Loading...
HomeMy WebLinkAboutNCS000575_Inspection Report_20201103ROY COOPER, Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality November 3, 2020 Duke Energy Progress LLC Attention: Antonio D. Price, Station Manager 46 Duke Energy Lane Arden, North Carolina 28704 Subject: Compliance Evaluation Inspection Asheville Steam Electric Power Plant Permit: NCS000575 Buncombe County, North Carolina Dear Mr. Price: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on October 23, 2020. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sinc�J', ,%`/. Isaiah Reed, C Q, MS4C Cl Environmental Specialist Land Quality Section Enclosure: Inspection Report North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 CAflOLINP ./ 828.296.4500 Compliance Inspection Report Permit: NCS000575 Effective: 06/22/17 Expiration: 04/30/21 Owner: Duke Energy Progress LLC SOC: Effective: Expiration: Facility: Asheville Steam Electric Power Plant County: Buncombe 46 Duke Energy Ln Region: Asheville Arden NC 28704 Contact Person: Garry Whisnant Title: Station Manager Phone: 828-687-5201 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 10/23/2020 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Entry Time 12:OOPM Reason for Inspection: Routine Permit Inspection Type: Stormwater Discharge, Individual Facility Status: 0 Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Certification: Phone: Exit Time: 03:30PM Phone: 828-2964614 Inspection Type: Compliance Evaluation Page 1 of 3 Permit: NCS000575 Owner- Facility: Duke Energy Progress LLC Inspection Date: 10/23/2020 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary On October 23, 2020 this facility was inspected for compliance with the NCS000575 Individual Permit for Stormwater Discharge. I met with Teresa Williams and Nathan Grant on site. No major issues were observed during the inspection. However, the following observation was made: 1) The "plugged" status of the stormwater infrastructure on the NE corner of the facility could not be confirmed during the inspection. To confirm that no stormwater with the potential of being impacted by operations on site is or can discharge the permittee shall asses and document the status of all related stormwater infrastructure in the Stormwater Pollution Prevention Plan. 2) An area adjacent to the removed section of railroad at the NE corner of the facility was observed to have the potential to discharge stormwater impacted by the processes on site into Lake Julian. The permittee shall confirm the status of this area, modify the monitoring procedures on site as necessary and include those changes in the next permit renewal. 3) Stormwater potentially impacted by the processes on site at the location of the current Stilling basin and future Leachate collection system is discharging to Powell Creek. The permittee shall confirm the status of this area, modify the monitoring procedures on site as necessary and include those changes in the next permit renewal. Please give the above items your immediate attention. If you have any questions, please contact this office at (828) 296-4614. Page 2 of 3 Permit: NCS000575 Owner- Facility: Duke Energy Progress LLC Inspection Date: 10/23/2020 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? E ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? E ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? E ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? N ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? M ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3