Loading...
HomeMy WebLinkAbout20081168 Ver 1_Information Letter_20100405NCDENR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director April 5, 2010 Mr. J. J. Swain, Jr., P.E. Division 13 Engineer N.C. Department of Transportation Post Office Box 3279 Asheville, North Carolina 28802 Dear Mr. Swain: Cv Natural Resources Dee Freeman Secretary Subject: Inspection-US 25 Biltmore Bridge TIP No. B-2515 Buncombe County On March 19, 2010, I inspected the construction work on US 25-Biltmore Bridge in Buncombe County. The bridge construction work is almost complete. Please continue to ensure that all sediment and erosion control structures are maintained and that seeding and mulching are performed as needed to protect downstream waters. Please refer to the attached inspection report for any specific items noted during the inspection. If you have questions, please call me at 828-296-4500. Sincerely, xzdol? ?ga, Michael R. Parker Environmental Senior Specialist Attachment cc: Cole Hood, PE Roger Bryan, Division 13, DEO Ed Ingle, Roadside Environmental Transportation Permitting Unit Mike Parker, Asheville Regional Office (Swain) US Highway 25 TIP No. 2515 Inspection Letter March 2010 An Equal Opportunity \ Affirmative Action Employer SURFACE WATER PROTECTION SECTION - Asheville Regional Office 2090 U.S. 70 Highway, Swannanoa, NC 28778-8211 Phone: 828-29645001 FAX: 828-299-7043 - One Customer Service: 1-877-623-6748 NorthCarolina Internet: www ncwateroualty ong Nahlrry //y .^ DWO Site Visits for DOT Proiects Field Sheet DWQ representative: Michael R. Parker Date: March 19, 2010 County: Buncombe Region: Asheville DOT Division: Division 13 Activity: X 401 Compliance Evaluation ? Complaint ?DWQ Follow Up Evaluation ? Other DWQ 4014:1 NW Permit #: 23 and 33 IP #: Project Name Location of Project: FTIP No. 2515 Bridge No. 39 over Swannanoa River US Highway 25 approximately I mile north of the intersection of US Highway 25 and Interstate 40 in Buncombe County. Project Complete: X ?Yes X No Activities (DOT): X? Bridge ? Culvert ? Bottomless Culvert ? Bottomless Arch X? Riprap Inlet/Outlet Stabilization ? Spoil Pile ? Borrow Pit ? Wetland Mitigation ? Stream Restoration ? On-site Stream Relocation ? Buffer Restoration ? Bank Stabilization ? Other Fill If no, estimated date of completion: Water Quality Concerns (DWQ): ? Steam Standards Violation X? Turbidity ? Evidence of spills ? Oil/Petroleum ? Solid Waste ? Failed E & S control measures X? Sedimentation Impacts ? Stormwater Permit Violation ? Fill ? Buffer Impacts (see below) ? Other Additional Wetland Impacts: ? yes ? no Estimated Acres ? Zone 1 Est Acres ? Zone 2 Est Acres Additional Stream Impacts: ? yes X? no Est Linear feet Estimated linear feet of impact: Buffer Impacts: ?Neuse []Tar-Pam []Randleman []Catawba Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Zone 2: ?Yes ?No Est linear fit/ acreage of buffer impact ft/ ac Buffer Designation: []Exempt []Allowable []Allowable w/mitigation []Prohibited Name of Waterway(s): Basin/ Subbasin DWO Site Visits for DOT Projects Background Info Swannanoa River FBR 040302 Wetland Type: ?Isolated ?Non-Isolated (Waters of US) Stream Class: ?Class B ?303d Listed ?WS-II ?WS-V ?SB X?Class C ?ORW ?Trout ?WS-IH ?NSW ?HQW ?WS-I ?WS-IV ?SA ?CA Type of Authorized Impact: ?Culvert ?BottomlessCulvert X?Bridge ?Bottomless Arch X?Riprap Inlet/Outlet Stabilization ?Fill Authorized Wetland Impacts: Authorized Stream Impacts: ?0 - 1/10'h acre ? 1/3`d to 1.0 acre ?< 150 linear feet ?I/I I'h to 1/3 rd acre ?> 1.0 acre ?> 150 linear feet Demolition of the old bridge is complete and the new bridge is almost complete. Sediment and erosion control devices appear to be working properly. Continue to maintain erosion control devices and continue with seeding and mulching as required. Project looked to be in good condition and shape. US Highway 25 Bridge No. 39 TIP Project No. 2515 March 2010 Inspection Report