Loading...
HomeMy WebLinkAbout20081020 Ver 1_Information Letter_20100511YISAA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director May 11, 2010 Mr. J. B. Setzer, P.E. Division 14 Engineer N.C. Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Subject: Inspection-NCSR 1102 Pearson Falls Road DWQ Project 08-1020 TIP No. B-4239 Polk County Dear Mr. Setzer: Dee Freeman Secretary On May 6, 2010, 1 inspected the construction work at the new bridge site on NCSR 1102, Pearson Falls Road in Polk County. The erosion and sedimentation control structures, vegetative covering, and matting appear to be working properly. Please continue to ensure that all sediment and erosion control structures are maintained and that seeding and mulching are performed as needed to protect downstream waters. A copy of the inspection report is attached to this letter. If you have questions, please call me at 828-296-4500. Sincerely, Michael R. Parker Environmental Senior Specialist Attachment cc: Aaron Powell Mark Davis, Division 14, DEO Ed Ingle, Roadside Environmental Transportation Permitting Unit Mike Parker, Asheville Regional Office (Selzer) NCSR 1102 Inspection Letter May 2010 SURFACE WATER PROTECTION SECTION -Asheville Regional Office 2090 U.S. 70 Highway, Swannamoa, NC 28778-8211 Phone: 828-296-45001 FAX : 828-299-7043 One Customer Service: 1-877-623-6748 North Carolina Internet: wviviomateroualiN.ora (/a n An Equal Opponunity\ Affirmative Action Employer Nahl ally DWQ Site Visits for DOT Projects Field Sheet DWQ representative: Michael R. Parker Date: May 6, 2010 County: Polk Region: Asheville DOT Division: Division 14 Activity: X 401 Compliance Evaluation ? Complaint ?DWQ Follow Up Evaluation ? Other DWQ 401 4: 08-1020 NW Permit #: 1P #: Project Name: Location of Project: I NCSR 1102 Pearson Falls Road B-4239 I From NC 176 in Saluda travel south on NCSR 1102, Pearson Falls Road, approximately I mile to the new bridge site Project Complete: ?Yes X No Activities (DOT): X? Bridge X? Culvert ? Bottomless Culvert ? Bottomless Arch X? Riprap Inlet/Outlet Stabilization ? Spoil Pile ? Borrow Pit ? Wetland Mitigation ? Stream Restoration ? On-site Stream Relocation ? Buffer Restoration ? Bank Stabilization ? Other If no, estimated date of completion: Water Quality Concerns (DWQ): ? Steam Standards Violation X? Turbidity ? Evidence of spills ? Oil/Petroleum ? Solid Waste ? Failed E & S control measures X? Sedimentation Impacts ? Stormwater Permit Violation X? Fill ? Buffer Impacts (see below) ? Other Additional Wetland Impacts: ? yes X? no Estimated Acres ? Zone 1 Est Acres ? Zone 2 Est Acres Additional Stream Impacts: ? yes X? no Est Linear feet Estimated linear feet of impact: Buffer Impacts: ?Neuse ?Tar-Pam ?Randleman ?Catawba Zone l: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Zone 2: ?Yes ?No Est linear fit/ acreage of buffer impact ft/ ac Buffer Designation: ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibited Name of Waterway(s): Basin/ Subbasin: DWO Site Visits for DOT Projects Background Info North Pacolet River Broad 030501 Wetland Type: ?Isolated ?Non-Isolated (Waters of US) Stream Class: ?Class B ?303d Listed ?WS-l1 ?WS-V ?SB X?Class C ?ORW X?Trout ?WS-Ill ?NSW ?HQW ?WS-I ?WS-IV ?SA ?CA Type of Authorized Impact: X?Culvert ?Bottomless Culvert X?Bridge ?Bottomless Arch X?Riprap Inlet/Outlet Stabi lization X?Fill Authorized Wetland Impacts: ?0- 1/10`n acre ?1/I l'h to UP acre ?1/3`d to 1.0 acre ?> 1.0 acre Authorized Stream Impacts: X?< 150 linear feet ?> 150 linear feet Additional comments: Reviewed project with DOT staff. Bridge deck has been poured. Work continues with remaining items consisting of piping„grading, paving and old bridge demolition. Estimate that project should be completed by end of May 2010. Sediment and erosion control devices appear to be in good shape Maintain erosion control devices and continue with seeding and matting as required to protect State surface waters.