HomeMy WebLinkAbout19980260 Ver 6_Modification Request_20201106 Staff Review Form •
NORFH CA.,i0:INA
En vironmenfrr!QvoGry
Updated September 4,2020
Staff Review
Does this application have all the attachments needed to accept it into the review process?*
6* Yes r No
ID#* Version* 6
19980260
Is this project a public transportation project?* (' Yes
r No
Is this a DOT ( Yes C No
project?*
Reviewer List:* Dave Wanucha:eads\djwanucha
Select Reviewing Office:* Winston-Salem Regional Office-(336)776-9800
Does this project require a request for payment to be sent?*
Yes
r
No
Project Submittal Form
Please note:fields marked with a red asterisk *below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type:* r For the Record Only(Courtesy Copy)
✓ New Project
✓ Modification/New Project with Existing ID
✓ More Information Response
✓ Other Agency Comments
✓ Pre-Application Submittal
✓ Re-Issuance\Renewal Request
✓ Stream or Buffer Appeal
Pre-Filing Meeting Information
Pre-Filing meeting request information is not needed for this project.
Project Contact Information
.......................................................................................................................................................................................................................................................................................................................................................................................................
Name: Kristi Lynn Carpenter for Amy Euliss
Who is submitting the information?
Email Address: aeuliss@ncdot.gov
Project Information
............................................................................................................................................................................................................................................................................................................
Existing ID#: Existing Version:
19980260 6
20170001(no dashes) 1
Project Name: Winston-Salem Northern Beltway Phase 2(R-2247/U-2579)
Is this a public transportation project?
a Yes
✓ No
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
✓ Yes r No a Unknown
TIP#: WBS#:
R-2247/U-2579 34839.3.GV7
(Applies to DOT projects only)
County(ies)
Gaston
Please upload all files that need to be submited.
Click the upload button or drag and drop files here to attach docurrent
U-2579DEF permit modification 11.4.20.pdf 8.59MB
19980260version6 application email.pdf 147.62KB
Only pdf or krrz files are accepted.
Describe the attachments
or comments:
Original submission via email.
Sign and Submit
.......................................................................................................................................................................................................................................................................................................................................................................................................
fJ By checking the box and signing box below, I certify that:
• I,the project proponent, hereby certifies that all information contained herein is true,accurate, and complete to
the best of my knowledge and belief.
• I,the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
• I agree that submission of this online form is a"transaction"subject to Chapter 66,Article 40 of the NC General
Statutes(the"Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General
Statutes(the"Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a
written signature;AND
• I intend to electronically sign and submit the online form.
Signature:
& rcfce',.eier. L:d,,c4n er?%t
Submittal Date: Is filled in autorretically.
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
ROY COOPER J. ERIC BOYETTE
GOVERNOR SECRETARY
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DIVISION 9
375 SILAS CREEK PARKWAY
WINSTON SALEM, NC 27127
Telephone: (336) 896-2330
Customer Service: 1-877-368-4968
Website: www.ncdot.gov
Location:
375 SILAS CREEK PARKWAY
WINSTON SALEM, NC 27127
November 04, 2020
U.S. Army Corps of Engineers
Asheville Regulatory Field Office
151 Patton Avenue, Room 208
Asheville, NC 28801-5006
ATTN: Mr. Eric Alsmeyer
NCDOT Regulatory Coordinator
Subject: Request for Modification to Individual Section 404 and Section 401Water Quality
Certification for the Winston-Salem Northern Beltway from US 52 to US 311 (New
Walkertown Road), Forsyth County. Federal Aid Project No. NHP-0074(213), TIP Nos.
U-2579D, E& F. Division 9.
Reference: Section 404 and 401 Individual Permit Application requested October 2, 2017 for Winston
Salem Northern Beltway from I-40 to US 52 (R-2247B Phase 2, CA, CB, CD, D, EA, EB,
and EC), from US 52 to US 311 north (U-2579C Phase 2, D, E, and F) and from I-40
Business to US 311 South (U-2579AA and AB)
- Modification Application for U-2579D, E, F / U-2579C Phase 2, dated
January 7, 2019.
- Modification Application for R-2247EB, dated June 26, 2019.
- Modification Application for U-2579D, E, F, dated October 17, 2019.
Section 404 Individual Permit issued for Winston Salem Northern Beltway from I-40 to
US 52 (R-2247B Phase 2, CA, CB, CD, D, EA, EB, and EC), from US 52 to US 311
north (U-2579C Phase 2, D, E, and F) and from I-40 Business to US 311 South (U-
2579AA and AB) January 22, 2018 (SAW-2017-02112)
- Permit Modification for U-2579D, E, F / U-2579C Phase 2, dated March 4, 2019.
- Permit Modification for R-2247EB, dated August 13, 2019.
- Permit Modification for U-2579D, E, F, dated January 29, 2020.
Section 401 Water Quality Certification issued November 14, 2017 (WQC004131); for
Winston Salem Northern Beltway from I-40 to US 52 (R- 2247B Phase 2, CA, CB, CD,
D, EA, EB, and EC), from US 52 to US 311 north (U-2579C Phase 2, D, E, and F) and
from I-40 Business to US 311 South (U- 2579AA and AB); Revision 1 dated
November 27, 2017, Revision 2 dated December 21, 2017 , Revision 3 dated February
7, 2019, Revision 4 dated August 13, 2019, Revision 5 dated November 14, 2019.
Dear Sir:
The North Carolina Department of Transportation (NCDOT) requests modification to the existing Section
404 Individual Permit and Section 401 Water Quality Certification for the proposed Winston Salem
Northern Beltway from US 52 to US 311 (TIP U-2759 D, E, and F) in Forsyth County. This project is
currently under construction.
This modification will result in no changes to wetland impacts previous documented. It will result in 31
linear feet of additional permanent stream fill impacts and 20 linear feet of additional temporary stream
impacts. The total project impacts for U-2579D, E, and F include 12,111 linear feet of permanent stream
impacts of which 405 linear feet is bank stabilization, 615 linear feet of temporary stream impacts, 1.66
acres of permanent wetland impacts, no temporary wetland impacts, and no hand clearing in wetlands.
Please see the enclosed revised permit drawings and updated impact summary sheets which reflect the
changes in impacts.
Permit Impact Site Modification
Site 18A (Roadway Plan Sheet 20): Site 18A impacts changed as a result of the decision to remove a 24”
reinforced concrete pipe (RCP) located to the south of the Winston Salem Northern Beltway roadway
alignment and to the west of Phelps Drive (Y6C). The parcels (5 total) where Stream ES-S68 (UT to Mill
Creek) and the existing 24” RCP are located were obtained by NCDOT during the right of way process.
Access to the parcel is being removed along with the homes and sheds that occurred on the parcel(s).
This site was reviewed for onsite mitigation potential; however, due to a number of constraints, it was
determined that the best solution was to remove the 24” RCP and replace it with a standard base ditch
with embedded rip rap. The main constraint and reason to use the standard base ditch is due to the steep
slope of the channel. There will be 20 linear feet of temporary impacts at this location in order to dewater
the existing stream around during construction. Removal of the 24” RCP will result in 141 linear feet of
channel being daylighted. There will be 7 linear feet of permanent bank stabilization impacts to the
channel beyond the pipe to tie the channel in at the inlet location and 24 linear feet of permanent impact
to correct the existing scour and tie at the pipe outlet. No additional impacts will occur at this site.
Site 26 (Roadway Plan Sheets 24/25): Site 26 impacts have not changed from the modification dated
January 2020; however, the design has changed due to the noise walls. A ditch is required along the toe
of fill that will tie to the existing bank stabilization at the inlet of ES-S24. The updated plan sheets are
attached.
Compensatory Mitigation
At site 18A, compensatory mitigation is proposed for the 24’ of new linear feet of permanent impacts to
correct the existing scour and tie at the pipe outlet. No compensatory mitigation is proposed for the 7’ of
permanent bank stabilization impacts. Table 1 below illustrates the current summary of stream impacts
requiring mitigation which has changed since the last permit modification request dated October 17, 2019.
Table 1. Summary of Stream Impacts by Project TIP Requiring Mitigation
Section Design Stage
Stream Impacts
Requiring
Mitigation from
Phased IP
Application (lf)
Final Stream
Impacts Requiring
Mitigation (lf) 1
Difference in
Impacts
Requiring
Mitigation
(lf)
R-2247EC Permitted 814 814 0
R-2247CD Permitted 611 611 0
U-2579C Phase
2 (U-2579D, E
&F Sites 29 &
30)
Permitted 3,409 3,178 - 231
U-2579AA Preliminary 3,019 3,019 0
U-2579AB Preliminary 10,351 10,351 0
U-2579D Permitted 5,043 4345+* - 698
U-2579E Permitted 4,864 4,817 - 47
U-2579F Permitted 2,544 2,502 - 42
R-2247EA Preliminary 0 774 + 774 +
R-2247EB Final 5,819 + 5,323 + - 496
Totals 36,474 + 35,710 2 - 764
1 Final impacts for each section in the preliminary design stage will be updated with future modifications.
2 Assumes the preliminary impacts for future sections.
+ Revised, per Permit Modification for R-2247EB [NCDOT’s R-2247EB Modification application, dated June 26, 2019; USACE’s R-
2247EB Phased Modification (Action ID SAW-2017-02112), dated August 13, 2019] and Permit Modification for U-2579DEF [NCDOT’s
U-2579DEF Modification application, dated October 17, 2019; USACE’sU-2579DEF Modification (Action ID SAW-2017-02112), dated
January 29, 2020].
*Revised, per the current permit modification for U-2579DEF, dated November 4, 2020.
Thank you for your assistance with this project. If you have any questions or need additional information,
please contact me at either aeuliss@ncdot.gov or (336) 747-7800.
Sincerely,
Amy Euliss
NCDOT Division 9 Environmental Officer
cc:
Bill Barrett, Environmental Analysis Unit
Michael Shumsky, PE, Project Manager, NCDOT Design Build Unit
Marcus Kiser, PE, NCDOT Division 9 Resident Engineer
Phil Suggs, NCDOT Division 9 and 10 Roadside Environmental Filed Operations Engineer
Beth Harmon, Division of Mitigation Services
Amy Chapman, NCDENR-DWR
Dave Wanucha, NCDENR-DWR
Page 1 of 7
North Carolina Department of Transportation
Environmental Analysis Unit (EAU)
Raleigh, North Carolina
UT to Mill Creek and Mill Creek
On-site Stream Mitigation Feasibility Report for
Winston-Salem Northern Beltway
Forsyth County, North Carolina
T.I.P. Number U-2579 D, E, and F
WBS No. 34839.3.GV7
May 22, 2020
1.0 BASELINE INFORMATION
The project is located within USGS Hydrologic Cataloging Unit 03040101, and NC Division of
Water Resources (NCDWR) sub-basin 03-07-04 of the Yadkin Pee-Dee River Basin, and is part
of the of the South Atlantic-Gulf region. The potential mitigation site is located along and to the
west of Phelps Drive approximately 0.35 mile east of Baux Mountain Road in Forsyth County on
the north side of Winston-Salem, on land that was purchased by the North Carolina Department
of Transportation (NCDOT). The project is within the Piedmont physiographic province,
specifically near the line between the Northern Inner Piedmont and the Southern Outer Piedmont
Ecoregions. Land use within the watershed is primarily residential development, forested areas,
and agricultural. The existing stream length, drainage area, and jurisdictional status are
summarized in Table 1.
Table 1. Summary of Existing Stream Length and Drainage Area.
Stream Reach Existing Length
(LF)
Drainage Area Intermittent/Perennial Status
UT to Mill
Creek 419 17.7 ac
Stream reach considered intermittent by
agencies during impact assessments.
Status = Intermittent
Mill Creek 285 3.45 sq. mi.
Stream reach considered perennial by agencies
during impact assessments.
Status = Perennial
The project includes analyzing the feasibility of restoration, enhancement, and preservation of an
unnamed tributary (UT) to Mill Creek as well as enhancement and restoration to areas along Mill
Creek. Mill Creek has been assigned Stream Index Number12-94-7 (NCDWR 2020) and is
designated a warm water stream with a classification of C. Class C waters are protected for
secondary recreation, fishing, and aquatic life.
Page 2 of 7
Most of the native plant communities have been removed from the site as the area has been
mowed and maintained for the nearby residence and outbuildings which have now been removed
through NCDOTs acquisition of the property.
NCDOT is analyzing the potential for on-site mitigation for jurisdictional stream impacts
associated with Transportation Improvement Program (TIP) U-2579DEF as part of the
construction of the Winston-Salem Northern Beltway. The project would serve as on-site
mitigation through the restoration, enhancement, and preservation of 705 linear feet of streams if
deemed feasible.
2.0 SITE SELECTION
TIP U-2579 DEF involves construction of the Winston-Salem Northern Beltway from US 52 to
US 311 (New Walkertown Road). The stream restoration, enhancement and preservation site
was selected due to its location within the U-2579DEF corridor and NCDOTs purchase of the
property related to the project. The potential mitigation area includes approximately 1.5 acres
within a Right of Way held by NCDOT. Within this area, the NCDOT reviewed the potential for
restoration of the UT to Mill Creek, restoration of Mill Creek at the crossing of Phelps Dr, and
enhancement along Mill Creek. These options are referred to as options 1, 2 and 3, respectfully.
These options are summarized in table 2.
3.0 OPTIONS REVIEWED
Option 1: Restoration of Unnamed Tributary to Mill Creek
The existing UT to Mill Creek begins immediately downstream of a 24” pipe within the footprint
of the U-2579DEF road construction project. The UT extends over 600 lf from this point to
where it ties to Mill Creek. The far upstream extent of the UT is marked by severe channel and
floodplain incision immediately downstream of the 24” pipe where the channel begins. From
this point, moving downstream, the floodplain begins to widen allowing the channel some
meander pattern progressing south toward Mill Creek. Around the midway point along the UT,
the channel proceeds through another 24” reinforced concrete pipe for 141 lf.
Approximately 180 lf of the upper portion of the UT will be filled in by the new roadway facility
(permit site 18). Extensive Class I Rip Rap outlet protection is called for in the construction
plans to address stability concerns due to a 42” cross pipe and 18” pipe system outlet at this
location. This mitigation feasibility analysis reviewed restoring the UT to a natural channel
design from the terminus of the existing impact at permit site 18 to the tie in with Mill Creek.
The feasibility analysis reviewed three options for the Unnamed Tributary to Mill Creek. These
are referred to as Options 1a, 1b, and 1c below.
• Option 1a proposes to remove 141 ft of existing 24” pipe and Provide full restoration of the
UT to Mill Creek by grading a new floodplain, installing a number of grade control structures
and steps to stabilize the channel, and plantings. See Figures 1 thru 3.
Page 3 of 7
• Option 1b incorporates restoration, enhancement, and preservation of UT to Mill Creek. This
option attempts to strike a balance between the costs of full restoration and obtaining
mitigation credits. See Figures 4 thru 6.
• Option 1c, is based on removing 141 linear feet of existing 24” pipe and replacing it with a
standard base ditch with embedded riprap for stability. This option does not propose
mitigation credits for this work. Instead, it avoids a potential issue with the existing pipe in
the future by removing it prior to access being removed or restricted. See Figures 7 and 8.
Issues Discovered with Options 1a and 1b
The feasibility analysis has several constraints which would make options 1a and 1b appear cost
prohibitive on the UT to Mill Creek. These challenges include long term stability, grade control,
cost associated with necessary cut to achieve adequate floodplain, and buffer limitations due to
utility easements.
Stability and Grade Control Concerns: First and foremost was the channel slope which is 3.8%
or more specifically the UT to Mill Creek drops 19 feet in elevation over 500 feet in length. In
order to address that slope and provide full restoration on the UT to Mill Creek would take
significant grading and a significant number of structures in order to stabilize the channel.
Because of the slope of the channel, there is also a high potential for head cutting if any proposed
structures were to fail within the restored channel. There is an approximately 8 foot drop to get
from the UT elevation in the floodplain to the elevation of Mill Creek which poses a challenge
for stability and would require a substantial structure and some grading if you left the channel at
existing grade and simply tried to tie it in at Mill Creek. Even by doing that there is still a steep
grade on the channel which would require a number of structures to stabilize the channel.
The existing 24” pipe to be removed has a slope of 2.5%. As shown in the profile drawing
(Figure 6), there is notable drop-down in channel elevation as water enters the inlet side of the
pipe. At the outlet end there is a 2’ drop from pipe outlet to channel bottom. This outlet drop is
stabilized by a small concrete pad.
Grade control structures would be needed for stability of the channel and prevention of potential
head-cutting in the channel. In addition, the new channel will need to be steeper than existing
pipe to avoid drastic elevation changes at the upstream and downstream ends. As seen in profile
drawings for Options 1a and 1b (Figures 3 and 6) the longitudinal slopes would need to be 3.5-
4% to better tie with the channel upstream and limit amount of grade change at the downstream
end. Grade control needs to be achieved through the use of rock cross vanes. These have been
shown on the mitigation plan drawings for Options 1a and 1b (Figures 1 and 4).
With the amount of grade change in this section, as well as the overall site, trying to achieve any
riffle-pool sequence would be problematic as the riffle sections would need to be very short in
Page 4 of 7
length and severely steep. Therefore a typical section resembling that of a constructed riffle with
adequately sized stone to be embedded to channel depth would be required.
At the locations noted on Figures 4 and 7, the existing channel braids with some channel flow
accessing the floodplain of Mill Creek. If we were to take this channel offline we would face
challenges with grade change and tying a new channel into Mill Creek in a stable fashion.
Floodplain Concerns: In addition to the slope and stability issues noted above, another item that
is of concern creating and maintaining the floodplain.
In the full restoration option (Option 1a) floodplain would need to be created due to channel
elevations and topography. For studying the feasibility of this option we set the longitudinal
grade by mirroring the existing channel grade for the UT and then stepping the proposed channel
down after reaching the top of bank for Mill Creek (See Figure 3, profile). Proceeding in this
fashion kept the longitudinal grade as low as possible (aided by drop structures near pipe
removal) and limited the amount of floodplain excavation needed. Even still, we estimated
approximately 1060 CY of grading.
Another concern is with potential backwater impacts to the channel that could occur due to high
flows in Mill Creek. As mentioned above about stepping a new channel down to tie back in with
Mill Creek, we would need to accomplish this with grade controls structures. There would be
potential for these to degrade or fail due to effects of higher flows in Mill Creek.
Other unanticipated impacts that could occur include potentially impacting wetlands that exist in
the floodplain of Mill Creek that were not previously mapped as jurisdictional to the west of the
existing tributary.
Option 2: Restoration to Mill Creek at Phelps Drive
The two options reviewed at the crossing of Phelps Drive included restoration using natural
channel design (option 2a) and stabilizing with conventional means as approved in the permit
application (option 2b).
Option 2a: Option 2a includes restoration along Mill Creek where the existing culvert will be
removed using natural channel design methods. The intent would be to lay back the slopes and
remove the existing roadbed/fill to accomplish this. The slopes would be matted and planted
with livestakes. The existing scour hole would be filled in and banks repaired to tie in with the
new opening from removal of the culvert and the existing channel downstream. The goal would
be to install a minimum of two structures to assist in stabilizing the channel grade where the
culvert is removed and scour hole is repaired. There would not be any relocation of the channel
with this option.
Option 2b: Option 2b includes removal of the existing culvert and stabilizing the area with riprap
as detailed and illustrated in the permitted plans.
Page 5 of 7
Issues Discovered with Options 2a
The main issue discovered when analyzing the options of restoration along Mill Creek include
the potential to increase instability along the reach and the existing utility easement along the left
bank of the channel. There is a potential to impact the utility easement by laying back the
channel to a stable slope depending on the final designed slope. In addition, when laying back
the slopes in just a short section of the channel there would be additional stress added to those
banks when the flow necks back down to the existing channel and could create a potential area of
erosion or scour. The channel has a large drainage area and storms or other events could
significantly impact the stability of the reach during the time it takes to stabilize the plantings.
This could lead to future maintenance issues and/or additional sedimentation into Mill Creek in
the interim.
Option 3: Enhancements Along Mill Creek
Option 3 includes enhancing the riparian buffer along Mill Creek. This option includes planting
of native bareroot tree and shrub species. The goal would be to plant a minimum 50-foot buffer
if possible; however, there is an existing utility easement that would not allow that width to the
south or along the left bank of Mill Creek. The minimum width of buffer along Mill Creek
would be 35 feet along the utility easement.
Table 2. Summary of Restoration and/or Enhancement Options 1, 2 and 3 and Proposed Mitigation
Amounts.
Mitigation
Area
Option Existing
Length Potential Credits Restoration Approach
UT to Mill
Creek 1a 420 LF 420
(1:1)
Restoration of entire UT to Mill Creek using
natural channel design.
UT to Mill
Creek 1b 87 LF 22
(4:1 ratio)
Preservation will consist of maintaining the
stream reach and existing stream riparian buffer
as it currently is in the upper section of UT.
UT to Mill
Creek 1b 156 LF 156
(1:1 ratio)
Restoration will consist of removing the
existing 24” RCP and replacing it with a stable
3’ wide base channel and building a 10’ wide
floodplain bench on each side.
UT to Mill
Creek 1b 177 LF 44
(4:1 ratio)
Enhancement will consist removing the
existing trees which are growing in portions of
the channel and planting a native riparian
species typical of a bottomland hardwood
forest. Any invasive tree/shrub species noted
will be cut and treated with herbicide.
Mill Creek 2a 89 LF 89
(1:1 ratio)
Restoration of the channel in the area of an
existing culvert and repair of adjacent scour
hole utilizing natural channel design.
Page 6 of 7
Mill Creek 2b 89 LF 0 Removal of existing culvert and install rip rap
channel per permitted plans.
Mill Creek 3 196 LF 49
(4:1 ratio)
Enhancement will consist of planting a native
riparian buffer with species typical of a
bottomland hardwood forest. Any invasive
tree/shrub species noted will be cut and treated
with herbicide. Full 50 ft wide buffer is not
possible due to existing utility easement.
4.0 PROJECT COST ESTIMATES FOR UT TO MILL CREEK
Three cost estimates are provided below based on the three options that have been reviewed for
the potential mitigation site (Table 3). The first cost estimate provided is based on providing a
full restoration of the UT to Mill Creek by grading a new floodplain, installing a number of grade
control structures and steps to stabilize the channel, and plantings. In the table below this is
Option 1a.
Option 1b below is based on the proposed plan detailed in the previous sections of this document
which incorporate restoration, enhancement, and preservation of UT to Mill Creek. This option
attempts to strike a balance between the costs of full restoration and obtaining mitigation credits.
The Table below illustrates the cost estimate for Option 2.
The final option, Option 1c, is based on removing 141 linear feet of existing 24” pipe and
replacing it with a standard base ditch. This option does not propose mitigation credits for this
work. Instead, it avoids a potential issue with the existing pipe in the future by removing it prior
to access being removed or restricted.
Table 3. Cost Estimates of Potential Options for UT to Mill Creek.
Option Description
Potential
Mitigation
Credits
Estimated Cost of
Construction 1
Option 1a Full Restoration of UT to Mill Creek 420 $180,000
Option 1b
Combination of Restoration,
Enhancement, and Preservation to UT
to Mill Creek
222 $111,000
Option 1c No Restoration – Pipe Removal on UT
to Mill Creek 0 $41,000 2
Option 2a Full Restoration – Mill Creek 89 $110,500
Option 2b No Restoration – Pipe Removal on
Mill Creek 0 Included in the cost of
the D-B contract
Page 7 of 7
Option 3 Enhancement – Mill Creek 49 $7,700
1 Please note: This is a preliminary Rough Oder of Magnitude Price only and final pricing would need to be
submitted following issuance of RFC plans for the selected option.
2 Assumes work would be completed by the D-B contractor rather than an approved mitigation contractor.
Recommendations
Based on the above description of options regarding mitigation at the UT to Mill Creek and
Mill Creek at Phelps Drive, NCDOT has determined the best path forward as Option 1c which
is to remove the pipe on the UT to Mill Creek and stabilize the area and 2b which is removing
the pipe on Mill Creek and proceeding with the permitted plans for stabilizing the channel.
The decision to move in this direction was based on a number of factors such as cost of
construction when weighed against the potential mitigation credits, long term monitoring and
maintenance of the site, and utility encroachments. The overall benefit of doing full restoration
would not provide significant ecological uplift on either reach and could introduce instability
of either reach following construction.
837838839
840841841841
842842 842843
843843844844 84484484484
4
844845
845
845
84
5
845845845845
84
5
845
846846
846
846
846
84
6
846
847847
847847
847847
84784
8
8
4
8
848
848
848848
848848848848848
848849849849 8498
4
9
849849849 849849
8498
4
9
849
849
850
85
0 85085
0
850
850
850
8
5
0
850850
850
85
0
850
850850
850850850850
850
850
8
5
0
85
1
851
851851851 85185
1
851851851851
851
8518
5
2
852
8
5
2852 85285285285
2
8
5
2
852
853
853
853
8
5
3 853853853853
853853
853854
854
854854 854854
854854854
855855855
855
85
5855 8 55 855855856
856 856856856
857
857
857 857858858 858859859859860
860
860
860
860860
860860861
861 861861862
862
86
2
863863
863 8638648648
6
4
86
4
864
865 8658658
6
5
86
5
865865
865 8658658668668
6
6
866866 866866
867 8678
6
7
8
6
7 867867868 868868868
868 868869 8698698
6
9
869869869870
870 870870870870
870 870870
871 871871871
871872872872 872 872873 873873
873
874 874874874875 875875875875875 875876 876876876877
877877
878 878879 879880
8
8
0 880880881881882883883884885885885886887888889890890891892893
856
854
853+00F
F
C
F
F
F
F
F
47" WW FENCE
FENCE
END C/A
+69.47
FENCE
BEGIN C/A
+96.84
175
.00' R
T-L
- +
9
5
.0
3
-Y6C-
2GI
18" RCP-III 24" RCP-III
2GI
2007
2008 2011
2013
2014
2016
2018
FS
W/FG
2GI-A
1
8
" RCP-
I
I
I
W/FG
2GI-A
18" RCP-III 18" RCP-III 872
RCP-III
18"
18
" W
/ EL
BOW
S
24" W/ ELBOWS
TO
ELE
V
. 8
5
7
.5'
C
LA
SS
II R
IP
RA
POOO
2
4" C
MP
1S
B
K
D
S
S
S
S
S
CONC
CONC
CANO
PY
MTL
BST BSTS
SWD D
K
155
156
W/LT157
W/LT
WD RAILW/LT
CANO
PY
MTL
W/LT
WD
R
AIL
INV=855.32
INV=854.72
EXISTIN
G R/W=PROP.LINE60.00'
T
T
6" DIP6" DIP6" DIPR/W=PROP.LINE
EXISTIN
G
1
5
8
W
LT
1SBKD
WALL
BK
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
REVISIONS PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\CADD\Stream Restoration\U2579DEF_STREAM_PSH_20_FULL LENGTH OPTION.dgnUSER:DWAGNERDATE:3/24/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:12:25:30 PMTIME:NCDOT_EC_Stream Restoration_DRW.tblBlythe
U-2579D, E & F
HDR Engineering, Inc. of the Carolinas
N.C.B.E.L.S. License Number: F-0116
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
NC License Number F-0991
Charlotte, NC 28202
900 West Trade St., Suite 715
STV Engineers, Inc.
N
A
D
83/ 95
N
A
D
83/ 95
0
PLANS
GRAPHIC SCALE
5025
72" RCP72" RCP
15" RCP
15" R
C
P
12" R
C
P
12" R
CP
18" R
CP
24" RCP24" RCPOUTLET CHANNEL PROTECTION
SEE DETAIL 20-10
139 SY GEOTEXTILE
EST 82 TONS
CLASS 'I' RIP RAP
SEE DETAIL 20-11
EXCAVATION
FLOODPLAIN
2 x 72" CMP
REMOVE
-L- POC Sta. 277+41.55 =
-Y6C- POC Sta. 18+92.14
-L- POC Sta. 277+41.55 =
D
-Y6C- POC Sta. 18+92.14
-Y6C- PC Sta. 23+86.07
REMOVE 24" RCP
PER CONSTRUCTION PLANS
CHANNEL RESTORATION
PIPE REMOVAL AND
REMOVED
CANOPIES HAVE BEEN
BUILDING AND METAL
BEEN REMOVED
BUILDINGS HAVE
SEE DETAIL 20-12
PROPOSED CHANNEL RESTORATION
PROPOSED ROCK CROSS VANE (TYP.)
DETAIL 20-11
ELEVATION
FLOODPLAIN
NATURAL
EXCAVATE TO
Ground
Existing@ CULVERT INLET
LOOKING DOWNSTREAM
PIPE REMOVAL
FLOODPLAIN EXCAVATION\
( Not to Scale)
5'2:12:1
2.0'
VARIES'BED ELEVATION
NATURAL STREAM
2:1Ground
Existing
RIP RAP
CLASS 'I'
STA. 24+34 -Y6C- LT
( Not to Scale)
PROPOSED CHANNEL RESTORATION
Ground
Natural
Ground
Natural
DETAIL 20-12
2:12:11'
3'
10'10'2:1 2:1
Channel Bottom
Stone Embedded toMatting
Coir Fiber
8378
38839
840841841841
842842842 842842843
843
843
843843843844844 844844844844844845
845845845
845
845
845
84
5
845845845845845845
845
8
4
6 846846
846
846846846
84
6
846
847847847
847847
847 847847
84784
8
8
4
8
848
848
848848848848848848848
848849849849 8498
49
849849849849
8498
4
9
849
850
850 8508
50
850
850
850
8
5
0
850850850 850850
850850850850
8
5
0
8
51
851
851851851851 851851851851851
8518
5
2
852
8
5
2
85285285285285285
2
8
5
2
852852
853
853
853
853
853853853853854
854
85
4854 854854854855 855855
855
855855 855
855856
856 856856856
857
857
857
858858 858859 859859860
860
860
860
860
860860861
861 861861862
862
862
863863
863 8638648648
6
4
864
864
865
865 86586586
5
865865
865 8658668
66
866866
866
867 8678
6
7
8
6
7 867
868 868868868
868 868869 86986
9 869870
870
870 870870870 870870
871 871871872872
872
873 873 873873
873
874 874 874874
875 875875875876 876877
877
878 878879 879880
880 880881882883884885885886886887
888
889
890 891893895856
854
853
+97
GREU (TL-3)+00+48F
F
C
F
F
47" WW FENCE
FENCE
END C/A
+69.47
-Y6C-
2GI
24" RCP-III
2007
2008 2011
2013
2014FS
872
18
" W
/ EL
BOW
S
24" W/ ELBOWS
1S
B
K
D
S
S
S
S
S
CONC
CONC
CANO
PY
MTL
BST BSTSWD D
KGR
155
156
161
W/LT157
W/LT
WD RAILW/LT
CANO
PY
MTL WD
R
AIL
EXISTIN
G R/W=PROP.LINE60.00'
T
T
6" DIP6" DIPR/W=PROP.LINE
EXISTING
15
8
W
LT
1SBKD
WALL
BK
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
REVISIONS PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\CADD\Stream Restoration\U2579DEF_PLANTING_PSH_20.dgnUSER:WYELVERTDATE:3/24/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:1:24:26 PMTIME:NCDOT_EC_Stream Restoration_DRW.tblBlythe
U-2579D, E & FHDR Engineering, Inc. of the Carolinas
N.C.B.E.L.S. License Number: F-0116
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
NC License Number F-0991
Charlotte, NC 28202
900 West Trade St., Suite 715
STV Engineers, Inc.
N
A
D
83/ 95
0
PLANS
GRAPHIC SCALE
5025
72" RCP72" RCP
15" R
CP
15" R
CP
12" R
C
P
12" R
CP
18" R
CP
24" RCP24" RCPOUTLET CHANNEL PROTECTION
SEE DETAIL 20-10
139 SY GEOTEXTILE
EST 82 TONS
CLASS 'I' RIP RAP
SEE DETAIL 20-11
EXCAVATION
FLOODPLAIN
2 x 72" CMP
REMOVE
-L- POC Sta. 277+41.55 =
-Y6C- POC Sta. 18+92.14
-L- POC Sta. 277+41.55 =
D
-Y6C- POC Sta. 18+92.14
-Y6C- PC Sta. 23+86.07
REMOVE 24" RCP
PER CONSTRUCTION PLANS
CHANNEL RESTORATION
PIPE REMOVAL AND
REMOVED
CANOPIES HAVE BEEN
BUILDING AND METAL
BEEN REMOVED
BUILDINGS HAVE
SEE DETAIL 20-12
PROPOSED CHANNEL RESTORATION
PROPOSED ROCK CROSS VANE (TYP.)
LEGEND
ZONE 1
ZONE 2
( Not to Scale)
2:12:1
PROPOSED CHANNEL RESTORATION
2:12:1
PLANTING PLAN
Zone 1
50'
Zone 2
50'
Zone 2
of Mill Creek as Shown
*Provide Zone 2 Plantings in Floodplain
PLANTING SPECIES LIST
ZONE 1 - LIVE STAKES ZONE 2 - BARE ROOT
*Substitutions due to lack of availability may occur with engineer approval.
)Cephalanthus occidentalisButtonbush (
)Sambucus canadensisElderberry (
)Physocarpus opulifoliusNine bark (
)Salix sericeaSilky willow (
)Cornus amonumSilky dogwood (
)Salix nigraBlack willow (
)Celtis laevigataSugarberry (
)Diospyros virginianaPersimmon (
)Betula nigraRiver birch (
)Quercus phellosWillow oak (
)Platanus occidentalisSycamore (
)Prunus serotinaWild cherry (
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\CADD\Stream Restoration\U2579DEF_STREAM_PFL_FULL LENGTH OPTION.dgnUSER:DWAGNERDATE:3/24/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:1:09:34 PMTIME:NCDOT_EC_Stream Restoration_DRW.tblBlythe
U-2579D, E & F
HDR Engineering, Inc. of the Carolinas
N.C.B.E.L.S. License Number: F-0116
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
NC License Number F-0991
Charlotte, NC 28202
900 West Trade St., Suite 715
STV Engineers, Inc.
1+00 2+00 3+00 4+00 5+000+00
890
845
850
855
860
865
870
875
880
885
895
REVISIONS 900
905
910
840
835
830
825
820
815
0+50 1+50 2+50 3+50 4+50
845
850
855
860
865
870
875
880
885
840
835
830
825
820
815
EXISTING GROUND
0.025 FT/FT
TO BE REMOVED
EXISTING 24" RCP
AT 42" RCP OUTLET
PROFILE BEGINNING
MILL CREEK
CHANNEL TIE WITH
PROFILE ENDING AT
(SLOPE VARIES)
PROPOSED GRADE
EL. = 862.52'
CHANNEL RESTORATION
PROPOSED
EL. = 843.51'
CHANNEL RESTORATION
PROPOSED
8378
38839
840841841841
842842 842843
843843844844 844844844844
844845
845
845
845
845845845845
845
845
846846
846
846
846
846
846
847847
847847
847847
847848
8
4
8
848
848
848848
848848848848848
848849849849 8498
4
9
849849849 849849
8498
4
9
849
849
85
0
850 850850
850
850
850
8
5
0
850850
850
850
850
850850
850850850850
850
850
850
8
5
1
851
851851851 851851
851851851851
851
8518
5
2
852
8
5
2852 852852852852
852
852
853
853
853
853
853853853853
853853
853854
854
854854 854854
854854854
855855855
855
855855 8 5 5 855855856
856 856856856
857
857
857 857858858 858859859859860
860
860
860
860860
860860861
861 861861862
862
862
863863
863 863864864864
8
6
4
864
865 8658658
6
5
865
865865
865 8658658668668
6
6
866866 866866
867 8678
6
7
867 867867868 868868868
868 868869 869869869
86
9869869870
870 870870870870
870 870870
871 871871871
871872872872 872 872873 873873
873
874 874874 874875 875875875875875 875876 876876876877
877877
878 878879 879880
8
80 88088088188188288388388488
5 885885886887888889890 890891892893856
854
853+00F
F
C
F
F
F
F
F
47" WW FENCE
FENCE
END C/A
+69.47
FENCE
BEGIN C/A
+96.84
1
7
5
.0
0' RT-L
- +
9
5
.
0
3
-Y6C-
2GI
18" RCP-III 24" RCP-III
2GI
2007
2008 2011
2013
2014
2016
2018
FS
W/FG
2GI-A
1
8
" RCP-III
W/FG
2GI-A
18" RCP-III 18" RCP-III 872
RCP-III
18"
18
" W
/ ELBOW
S
24" W/ ELBOWS
TO
ELEV
. 8
5
7
.5'
C
LA
S
S
II R
IP
RA
P
24" C
MP
1S
B
K
D
S
S
S
SS
CONC
CONC
CANOPY
MTL
BST BSTS
SWD DK
155
156
W/LT157
W/LT
WD RAILW/LT
CANOPY
MTL
W/LT
WD
R
AIL
INV=855.32
INV=854.72
EXISTING R/W=PROP.LINE60.00'
T
T
6" DIP6" DIP6" DIPR/W=PROP.LINE
EXISTING
15
8
W
L
T
1SBKD
WALL
BK
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
REVISIONS PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\CADD\Stream Restoration\U2579DEF_STREAM_PSH_20.dgnUSER:WYELVERTDATE:2/20/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:10:03:17 AMTIME:NCDOT_EC_Stream Restoration_DRW.tblBlythe
U-2579D, E & FHDR Engineering, Inc. of the Carolinas
N.C.B.E.L.S. License Number: F-0116
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
NC License Number F-0991
Charlotte, NC 28202
900 West Trade St., Suite 715
STV Engineers, Inc.
N
A
D 83/ 95
N
A
D 83/ 95
0
PLANS
GRAPHIC SCALE
5025
OUTLET CHANNEL PROTECTION
SEE DETAIL 20-10
139 SY GEOTEXTILE
EST 82 TONS
CLASS 'I' RIP RAP
SEE DETAIL 20-11
EXCAVATION
FLOODPLAIN
2 x 72" CMP
REMOVE
-L- POC Sta. 277+41.55 =
-Y6C- POC Sta. 18+92.14
-L- POC Sta. 277+41.55 =
D
-Y6C- POC Sta. 18+92.14
-Y6C- PC Sta. 23+86.07
AND FLOODPLAIN
RETAIN EXISTING CHANNEL
CONSTRUCTION PLANS
OUTLET PROTECTION PER
RESTORATION
PROPOSED CHANNEL
REMOVE 24" RCP
CHANNEL
RETAIN EXISTING
GRADE CONTROL
ROCK CROSS VANE
PER CONSTRUCTION PLANS
CHANNEL RESTORATION
PIPE REMOVAL AND
GRADE CONTROL
ROCK CROSS VANE
LOCATION
BRAIDING AT THIS
EXISTING CHANNEL
TO GROUND LEVEL
TRIM HARDWOOD VEGETATION IN CHANNEL
REMOVED
CANOPIES HAVE BEEN
BUILDING AND METAL
BEEN REMOVED
BUILDINGS HAVE
72" RCP72" RCP
15" RCP
15" RCP
12" RCP
12" RCP
18" RCP
24" RCP24" RCPDETAIL 20-11
ELEVATION
FLOODPLAIN
NATURAL
EXCAVATE TO
Ground
Existing@ CULVERT INLET
LOOKING DOWNSTREAM
PIPE REMOVAL
FLOODPLAIN EXCAVATION\
( Not to Scale)
5'2:12:1
2.0'
VARIES'BED ELEVATION
NATURAL STREAM
2:1Ground
Existing
RIP RAP
CLASS 'I'
STA. 24+34 -Y6C- LT
Ground
Existing ( Not to Scale)
2:12:1
PROPOSED CHANNEL RESTORATION
2:12:1
Ground
Existing
3'
10'10'
LOOKING DOWNSTREAM
TYPICAL SECTION
1'
MATTING
COIR FIBER
EMBEDDED STONE - TYPE TBD
Channel Bottom
Stone Embedded to
8378
38839
840841841841
842842 842843
843843844844 844844844844
844845
845
845
845
845845845845
845
845
846846
846
846
846
846
846
847847
847847
847847
847848
8
4
8
848
848
848848
848848848848848
848849849849 8498
4
9
849849849 849849
8498
4
9
849
849
85
0
850 850850
850
850
850
8
5
0
850850
850
850
850
850850
850850850850
850
850
850
8
5
1
851
851851851 851851
851851851851
851
8518
5
2
852
8
5
2852 852852852852
852
852
853
853
853
853
853853853853
853853
853854
854
854854 854854
854854854
855855855
855
855855 8 5 5 855855856
856 856856856
857
857
857 857858858 858859859859860
860
860
860
860860
860860861
861 861861862
862
862
863863
863 863864864864
8
6
4
864
865 8658658
6
5
865
865865
865 8658658668668
6
6
866866 866866
867 8678
6
7
867 867867868 868868868
868 868869 869869869
86
9869869870
870 870870870870
870 870870
871 871871871
871872872872 872 872873 873873
873
874 874874 874875 875875875875875 875876 876876876877
877877
878 878879 879880
8
80 88088088188188288388388488
5 885885886887888889890 890891892893856
854
853+00F
F
C
F
F
F
F
F
47" WW FENCE
FENCE
END C/A
+69.47
FENCE
BEGIN C/A
+96.84
1
7
5
.0
0' RT-L
- +
9
5
.
0
3
-Y6C-
2GI
18" RCP-III 24" RCP-III
2GI
2007
2008 2011
2013
2014
2016
2018
FS
W/FG
2GI-A
1
8
" RCP-III
W/FG
2GI-A
18" RCP-III 18" RCP-III 872
RCP-III
18"
18
" W
/ ELBOW
S
24" W/ ELBOWS
TO
ELEV
. 8
5
7
.5'
C
LA
S
S
II R
IP
RA
P
24" C
MP
1S
B
K
D
S
S
S
SS
CONC
CONC
CANOPY
MTL
BST BSTS
SWD DK
155
156
W/LT157
W/LT
WD RAILW/LT
CANOPY
MTL
W/LT
WD
R
AIL
INV=855.32
INV=854.72
EXISTING R/W=PROP.LINE60.00'
T
T
6" DIP6" DIP6" DIPR/W=PROP.LINE
EXISTING
15
8
W
L
T
1SBKD
WALL
BK
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
REVISIONS PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\CADD\Stream Restoration\U2579DEF_PLANTING_PSH_20.dgnUSER:WYELVERTDATE:2/20/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:10:01:13 AMTIME:NCDOT_EC_Stream Restoration_DRW.tblBlythe
U-2579D, E & FHDR Engineering, Inc. of the Carolinas
N.C.B.E.L.S. License Number: F-0116
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
NC License Number F-0991
Charlotte, NC 28202
900 West Trade St., Suite 715
STV Engineers, Inc.
N
A
D 83/ 95
0
PLANS
GRAPHIC SCALE
5025OUTLET CHANNEL PROTECTION
SEE DETAIL 20-10
139 SY GEOTEXTILE
EST 82 TONS
CLASS 'I' RIP RAP
SEE DETAIL 20-11
EXCAVATION
FLOODPLAIN
2 x 72" CMP
REMOVE
-L- POC Sta. 277+41.55 =
-Y6C- POC Sta. 18+92.14
-L- POC Sta. 277+41.55 =
D
-Y6C- POC Sta. 18+92.14
-Y6C- PC Sta. 23+86.07
AND FLOODPLAIN
RETAIN EXISTING CHANNEL
CONSTRUCTION PLANS
OUTLET PROTECTION PER
RESTORATION
PROPOSED CHANNEL
REMOVE 24" RCP
CHANNEL
RETAIN EXISTING
GRADE CONTROL
ROCK CROSS VANE
PER CONSTRUCTION PLANS
CHANNEL RESTORATION
PIPE REMOVAL AND
GRADE CONTROL
ROCK CROSS VANE
LOCATION
BRAIDING AT THIS
EXISTING CHANNEL
TO GROUND LEVEL
TRIM HARDWOOD VEGETATION IN CHANNEL
REMOVED
CANOPIES HAVE BEEN
BUILDING AND METAL
BEEN REMOVED
BUILDINGS HAVE
72" RCP72" RCP
15" RCP
15" RCP
12" RCP
12" RCP
18" RCP
24" RCP24" RCPLEGEND
ZONE 1
ZONE 2
( Not to Scale)
2:12:1
PROPOSED CHANNEL RESTORATION
2:12:1
PLANTING PLAN
Zone 1
50'
Zone 2
50'
Zone 2
of Mill Creek as Shown
*Provide Zone 2 Plantings in Floodplain
PLANTING SPECIES LIST
ZONE 1 - LIVE STAKES ZONE 2 - BARE ROOT
*Substitutions due to lack of availability may occur with engineer approval.
)Cephalanthus occidentalisButtonbush (
)Sambucus canadensisElderberry (
)Physocarpus opulifoliusNine bark (
)Salix sericeaSilky willow (
)Cornus amonumSilky dogwood (
)Salix nigraBlack willow (
)Celtis laevigataSugarberry (
)Diospyros virginianaPersimmon (
)Betula nigraRiver birch (
)Quercus phellosWillow oak (
)Platanus occidentalisSycamore (
)Prunus serotinaWild cherry (
U-2579D, E & F
890
845
850
855
860
865
870
875
880
885
895
900
905
910
840
835
830
825
820
815
845
850
855
860
865
870
875
880
885
840
835
830
825
820
815
Blythe
HDR Engineering, Inc. of the Carolinas
N.C.B.E.L.S. License Number: F-0116
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.PENTABLE:FILE:U2579DEF_STREAM_PFL.dgnUSER:_USERNAME_DATE:2/20/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:10:07:51 AMTIME:NCDOT_PFL_XSC.tblNC License Number F-0991
Charlotte, NC 28202
900 West Trade St., Suite 715
STV Engineers, Inc.
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
1+00 2+00 3+00 4+00 5+000+00REVISIONS
0+50 1+50 2+50 3+50 4+50
EXISTING GROUND
EL. = 860.55'
RESTORATION
BEGIN CHANNEL
EL. = 854.29'
RESTORATION
END CHANNEL
0.025 FT/FT
TO BE REMOVED
EXISTING 24" RCP
0.040 FT/FT
PROPOSED GRADE
AT 42" RCP OUTLET
PROFILE BEGINNING
PROPERTY LINE
CHANNEL TIE WITH
PROFILE ENDING AT
8378
38839
840841841841
842842 842843
843843844844 844844844844
844845
845
845
845
845845845845
8
4
5
845
846846
846
846
846
846
846
847847
847847
847847
847848
8
4
8
848
848
848848
848848848848848
848849849849 8498
4
9
849849849 849849
8498
4
9
849
849
8
5
0
850 850850
850
850
850
8
5
0
850850
850
850
850
850850
850850850850
850
850
850
8
5
1
851
851851851 851851
851851851851
851
8518
5
2
852
8
5
2852 852852852852
852
852
853
853
853
853
853853853853
853853
853854
854
854854 854854
854854854
855855855
855
855855 8 5 5 855855856
856 856856856
857
857
857 857858858 858859859859860
860
860
860
860860
860860861
861 861861862
862
862
863863
863 863864864864
8
6
4
864
865 8658658
6
5
865
865865
865 8658658668668
6
6
866866 866866
867 8678
6
7
867 867867868 868868868
868 868869 869869869
869869869870
870 870870870870
870 870870
871 871871871
871872872872 872 872873 873873
873
874 874874874875 875875875875875 875876 876876876877
877877
878 878879 879880
8
8
0 8808808818818828838838848
8
5 885885886887888889890 890891892893856
854
853+00F
F
C
F
F
F
F
F
47" WW FENCE
FENCE
END C/A
+69.47
FENCE
BEGIN C/A
+96.84
1
7
5
.0
0' R
T-L
- +
9
5
.0
3
-Y6C-
2GI
18" RCP-III 24" RCP-III
2GI
2007
2008 2011
2013
2014
2016
2018
FS
W/FG
2GI-A
1
8
" RCP-III
W/FG
2GI-A
18" RCP-III 18" RCP-III 872
RCP-III
18"
1
8
" W
/ ELBOW
S
24" W/ ELBOWS
TO
E
LEV
. 8
5
7
.5'
C
LA
S
S
II R
IP
RA
POOO
24" C
MP
1S
B
K
D
S
S
S
S
S
CONC
CONC
CANO
PY
MTL
BST BSTS
SWD DK
155
156
W/LT157
W/LT
WD RAILW/LT
CANOPY
MTL
W/LT
WD
R
AIL
INV=855.32
INV=854.72
EXISTING R/W=PROP.LINE60.00'
T
T
6" DIP6" DIP6" DIPR/W=PROP.LINE
EXISTING
1
5
8
W
L
T
1SBKD
WALL
BK
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
REVISIONS PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\CADD\Stream Restoration\U2579DEF_STREAM_PSH_20.dgnUSER:DWAGNERDATE:3/23/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:12:17:07 PMTIME:NCDOT_EC_Stream Restoration_DRW.tblBlythe
U-2579D, E & F
HDR Engineering, Inc. of the Carolinas
N.C.B.E.L.S. License Number: F-0116
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
NC License Number F-0991
Charlotte, NC 28202
900 West Trade St., Suite 715
STV Engineers, Inc.
N
A
D 83/ 95
N
A
D 83/ 95
0
PLANS
GRAPHIC SCALE
5025
OUTLET CHANNEL PROTECTION
SEE DETAIL 20-10
139 SY GEOTEXTILE
EST 82 TONS
CLASS 'I' RIP RAP
SEE DETAIL 20-11
EXCAVATION
FLOODPLAIN
2 x 72" CMP
REMOVE
-L- POC Sta. 277+41.55 =
-Y6C- POC Sta. 18+92.14
-L- POC Sta. 277+41.55 =
D
-Y6C- POC Sta. 18+92.14
-Y6C- PC Sta. 23+86.07
AND FLOODPLAIN
RETAIN EXISTING CHANNEL
CONSTRUCTION PLANS
OUTLET PROTECTION PER
REMOVE 24" RCP
CHANNEL
RETAIN EXISTING
PER CONSTRUCTION PLANS
CHANNEL RESTORATION
PIPE REMOVAL AND
LOCATION
BRAIDING AT THIS
EXISTING CHANNEL
REMOVED
CANOPIES HAVE BEEN
BUILDING AND METAL
BEEN REMOVED
BUILDINGS HAVE
SEE DETAIL 20-12
345 SY GEO-TEXTILE
EST 115 TONS
CLASS 'I' RIPRAP
STANDARD BASE DITCH
72" RCP72" RCP
15" RCP
15" RCP
12" RCP
12" RCP
18" RCP
24" RCP24" RCPDETAIL 20-11
ELEVATION
FLOODPLAIN
NATURAL
EXCAVATE TO
Ground
Existing@ CULVERT INLET
LOOKING DOWNSTREAM
PIPE REMOVAL
FLOODPLAIN EXCAVATION\
( Not to Scale)
5'2:12:1
2.0'
VARIES'BED ELEVATION
NATURAL STREAM
2:1Ground
Existing
RIP RAP
CLASS 'I'
STA. 24+34 -Y6C- LT
D
( Not to Scale)
STANDARD BASE DITCH
B
d
Ground
Natural
Ground
Natural
Geotextile
DETAIL 20-12
3:13:1
B=3Ft.
Max. d=1.5Ft.
Min. D=2Ft.
Rip-Rap (1' min.)
Embedded Class 'I'
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\CADD\Stream Restoration\U2579DEF_STREAM_PFL.dgnUSER:DWAGNERDATE:3/23/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:10:18:46 AMTIME:NCDOT_EC_Stream Restoration_DRW.tblBlythe
U-2579D, E & F
HDR Engineering, Inc. of the Carolinas
N.C.B.E.L.S. License Number: F-0116
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
NC License Number F-0991
Charlotte, NC 28202
900 West Trade St., Suite 715
STV Engineers, Inc.
1+00 2+00 3+00 4+00 5+000+00
890
845
850
855
860
865
870
875
880
885
895
REVISIONS 900
905
910
840
835
830
825
820
815
0+50 1+50 2+50 3+50 4+50
845
850
855
860
865
870
875
880
885
840
835
830
825
820
815
EXISTING GROUND
0.025 FT/FT
TO BE REMOVED
EXISTING 24" RCP
0.039 FT/FT
PROPOSED GRADE
AT 42" RCP OUTLET
PROFILE BEGINNING
EL. = 860.55'
BASE DITCH
STANDARD
EL. = 853.90'
BASE DITCH
STANDARD
MILL CREEK
CHANNEL TIE WITH
PROFILE ENDING AT
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
REVISIONS PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\PERMITS_Environmental\Drawings\U2579DEF_PRM_4C PSH.dgnUSER:CMYERSDATE:11/4/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:1:12:49 PMTIME:NCDOT_permits_NOCON.tblBlythe
U-2579D, E & FHDR Engineering, Inc. of the Carolinas
N.C.B.E.L.S. License Number: F-0116
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
NC License Number F-0991
Charlotte, NC 28202
900 West Trade St., Suite 715
STV Engineers, Inc.
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
NW1620 25SEE SHEET 19MATCHLINE -L- STA 269+00SEE SHEET 21MATCHLINE -L- STA 281+50SEE SHEET 51
-Y6C- STA 14+20
MATCHLINE
SEE
SHEET
51
-Y6A- STA
13+00
MATCHLINE
N
A
D 83/ 95
SEE SHEET 51
-Y6C- STA 24+50
MATCHLINE
24" C
MP
24"
R
C
P
72" RCP72" RCPPOOL36" CONC
15" RCPSO
IL
W 48" CHL48" CHL
36" CONC
GR
GR18" RCP15" RCPCONC15" RCPB
S
T
7
2" W
D
CONC
CONC
15" RCP
15" RCP
12" RCP BST BST
12" RCP
18" RCPWD DK
7
2" WDGRGR
GATE
72"WD
7
2
"WD72"WD
7
2
"WD12
" RCP
CONC
BST
2
4" CONC3
6
" WDBST
48" CHL
48" CHL 60"
C
H
LSR 2513 LYMAN RD BST WD RAILWD
R
AIL
24" R
CP72" WDINV=855.60
INV=855.32
INV=854.72
24" R
CP
INV=855.35
INV=854.61
24" RCPINV=859.15
18
" RCP
INV=880.32
TOP=887.77
BOTTOM OF BOX=882.11
INV=880.41
INV=882.83
INV=844.26'INV=843.77'
INV=843.17'EXISTING R/W=PROP.LINEEXISTING R/W=PROP.LINE6
0.0
0'
E
XIS
TI
NG
R/W=
P
R
OP.
LI
NE
EXISTING R/W=PROP.LINE60.00'-EY5--EY5- T
T
T
T METERELECTRICT
T
T
6" DIP6" DIP6" DIP6" DIPBST
POOL
FES
R/W=PROP.LINE
EXISTING
F
F
F
C
F
C
F
C
C
C
F
F
F C
F
F
F
F
F
F
0404080706050404040404040404-Y6
C-
-Y6C-275+00280+0020+00
10+00270+00SHEET __ OF __
PERMIT DRAWING
U-2579D, E & F
20
GRAPHIC SCALE
0 252512.5 50
47" WW FENCE
47" WW FENCE
47" WW FENCE
CHORD
605
604
606
180
181
182
183
184
185
186
187 188
185
604
604
655
SEE SHEET 20A
865
864
863
862
861
860
859
858
857
856
855
854
853
852
851 850
845849
848 847
846 845
18"
R
C
P-III
BDO
2GI
HW
2GI
2GI
18" RCP-III
2GI
2GI
2GI15" RCP-III 15"7 SY GEOTEXTILE
EST 2 TONS
CLASS 'B' RIP RAP
FS
FS
FS
FS
18" RCP-III GR
ADE
T
O DR
AI
NW/FG
2GI-A
2GI
1
8
" RCP-III
18" RCP-III
W/FG
2GI-A
18" RCP-III 18" RCP-III 42"
R
C
P-I
V
SEE DETAIL 20-8
90 SY GEOTEXTILE
EST 62 TONS
CLASS 'I' RIP RAP
BANK STABILIZATION
5' X 7' RCBC (1' BURIED)
42 SY GEOTEXTILE
EST 25 TONS
CLASS 'I' RIP RAP
872
OUTLET CHANNEL PROTECTION
SEE DETAIL 20-10
139 SY GEOTEXTILE
EST 82 TONS
CLASS 'I' RIP RAP
III
15" RCP-
SEE DETAIL 20-1
BASE DITCH
2' BERM
SEE DETAIL 20-2
205 SY GEOTEXTILE
EST 209 TONS
CLASS 'I' RIPRAP
5' STANDARD BASE DITCH
SEE DETAIL 20-10
86 SY GEOTEXTILE
EST 40 TONS
CLASS 'I' RIP RAP
PROTECTION
OUTLET CHANNEL
W/ ELBOWS
24"
DDE = 106 CY
SEE DETAIL 20-9
152 SY GEO-TEXTILE
EST 69 TONS
CLASS 'B' RIPRAP
LATERAL 'V' DITCH
DDE = 130 CY
SEE DETAIL 20-3
LATERAL 'V' DITCH
FS
2GI
2
4
" RCP-III
RCP-III
18"
24" RCP-III
W/ ELBOWS
24"
15" RCP-IIIW/FG
2GI
18" W
/ ELBOWS
FS
2GI
EST. 5 TONS
CLASS 'B' RIP RAP
14 SY GEO-TEXTILE W/ ELBOWS24
"
W/FG
2GI
15" RCP-III
W/FG
2GI
2
4
" RCP-III
DDE = 572 CY
SEE DETAIL 20-4
210 SY GEO-TEXTILE
EST 118 TONS
CLASS 'I' RIPRAP
6' LATERAL BASE DITCH
SEE DETAIL 20-11
EXCAVATION
FLOODPLAIN
2 x 72" CMP
REMOVE
CONSTRUCTION PLANS
OUTLET PROTECTION PER
REMOVE 24" RCP
CHANNEL
RETAIN EXISTING
PER CONSTRUCTION PLANS
CHANNEL RESTORATION
PIPE REMOVAL AND
LOCATION
BRAIDING AT THIS
EXISTING CHANNEL
REMOVED
CANOPIES HAVE BEEN
BUILDING AND METAL
BEEN REMOVED
BUILDINGS HAVE
SEE DETAIL 20-12
345 SY GEO-TEXTILE
EST 115 TONS
CLASS 'I' RIPRAP
STANDARD BASE DITCH
AND FLOODPLAINCHANNEL
RETAIN EXISTING
FIRST 7 FT OF DITCH
NO RIP RAP IN BED
SITE 18A
ES-S68
SITE 18
ES-S19
SITE 19
SITE 20(ES-S20)
MILL CREEK
(ES-S20)
MILL CREEK
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
LEGEND:
JS
BEGIN
SEE DETAIL 20-11
PIPE REMOVALDETAIL 20-11
BED ELEVATION
NATURAL STREAM
5'
2.0'
RIP RAP
CLASS 'I'
Ground
Existing
Ground
Existing
ELEVATION
FLOODPLAIN
NATURAL
EXCAVATE TO
@ CULVERT INLET
LOOKING DOWNSTREAM
PIPE REMOVAL
FLOODPLAIN EXCAVATION\2:12:1( Not to Scale)
Geotextile
Elevation
Natural Bed
STA. 280+78 -L- RT
STA. 271+50 -L- RT
Ground
Natural
Ground
Natural
(Variable)
Channel Bed
OUTLET CHANNEL PROTECTION
DETAIL 20-10
1.5'
Type of Liner= CL 'I' RIP RAP
( Not to Scale)
DETAIL 20-8
JURISDICTIONAL STREAM
BANK STABILIZATION AT
Type of Liner= CL I Rip-Rap
STA. 279+50 -L- LT
GEOTEXTILE1.5'
ELEVATION
NATURAL BED
Ground
Natural
Ground
Natural
( Not to Scale)
2:1 2:1 2:1
STA. 24+34 -Y6C- LT
VARIES'
2:12:1D
( Not to Scale)
STANDARD BASE DITCH
B
d
FROM -L- STA. 280+78 TO STA. 281+50 RT
DETAIL 20-2
B= 5.0Ft.
Max. d= 3.0Ft.
Min. D= 3.0Ft.
Ground
Natural
Ground
Natural
*When B is < 6.0'
Type of Liner= Class 'I' Rip-Rap
Geotextile
LATERAL 'V' DITCH
( Not to Scale)
D
2:12:1
b
1"/Ft.
FROM -L- STA. 279+50 TO STA. 281+50 LT
FROM -L- STA. 269+00 TO STA. 276+50 LT
b= 5.0Ft.
Min. D= 1.5Ft.
DETAIL 20-3
Ground
Natural
Slope
Fill
( Not to Scale)
LATERAL BASE DITCH
2:
1 D
B
b
d
2:1 1"/Ft.
FROM -L- STA. 279+00 TO STA. 280+80 RT
DETAIL 20-4
b= 5.0Ft.
B= 6.0Ft.
Max. d= 1.5Ft.
Min. D= 1.5Ft.
*When B is < 6.0'
Type of Liner= Class 'I' Rip-Rap
Ground
Natural
Slope
Fill
GEOTEXTILE
D
( Not to Scale)
STANDARD BASE DITCH
B
d
Ground
Natural
Ground
Natural
Geotextile
DETAIL 20-12
3:13:1
B=3Ft.
Max. d=1.5Ft.
Min. D=2Ft.
Rip-Rap (1' min.)
Embedded Class 'I'
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
REVISIONS PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\PERMITS_Environmental\Drawings\U2579DEF_PRM_4C PSH.dgnUSER:CMYERSDATE:11/4/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:1:11:44 PMTIME:NCDOT_permits_CON.tblBlythe
U-2579D, E & FHDR Engineering, Inc. of the Carolinas
N.C.B.E.L.S. License Number: F-0116
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
NC License Number F-0991
Charlotte, NC 28202
900 West Trade St., Suite 715
STV Engineers, Inc.
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
NW1620 25SEE SHEET 19MATCHLINE -L- STA 269+00SEE SHEET 21MATCHLINE -L- STA 281+50SEE SHEET 51
-Y6C- STA 14+20
MATCHLINE
SEE
SHEET
51
-Y6A- STA
13+00
MATCHLINE
N
A
D 83/ 95
SEE SHEET 51
-Y6C- STA 24+50
MATCHLINE837838839840841841
842842842
843
843844 844844844845
845
845
845
845845845845
845
845 846846
846
846
846 847847
847847
847847848
848
8
4
8
848 848
8
4
8
848
848
8488488
48848
848849849849
849
849849849 849849
849849
849
849
850
850
850
850 850850 850850
850
850 850850 850
850
850
850850
850
850850850
851 851851 8518
51
851
851851
851
851
852
852 8
5
2852
852
8
5
2
852
8
5
2852 852852
852
852
85
3853
8
5
3
853
853
853
853 853853853
853
853853854 854854854854
854
854854 8548
5
4
854
854854854
855
855 855855
855 855
855 855
8
55 855855
855
855855 8 5 5 855855855
855856
856
856
856
856
856 856856856856856
857 857857857
857
857
857
857 8578
5
7
857
857
858
858 858858858 858858 858858858858859 859859859 859 859 8598598598598
598598
59
860 860860
860 860860860
860860
86
0860
860
860
860
860
860860860860 860
860860860860
8
6
0
860860860860
861 86186186186
1
861861
861
861 861861861
8
6
1
8618
6
1
861862
862 862862
862862 862
862
862862862862862
862
862
862
862
863
863 863863
863
863
863 863863
863 863863863863863
863
863
863
864 864864864864864
864 864864864
864
8648648648648648
6
4
864
864
864865
865 865865 865865865865865
865
8
6
5
865
865
865
865 8658658658
6
5
865
865865
865 8658658658658658658658658
6
5
8
6
5
8
6
5
865
865
865
866
866866866 866866
866
8 668668
6
6
866866 866866866866866866
8
66
866
867867867867867
8
67867 8678678
6
7
867
86
7867867867867867
867
868
8688688
6
8
868
868868 868868868
868
868 868868868868868
8
6
8
868
869 869869869869
869869
869 869869869
8
6
9869869869869
869
869870
870 8708708708708708
7
0 870
8708708
7
0
870
870
870
870 8708708708
7
0
870
870 870870870870870870870870870 870
870
870871871 871871
871 871871871
871871
871 871871871
871871871871872
872
872
872 8728728728
72
872
8
72872872872 872872872872872873
8
7
3
873
873873873873
87
3
873
873 873 873873
873
873873873873 874
87
4874874874874
874
874
8
74 874 874874
8
74 874874874874874875
875
875
875 875875 875875875875875
87587
5
875875875
875 875875875875875
8
7
5
875 875875875875875875875875
876
876876876876
876
876
876 8768768
7
6
876876876876877
877877877877
877
877
877
877877 8
7
7
877877877877 878
878878878878
8
78
878
878 878878
8
7
8 8788 7 8878
878
879
879879879879
879
879
879 879879879879879879879880
88
08808808808808808
8
0
880
8808
8
0
880880
880
880 880880880
880
880
880 880880880880880880880
880881
8818818818
8
1
881881
881881881
881881881881881
881881882
8828828
8
2
882
8828
8
2 882882882 882 882882882
882
882882882
883
883883883883
883
883
883883883883883 88
3883 883883883884
884884884
884884
884 884884884884884
884 8848848
8
5
8858858858858858
8
5
885
885
885885
885885 885885885885885885885 885
885
885
885885885885885 8
8
6
886886886886
886886 886886886 886
886
886 886886887887887
887
887
887 887887887887
887
887887887
8888888
8
8
888
888
888 888888888888888
888 888888889889889889889
889 8898898898
8
9
8898898898908908908908908
9
0
890
890
890
890
890
890 890890890890890890890
890 890890 8908908918918
9
1
891
891 891891891891 891
891891
892892892892
892 892892892892
892 892893893893
8
9
3
8
9
3
893 893893893893
893 893894894894
894
894
8
9
4 894894894894 894894895 895895895895 895895
895
895
895
895
895895895895895895895
895
895
895
896896896
8
9
6
896896 896896896 896897897
89789789789789
7 897897897897898898898898 898898
898
898898898899899
8
99899 899899900900900
9
0
0
900
900
900900900900900900901901
90
1
901901901902902
902 902902902903903903
903903903903904904904
904 904904905
905
9
0
5
905
905905 905905905905905
905906906
906 906906907907
907 907907907
908
908
908 908908909
909
9
0
9909909910910
9
1
0
910910
910 910910910911
9
1
1
911911911912
9
12
912912913913913913914914914914915915
915
9
1
5
915915915915916916
9
1
6916916917917
9
1
7
9
17918918
918
918919919
919
920920920
920922923
924
925
24" C
MP
24"
R
C
P
72" RCP72" RCPPOOL36" CONC
15" RCPSO
IL
W 48" CHL48" CHL
36" CONC
GR
GR18" RCP15" RCPCONC15" RCPB
S
T
7
2" W
D
CONC
CONC
15" RCP
15" RCP
12" RCP BST BST
12" RCP
18" RCPWD DK
7
2" WDGRGR
GATE
72"WD
7
2
"WD72"WD
7
2
"WD12
" RCP
CONC
BST
2
4" CONC3
6
" WDBST
48" CHL
48" CHL 60"
C
H
LSR 2513 LYMAN RD BST WD RAILWD
R
AIL
24" R
CP72" WDINV=855.60
INV=855.32
INV=854.72
24" R
CP
INV=855.35
INV=854.61
24" RCPINV=859.15
18
" RCP
INV=880.32
TOP=887.77
BOTTOM OF BOX=882.11
INV=880.41
INV=882.83
INV=844.26'INV=843.77'
INV=843.17'EXISTING R/W=PROP.LINEEXISTING R/W=PROP.LINE6
0.0
0'
E
XIS
TI
NG
R/W=
P
R
OP.
LI
NE
EXISTING R/W=PROP.LINE60.00'-EY5--EY5- T
T
T
T METERELECTRICT
T
T
6" DIP6" DIP6" DIP6" DIPBST
POOL
FES
R/W=PROP.LINE
EXISTING
F
F
F
C
F
C
F
C
C
C
F
F
F C
F
F
F
F
F
F
0404080706050404040404040404-Y6
C-
-Y6C-275+00280+0020+00
10+00270+00SHEET __ OF __
PERMIT DRAWING
U-2579D, E & F
20
GRAPHIC SCALE
0 252512.5 50
47" WW FENCE
47" WW FENCE
47" WW FENCE
CHORD
605
604
606
180
181
182
183
184
185
186
187 188
185
604
604
655
SEE SHEET 20A
865
864
863
862
861
860
859
858
857
856
855
854
853
852
851 850
845849
848 847
846 845
18"
R
C
P-III
BDO
2GI
HW
2GI
2GI
18" RCP-III
2GI
2GI
2GI15" RCP-III 15"7 SY GEOTEXTILE
EST 2 TONS
CLASS 'B' RIP RAP
FS
FS
FS
FS
18" RCP-III GR
ADE
T
O DR
AI
NW/FG
2GI-A
2GI
1
8
" RCP-III
18" RCP-III
W/FG
2GI-A
18" RCP-III 18" RCP-III 42"
R
C
P-I
V
SEE DETAIL 20-8
90 SY GEOTEXTILE
EST 62 TONS
CLASS 'I' RIP RAP
BANK STABILIZATION
5' X 7' RCBC (1' BURIED)
42 SY GEOTEXTILE
EST 25 TONS
CLASS 'I' RIP RAP
872
OUTLET CHANNEL PROTECTION
SEE DETAIL 20-10
139 SY GEOTEXTILE
EST 82 TONS
CLASS 'I' RIP RAP
III
15" RCP-
SEE DETAIL 20-1
BASE DITCH
2' BERM
SEE DETAIL 20-2
205 SY GEOTEXTILE
EST 209 TONS
CLASS 'I' RIPRAP
5' STANDARD BASE DITCH
SEE DETAIL 20-10
86 SY GEOTEXTILE
EST 40 TONS
CLASS 'I' RIP RAP
PROTECTION
OUTLET CHANNEL
W/ ELBOWS
24"
DDE = 106 CY
SEE DETAIL 20-9
152 SY GEO-TEXTILE
EST 69 TONS
CLASS 'B' RIPRAP
LATERAL 'V' DITCH
DDE = 130 CY
SEE DETAIL 20-3
LATERAL 'V' DITCH
FS
2GI
2
4
" RCP-III
RCP-III
18"
24" RCP-III
W/ ELBOWS
24"
15" RCP-IIIW/FG
2GI
18" W
/ ELBOWS
FS
2GI
EST. 5 TONS
CLASS 'B' RIP RAP
14 SY GEO-TEXTILE W/ ELBOWS24
"
W/FG
2GI
15" RCP-III
W/FG
2GI
2
4
" RCP-III
DDE = 572 CY
SEE DETAIL 20-4
210 SY GEO-TEXTILE
EST 118 TONS
CLASS 'I' RIPRAP
6' LATERAL BASE DITCH
SEE DETAIL 20-11
EXCAVATION
FLOODPLAIN
2 x 72" CMP
REMOVE
CONSTRUCTION PLANS
OUTLET PROTECTION PER
REMOVE 24" RCP
CHANNEL
RETAIN EXISTING
PER CONSTRUCTION PLANS
CHANNEL RESTORATION
PIPE REMOVAL AND
LOCATION
BRAIDING AT THIS
EXISTING CHANNEL
REMOVED
CANOPIES HAVE BEEN
BUILDING AND METAL
BEEN REMOVED
BUILDINGS HAVE
SEE DETAIL 20-12
345 SY GEO-TEXTILE
EST 115 TONS
CLASS 'I' RIPRAP
STANDARD BASE DITCH
AND FLOODPLAINCHANNEL
RETAIN EXISTING
FIRST 7 FT OF DITCH
NO RIP RAP IN BED
SITE 18A
ES-S68
SITE 18
ES-S19
SITE 19
SITE 20(ES-S20)
MILL CREEK
(ES-S20)
MILL CREEK
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
LEGEND:
JS
BEGIN
SEE DETAIL 20-11
PIPE REMOVALDETAIL 20-11
BED ELEVATION
NATURAL STREAM
5'
2.0'
RIP RAP
CLASS 'I'
Ground
Existing
Ground
Existing
ELEVATION
FLOODPLAIN
NATURAL
EXCAVATE TO
@ CULVERT INLET
LOOKING DOWNSTREAM
PIPE REMOVAL
FLOODPLAIN EXCAVATION\2:12:1( Not to Scale)
Geotextile
Elevation
Natural Bed
STA. 280+78 -L- RT
STA. 271+50 -L- RT
Ground
Natural
Ground
Natural
(Variable)
Channel Bed
OUTLET CHANNEL PROTECTION
DETAIL 20-10
1.5'
Type of Liner= CL 'I' RIP RAP
( Not to Scale)
DETAIL 20-8
JURISDICTIONAL STREAM
BANK STABILIZATION AT
Type of Liner= CL I Rip-Rap
STA. 279+50 -L- LT
GEOTEXTILE1.5'
ELEVATION
NATURAL BED
Ground
Natural
Ground
Natural
( Not to Scale)
2:1 2:1 2:1
STA. 24+34 -Y6C- LT
VARIES'
2:12:1D
( Not to Scale)
STANDARD BASE DITCH
B
d
FROM -L- STA. 280+78 TO STA. 281+50 RT
DETAIL 20-2
B= 5.0Ft.
Max. d= 3.0Ft.
Min. D= 3.0Ft.
Ground
Natural
Ground
Natural
*When B is < 6.0'
Type of Liner= Class 'I' Rip-Rap
Geotextile
LATERAL 'V' DITCH
( Not to Scale)
D
2:12:1
b
1"/Ft.
FROM -L- STA. 279+50 TO STA. 281+50 LT
FROM -L- STA. 269+00 TO STA. 276+50 LT
b= 5.0Ft.
Min. D= 1.5Ft.
DETAIL 20-3
Ground
Natural
Slope
Fill
( Not to Scale)
LATERAL BASE DITCH
2:
1 D
B
b
d
2:1 1"/Ft.
FROM -L- STA. 279+00 TO STA. 280+80 RT
DETAIL 20-4
b= 5.0Ft.
B= 6.0Ft.
Max. d= 1.5Ft.
Min. D= 1.5Ft.
*When B is < 6.0'
Type of Liner= Class 'I' Rip-Rap
Ground
Natural
Slope
Fill
GEOTEXTILE
D
( Not to Scale)
STANDARD BASE DITCH
B
d
Ground
Natural
Ground
Natural
Geotextile
DETAIL 20-12
3:13:1
B=3Ft.
Max. d=1.5Ft.
Min. D=2Ft.
Rip-Rap (1' min.)
Embedded Class 'I'
SHEET __ OF __
PERMIT DRAWING
U-2579D, E & F
24GRAPHIC SCALE
0 252512.5 50
60" WW72" WD60" WW60" WW60" WW
15" RCP 60" WWW60" WW6
0" WW60" WWGRGR12" RCPS OIL
SOILBLKSCONCSR 2215 NORTH
WEST DR GR
72" WD60" WWWD DK36" WDRUI
NSR
U
IN
S RAI
LWW & WD60" WW36" CONCW
D DK6
0
" CH
L
15" RCPINV=962
.01'INV=961.21'EX
IS
T
ING
R
/W
EX
IST
ING
R
/W30.00'EXISTING R/W=PROP
.LINE
WINSTON-SALEM CITY LIMITS
ECM
-EY6-TTTMETER
ELECTRICCONC
GRF
F
F
C
C
C
F
F C
C
C
C
C
F
C
C
F
F
F
F
C
C
C F
020100025010203040506070304050607025025025025325+00330+00335+00898.7
W.E.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
REVISIONS PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\PERMITS_Environmental\Drawings\U2579DEF_PRM_4C PSH.dgnUSER:CMYERSDATE:10/19/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:11:30:43 AMTIME:NCDOT_permits_NOCON.tblBlythe
U-2579D, E & FHDR Engineering, Inc. of the Carolinas
N.C.B.E.L.S. License Number: F-0116
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
NC License Number F-0991
Charlotte, NC 28202
900 West Trade St., Suite 715
STV Engineers, Inc.
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
SEE SHEET 23MATCHLINE -L- STA 323+50SEE SHEET 25MATCHLINE -L- STA 337+50NAD
8
3/
9
5
CHORD
47" WW FENCE
47" WW FENCE
CHORD
47" WW FENCE
189
190
191
190
192
704
704
704
704
191A
P
OOL
FSFS
FS
FS
FS
FS
FS
FS
FS
FS
15" RCP-III 18" RCP-III 18" RCP-III 2
4"
R
C
P-III
2
4"
R
C
P-III
2GI
2GI
BDO
2GI
2GI2GI
2GI
BDO
2GI
2GI-A2GI-A
SEE DETAIL 24-2
196 SY GEOTEXTILE
EST 116 TONS
CLASS 'I' RIPRAP
BERM DITCH
SEE DETAIL 24-3
BERM DITCH w/ELBOWS18"w/ELBOWS15"w/ELBOWS
24"
W/FG
2GI
SEE DETAIL 24-2
266 SY GEOTEXTILE
EST 157 TONS
CLASS 'I' RIPRAP
BERM DITCH
SEE DETAIL 24-5
768 SY GEOTEXTILE
EST 454 TONS
CLASS 'I' RIPRAP
2' BERM DITCH
FS
SEE DETAIL 24-6
101 SY GEOTEXTILE
EST 59 TONS
CLASS 'II' RIP RAP
PROTECTION
OUTLET CHANNEL 18" RCP-III
15" RCP-III
15"
2GI-A 18" RCP-III 18" RCP-III 15"
2GI
NOT BURIED
6' X 6' RCBC
2GI-A
15 SY GEOTEXTILE
EST 7 TONS
CL 'I' RIP RAP
24" W/ ELBOWS24" RCP-III ELBOWS24" W/DDE = 393 CY
SEE DETAIL 24-1
270 SY GEOTEXTILE
EST 159 TONS
CLASS 'I' RIPRAP
2' LATERAL BASE DITCH
W/FG
2GI
W/FG
2GI
BDO
15" RCP-III
W/ ELBO
WS15"15"JBw/MH
W/FG
2GI
w/ELBOWS15"DDE = 206 CY
SEE DETAIL 24-1
101 SY GEOTEXTILE
EST 60 TONS
CLASS 'I' RIPRAP
2' LATERAL BASE DITCH
SEE DETAIL 24-10
2' BERM DITCH
SEE DETAIL 24-12
100 SY GEOTEXTILE
EST 58 TONS
CLASS 'B' RIPRAP
2' BERM DITCH
SEE DETAIL 24-11
107 SY GEOTEXTILE
EST 64 TONS
CLASS 'B' RIPRAP
BERM DITCH
SEE DETAIL 24-9
SEE PROFILE FOR DETAILS
SPECIAL BERM DITCH
SEE DETAIL 24-10
SEE PROFILE FOR DETAILS
SPECIAL 2' BERM DITCH
SEE DETAIL 24-9
BERM DITCH
ES-S24
ES-S50
ES-S49
ES-W23
SITE 26
ES-S23
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SITE 25
JS
BEGIN
LEGEND:
( Not to Scale)
LATERAL BASE DITCH
2:1D
B
b
d
2:1 1"/Ft.
FROM -L- STA. 335+73 TO STA. 337+50 LT
DETAIL 24-1
b= 5.0Ft.
B= 2.0Ft.
Max. d= 2.0Ft.
Min. D= 2.0Ft.
*When B is < 6.0'
Type of Liner= Class 'I' Rip-Rap
Ground
Natural
Slope
Fill
GEOTEXTILE
2:12:1( Not to Scale)
Geotextile
Elevation
Natural Bed
STA. 335+81 -L- LT
Ground
Natural
Ground
Natural
(Variable)
Channel Bed
OUTLET CHANNEL PROTECTION
DETAIL 24-6
1.5'
Type of Liner= CL 'II' RIP RAP
SHEET __ OF __
PERMIT DRAWING
U-2579D, E & F
24GRAPHIC SCALE
0 252512.5 50
8938938938948958958
9
5
895
8
9
5895
8968968
96
897897897897897898898898898898898898899899 899899899 899899899899899900900900900900900900900900900
900
900
900900900900900900900901901901901901901
901901
901902902902902902902902902
902902903903903903 9
0
3
903
903903
903
9039039049049049049049
0
4
904
904
904
904905905905905905905905905905905905
905
9
0
590590
5
905
905905
905906906906906906906906906
906
906
906
9
0
7907 907907907907907907907
9
0
7907907
907
907
908908908908908908908908908908908
908
908908909 909909909909909909909
909
909
909
909909
910 910910910910910910910910910910910910910
9109109109
1
0910910910910
910
910
910
910
9119119119119119119119119119
11911911911911911
9129129129129129129129129129
1
2912912912912
912
912
9
1
3913 9139139139139139139139139139
1
3913
9139139
13
913913914 9149149149149149149149
14
9
1
4914914914
914
914
915915915915 915915915915915915915915915915915915915915915915
91591
5
915915915915915
915915915915
9
15
9
1
6916916 9169169169169169169169169
16916916916
9
1
6
916917917917 9179179179179179179179179
17
917917917917917
917918918918 9189189189
1
8 918918918918
9
1
8918918
918
919919919 9199199199199
19 919919919919
919919919
919919
920920920
920920920 9209209209209209209209209209
20920920920920920920920
920920920920920
9
2
0
9 20920
920921921
921 92192192192192192192192192
1
921921921921
9 21
922922
922 922922922922922922922922922922
9
2
2
922
922
9
2
2
922923923
9
2
3 923923923923923923923923923923923923923923
9239249
2
4
9
2
4 924924924924924924924924924924
924
924
9 2 4
9259259259
2
5
925
9
2
5925 925925925925925925925925925925925925925925925925925925
9
2
5
9
2
5925925
9
25
9
2
5
925926926926926 926926926926926926926926926
9
2
6
9
2
6
926
927927927927927 927927927927927927927927927927
927
927
928928928928 9289289289289289289289289289
2
8
9
2
8
928
928
9
2
9
929
929
929929929929929929929929929929929
9
2
9929 9
3
0
9
3
0
9
3
0
930
930930930930930930930930930930930930930930930930930930930930
9
3
0
930930
9309309309
3
1
93
1931
931931931931931931931931931931
931
9319319
3
2
9
3
2
932
9329329329329329329329329329329
3
2
9329329
3
3
933
9339339339339339339339339339
3
3
933
933933934934934934934934934934934934934
934
9349349
3
5
935
935
935935935935935935935935935935935935935935935935935935935935935
9
3
5
935
935935935935936
936936936936936936936936936936936
936
936936937
937937937937937937937937937937937937
937937937938
93893893893893893893893893893893
8938
938938938939
939939939939939939939939939939939939939939940
9409409409409409409409409409409409409409409409409409409409409
4
0
940940
940940940940941
941941941941941941941941941941941
941
941941941942
9429429429429429429429429429429
4
2
942942942942
943
943943943943943943943943943943943943943944944944944944944944944944944944
944944944945945945945945945945945945945945945945945945945945945945
9
4
5
9
4
5
945
945945945945945945
94
5 9469469469469469469469469469
4
6
946
946946946946 9479479479479479479479479479
4
7
947
9479479479479489489489489489489489489489
4
8
948
9
48
948948948948949949949949949949949949949949949
9499499499
4
9
949
9
4
9
9509509509509509509509509509509509509509509509509509509
5
0
9509
5
0
950
950950950950950950950950950
950 951951951951951951951951951951951
951951951951
951 95195295295295295295295295295295295295295295295
2952 95295395395395395395395395395395
3953
953953953953953 9539549549549549549549549549
549
5
4
954
954954954
954 9559559559559559559559559559559559559559559559559559
5
5
955
955
955955955955955955955
9559
5
5
955 956956956956956956956956956956
956956956956956
956
956 9569579579579579579579579579579
5
7
957957957957
957
957
957957957957 9589589589589589589589589589
5
8
9
5
8
9589589589589589589
5
8 9599599599599599599599599599
5
9
959959959959
9
5
9
959959959959
959
959959960960960960960960960960960960960960960960960960960960
960
9
6
0
9609609609609609
60
960960 960960960960 9619619619619619619619619619
6
1
961961961
961
961961 9619619629629629629629629629629
6
2
962962962
962962962962
9639639639639639639639639639639639
6
3
9639639649649649649649649649649649649649649659659659659659659659659659659659659659
6
5
9659659659
6
5
9659659
6
5 96696696696696696696696696
6
966966
967967967967967967967967967967 968968968968968968968968968
969969969969969969969969 970970970970970970970970
970970970970970970970970
970971971971971971971971
971 971972972972972972972972972
9739739739739739739739749749749749749749
7
4974 974
975975975975975975975975975975975
975
975
975
9769769769769769769
7
6976976 977977977
977977
977
978978978978978
9789789799799
79
979979980980980980980980980981981982982983983 98398460" WW72" WD60" WW60" WW60" WW
15" RCP 60" WWW60" WW6
0" WW60" WWGRGR12" RCPS OIL
SOILBLKSCONCSR 2215 NORTH
WEST DR GR
72" WD60" WWWD DK36" WDRUI
NSR
U
IN
S RAI
LWW & WD60" WW36" CONCW
D DK6
0
" CH
L
15" RCPINV=962
.01'INV=961.21'EX
IS
T
ING
R
/W
EX
IST
ING
R
/W30.00'EXISTING R/W=PROP
.LINE
WINSTON-SALEM CITY LIMITS
ECM
-EY6-TTTMETER
ELECTRICCONC
GRF
F
F
C
C
C
F
F C
C
C
C
C
F
C
C
F
F
F
F
C
C
C F
020100025010203040506070304050607025025025025325+00330+00335+00898.7
W.E.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
REVISIONS PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\PERMITS_Environmental\Drawings\U2579DEF_PRM_4C PSH.dgnUSER:CMYERSDATE:10/19/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:11:25:38 AMTIME:NCDOT_permits_CON.tblBlythe
U-2579D, E & FHDR Engineering, Inc. of the Carolinas
N.C.B.E.L.S. License Number: F-0116
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
NC License Number F-0991
Charlotte, NC 28202
900 West Trade St., Suite 715
STV Engineers, Inc.
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
SEE SHEET 23MATCHLINE -L- STA 323+50SEE SHEET 25MATCHLINE -L- STA 337+50NAD
8
3/
9
5
CHORD
47" WW FENCE
47" WW FENCE
CHORD
47" WW FENCE
189
190
191
190
192
704
704
704
704
191A
P
OOL
FSFS
FS
FS
FS
FS
FS
FS
FS
FS
15" RCP-III 18" RCP-III 18" RCP-III 2
4"
R
C
P-III
2
4"
R
C
P-III
2GI
2GI
BDO
2GI
2GI2GI
2GI
BDO
2GI
2GI-A2GI-A
SEE DETAIL 24-2
196 SY GEOTEXTILE
EST 116 TONS
CLASS 'I' RIPRAP
BERM DITCH
SEE DETAIL 24-3
BERM DITCH w/ELBOWS18"w/ELBOWS15"w/ELBOWS
24"
W/FG
2GI
SEE DETAIL 24-2
266 SY GEOTEXTILE
EST 157 TONS
CLASS 'I' RIPRAP
BERM DITCH
SEE DETAIL 24-5
768 SY GEOTEXTILE
EST 454 TONS
CLASS 'I' RIPRAP
2' BERM DITCH
FS
SEE DETAIL 24-6
101 SY GEOTEXTILE
EST 59 TONS
CLASS 'II' RIP RAP
PROTECTION
OUTLET CHANNEL 18" RCP-III
15" RCP-III
15"
2GI-A 18" RCP-III 18" RCP-III 15"
2GI
NOT BURIED
6' X 6' RCBC
2GI-A
15 SY GEOTEXTILE
EST 7 TONS
CL 'I' RIP RAP
24" W/ ELBOWS24" RCP-III ELBOWS24" W/DDE = 393 CY
SEE DETAIL 24-1
270 SY GEOTEXTILE
EST 159 TONS
CLASS 'I' RIPRAP
2' LATERAL BASE DITCH
W/FG
2GI
W/FG
2GI
BDO
15" RCP-III
W/ ELBO
WS15"15"JBw/MH
W/FG
2GI
w/ELBOWS15"DDE = 206 CY
SEE DETAIL 24-1
101 SY GEOTEXTILE
EST 60 TONS
CLASS 'I' RIPRAP
2' LATERAL BASE DITCH
SEE DETAIL 24-10
2' BERM DITCH
SEE DETAIL 24-12
100 SY GEOTEXTILE
EST 58 TONS
CLASS 'B' RIPRAP
2' BERM DITCH
SEE DETAIL 24-11
107 SY GEOTEXTILE
EST 64 TONS
CLASS 'B' RIPRAP
BERM DITCH
SEE DETAIL 24-9
SEE PROFILE FOR DETAILS
SPECIAL BERM DITCH
SEE DETAIL 24-10
SEE PROFILE FOR DETAILS
SPECIAL 2' BERM DITCH
SEE DETAIL 24-9
BERM DITCH
ES-S24
ES-S50
ES-S49
ES-W23
SITE 26
ES-S23
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SITE 25
JS
BEGIN
LEGEND:
( Not to Scale)
LATERAL BASE DITCH
2:1D
B
b
d
2:1 1"/Ft.
FROM -L- STA. 335+73 TO STA. 337+50 LT
DETAIL 24-1
b= 5.0Ft.
B= 2.0Ft.
Max. d= 2.0Ft.
Min. D= 2.0Ft.
*When B is < 6.0'
Type of Liner= Class 'I' Rip-Rap
Ground
Natural
Slope
Fill
GEOTEXTILE
2:12:1( Not to Scale)
Geotextile
Elevation
Natural Bed
STA. 335+81 -L- LT
Ground
Natural
Ground
Natural
(Variable)
Channel Bed
OUTLET CHANNEL PROTECTION
DETAIL 24-6
1.5'
Type of Liner= CL 'II' RIP RAP
SHEET __ OF __
PERMIT DRAWING
U-2579D, E & F 25
GRAPHIC SCALE
0 252512.5 50
BST W72" CONC
12" RCP
GRGR12" RCP12" RCPCONC
DKWD
12" RCP
12" R
CP
CONC
GR
CONC
CONC
GR
GR
GR 12" RCP12"
R
C
P
12" R
CP
D
KWD
CONC
SR 2519 DRY BROOK RD 20' BST
C
O
N
C36"36" C
O
NC
CONC36"48" CHL
12' C
O
N
C
48" CHL
48" CHL48" CHL 48" C
HL
48" CHL
36" CONC
C
HL
48"
CHL
48"
DKWD
WD
D
K
36" C
O
N
C
60" CHL48" CHL60" CHL
36" CONC
P
A
VERS WD R
AIL
48"
C
H
L48" CHL48" CHL
36" C
O
NC
WD DK
WD R
AIL
12" R
CP
12' CONC
48" C
O
N
C
60" CHL
60" CHL
60" CHL36" CONC12" RCP
15
" RCPINV=934.84
UNKNOWN
OTHER END SIGHT EASEMENTSIGHT EASEMENTWINSTON-SALEM CITY LIMITS
TT
TT
TT
8" DIP
8" DIP
UNKNOWN SIZE & TYPE
E
XISTIN
G R/W60.00'
E
XISTIN
G R/WC
C
F
F
F
F
F
F
F F
F
F
F
F
C
C
F
F
F
C
F
C
C
C
C
C
C
C
C
C
F
002036
03
0202
01
0250250202
025025
02020707 070703
02
01
00
01340+00345+0015+00
350+0020+00345+00HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.REVISIONS PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\PERMITS_Environmental\Drawings\U2579DEF_PRM_4C PSH.dgnUSER:CMYERSDATE:10/19/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:11:27:40 AMTIME:NCDOT_permits_NOCON.tblBlythe
HDR Engineering, Inc. of the Carolinas
N.C.B.E.L.S. License Number: F-0116
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
NC License Number F-0991
Charlotte, NC 28202
900 West Trade St., Suite 715
STV Engineers, Inc.
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
NW18
NW19-1B20+00
10+00
15+00
10+00
2
0
+0
0-L- STA 337+50 SEE 24MATCHLINESEE SHEET 26MATCHLINE -L- STA 351+50SEE SHEET 52
-Y7- STA 23+00
MATCHLINE
NAD 83/ 95
47" WW
FENCE
47" WW FENCE
FENCE47" WW
192
193
612
198
199
661
677
610
602
611
673
190
232
610
193
608
608
175.00' RT
-L- +17.06
214.35' RT
-L- +71.59
190A
FS
15"
2GI
15" w/ELBO
WS
FS
FS
FS
FS
FS
FS
FS
FS
18" RCP-III 18" RCP-III 18" RCP-III
BDO
2GI
2GI
2GI
2GI
2GI
2GI
2GI
SEE DETAIL 25-1
BERM DITCH
SEE DETAIL 25-1
BERM DITCH
w/ELBOWS15"
SEE DETAIL 25-8
47 SY GEOTEXTILE
EST 28 TONS
CLASS 'I' RIP RAP
BANK STABILIZATION
NOT BURIED
6' X 6' RCBC
W/ FG
2GI
W/ FG
2GI
15"
R
C
P-III
RCP-III 15"
RC
P
-III 15"
15" RCP-III
SEE DETAIL 25-7
TOE PROTECTION
DDE = 3002 CY
SEE DETAIL 25-3
305 SY GEOTEXTILE
EST 180 TONS
CLASS 'I' RIPRAP
2' LATERAL BASE DITCH
DDE = 92 CY
SEE DETAIL 25-2
LATERAL 'V' DITCH
DDE = 9 CY
SEE DETAIL 25-2
LATERAL 'V' DITCH
DDE = 47 CY
SEE DETAIL 25-2
LATERAL 'V' DITCH
RCP-III 15"
2GI
2GI
OTCB
w/ELBOWS15"2GI-A
24"18" RCP-III 2
4"
24"
GRADE TO DRAIN
GRADE TO DRAIN
DDE = 304 CY
SEE DETAIL 25-3
117 SY GEOTEXTILE
EST 69 TONS
CLASS 'I' RIPRAP
2' LATERAL BASE DITCH
SEE DETAIL 25-9
BERM DITCH
18" RCP-III
18"
SEE DETAIL 25-10
2' BERM DITCH
SITE 26
ES-S24
ES-S51
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
LEGEND:
JS
BEGIN JS
BEGIN
( Not to Scale)
DETAIL 25-8
JURISDICTIONAL STREAM
BANK STABILIZATION AT
Type of Liner= CL I Rip-Rap
STA. 338+75 -L- RT
GEOTEXTILE1.5'
ELEVATION
NATURAL BED
Ground
Natural
Ground
Natural
( Not to Scale)
TOE PROTECTION
d
FLATTER2:1 OR
FROM -L- STA. 338+53 TO STA. 340+50 RT
FROM -L- STA. 337+50 TO STA. 338+52 RT
DETAIL 25-7
Type of Liner= Class 'I' Rip-Rap
d= 1.0Ft.
GROUND
NATURAL SLOPE
FILL
GEOTEXTILE
SHEET __ OF __
PERMIT DRAWING
U-2579D, E & F 25
GRAPHIC SCALE
0 252512.5 50
9
1
4915
9159
15
915
9169169179
17
9189189189199199
19
920
9209209209209209209209219219219219
2
1
9219229229229229229239239
2
3
9
2
3923
9249249
2
49249
2
4
9
2
4925925925925
9259259259259259
2
5
925
9
2
5926
9269269269
2
6
926
927927927927927
9289289 2 8
9
2
8928928929929929929929929930930930930930930930
930930930930931
931931931931931932
932
932932932932933
933
933933933933934
9
34
934934934934935
9
3
5
935935
935935935935935935935936 936936936936936937
937937937937937938
938938938938938938
939
9399399
3
9
939939939
939
940
940 940940940
940940940940940940940940941
9419
4
1
941941941941942
942942
942942942942942943 9439
4
3
943943943943943943944
944 944944944944944944944945945945945945
945
945
945
945945945945945945945945946946946
946
946946
946946946947947947
947
947947
947947948948948
948
948948948948948948949949949
949
949949
949949949950950950950 950
950950
950950950950
950950950
95095
0 950950950951951951
951
951951951951951951952952952
952
9529529529
5
2
9
5
2 952953953953
953
953953953953
953953953954954954
954
954954954954
954954954955955955955955955
955
955
955955
955955955955
9559559559559559
5
5 955955955955956956956956
956
956956956956
9569
5
6 956956957957957957
957
957957957957
957957 957957958958958
958
958958958958
958958
958958958958959959959
95
9959959959959959
959 9599599609609609609
6
0
960
960
960
9609609609
6
0
960960
960
960
960
960 9609609609609609609619
6
1
961
9
6
1
961961961
961
961 961961961962
962
962
962962962
962
962 962962963963
9
6
3
963963963963963 96396396396
3
9
6
4
964
964
9649
64
964
964
964 9649649649659659659
65
965
965
965
965965965965965965
965
965
965 965965965965965965966
966
9
6
6
966966966
966
966 966966966967
967
967
967967967967
967 9679679679
68968
968
968968968968
968
968 968968968968968969969969
969969969969
969
969 9699699699699699709
7
0
970970970
9
7
0
970
9709709709709709
7
0
970
970
970
9
7
0
970970970 9709709709709709
7
0
971
971
971
971971971971
971
9719719719719719
7
1972972 972972
9729729
72
972
972972972972972973973973973973
973
973
9739739
7
3
973
973
973
973
974974974974974974
974974974974974
974
974 9759759759759759759759759759
7
5
975
975
975975
975
975975975975975
975975
975
975975
97597697697697697697697
6
976
976976976976
976976976
977977977977977977
9
7
7
9
7
7
977
977977977977
9779
7
7
977
978978978978978978
9
7
8
978
9789789789789
7
8
9
7
8
978
978978
979979979979979979
979979979979
9799
7
9
9799799
7
9
979
979
979 980980980980980980980980
98
0980980980
9
8
0
980
9809809809809
8
0
980980
98
098
0980980980980980980
9
80981981981981981
9819819819819
8
1
981981981981 982982982982
982982982982982
982982982982982982 983983983983983
983983983983
983
983983 984984984984984984984984
984984 985985985985985985
9859859859859859
85
985985
985
985
985 985986986986986986986986986
986986987987987987987987
987987987988988988988988988988988989989989989989989989
9
8
9989 990990990990990990990
9909909909
9
0
990
9
90
990990 991991991991991991
991 992992992
992992992
992
993993993
993993
993 9939949
94994994 994994
995995995995995995995
995
995
996996
996997997997 99899899899999910001
0
0
0 1001BST W72" CONC
12" RCP
GRGR12" RCP12" RCPCONC
DKWD
12" RCP
12" R
CP
CONC
GR
CONC
CONC
GR
GR
GR 12" RCP12"
R
C
P
12" R
CP
D
KWD
CONC
SR 2519 DRY BROOK RD 20' BST
C
O
N
C36"36" C
O
NC
CONC36"48" CHL
12' C
O
N
C
48" CHL
48" CHL48" CHL 48" C
HL
48" CHL
36" CONC
C
HL
48"
CHL
48"
DKWD
WD
D
K
36" C
O
N
C
60" CHL48" CHL60" CHL
36" CONC
P
A
VERS WD R
AIL
48"
C
H
L48" CHL48" CHL
36" C
O
NC
WD DK
WD R
AIL
12" R
CP
12' CONC
48" C
O
N
C
60" CHL
60" CHL
60" CHL36" CONC12" RCP
15
" RCPINV=934.84
UNKNOWN
OTHER END SIGHT EASEMENTSIGHT EASEMENTWINSTON-SALEM CITY LIMITS
TT
TT
TT
8" DIP
8" DIP
UNKNOWN SIZE & TYPE
E
XISTIN
G R/W60.00'
E
XISTIN
G R/WC
C
F
F
F
F
F
F
F F
F
F
F
F
C
C
F
F
F
C
F
C
C
C
C
C
C
C
C
C
F
002036
03
0202
01
0250250202
025025
02020707 070703
02
01
00
01340+00345+0015+00
350+0020+00345+00HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.REVISIONS PENTABLE:FILE:Flatiron_Construction_Corp.\Flatiron-U-2579_D_E_F_WS\6.0_CAD_BIM\6.2_WIP\U-2579DEF\Hydraulics\PERMITS_Environmental\Drawings\U2579DEF_PRM_4C PSH.dgnUSER:CMYERSDATE:10/19/2020NCDOT_pdf_color_eng_100.pltPLOT DRIVER:11:26:29 AMTIME:NCDOT_permits_CON.tblBlythe
HDR Engineering, Inc. of the Carolinas
N.C.B.E.L.S. License Number: F-0116
555 Fayetteville St, Suite 900 Raleigh, N.C. 27601
NC License Number F-0991
Charlotte, NC 28202
900 West Trade St., Suite 715
STV Engineers, Inc.
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
NW18
NW19-1B20+00
10+00
15+00
10+00
2
0
+0
0-L- STA 337+50 SEE 24MATCHLINESEE SHEET 26MATCHLINE -L- STA 351+50SEE SHEET 52
-Y7- STA 23+00
MATCHLINE
NAD 83/ 95
47" WW
FENCE
47" WW FENCE
FENCE47" WW
192
193
612
198
199
661
677
610
602
611
673
190
232
610
193
608
608
175.00' RT
-L- +17.06
214.35' RT
-L- +71.59
190A
FS
15"
2GI
15" w/ELBO
WS
FS
FS
FS
FS
FS
FS
FS
FS
18" RCP-III 18" RCP-III 18" RCP-III
BDO
2GI
2GI
2GI
2GI
2GI
2GI
2GI
SEE DETAIL 25-1
BERM DITCH
SEE DETAIL 25-1
BERM DITCH
w/ELBOWS15"
SEE DETAIL 25-8
47 SY GEOTEXTILE
EST 28 TONS
CLASS 'I' RIP RAP
BANK STABILIZATION
NOT BURIED
6' X 6' RCBC
W/ FG
2GI
W/ FG
2GI
15"
R
C
P-III
RCP-III 15"
RC
P
-III 15"
15" RCP-III
SEE DETAIL 25-7
TOE PROTECTION
DDE = 3002 CY
SEE DETAIL 25-3
305 SY GEOTEXTILE
EST 180 TONS
CLASS 'I' RIPRAP
2' LATERAL BASE DITCH
DDE = 92 CY
SEE DETAIL 25-2
LATERAL 'V' DITCH
DDE = 9 CY
SEE DETAIL 25-2
LATERAL 'V' DITCH
DDE = 47 CY
SEE DETAIL 25-2
LATERAL 'V' DITCH
RCP-III 15"
2GI
2GI
OTCB
w/ELBOWS15"2GI-A
24"18" RCP-III 2
4"
24"
GRADE TO DRAIN
GRADE TO DRAIN
DDE = 304 CY
SEE DETAIL 25-3
117 SY GEOTEXTILE
EST 69 TONS
CLASS 'I' RIPRAP
2' LATERAL BASE DITCH
SEE DETAIL 25-9
BERM DITCH
18" RCP-III
18"
SEE DETAIL 25-10
2' BERM DITCH
SITE 26
ES-S24
ES-S51
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
LEGEND:
JS
BEGIN JS
BEGIN
( Not to Scale)
DETAIL 25-8
JURISDICTIONAL STREAM
BANK STABILIZATION AT
Type of Liner= CL I Rip-Rap
STA. 338+75 -L- RT
GEOTEXTILE1.5'
ELEVATION
NATURAL BED
Ground
Natural
Ground
Natural
( Not to Scale)
TOE PROTECTION
d
FLATTER2:1 OR
FROM -L- STA. 338+53 TO STA. 340+50 RT
FROM -L- STA. 337+50 TO STA. 338+52 RT
DETAIL 25-7
Type of Liner= Class 'I' Rip-Rap
d= 1.0Ft.
GROUND
NATURAL SLOPE
FILL
GEOTEXTILE
HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)11 173+80 -L- 48" RCP 0.04 615 11A** 174+23 -L- RT 48" RCP 0.08 12 203+75 - 207+10 -L- RT ROADWAY FILL 0.02 < 0.01410 10 12A 205+69 -L- RT FILL IN WETLAND 0.08 13 207+24 -L- 5x6 CULVERT 0.03 < 0.01 337 22 13A 209+14 -L- LT 4' BASE DITCH < 0.01 14 222+50 - 223+56 -L- RT 48" RCP 0.01 < 0.01 220 11 14A 222+65 -L- LT POND 3.06 15 242+86/244+20 -L- 5'x6' RCBC 0.05 < 0.01 520 15 15A 243+60/244+00 -L- 5'x6' RCBC 0.04 16 253+92/255+58 -L- 42" RCP AND DITCH 0.05 < 0.01513 20 17 261+02/262+96 -L- 6'x6' RCBC 0.08 < 0.01 928 23 18 275+75/276+78 -L- 42" RCP 0.03 < 0.01 161 11 18A 277+00 RT -L- PIPE REMOVAL AND DITCH < 0.01 < 0.01 24 20 18A277+00 RT -L-BANK STABILIZATION < 0.01 7 19 279+30/280+86 -L- 5'x7' RCBC 0.04 < 0.01 250 11 19 280+86/281+71 -L- 5' STANDARD BASE DITCH < 0.01 < 0.01 91 15 20 280+61/281+66 -L- REMOVE 2 - 72" CMP 0.02 < 0.01 35 31 20A 285+56/285+81 -L- BANK STABILIZATION < 0.01 < 0.01 16 21 20B 285+56/285+81 -L- BANK STABILIZATION < 0.01 < 0.01 20 21 20C 284+44/285+33 -L- TEMPORARY WORK PAD 0.06 165 21 285+19/285+65 -L- CHANNEL CHANGE < 0.01 133 21 285+19 -L- BANK STABILIZATION < 0.01 < 0.01 10 10 22 303+57/304+09 -L- 30" RCP/ 36" RCP < 0.01 < 0.01 97 7 TOTALS SHEET 2*:0.20 < 0.01 3.47 0.09 4387 413 0*Rounded totals are sum of actual impactsNOTES:Revised 2013 10 24SHEET OF -**Wetland ES-W33 is total take-Site 24 is a Channel Relocation WETLAND PERMIT IMPACT SUMMARYWETLAND IMPACTSSURFACE WATER IMPACTSFORSYTHU-2579D, E & F34839.3.GV7NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS11/03/2020
HandExisting Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)23 316+25/317+41 -L- 6'x6' RCBC 0.04 363 23 317+40/317+49 -L- BANK STABILIZATION < 0.01 < 0.01 28 10 24 316+84/317+01 -L- CHANNEL CHANGE < 0.01 < 0.01 120 10 25 323+23/325+22 -L- 24" RCP 0.02 < 0.01 294 10 26 335+66/338+74 -L- 6'x6' RCBC 0.05 < 0.01 523 10 26 338+82 -L- BANK STABILIZATION < 0.01 < 0.01 29 8 27 356+07/357+64 -L- 7'x7' RCBC 0.05 328 27 356+07 -L- LT BANK STABILIZATION < 0.01 < 0.01 35 8 27 357+63 -L- RT BANK STABILIZATION < 0.01 < 0.01 37 12 28** 397+37/400+85 -L- ROADWAY FILL 0.26 29** 398+61/405+73 -L- ROADWAY FILL / 5' BASE DITCH 0.06 906 29** 398+61/405+73 -L- BANK STABILIZATION < 0.01 < 0.01 40 10 29A** 401+96 -L- ROADWAY FILL < 0.01 29B** 402+33/405+59 -L- ROADWAY FILL / 5' BASE DITCH 0.26 0.03 0.01 30*** 409+52/411+61 -L- 54" RCP 0.05 < 0.01 563 14 30*** 409+53 -L- BANK STABILIZATION < 0.01 < 0.01 15 10 31 49+59 - 50+28 -Y3- LT 2' BASE DITCH < 0.01 57 32 35+68/37+32 -Y6- BANK STABILIZATION 0.03 < 0.01 172 19 33 173+50 -L- LT CHANNEL IMPROVEMENT TIE-IN < 0.01 < 0.01 20 21 34 357+38/357+49 -L- BANK STABILIZATION < 0.01 < 0.01 24 11 TOTAL SHEET 1 0.87 < 0.01 0.01 0.49 < 0.01 5694 49 TOTAL SHEET 2 0.20 < 0.01 3.47 0.09 4387 413 TOTAL SHEET 3 0.53 0.03 0.01 0.34 0.02 3554 153 TOTALS ALL SHEETS*:1.60 0.00 0.03 0.03 0.00 4.31 0.11 13635 615*Rounded totals are sum of actual impacts** SITE 28, 29, 29A, AND 29B - SITE 1 IN U-2579C PHASE 2 PERMITRevised 2013 10 24SHEET OF WETLAND PERMIT IMPACT SUMMARYWETLAND IMPACTSSURFACE WATER IMPACTSFORSYTHNC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS11/03/2020NOTES- SITE 24 IS A CHANNEL RELOCATION*** SITE 30 - SITE 2 IN U-2579C PHASE 2 PERMIT- ISOLATED WETLANDS SITEU-2579D, E & F34839.3.GV7
1
Carpenter,Kristi
From:Euliss, Amy
Sent:Thursday, November 05, 2020 3:17 PM
To:Alsmeyer, Eric C CIV USARMY CESAW (USA); Wanucha, Dave
Cc:Turchy, Michael A; Barrett, William A; Shumsky, Michael J; Kiser, Marcus K; McLaughlin, Zachery R;
Harmon, Beth; Suggs, Phillip H; Carpenter,Kristi; Miller, Vickie M (Vickie.Miller@hdrinc.com);
Yelverton, Wyatt; Edelberg, Kristofer
Subject:U-2579DEF Permit modification
Attachments:U-2579DEF permit modification 11.4.20.pdf; RE: U2579DEF potential mitigation site
Follow Up Flag:Follow up
Flag Status:Flagged
Eric and Dave,
Attached is a permit modification request for U‐2579DEF. Let me know if you have any questions or need additional
information to process.
Dave and Kristi,
Please use the meeting held January 10, 2019 to review the site as our preapplication meeting. I’ve included an email
chain that documents our discussion at the site as well as some additional mitigation questions. As you will see in the
application, we determined that onsite mitigation was not feasible.
Michael Turchy,
Please add to the permit application website for the WSNB.
Amy Euliss
Division 9 Environmental Officer
North Carolina Department of Transportation
336 747 7802 office
aeuliss@ncdot.gov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.