 NC License Number F-0991 Charlotte, NC 28202 900 West Trade St., Suite 715 STV Engineers, Inc. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED SEE SHEET 23MATCHLINE -L- STA 323+50SEE SHEET 25MATCHLINE -L- STA 337+50NAD 8 3/ 9 5 CHORD 47" WW FENCE 47" WW FENCE CHORD 47" WW FENCE 189 190 191 190 192 704 704 704 704 191A P OOL FSFS FS FS FS FS FS FS FS FS 15" RCP-III 18" RCP-III 18" RCP-III 2 4" R C P-III 2 4" R C P-III 2GI 2GI BDO 2GI 2GI2GI 2GI BDO 2GI 2GI-A2GI-A SEE DETAIL 24-2 196 SY GEOTEXTILE EST 116 TONS CLASS 'I' RIPRAP BERM DITCH SEE DETAIL 24-3 BERM DITCH w/ELBOWS18"w/ELBOWS15"w/ELBOWS 24" W/FG 2GI SEE DETAIL 24-2 266 SY GEOTEXTILE EST 157 TONS CLASS 'I' RIPRAP BERM DITCH SEE DETAIL 24-5 768 SY GEOTEXTILE EST 454 TONS CLASS 'I' RIPRAP 2' BERM DITCH FS SEE DETAIL 24-6 101 SY GEOTEXTILE EST 59 TONS CLASS 'II' RIP RAP PROTECTION OUTLET CHANNEL 18" RCP-III 15" RCP-III 15" 2GI-A 18" RCP-III 18" RCP-III 15" 2GI NOT BURIED 6' X 6' RCBC 2GI-A 15 SY GEOTEXTILE EST 7 TONS CL 'I' RIP RAP 24" W/ ELBOWS24" RCP-III ELBOWS24" W/DDE = 393 CY SEE DETAIL 24-1 270 SY GEOTEXTILE EST 159 TONS CLASS 'I' RIPRAP 2' LATERAL BASE DITCH W/FG 2GI W/FG 2GI BDO 15" RCP-III W/ ELBO WS15"15"JBw/MH W/FG 2GI w/ELBOWS15"DDE = 206 CY SEE DETAIL 24-1 101 SY GEOTEXTILE EST 60 TONS CLASS 'I' RIPRAP 2' LATERAL BASE DITCH SEE DETAIL 24-10 2' BERM DITCH SEE DETAIL 24-12 100 SY GEOTEXTILE EST 58 TONS CLASS 'B' RIPRAP 2' BERM DITCH SEE DETAIL 24-11 107 SY GEOTEXTILE EST 64 TONS CLASS 'B' RIPRAP BERM DITCH SEE DETAIL 24-9 SEE PROFILE FOR DETAILS SPECIAL BERM DITCH SEE DETAIL 24-10 SEE PROFILE FOR DETAILS SPECIAL 2' BERM DITCH SEE DETAIL 24-9 BERM DITCH ES-S24 ES-S50 ES-S49 ES-W23 SITE 26 ES-S23 S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SITE 25 JS BEGIN LEGEND: ( Not to Scale) LATERAL BASE DITCH 2:1D B b d 2:1 1"/Ft. FROM -L- STA. 335+73 TO STA. 337+50 LT DETAIL 24-1 b= 5.0Ft. B= 2.0Ft. Max. d= 2.0Ft. Min. D= 2.0Ft. *When B is < 6.0' Type of Liner= Class 'I' Rip-Rap Ground Natural Slope Fill GEOTEXTILE 2:12:1( Not to Scale) Geotextile Elevation Natural Bed STA. 335+81 -L- LT Ground Natural Ground Natural (Variable) Channel Bed OUTLET CHANNEL PROTECTION DETAIL 24-6 1.5' Type of Liner= CL 'II' RIP RAP SHEET __ OF __ PERMIT DRAWING U-2579D, E & F 25 GRAPHIC SCALE 0 252512.5 50 BST W72" CONC 12" RCP GRGR12" RCP12" RCPCONC DKWD 12" RCP 12" R CP CONC GR CONC CONC GR GR GR 12" RCP12" R C P 12" R CP D KWD CONC SR 2519 DRY BROOK RD 20' BST C O N C36"36" C O NC CONC36"48" CHL 12' C O N C 48" CHL 48" CHL48" CHL 48" C HL 48" CHL 36" CONC C HL 48" CHL 48" DKWD WD D K 36" C O N C 60" CHL48" CHL60" CHL 36" CONC P A VERS WD R AIL 48" C H L48" CHL48" CHL 36" C O NC WD DK WD R AIL 12" R CP 12' CONC 48" C O N C 60" CHL 60" CHL 60" CHL36" CONC12" RCP 15 " RCPINV=934.84 UNKNOWN OTHER END SIGHT EASEMENTSIGHT EASEMENTWINSTON-SALEM CITY LIMITS TT TT TT 8" DIP 8" DIP UNKNOWN SIZE & TYPE E XISTIN G R/W60.00' E XISTIN G R/WC C F F F F F F F F F F F F C C F F F C F C C C C C C C C C F 002036 03 0202 01 0250250202 025025 02020707 070703 02 01 00 01340+00345+0015+00 350+0020+00345+00HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.REVISIONS PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\PERMITS_Environmental\Drawings\U2579DEF_PRM_4C PSH.dgnUSER:CMYERSDATE:10/19/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:11:27:40 AMTIME:NCDOT_permits_NOCON.tblBlythe HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 NC License Number F-0991 Charlotte, NC 28202 900 West Trade St., Suite 715 STV Engineers, Inc. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NW18 NW19-1B20+00 10+00 15+00 10+00 2 0 +0 0-L- STA 337+50 SEE 24MATCHLINESEE SHEET 26MATCHLINE -L- STA 351+50SEE SHEET 52 -Y7- STA 23+00 MATCHLINE NAD 83/ 95 47" WW FENCE 47" WW FENCE FENCE47" WW 192 193 612 198 199 661 677 610 602 611 673 190 232 610 193 608 608 175.00' RT -L- +17.06 214.35' RT -L- +71.59 190A FS 15" 2GI 15" w/ELBO WS FS FS FS FS FS FS FS FS 18" RCP-III 18" RCP-III 18" RCP-III BDO 2GI 2GI 2GI 2GI 2GI 2GI 2GI SEE DETAIL 25-1 BERM DITCH SEE DETAIL 25-1 BERM DITCH w/ELBOWS15" SEE DETAIL 25-8 47 SY GEOTEXTILE EST 28 TONS CLASS 'I' RIP RAP BANK STABILIZATION NOT BURIED 6' X 6' RCBC W/ FG 2GI W/ FG 2GI 15" R C P-III RCP-III 15" RC P -III 15" 15" RCP-III SEE DETAIL 25-7 TOE PROTECTION DDE = 3002 CY SEE DETAIL 25-3 305 SY GEOTEXTILE EST 180 TONS CLASS 'I' RIPRAP 2' LATERAL BASE DITCH DDE = 92 CY SEE DETAIL 25-2 LATERAL 'V' DITCH DDE = 9 CY SEE DETAIL 25-2 LATERAL 'V' DITCH DDE = 47 CY SEE DETAIL 25-2 LATERAL 'V' DITCH RCP-III 15" 2GI 2GI OTCB w/ELBOWS15"2GI-A 24"18" RCP-III 2 4" 24" GRADE TO DRAIN GRADE TO DRAIN DDE = 304 CY SEE DETAIL 25-3 117 SY GEOTEXTILE EST 69 TONS CLASS 'I' RIPRAP 2' LATERAL BASE DITCH SEE DETAIL 25-9 BERM DITCH 18" RCP-III 18" SEE DETAIL 25-10 2' BERM DITCH SITE 26 ES-S24 ES-S51 S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY LEGEND: JS BEGIN JS BEGIN ( Not to Scale) DETAIL 25-8 JURISDICTIONAL STREAM BANK STABILIZATION AT Type of Liner= CL I Rip-Rap STA. 338+75 -L- RT GEOTEXTILE1.5' ELEVATION NATURAL BED Ground Natural Ground Natural ( Not to Scale) TOE PROTECTION d FLATTER2:1 OR FROM -L- STA. 338+53 TO STA. 340+50 RT FROM -L- STA. 337+50 TO STA. 338+52 RT DETAIL 25-7 Type of Liner= Class 'I' Rip-Rap d= 1.0Ft. GROUND NATURAL SLOPE FILL GEOTEXTILE SHEET __ OF __ PERMIT DRAWING U-2579D, E & F 25 GRAPHIC SCALE 0 252512.5 50 9 1 4915 9159 15 915 9169169179 17 9189189189199199 19 920 9209209209209209209209219219219219 2 1 9219229229229229229239239 2 3 9 2 3923 9249249 2 49249 2 4 9 2 4925925925925 9259259259259259 2 5 925 9 2 5926 9269269269 2 6 926 927927927927927 9289289 2 8 9 2 8928928929929929929929929930930930930930930930 930930930930931 931931931931931932 932 932932932932933 933 933933933933934 9 34 934934934934935 9 3 5 935935 935935935935935935935936 936936936936936937 937937937937937938 938938938938938938 939 9399399 3 9 939939939 939 940 940 940940940 940940940940940940940940941 9419 4 1 941941941941942 942942 942942942942942943 9439 4 3 943943943943943943944 944 944944944944944944944945945945945945 945 945 945 945945945945945945945945946946946 946 946946 946946946947947947 947 947947 947947948948948 948 948948948948948948949949949 949 949949 949949949950950950950 950 950950 950950950950 950950950 95095 0 950950950951951951 951 951951951951951951952952952 952 9529529529 5 2 9 5 2 952953953953 953 953953953953 953953953954954954 954 954954954954 954954954955955955955955955 955 955 955955 955955955955 9559559559559559 5 5 955955955955956956956956 956 956956956956 9569 5 6 956956957957957957 957 957957957957 957957 957957958958958 958 958958958958 958958 958958958958959959959 95 9959959959959959 959 9599599609609609609 6 0 960 960 960 9609609609 6 0 960960 960 960 960 960 9609609609609609609619 6 1 961 9 6 1 961961961 961 961 961961961962 962 962 962962962 962 962 962962963963 9 6 3 963963963963963 96396396396 3 9 6 4 964 964 9649 64 964 964 964 9649649649659659659 65 965 965 965 965965965965965965 965 965 965 965965965965965965966 966 9 6 6 966966966 966 966 966966966967 967 967 967967967967 967 9679679679 68968 968 968968968968 968 968 968968968968968969969969 969969969969 969 969 9699699699699699709 7 0 970970970 9 7 0 970 9709709709709709 7 0 970 970 970 9 7 0 970970970 9709709709709709 7 0 971 971 971 971971971971 971 9719719719719719 7 1972972 972972 9729729 72 972 972972972972972973973973973973 973 973 9739739 7 3 973 973 973 973 974974974974974974 974974974974974 974 974 9759759759759759759759759759 7 5 975 975 975975 975 975975975975975 975975 975 975975 97597697697697697697697 6 976 976976976976 976976976 977977977977977977 9 7 7 9 7 7 977 977977977977 9779 7 7 977 978978978978978978 9 7 8 978 9789789789789 7 8 9 7 8 978 978978 979979979979979979 979979979979 9799 7 9 9799799 7 9 979 979 979 980980980980980980980980 98 0980980980 9 8 0 980 9809809809809 8 0 980980 98 098 0980980980980980980 9 80981981981981981 9819819819819 8 1 981981981981 982982982982 982982982982982 982982982982982982 983983983983983 983983983983 983 983983 984984984984984984984984 984984 985985985985985985 9859859859859859 85 985985 985 985 985 985986986986986986986986986 986986987987987987987987 987987987988988988988988988988988989989989989989989989 9 8 9989 990990990990990990990 9909909909 9 0 990 9 90 990990 991991991991991991 991 992992992 992992992 992 993993993 993993 993 9939949 94994994 994994 995995995995995995995 995 995 996996 996997997997 99899899899999910001 0 0 0 1001BST W72" CONC 12" RCP GRGR12" RCP12" RCPCONC DKWD 12" RCP 12" R CP CONC GR CONC CONC GR GR GR 12" RCP12" R C P 12" R CP D KWD CONC SR 2519 DRY BROOK RD 20' BST C O N C36"36" C O NC CONC36"48" CHL 12' C O N C 48" CHL 48" CHL48" CHL 48" C HL 48" CHL 36" CONC C HL 48" CHL 48" DKWD WD D K 36" C O N C 60" CHL48" CHL60" CHL 36" CONC P A VERS WD R AIL 48" C H L48" CHL48" CHL 36" C O NC WD DK WD R AIL 12" R CP 12' CONC 48" C O N C 60" CHL 60" CHL 60" CHL36" CONC12" RCP 15 " RCPINV=934.84 UNKNOWN OTHER END SIGHT EASEMENTSIGHT EASEMENTWINSTON-SALEM CITY LIMITS TT TT TT 8" DIP 8" DIP UNKNOWN SIZE & TYPE E XISTIN G R/W60.00' E XISTIN G R/WC C F F F F F F F F F F F F C C F F F C F C C C C C C C C C F 002036 03 0202 01 0250250202 025025 02020707 070703 02 01 00 01340+00345+0015+00 350+0020+00345+00HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.REVISIONS PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\PERMITS_Environmental\Drawings\U2579DEF_PRM_4C PSH.dgnUSER:CMYERSDATE:10/19/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:11:26:29 AMTIME:NCDOT_permits_CON.tblBlythe HDR Engineering, Inc. of the Carolinas N.C.B.E.L.S. License Number: F-0116 555 Fayetteville St, Suite 900 Raleigh, N.C. 27601 NC License Number F-0991 Charlotte, NC 28202 900 West Trade St., Suite 715 STV Engineers, Inc. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NW18 NW19-1B20+00 10+00 15+00 10+00 2 0 +0 0-L- STA 337+50 SEE 24MATCHLINESEE SHEET 26MATCHLINE -L- STA 351+50SEE SHEET 52 -Y7- STA 23+00 MATCHLINE NAD 83/ 95 47" WW FENCE 47" WW FENCE FENCE47" WW 192 193 612 198 199 661 677 610 602 611 673 190 232 610 193 608 608 175.00' RT -L- +17.06 214.35' RT -L- +71.59 190A FS 15" 2GI 15" w/ELBO WS FS FS FS FS FS FS FS FS 18" RCP-III 18" RCP-III 18" RCP-III BDO 2GI 2GI 2GI 2GI 2GI 2GI 2GI SEE DETAIL 25-1 BERM DITCH SEE DETAIL 25-1 BERM DITCH w/ELBOWS15" SEE DETAIL 25-8 47 SY GEOTEXTILE EST 28 TONS CLASS 'I' RIP RAP BANK STABILIZATION NOT BURIED 6' X 6' RCBC W/ FG 2GI W/ FG 2GI 15" R C P-III RCP-III 15" RC P -III 15" 15" RCP-III SEE DETAIL 25-7 TOE PROTECTION DDE = 3002 CY SEE DETAIL 25-3 305 SY GEOTEXTILE EST 180 TONS CLASS 'I' RIPRAP 2' LATERAL BASE DITCH DDE = 92 CY SEE DETAIL 25-2 LATERAL 'V' DITCH DDE = 9 CY SEE DETAIL 25-2 LATERAL 'V' DITCH DDE = 47 CY SEE DETAIL 25-2 LATERAL 'V' DITCH RCP-III 15" 2GI 2GI OTCB w/ELBOWS15"2GI-A 24"18" RCP-III 2 4" 24" GRADE TO DRAIN GRADE TO DRAIN DDE = 304 CY SEE DETAIL 25-3 117 SY GEOTEXTILE EST 69 TONS CLASS 'I' RIPRAP 2' LATERAL BASE DITCH SEE DETAIL 25-9 BERM DITCH 18" RCP-III 18" SEE DETAIL 25-10 2' BERM DITCH SITE 26 ES-S24 ES-S51 S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY LEGEND: JS BEGIN JS BEGIN ( Not to Scale) DETAIL 25-8 JURISDICTIONAL STREAM BANK STABILIZATION AT Type of Liner= CL I Rip-Rap STA. 338+75 -L- RT GEOTEXTILE1.5' ELEVATION NATURAL BED Ground Natural Ground Natural ( Not to Scale) TOE PROTECTION d FLATTER2:1 OR FROM -L- STA. 338+53 TO STA. 340+50 RT FROM -L- STA. 337+50 TO STA. 338+52 RT DETAIL 25-7 Type of Liner= Class 'I' Rip-Rap d= 1.0Ft. GROUND NATURAL SLOPE FILL GEOTEXTILE HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)11 173+80 -L- 48" RCP 0.04 615 11A** 174+23 -L- RT 48" RCP 0.08 12 203+75 - 207+10 -L- RT ROADWAY FILL 0.02 < 0.01410 10 12A 205+69 -L- RT FILL IN WETLAND 0.08 13 207+24 -L- 5x6 CULVERT 0.03 < 0.01 337 22 13A 209+14 -L- LT 4' BASE DITCH < 0.01 14 222+50 - 223+56 -L- RT 48" RCP 0.01 < 0.01 220 11 14A 222+65 -L- LT POND 3.06 15 242+86/244+20 -L- 5'x6' RCBC 0.05 < 0.01 520 15 15A 243+60/244+00 -L- 5'x6' RCBC 0.04 16 253+92/255+58 -L- 42" RCP AND DITCH 0.05 < 0.01513 20 17 261+02/262+96 -L- 6'x6' RCBC 0.08 < 0.01 928 23 18 275+75/276+78 -L- 42" RCP 0.03 < 0.01 161 11 18A 277+00 RT -L- PIPE REMOVAL AND DITCH < 0.01 < 0.01 24 20 18A277+00 RT -L-BANK STABILIZATION < 0.01 7 19 279+30/280+86 -L- 5'x7' RCBC 0.04 < 0.01 250 11 19 280+86/281+71 -L- 5' STANDARD BASE DITCH < 0.01 < 0.01 91 15 20 280+61/281+66 -L- REMOVE 2 - 72" CMP 0.02 < 0.01 35 31 20A 285+56/285+81 -L- BANK STABILIZATION < 0.01 < 0.01 16 21 20B 285+56/285+81 -L- BANK STABILIZATION < 0.01 < 0.01 20 21 20C 284+44/285+33 -L- TEMPORARY WORK PAD 0.06 165 21 285+19/285+65 -L- CHANNEL CHANGE < 0.01 133 21 285+19 -L- BANK STABILIZATION < 0.01 < 0.01 10 10 22 303+57/304+09 -L- 30" RCP/ 36" RCP < 0.01 < 0.01 97 7 TOTALS SHEET 2*:0.20 < 0.01 3.47 0.09 4387 413 0*Rounded totals are sum of actual impactsNOTES:Revised 2013 10 24SHEET OF -**Wetland ES-W33 is total take-Site 24 is a Channel Relocation WETLAND PERMIT IMPACT SUMMARYWETLAND IMPACTSSURFACE WATER IMPACTSFORSYTHU-2579D, E & F34839.3.GV7NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS11/03/2020 HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)23 316+25/317+41 -L- 6'x6' RCBC 0.04 363 23 317+40/317+49 -L- BANK STABILIZATION < 0.01 < 0.01 28 10 24 316+84/317+01 -L- CHANNEL CHANGE < 0.01 < 0.01 120 10 25 323+23/325+22 -L- 24" RCP 0.02 < 0.01 294 10 26 335+66/338+74 -L- 6'x6' RCBC 0.05 < 0.01 523 10 26 338+82 -L- BANK STABILIZATION < 0.01 < 0.01 29 8 27 356+07/357+64 -L- 7'x7' RCBC 0.05 328 27 356+07 -L- LT BANK STABILIZATION < 0.01 < 0.01 35 8 27 357+63 -L- RT BANK STABILIZATION < 0.01 < 0.01 37 12 28** 397+37/400+85 -L- ROADWAY FILL 0.26 29** 398+61/405+73 -L- ROADWAY FILL / 5' BASE DITCH 0.06 906 29** 398+61/405+73 -L- BANK STABILIZATION < 0.01 < 0.01 40 10 29A** 401+96 -L- ROADWAY FILL < 0.01 29B** 402+33/405+59 -L- ROADWAY FILL / 5' BASE DITCH 0.26 0.03 0.01 30*** 409+52/411+61 -L- 54" RCP 0.05 < 0.01 563 14 30*** 409+53 -L- BANK STABILIZATION < 0.01 < 0.01 15 10 31 49+59 - 50+28 -Y3- LT 2' BASE DITCH < 0.01 57 32 35+68/37+32 -Y6- BANK STABILIZATION 0.03 < 0.01 172 19 33 173+50 -L- LT CHANNEL IMPROVEMENT TIE-IN < 0.01 < 0.01 20 21 34 357+38/357+49 -L- BANK STABILIZATION < 0.01 < 0.01 24 11 TOTAL SHEET 1 0.87 < 0.01 0.01 0.49 < 0.01 5694 49 TOTAL SHEET 2 0.20 < 0.01 3.47 0.09 4387 413 TOTAL SHEET 3 0.53 0.03 0.01 0.34 0.02 3554 153 TOTALS ALL SHEETS*:1.60 0.00 0.03 0.03 0.00 4.31 0.11 13635 615*Rounded totals are sum of actual impacts** SITE 28, 29, 29A, AND 29B - SITE 1 IN U-2579C PHASE 2 PERMITRevised 2013 10 24SHEET OF WETLAND PERMIT IMPACT SUMMARYWETLAND IMPACTSSURFACE WATER IMPACTSFORSYTHNC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS11/03/2020NOTES- SITE 24 IS A CHANNEL RELOCATION*** SITE 30 - SITE 2 IN U-2579C PHASE 2 PERMIT- ISOLATED WETLANDS SITEU-2579D, E & F34839.3.GV7 1 Carpenter,Kristi From:Euliss, Amy Sent:Thursday, November 05, 2020 3:17 PM To:Alsmeyer, Eric C CIV USARMY CESAW (USA); Wanucha, Dave Cc:Turchy, Michael A; Barrett, William A; Shumsky, Michael J; Kiser, Marcus K; McLaughlin, Zachery R; Harmon, Beth; Suggs, Phillip H; Carpenter,Kristi; Miller, Vickie M (Vickie.Miller@hdrinc.com); Yelverton, Wyatt; Edelberg, Kristofer Subject:U-2579DEF Permit modification Attachments:U-2579DEF permit modification 11.4.20.pdf; RE: U2579DEF potential mitigation site Follow Up Flag:Follow up Flag Status:Flagged Eric and Dave,  Attached is a permit modification request for U‐2579DEF.  Let me know if you have any questions or need additional  information to process.    Dave and Kristi,  Please use the meeting held January 10, 2019 to review the site as our preapplication meeting.  I’ve included an email  chain that documents our discussion at the site as well as some additional mitigation questions.  As you will see in the  application, we determined that onsite mitigation was not feasible.    Michael Turchy,  Please add to the permit application website for the WSNB.      Amy Euliss Division 9 Environmental Officer  North Carolina Department of Transportation     336 747 7802 office aeuliss@ncdot.gov     375 Silas Creek Parkway  Winston Salem, NC 27127-7167          Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.