Loading...
HomeMy WebLinkAboutProgress Energy Mechanical ComplexNCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director April 27, 2010 George Buchholz EcoEngineering Post Office Box 14005 Research Triangle Park, NC 27709 Dee Freeman Secretary N B RRO# 10-072 Wake County BASIN: ® Neuse (15A NCAC 2B .0233) ? Tar-Pamlico (15A NCAC 2B .0259) ® Ephemeral/Intermittent/Perennial Determination ? Isolated Wetland Determination Project Name: Location/Directions: Subject Stream: Progress Energy Mechanical Blvd Complex Property is located on north side of Mechanical Blvd, west of Old Garner Road in Wake County; MRCS Wake County Sheet 69; USGS Lake Wheeler l1T to Walnut Creek Date of Determination: April 20, 2010 Feature E/I/P* Not Subject Subject Start@ Stop@ Stream Form Pts. Soil Survey USGS To o A I X Flag Al Flag `Start Perennial X A P X Flag `Start Perennial' X B I X Fla B 1 C I X Fla CI Wetland C D P X Outfall X E X X F X X *E///P = Ephemeral/lntermittent/Perennial Explanation: The feature(s) listed above has or have been located on the Soil Survey of Wake County, North Carolina or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each feature that is checked "Not Subject" has been determined not to be a stream or is not present on the property. Features that are checked "Subject" have been located on the property and possess characteristics that qualify it to be a stream. There may be other streams located on your property that do not show up on the maps referenced above but, still may be considered jurisdictional according to the US Army Corps of Engineers and/or to the Division of Water Quality. No ehCarolina ,/Naturally North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Phone (919) 791-4200 Customer Service Internet: www.ncwaterquality.org 1628 Mail Service Center Raleigh, NC 27699-1628 FAX (919) 571-4718 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Progress Energy Mechanical Blvd Complex Wake County April 27, 2010 Page 2 of 2 This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWQ or Delegated Local Authority may request a determination by the Director. An appeal request must be made within sixty (60) days of date of this letter or from the date the affected party (including downstream and/or adjacent owners) is notified of this letter. A request for a determination by the Director shall be referred to the Director in writing c/o Ian McMillan, DWQ Wetlands/401 Unit, 2321 Crabtree Blvd., Raleigh, NC 27604-2260. If you dispute the Director's determination you may file a petition for an administrative hearing. You must file the petition with the Office of Administrative Hearings within sixty (60) days of the receipt of this notice of decision. A petition is considered filed when it is received in the Office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:00 am and 5:00 pm, except for official state holidays. To request a hearing, send the original and one (1) copy of the petition to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. The petition may also be faxed to the attention of the Office of Administrative Hearings at (919) 733-3478, provided the original and one (1) copy of the document is received by the Office of Administrative Hearings within five (5) days following the date of the fax transmission. A copy of the petition must also be served to the Department of Natural Resources, c/o Mary Penny Thompson, General Counsel, 1601 Mail Service Center, Raleigh, NC 27699-1601. This determination is final and binding unless, as detailed above, you ask for a hearing or appeal within sixty (60) days. The owner/future owners should notify the Division of Water Quality (including any other Local, State, and Federal Agencies) of this decision concerning any future correspondences regarding the subject property (stated above). This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the Division of Water Quality (Central Office) at (919)-733-1786, and the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-876-8441. Respectfully, / Martin Ri mond Environ ental Specialist cc: Wetlands/ Stormwater Branch, 2321 Crabtree Blvd, Suite 250, Raleigh, NC 27604 RRO/SWP File Copy 3 I W 1 Ap( L CeC2 East Parkland ?? ApB2 CApC2 Q° ApD {?\ le 4c m' CeC2 ' CeC2 \ z CeB2 ? - ? PC? Gu pC2 -_? M Ap - CeF D C c Wy ApC2 ? eD CeB2 3 ;eC2 ?0 CIB3 A ?eG? ?Vti cl c 9?'p ApC2 82 CIB3 QQ ApB2 i ?c 1 En CIC3 ' Cn r' C) EnC2 Ap6 CeC2 / \ Ap.D - ApC2 ApC2 / CeD in & D of m C) EnB2 Sch of n wY C i C ? eC2 CeD ` N CIB3 Q \ \ CeG? ?-N Me CeB2 WY ApC2 ApB2 CeB2 CeB2 CeC2 ?. ?I App ?\ ApC ??' \ .94 0 \ q?? • e Art v ApD? CeB2 Ap Ch : I CeB CIB3 B2 9 32 ApB2 9o CIB3 CeB? !Gu ce0 I ver ApO. ?. c? q • ApC2 \ CO CeC2 CIB3 CeC1 CZ Al ?sobb pB2 CIC3 / CeB Ap62 Ce62 1 n CIO CeB? ApC2 f n ApB2 Cn CIB3 \ PB2 CIC3I C2 ApC2 G A PQ CIC3 ApB2 (-- ApB2 ) Cn v ApC2 Apf2 Gum- 70 ApC2 `Y = q C _ -- i - j ApB2 Q cV q j n/... \ n ApC \ ApB2 Apl ApC2 ApB2 -?? ApB l_ r PROJECT NO. MID-09°10 PROGRESS ENERGY LIJEcoEngineerin0 FILENAME: M I D O9 O 1 O X. D WG A divialon of Th0 John R McAdam! Compa9 F.NGINEERS•PLANNERS-SURVEYORS•ENVIRONMC7 SCALE: 1.. - 1,000. GARNER COMPLEX -. _ WETLAND DELINEATI ON NESEARCH TRIANGLE PANK • CHARLOTTE 2905 aendim Parkway, Durham m NC NC 27713 27713 ? DATE: O3- 31 - 1 0 " R, NORTH CAROLINA 600-733-5618 6cmae No.: C°02