HomeMy WebLinkAbout20081020 Ver 1_Information Letter_20100511YISAA
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins
Governor Director
May 11, 2010
Mr. J. B. Setzer, P.E.
Division 14 Engineer
N.C. Department of Transportation
253 Webster Road
Sylva, North Carolina 28779
Subject: Inspection-NCSR 1102
Pearson Falls Road
DWQ Project 08-1020
TIP No. B-4239
Polk County
Dear Mr. Setzer:
Dee Freeman
Secretary
On May 6, 2010, 1 inspected the construction work at the new bridge site on NCSR 1102, Pearson Falls Road
in Polk County. The erosion and sedimentation control structures, vegetative covering, and matting appear to
be working properly.
Please continue to ensure that all sediment and erosion control structures are maintained and that seeding and
mulching are performed as needed to protect downstream waters. A copy of the inspection report is attached
to this letter.
If you have questions, please call me at 828-296-4500.
Sincerely,
Michael R. Parker
Environmental Senior Specialist
Attachment
cc: Aaron Powell
Mark Davis, Division 14, DEO
Ed Ingle, Roadside Environmental
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
(Selzer) NCSR 1102 Inspection Letter May 2010
SURFACE WATER PROTECTION SECTION -Asheville Regional Office
2090 U.S. 70 Highway, Swannamoa, NC 28778-8211
Phone: 828-296-45001 FAX : 828-299-7043 One
Customer Service: 1-877-623-6748 North Carolina
Internet: wviviomateroualiN.ora (/a n
An Equal Opponunity\ Affirmative Action Employer Nahl ally
DWQ Site Visits for DOT Projects
Field Sheet
DWQ representative: Michael R. Parker Date: May 6, 2010
County: Polk Region: Asheville
DOT Division: Division 14
Activity: X 401 Compliance Evaluation ? Complaint
?DWQ Follow Up Evaluation ? Other
DWQ 401 4: 08-1020 NW Permit #: 1P #:
Project Name:
Location of Project:
I NCSR 1102 Pearson Falls Road B-4239 I
From NC 176 in Saluda travel south on NCSR 1102, Pearson Falls Road, approximately
I mile to the new bridge site
Project Complete: ?Yes X No
Activities (DOT):
X? Bridge
X? Culvert
? Bottomless Culvert
? Bottomless Arch
X? Riprap Inlet/Outlet Stabilization
? Spoil Pile
? Borrow Pit
? Wetland Mitigation
? Stream Restoration
? On-site Stream Relocation
? Buffer Restoration
? Bank Stabilization
? Other
If no, estimated date of completion:
Water Quality Concerns (DWQ):
? Steam Standards Violation
X? Turbidity
? Evidence of spills
? Oil/Petroleum
? Solid Waste
? Failed E & S control measures
X? Sedimentation Impacts
? Stormwater Permit Violation
X? Fill
? Buffer Impacts (see below)
? Other
Additional Wetland Impacts: ? yes X? no Estimated Acres
? Zone 1 Est Acres ? Zone 2 Est Acres
Additional Stream Impacts: ? yes X? no Est Linear feet
Estimated linear feet of impact:
Buffer Impacts: ?Neuse ?Tar-Pam ?Randleman ?Catawba
Zone l: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac
Zone 2: ?Yes ?No Est linear fit/ acreage of buffer impact ft/ ac
Buffer Designation: ?Exempt ?Allowable ?Allowable w/mitigation ?Prohibited
Name of Waterway(s):
Basin/ Subbasin:
DWO Site Visits for DOT Projects
Background Info
North Pacolet River
Broad 030501
Wetland Type: ?Isolated ?Non-Isolated (Waters of US)
Stream Class: ?Class B ?303d Listed ?WS-l1 ?WS-V ?SB
X?Class C ?ORW X?Trout ?WS-Ill ?NSW
?HQW ?WS-I ?WS-IV ?SA ?CA
Type of Authorized Impact: X?Culvert ?Bottomless Culvert
X?Bridge ?Bottomless Arch
X?Riprap Inlet/Outlet Stabi lization X?Fill
Authorized Wetland Impacts: ?0- 1/10`n acre ?1/I l'h to UP acre
?1/3`d to 1.0 acre ?> 1.0 acre
Authorized Stream Impacts: X?< 150 linear feet ?> 150 linear feet
Additional comments:
Reviewed project with DOT staff. Bridge deck has been poured.
Work continues with remaining items consisting of piping„grading, paving and old bridge demolition.
Estimate that project should be completed by end of May 2010.
Sediment and erosion control devices appear to be in good shape
Maintain erosion control devices and continue with seeding and matting as required to protect State surface
waters.