Loading...
HomeMy WebLinkAbout20051824 Ver 1_Complete File_20051010 A W A T?R?G r Mr. Benton Payne, P.E. NCDOT Division 10 716 West Main Street Albemarle, NC 28001 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources o C?C?GOd?? 0 CT 1 S 2005 R . WATER QUALITY ()EI? L14 AND STORMWATER BRANCH WETLANDS APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Mr. Payne: Alan W. Klimek, P,E. Director Division of Water Quality October 10, 2005 DWQ# 05-1824 Stanly County You have our approval, in accordance with the attached conditions and those listed below, to permanently impact 49 linear feet (If) of Rock Hole Creek for the purpose of replacing a bridge with an open-bottomed concrete culvert as described in your application received by the Division of Water Quality (DWQ) on September 28, 2005. The location of the project is Bridge No. 135 on State Road 1147 (Polk Ford Road) in Stanly County. After reviewing your application, we have determined that this project is covered by Water Quality General Certification Number 3404. This certification corresponds to the Regional General Permit Number 198200031 issued by the U.S. Army Corps of Engineers (USACE). Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. This approval is valid solely for the purpose and design that you described in your application (unless modified below) and will expire with the associated USACE 404 permit unless otherwise specified in the Water Quality Certification. Should your project change, you must notify the DWQ in writing and you may be required to submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, or if total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h)(6) and (7). For this approval to remain valid, you must adhere to the conditions in the attached certification and those listed below: 1. Disposal of old bridge material into surface waters is not allowed. Strict adherence to the USACE guidelines for bridge demolition will be required. 2. Caution should be exercised to install the culvert such that the existing floodplain benches are not disturbed. 3. Riprap must not interfere with thalweg performance and aquatic life passage during low flow conditions. 4. Heavy equipment must be operated from the banks rather than in the stream channel, when possible, in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into the stream. 5. Temporary dewatering sites must be restored to pre-existing conditions unless more natural geomorphic conditions can be provided. North Carolina Division of Water Quality 610 East Center Avenue, Suite 301 Intemet h2o.enr.state.nr-us Mooresville, NC 28115 Phone (704) 663-1699 FAX (704) 663-6040 ` Carolina rurul; An Equal Opportunity/Affirmative Action Employer- 50% RecycleW10°/U Post Consumer Paper Page 2 6. No live or fresh concrete shall come into contact with waters of the state until the concrete has hardened. 7. The dimension, pattern and profile of the stream above and below the crossing should not be modified. Disturbed floodplains and streams should be restored to natural geomorphic conditions. 8. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 9. All work shall be performed during low or normal flow conditions. 10. Discharging hydroseeding mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is strictly prohibited. 11. Erosion and sediment control practices must utilize Best Management Practices (BMP) and be in full compliance with all specifications governing the proper design, installation, and operation and maintenance of such BMP in order to protect surface water standards: a. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow pit sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. b. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. c. The reclamation measures and implementation of these measures must be in accordance with the requirements of the Sedimentation Pollution Control Act. 12. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within 30 days after the Division of Land Resources has released the project. 13. The North Carolina Department of Transportation (NCDOT) and its contractors and/or agents shall not excavate, fill or perform mechanized land clearing at any time in the construction or maintenance of this project within waters and/or wetlands, except as authorized by this Certification, or any modification to this Certification (e.g., no work shall occur outside of the footprint of the plans provided). In addition, there shall be no excavation from or waste disposal into jurisdictional wetlands or waters associated with this Certification without appropriate modification. If this occurs, compensatory mitigation may be required since it is a direct impact from road construction activities. 14. Upon completion of the project, the applicant shall complete and return the enclosed "Certificate of Completion" form to notify DWQ when all work included in the 401 Certification has been completed. Please include photographs upstream and downstream of the structure to document correct installation. 15. Continuing Compliance. NCDOT shall conduct its activities in a manner so as not to contravene any state water quality standard [including any requirements for compliance with section 303(d) of the Clean Water Act] and any other appropriate requirements of state and federal law. If DWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that state or federal law is being violated, or that further conditions are necessary to assure compliance, DWQ may reevaluate and modify this certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15 A NCAC 2H.0507(d). Page 3 Before codifying the certification, DWQ shall notify NCDOT and the USACE, provide public notice in accordance with 15A NCAC 2H.0503, and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to NCDOT in writing, shall be provided to the USACE for reference in any permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Polly Lespinasse in the Mooresville Regional Office at 704-663- 1699. Sincerely, for Alan W. Klimek, P.E. Attachments cc: Steve Lund, USACE Asheville Field Office Rob Ridings, DWQ Wetlands Unit Central Files File Copy S E P 2 8 2005 DENR - WATER QUALITY STATE OF NORTH CAROLINA WETLANDS AND STQRMWATER BRANCH DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY DIVISION OF HIGHWAYS W. LYNDO TIPPF,TT GOVERNOR September 26, 2005 SECRETARY U. S. Army Corps of Engineers Asheville Regulatory Field Office Attention: Mr. Steve Lund, MS, PWS 151 Patton Avenue, Room 208 r051824 Asheville, NC 28801-5006 Subject: Stanly County - Bridge No. 135 (Polk Ford Road) over Rock Hole Creek. WBS Element No. 33342 (DWQ Minor Permit Fee $200.00). Dear Mr. Lund: The North Carolina Department of Transportation (NCDOT) proposes to replace Bridge No. 135 on SR 1147 (Polk Ford Road) over Rock Hole Creek in Stanly. The existing timber decked bridge measures 29 feet 7 inches long by 15 feet 9 inches wide. The proposed replacement structure will be a pre-cast open bottomed concrete culvert that measures 30 feet long by 48 feet 6 inches feet wide. The subject project has been reviewed for the presence of federally protected species and described in a Minimum Criteria Checklist. It has been determined that the construction of this project will have no effect on any listed plant or animal species. This project cannot be completed without impacts to waters of the United States. The project lies in the Yadkin River Basin (Hydrologic Unit # 03040105), affecting the drainage of Rock Hole Creek. There will be approximately 49 linear feet of permanent impacts to the existing stream channel as a result of the proposed construction. The purpose of this letter is to request authorization to construct the proposed project under Section 404 Regional General Permit 198200031. Application is also made to the North Carolina Division of Water Quality (NCDWQ) for the Section 401 Water Quality Certificate (WQC) No. GC3404 that is required in order to construct this project. If you have any questions or need any additional information concerning this project, please feel free to contact Mr. Larry Thompson, Division Environmental Supervisor, at (704) 982-0101. Sinc ely, P A Benton G. Payne, P. E. Division Engineer BGP/LBT cc: Mr. John Dorney, NCDWQ Mrs. Polly Lespinasse, NCDWQ Ms. Marella Buncick, USFWS Mrs. Marla Chambers, NCWRC Bridge Maintenance Unit 716 West Main Street, Albemarle, NC 28001 • (704) 982-0101 Fax (704) 982-3146 SR 1147 (Polk Ford Road) Stanly County Office Use Only: Form Version March 05 20051824 USACE Action ID No. DWQ No. rTf nnv nartirnfar item is not annlicable to this proiect, please enter "Not Applicable" or "N/A".) 1. Processing Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification ? Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested General Permit No. 198200031 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: N C Department of Transportation Mailing Address: 716 West Main Street Albemarle NC 28001 Telephone Number: (704) 982-0101 Fax Number: (704) 982-3146 E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Benton G Payne P E Company Affiliation: Division Engineer Mailing Address: I O'h Highway Division 716 W. Main Street Albemarle NC 28001 Telephone Number: (704) 982-0101 Fax Number: (704) 982-3146 E-mail Address: bpMMe@,dot.state.nc.us 1 of 9 SR 1147 (Polk Ford Road) Stanly County III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1.Name of project: Bridge No. 135 on SR 1147 (Polk Ford Road) 2.T.I.P. Project Number or State Project Number (NCDOT Only): 8.2682001 3.Property Identification Number (Tax PIN): N/A 4.Location County: Stanly Nearest Town: Stanfield Subdivision name (include phase/lot number): N/A Directions to site (include road numbers/names, landmarks, etc.): From the intersection of NC 24/27 and NC 200 in the town of Locust travel south on NC 200 approximately 2 miles, turn right onto Love Ch4XI Road and travel 0.8 miles to Polk Ford Road. Turn right onto Polk Ford Road and continue until you reach the first bridge. 5.Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): 035° 12' 56.08" N / 80° 26' 26.15" W 6.Property size (acres): N/A 7.Name of nearest receiving body of water: Rock Hole Creek 8.River Basin: Yadkin (Hydrologic Unit 03040105) (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 2 of 9 SR 1147 (Polk Ford Road) Stanly County 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: The site is located in a rural setting and is surrounded by pastures on both sides of the road Rock Hole Creek is a perennial stream with relatively stable banks. 10. Describe the overall project in detail, including the type of equipment to be used: Bridge No 135 is a single lane timbered decked bridge located on a secondary road in rural Stanly County. The existing structure will be removed using non-shattering, methods in order to prevent debris from falling into the water. The existing bridge will be replaced with a pre- cast three sided culvert (men bottom culvert) attached to footers that are anchored in consolidated rock The culvert will have head and wing walls attached. The following equipment will be used to construct the project: Track hoe, boom truck. vibrator roller, dump trucks and various hand tools All work will take place in the dry and erosion and sediment control devices will be installed accordingly. - 11. Explain the purpose of the proposed work: To remove the failing single lane 29'7' L X 15'9" W) bridge and replace it with a pre-cast three sided culvert- (30' L X 48' 6" W). IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain- Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I_P. project, along with construction schedules. N/A V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application- N/A 3 of 9 SR 1147 (Polk Ford Road) Stanly County VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: There will be 48' 6" of permanent impacts to Rock Hole Creek due to the construction of this project. Impacts are limited to linear impacts along the stream bank where proposed footers are to be constructed 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) Located within I00-}ear Floodplam (yesino Distance to Nearest Stream linear feet) Area of Impact (acres) Total Wetland Impact (acres) 4. List the total acreage (estimated) of all existing wetlands on the property: N/A 5. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included To calculate acreage, multiply length X width, then divide by 43,560. 4 of 9 SR 1147 (Polk Ford Road) Stanly County Stream Impact Number indicate on ma Stream Name Type of Impact Perennial Intermittent 9 ? Average Stream Width Before Impact Impact Length tin ear feet Area of Impact acres Site 1 Rock Hole Creek Open Bottom Culvert Footers (Linear Impact) Perennial Var. 10-12' 49 feet NA Total Stream Impact (by length and acreage) 49 feet 6. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dredging, flooding, drainage, bulkheads, etc. Open Water Impact Site Number indicate on ma Nam e applicable) Wat e) (if ap Type of Impact Type of Waterbody (lake, pond, estuary, sound, bay, ocean. etc. Area of Impact (acres) Total Open Water Impact (acres) 7. List the cumulative impact to all Waters of the U.S. resulting from the project: Stream Impact (acres): N/A Wetland Impact (acres): N/A Open Water Impact (acres): N/A Total Impact to Waters of the U.S. (acres) N/A Total Stream Impact (linear feet): 49 feet 8. Isolated Waters Do any isolated waters exist on the property? ? Yes ® No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. 9. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. 5 of 9 SR 1147 (Polk Ford Road) Stanly County Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: VII. Impact Justification (Avoidance and Minimization) Expected pond surface area: Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. While there are impacts associated with this project impacts will be limited to an area that has been previously impacted due to the construction of bridge headwalls. It is anticipated that the footers required for the proposed open bottom culvert will extend slightly beyond the limits of the existing headwalls hence the need for a PCN. Surface waters not affected by the construction of this project will be protected from unnecessary encroachment The staging of construction equipment will not be allowed in or near the Rock Hole Creek. Strict enforcement of the sediment and erosion control BMP's for the protection of wetlands and surface waters will be enforced during all phases of project construction. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. 6 of 9 SR 1147 (Polk Ford Road) Stanly County if mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/stnngide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. If mitigation is required for this project the NCDOT will request that the EEP consider accepting payment in lieu. 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form For additional information regarding the application process for the NCEEP, check the NCEEP website at http://h2o.enr.state.nc.us/yn/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): • Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federaUstate) land? Yes ® No El 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No 7 of 9 SR 1147 (Polk Ford Road) Stanly County 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No IX. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ? 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zones mpact (square feet Multiplier Required Mitigation 1 3 (2 for Catawba) 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 213 .0242 or .0244, or .0260. N/A X. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. All appropriate best management practices for sediment and erosion control will be implemented during work activities There will not be a net increase in storm water runoff as a result of this project being constructed 8 of 9 SR 1147 (Polk Ford Road) Stanly County XI. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A • Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No 0 Is this an after-the-fact permit application? Yes ? No XII. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ? No ? If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http//h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: XIII. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). 7/05 Applicant/AgentYs Sign ure v /Date/ (Agent's signature is valid only f an authorization letter from the applicant is provided.) 9 of 9 LO U ST\, J r'? ? f 5 0 s 00?011 Q_. y \ RO row/ ;?? i \ I? "? oe oQO ?? F ? ?Lj I ?oo?? J6- 107 o G Cl- aov , (0A S SI .u ? `AHP r? i JrII w? I e? STANFIELD RIVER I (SR 11151 ? I MILL I 2 77.7) ,? (1 no_? Loves o Unitell q 9`?O GB i DoF Sy R?\??jl? O9 09 s ? I 9/ '3l / O d co f ? ® - O QP 4k? i Wv w r. 71 Chipol- wff? Alk Lee L` f \ r __.,• ,,1 •: ?"? 1,; \ ?? ter' ,.??? \$ _ ? ?/ - 1 N-2 y 1lie r + . _? ) 7* W Stanly County Bridge 135 Polk Ford Road over Rock Hole Creek i" I % I If . ?k ., - - " 1 4 4 ?/ o ? 1 kt , r; `? ? 1S ,? r `• r ti t r ? r. • ?fiw k , ? ???`?k?s } p 1 f ?? ?` i ? fi I+ i p• ??7'????1Jg?`' ? ? `.?,a,•. ? J?# ?' ?i ?, wB J1 1r R f TbB' ! ~- mar s. ??i )Bayi r + 1 aD ?. ,. 4 -',..,.r+ F}?,r3 ?t• ji .' r d` L ?r r. ?V-7- Ile, 'OG 1 r 17' ,. , vex- Ch;tpell( CJO .a D B TbM -- ,? Legend ,a, a -? ?•.'? T?D,? sa[? 0 permit site ? ?:?? f/ 'Y 1 4I r ?r ILI ? ll ??? • 1 ?y\ }}???f t?``?1 i { •; ?? +1 +l Z-;°C?? ;y, 'a +.'r ;-w ? .k ji °'.4? TcB2 + +. J ' Prepared by: 14 if f{,? . ?„ y •-!.•? t `f' A'1. 4' `'`? ;'4 •-? North Carolina 4 .' ?' j-,', Ce. 'yrFU ,I ` l r 74 "` . ?r } i `+ k ?•r Sj? Dqmrt soira t. B. hompsoe tloe f k .., "a +^?ti? y7 '• i _ Emtroameotal UnK DWm 10 Date: September 26, 2005 1 j Thla map b YAeedad for Internal DOT we any. + ^? ., ,.? ,; w .rte j` ?'r?1 :: ^? y •_!? ; err ?? Inds accaac7,ft or mr-dw biota Ily aceompony this pmdart. T6B2 f Feet 0 370 740 1,480 2,220 2,960 ' I i i ? . ? t I f t ? ? ?, I j i ? r I ?, ? ? -: 1_ n 0 C1 x .. s a 3 ?o N I !l 1rT Q 1 ir S W F- O Z Z Z J H H W r N a W J Z a r DO U N NHOH J Otr il, - r r m X r3V7WMW O H U- W LL [rw JJO rQ J O"ZM2< U-! W-> zHvWZO H 2 LL H w In ZOMFQ-q' HOF OZ• WFHWOU2 Wz--,00 Fx-~HNQw ZQW(L W ¢F-I O N -M J rW a` MLOaQ oO W O¢ U O rral"1 H N U O J O m m >-QZaOw+ NCr I- - O Z 21 Z N S H Z H U W h J H 0 Q SF+O H axr3a°Q WhLLW2Wh = O U O Z N H O N W I H h U Q QJ OCL Z"W SN?MHww U Z W O Z m D DHJUH r M Q U Q J U NF-Hmr JO QZF-0M<X ZO[m(rWx)- HUQW(LNN x ?I XI I X 3 cr U 2 Z F - H U (D V) W ' H J C- W (r N I U 11 ?x W I J 0o I X za I H rx H3 W CL I X C7 Z H m W r 1Q x N O1 W 2w Cr; O ?w Z Ix- a 00 Z Z H H a J NQ N LL mr O W Z > J O J W H W 3 W N m1) m J W ap 2 N h W = U H O H x U M=) =) UN Z V) H O r O V7M HF- X W Wm Cr O r [r r p 1 Wr N ?m O u. IQ iW -? W J m W Z U V) m0 Ix_O = ZW z W- Z Q H r F a O Q J Q WO H 3 3 v H°Z z L) Mm0>-? °r h N Va WIHi r° LLrw JI-F fL =mC7? Q H (r Ir/1H?V QpHJZW dB,. B Z QLLxLLW W"3aaU N C LW H WH ~U U HOQ"V) /-I"'I D..p O(m -I z H> O J N Q N O Z Q a o z LLXFI o2 O? HO KZO>-6Q mLUJJ U.,Wxr O Q QHMro aHrH Za o JmHr z Hw w aQ J UFO"Q HN(r(m6z Om QSp ?x W Ix_.a HVWj? i=WU(Wjr a Q Q N Z A z m Q m 0 0 LL H Y O O mTJ Hm =H r Qa aHO 2(rN z r r w UNUI N o -0"00 O h y.H WF-IQ H 3UZU ZJ F ? Z 2 Q NO LLr "') mCLOJr>' Qa mH "N QU oW Q a°am(r aQO(rxw O U W "M -'r, Swx ?-a r rO vz)O W (L Hh CDO Q m r ° z m NZ ma a z w (r H -t ..r 0 z U 2 M W Z Q H W F-1 3 F- Wa ZU Q= ?? NH QI--(m0 OSUO°Q JO OH al` P7 W33 1-N WQW W(r H V) 2 11 00 LL N Q O WW U W H H OM W U H J 0 7 2 N Z H H 0 Y ?J I mQ MF-U CLQQ3xH "H NO Z 0 M Q W F..I J JZD H JO WQ WF- KF- CmW CHy CHi O F-CLOJWX MUF mW 0U am Q OC>_Q2h rZ O rU W Z O rU 21-N 1I SWH(rW J UfY mJ 36 J My wx OUJWww JF- Qr J Wag a0 Qamx xW HZ WS WW > JZHOWQ hWO>-pJ N?(r ZO SN WW H JHrHO HCUm H WO OU H 00 J U <F- N r0 (rte J U U p(N7 S ° rWH ZQ QNmW°a QOQ WW WZ » W NWLL(r"O iW-mv)< 34.(r Sm XH 21 QZHF-JCr O0 OWK OZF- r F- HH UHUNO rONJ QHZ >- WE XZ N WUWZCr(r W F-000L WWO F-Q SO ,% F4 N KZa OQo SLLZWUH x(rU QM F-LL : 1 7 a (L WNVULL F-O">Om fl 0.09 O O - V) 0 H I J lf) O In O Z N Z N Z O Z O O Q 3 H QHO mo Zh JI--F'• S SOa LLQQ 0-,•. hHH =(r L.,W z aQOH ~2z,s--r Q Ot- Z WCL 0H"Z"W J M 7 H O W U S O ~ x~ CL N m a (r M ?iF a C)ujow°:w Or O "WOO NS LO ?(r aQ HOZUWQWF- U W WLL h z H Q x Z U r Z a r N N H N r O "H< N W Jx -JOOHmZ JJHaLL "QwHOZIO-I W = HO mHHGaIH-H w NIO_,?N U> a3N2 N U H N NO H Q O W N 'a N O v N Z W> r W U [r mJZW XHZIO-J- LLJ ~FS- VO) mLLQU WQHrO H IHr°a roz3a3w_ O NN(r LLZO? r (r -I(rmr O -IUF-I O W)-- Z W w= H W(r N= J W m O O W°r ?WF-UZwQ U M W" U Z O Z N F- Z O>Z HWO F'-WZ O LL JOQ XXLLw a[m X J r F Q LLi -j O aJ 0 0 m 3= 0 LL a W >h U M00 CLLLW J NCm2JNHS O J Q LLN J Z O r O W O x Z x N N M 2 Z Z LL (rZNH hHHNF-00 W H N a a J O 00 O 0 cr ao o W t- + W +Q 3 I W r .. W X33210 31011 X0021_ / i V tD N + N F D a wr S N r I 1 Y Jm V a O i D v p + N (? Z ~ H S O r, F YCrm v H?,Q 0- O 11 V) )(rvJ •[rMW F W U J ? O ? O [C ti X + v + W U X z 3 HW rU Non \I m W 11 IHH? 1 W U I I I (m " I o E - X W r J N U O Q J z a I CL H I r (m N N W k t- H (L N ><O tD ' wa Q h N I I Cr ' W N H (r W N m / FA I FA > m N \ Q Z H I p Q W Qaz:1 >- C) V) (r X Sti m X O QQ W N ° h m • JwmJ D U m m 1 Z M O m / z I .N.NrZ[m P h ?O X X 3 X o Z H F X X W CL w a W H (r (r ZD U N z Q H a F- X W z H C Q c r a W Ix i 3 J O O ? T J O r) + N N.. " o Cn Ln ? O M N ? t y O N N F N M N LI) n u H CL QO J (r r J or lD J t_ + q rn + a} M O ?0 N N P v F MN? co N N a Q O J h m N 1.4 Z It O z U Z a L'i O N :3 Z J O U H z r H Q z O J W O W N -1 0 ° z a W W N N (r H 2 O 3 co w z W w x x W J U h a W O J ) ~ N H W N tr U W O D (r N a w J r 1 U O Z Z W W p I' ° O 7 Z N co Ui) O O H N V7 (r ?U UQ O 10 TN0 O N W M m N V V .. V 1 O Z p H O O Q r J > W W > J Z W U O W W VH) W x c?Wr I WW [rOQ Uh Q 3Q(ra S W W Q 3 V Ox(rx v) U a"z F-/ >- H N U pz <1-4 = Z W 7_ (•7=UZUU h/O"HIHH V) W NQNV) WMW2aa MWoomm a r 0 U H IL UU O CC N x LL) 1 z Q ` J • V W U Z ,.• H a r >- H W` 3 xlklI ~ O O [r O cl:j 1 3 X + W + v I\ r J z I I I 00 0 N + XI l'i NJ N U D O W ? 3 J ~ M N U u 1 / O X Z N U O M Q ? w a h U ~ O N O v C;,! N M +V QW h J N W Q N H R a? ° (D O Ulm O Q 1 I (r J U 1 O D O_ 0N N ? + Q N Q W J N lJ F- . 1 z O J O O O w O N Lr) N e.y J O Z Z Q F- F- N U W O a- Z O H F- Q H V) LLJ a Z M CC W J a (r o Na W H u V> M 0+ O O O N tD o(T M N V r 0 01 O Z IJy O H U h I Z Q WCLW d U(L J H (r OW d <)- 0 MMO U W O O N>O p H0J 0 0 W w Z O z u ">-" Z MUCL H CLzn- a 0wC) M rDF- o (r 0 (r )- W WW (r > (r > w OLLo 0 W F- z W z O a W ~ U F- W d Z W °-° z s N Q Zfr ?.r -O Z OWZF- ? O H J m Z q- WU,T 4W 3 ? N w ?3? N w ~WOxO m Ww D2S LL -J, LLpNU z o o QOzH o0 H P ? z W-MHV)XLLJ • W W W _J .-1 W u Z w z W woor, H :E W WZa: m Nz=YN N ° Q~ O a o W m a L IL °z P '...... .,No a W ? rm 3 9 ?d• odd ?CCt W F- a ^) w Cr O Q Cr z r W N I O - U> J h J QU O w° (r W m w I +ao Qv ?aH Cr3, T N r x v Q r X W p N J d N , (r (40h x L_; i 1 Fr1T)lintlrlTgTrrr1mrir))rlimPn1 OI O O O O N O D) 00 N N Q [T V r I D W Z > Cr e 2 V N Q `B'IZ .9- 8b . - i - h£-6 r (D: r r' N ~ 1' • I ), w O O + lD 1 0 Lt! lf) + O T 'Q W v M J O w ,? V;0 3 O +I tD z Q H r L no 0wr OLLa:+1 LL <-: O N a > `r O J J rww O O .N. Z .. OW _J a a V) W J LL- 0 M N O p w W H H d d 00 z z ? o J ? J ? d J m () ? ru m 2 U Q W ? S O U ?Op'CO-07-OS"l06CB\••?^)pn?16\106C-a\20'06L\Z002\I?aIp?O\"J ryY IC'B S'9 SO^2/62/9