Loading...
HomeMy WebLinkAbout20050895 Ver 1_Complete File_20050607Certificate of Completion DWQ Project No. Applicant: County: Project Name: Date of Issuance of 401 Water Quality Certification: `7 Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification Date: LG,,Tr ` l? , hereby state that, to the best of my abilities, due care and diligence was u ed in the bservation of the construction such that the construction was observed to built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. ,/9/ C? / ?, I Date: C--,-5 Signature: - If this p?ojlwas designed by a Certified Professional 1, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No.: Date: O?O?WAT?RpG O 'C Mr. Benton G. Payne, P.E. NCDOT Division 10 716 West Main Street Albemarle, NC 28001 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality 109NAWWAO JUN 2 0 2005 WATER 0 TE QUALITY TERBRWH ? N AND S APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Mr. Payne: June 7, 2005 DWQ# 05-0895 Stanly County You have our approval, in accordance with the attached conditions and those listed below, to permanently impact 37 linear feet (If) (culvert extension) of an unnamed tributary* to Big Bear Creek for the purpose of replacing an existing culvert for the proposed upgrading of an unpaved road to a paved road as described in your application received by the Division of Water Quality (DWQ) on May 23, 2005. The location of the project is State Road 1432 (Gold Hill Road) in Stanly County. After reviewing your application, we have determined that this project is covered by Water Quality General Certification Number 3404. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. This approval will expire with the associated 404 permit unless otherwise specified in the Water Quality Certification. This approval is valid solely for the purpose and design that you described in your application (unless modified below). Should your project change, you must notify the DWQ in writing and you may be required to submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, or if total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h)(6) and (7). For this approval to remain valid, you must adhere to the conditions listed in the attached certification and those listed below: Placement of culverts and other structures in waters, streams and wetlands must be below the elevation of the streambed by one (1) foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow for low flow passage of water and aquatic life, as well as prevent headcutting of the streams. Existing stream dimensions (including pattern and profile) are to be maintained above and below locations of each culvert. The applicant may be required to provide evidence that the equilibrium has been maintained, if requested in writing by the DWQ. 2. Erosion and sediment control practices must utilize Best Management Practices (BMP) and be in full compliance with all specifications governing the proper design, installation, and operation and maintenance of such BMP in order to protect surface water standards: * No stream determination performed. North Carolina Division of Water Quality 610 East Center Avenue, Suite 301 Internet h2o.enr.state.nc.us Mooresville, NC 28115 Phone (704) 663-1699 Fax (704) 663-6040 V0ne Caro ma Naturally An Equal Opportunity/Affirmative Action Employer- 50°% Recycled/10% Post Consumer Paper Page 2 a. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow pit sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. b. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. c. The reclamation measures and implementation of these measures must be in accordance with the requirements of the Sedimentation Pollution Control Act. 3. Heavy equipment must be operated from the banks rather than in the stream channel, when possible, in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into the stream. 4. Temporary dewatering sites must be restored to pre-existing conditions unless more natural geomorphic conditions can be provided. 5. No live or fresh concrete shall come into contact with waters of the state until the concrete has hardened. 6. The dimension, pattern and profile of the stream above and below the crossing should not be modified. Disturbed floodplains and streams should be restored to natural geomorphic conditions. 7. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 8. All work shall be performed during low or normal flow conditions. 9. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. 10. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within 30 days after the Division of Land Resources I released the project. 11. The North Carolina Department of Transportation (NCDOT) and its contractors and/or agents shall not excavate, fill or perform mechanized land clearing at any time in the construction or maintenance of this project within waters and/or wetlands, except as authorized by this Certification, or any modification to this Certification (e.g., no work shall occur outside of the footprint of the plans provided). In addition, there sha be no excavation from or waste disposal into jurisdictional wetlands or waters associated with this Certification without appropriate modification. If this occurs, compensatory mitigation may be required sin( is a direct impact from road construction activities. 12. Upon completion of the project, the applicant shall complete and return the enclosed "Certificate of Completion form to notify DWQ when all work included in the 401 Certification has been completed. Plea include photographs upstream and downstream of the structure to document correct installation. 13. Continuing Compliance. NCDOT shall conduct its activities in a manner so as not to contravene any state water quality standard [including any requirements for compliance with section 303(d) of the Clean Water and any other appropriate requirements of state and federal law. Page 3 If DWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that state or federal law is being violated, or that further conditions are necessary to assure compliance, DWQ may reevaluate and modify this certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15 A NCAC 2H.0507(d). Before codifying the certification, DWQ shall notify NCDOT and the USACE, provide public notice in accordance with 15A NCAC 2H.0503, and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to NCDOT in writing, shall be provided to the USACE for reference in any permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Polly Lespinasse in the Mooresville Regional Office at 704-663- 1699. Sincerely, for Alan W. Klimek, P.E. Attachments cc: Steve Lund, USACE Asheville Field Office Rob Ridings, DWQ Central Office Central Files File Copy VO STATE OF NORTH CAROLINA D? k14Y b? r of 23Z ?osq °sr?ROU? OS S ?cvq? DEPARTMENT OF TRANSPORTATION B'*cy MICHAEL F. EASLEY DIVISION OF HIGHWAYS W. LYNDo TIPPETT GOVERNOR May 20, 2005 SECRETARY North Carolina Division of Water Quality 401 Wetlands Certification Unit 0 5 0 6 9 5 2321 Crabtree Boulevard Raleigh, NC 27604-2260 Subject: Secondary Road Improvements to SR 1432 (Gold Hill Road), Stanly County. WBS Element Number 10C.084035 (DWQ Minor Permit Fee $200.00) Dear Sir or Madam: The North Carolina Department of Transportation (NCDOT) proposes to upgrade SR 1432 (Gold Hill Road) in Stanly County. SR 1432 is an unpaved roadway that will be upgraded to a paved roadway. The total project length is 0.96 of a mile. Transportation and highway laws of North Carolina (G.S. 136-44.6, 136-44.7, 136-44.7A, 136- 44.8 and 136-44.9) require the NCDOT to develop annual work programs for construction and maintenance of secondary roads. These general statutes specifically set forth requirements for annual construction and paving of existing unpaved roads. Paving of these roads is performed in priority order as established by the NCDOT for each unpaved road within a given county. This number is based on characteristics of each road, including number of homes, schools, churches, businesses, industries, recreational facilities, traffic counts, presence of school bus routes, and value as a thoroughfare. SR 1432 is scheduled for paving in the 2005-2006 Secondary Roads Construction Program. Protected Species The subject project has been reviewed for the presence of listed threatened and endangered species. It has been determined that the construction of this project will have no effect on any listed plant or animal species. Impacts to Waters of the United States This project cannot be completed without impacts to waters of the United States. The project lies within the Yadkin River Basin (Hydrologic Unit # 03040105), affecting the drainage of an unnamed tributary to Big Bear Creek. One stream impact will be incurred due to replacement of an existing cross pipe. There will be approximately 37 linear feet of impacts to an existing intermittent stream channel as a result of the proposed construction. 716 West Main Street, Albemarle, NC 28001 9 (704) 982-0101 • Fax (704) 982-3146 N ?+4V Wetland Impacts There are no wetland impacts that will result from the construction of this project. Potential impacts would be avoided by the proposed new location. Stream Impacts Table 1 includes information related to site number, stream name, existing pipe length (ft), existing pipe width (in), proposed replacement or extended pipe length (ft) and width (in). Site S 1 is a perennial stream while Site S2 is an intermittent stream. T bl 1St m Im acts due to im rovements to SR 1432 Gold Hill Road Site a e rea Existing Existing Proposed Proposed No. Stream Name Length Width Length Width feet inches feet inches Sta. UT of Big Bear Creek 27 24 64 42 25+00 Note: "UT" refers to unnamed tributary. Avoidance/Minimization The proposed road shoulders for this project have been reduced to a 2:1 slope in an effort to minimize unnecessary impacts. The longer pipe length has been requested due to the fact that the replacement pipe should be placed on a skew to line with the existing stream channel. In it's current state, the stream makes a 90 degree turn into the inlet of the existing cross pipe. Any wetlands or surface waters not affected by this project will be protected from unnecessary encroachment. No staging of construction equipment or storage of construction supplies will be allowed in or near wetlands or surface waters. Best Management Practices for the protection of wetlands and surface waters will be enforced during all phases of project construction. Continued coordination will occur between maintenance forces and the Division Environmental Supervisor during construction in an effort to minimize impacts to jurisdictional sites. Compensatory Mitigation Based upon a May 20, 2005 conversation with Mr. Steve Lund of the US Army Corps of Engineers, the NCDOT does not anticipate the need for compensatory mitigation for this project. Summary The purpose of this letter is to request authorization to construct the proposed project under a Section 401 Water Quality Certificate (WQC) No. GC3404. We have enclosed seven copies of the pre-construction notification package for dissemination and review. If you have any questions or need any additional information concerning this project, please fee free to contact Mr. Larry Thompson, Division Environmental officer, at (704) 982-0101. Sincerely, Benton G. Payne, P. E. Division Engineer BGP/LBT cc: Ms. Polly Lespinasse, NCDWQ Ms. Marella Buncick, USFWS Ms. Marla Chambers, NCWRC Mr. Ritchie Hearne, P. E. Ms. Ranette Davis, CME Mr. Larry Thompson, DEO Area Field Operations Unit Stanly County SR 1432 (Gold Hill Road) Office Use Only: O 5 Ot7Q 9 ?rm Version March 05 USACE Action ID No. DWQ No. (If anv t)articular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing 1. Check all of the approval(s) requested for this project: ? Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification ? Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: WQC GC3404 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ? If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: N C Department of Transportation Mailing Address: 716 West Main Street Albemarle NC 28001 Telephone Number: (704) 982-0101 Fax Number: (704) 982-3146 E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Benton G. Pa ne P.E. Company Affiliation: Division Engineer Mailing Address: 10th Highway Division 716 W. Main Street Albemarle NC 28001 Telephone Number: (704) 982-0101 Fax Number: (704) 982-3146 E-mail Address: bpaynegdot state nc us 1 of 9 Stanly County SR 1432 (Gold Hill Road) III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible. the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: SR 1432 (Gold Hill Road) 2. T.I.P. Project Number or State Project Number (NCDOT Oniv): 3. Property Identification Number (Tax PIN): 4. Location County: STANLY Nearest Torn: MT. PLEASANT Subdivision name (include phase/lot number): N/A Directions to site (include road numbers/names, landmarks. etc.): From the Town of Mt. Pleasant travel south on NC 73 4.5 miles to the intersection of NC 73 an d Finger. Road. Turn left (north) onto Finger Road and travel 2 miles to Bear Creek Church Road. Turn right (south) onto Bear Creek Church Road and travel approximately 0.9 mules to Gold Hill Rd Turn left (north) onto Gold Hill Road -pipe crossing is approximately 0.4 miles ahead 5. Site coordinates (For linear projects, such as a road or utility line. attach a sheet that separately lists the coordinates for each crossing of a distinct waterbodv.) Decimal Degrees (6 digits minimum): 035°24' 48.37" °N 80° 19' 51.57" °W 6. Property size (acres): 7. Name of nearest receiving body of water: Big Bear Creek 8. River Basin: Yadkin (Hydrologic Cnit 03040105) (Note - this must be one of North Carolina's seventeen desiariated major river basins. The River Basin map is available at http://h2o enr.state.ncus/admin/maps/.) 2 of 9 Stanly County SR 1432 (Gold Hill Road) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: This is an intermittent tributary to Big Bear Creek that originates in an open field There is a small vegetated buffer along the channel on the downstream side of this crossing. 10. Describe the overall project in detail, including the type of equipment to be used: This is a secondary road that will be graded drained a new gravel base added and paved. Construction will be staged in order to allow sediment and erosion control devices to be installed initialer and pipe replacement activities to follow. Once pipe installation is complete the grading operation will begin. Typical road construction equipment to be used. 11. Explain the purpose of the proposed work: SR 1432 (Gold Hill Road) is an unpaved secondary road located in Stanly County that has been scheduled to be improved in the 2005- 2006 Secondary Road Program The existing 24" x 27' RCP will need to be replaced with a 42" x 64' RCP The increase in pipe length is requested due to the proposed skew of the new pipe The new pipe will be placed on a skew to align with the stream and increase the road shoulder width at this crossing. IV. Prior Project History if jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. N/A 3 of 9 Stanly County SR 1432 (Gold Hill Road) VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, SG d1aL Wetland Impact Site Number (indicate on map) G1 1131 1111 a?.w uuv w Type of Impact vvu• v••» «__ -__? ___ _ __ T e of Wetland yp (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-year Floodplar es/no Distance to Nearest Stream linear feet Area of Impact (acres) Total Wetland Impact (acres) 3. List the total acreage (estimated) of all existing wetlands on the property: 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. 4 of 9 Stanly County SR 1432 (Gold Hill Road) t I Area of Stream Impact Number indicate on ma Stream Name Type of Impact Perennial or Intermittent? Average Stream Width Before Impact mpac Length linear feet Impact acres Sta. 25+00 N/A Replace existing 24" X 27' RCP with a 42" X 64' RCP Intermittent Var. 2-4' 37' N/A Total Stream Impact (by length and acreage) 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to 41,.,..7: .7r -- h.,llrh Park Ptr Open Water Impact Site Number indicate on ma Name of Waterbody if a licable ( pp ) Type of Impact Type of Waterbody lake, pond, estuary, bay ( ocean, etc. Area of Impact acres Total Open Water Impact (acres) 6. List the c?. * * .,it Wntarc nfthP I1 C re.-ultinu from the moiect: Stream Impact (acres): Wetland Impact (acres): Open Water Impact (acres): Total Impact to Waters of the U.S. (acres) Total Stream Impact (linear feet): 37 7. Isolated Waters Do any isolated waters exist on the property? ? Yes ® No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. 8. Pond Creation if construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands 5 of 9 Stanly County SR 1432 (Gold Hill Road) Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: VII. Impact Justification (Avoidance and Minimization) Expected pond surface area: Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Surface waters not affected by the construction of this project will be protected from any unnecessary encroachment The staging of construction equipment will not be allowed in or near the jurisdictional stream crossing. Strict enforcement of the sediment and BMP's for the protection of wetlands and surface waters will be enforce during all phases of project construction. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwettands/strmgide.html- 6 of 9 Stanly County SR 1432 (Gold Hill Road) 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://h2o enr state nc.us/wrp/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ® No ? 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SERA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, 7 of 9 Stanly County SR 1432 (Gold Hill Road) 2. and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ? If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation 1 3 (2 for Catawba) 2 1.5 Total * Zone 1 extends out 30 feet perpendicular tom the top of the near bank of channel; "Lone 2 extends an additional 20 feet from the edge of Zone I. 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0244, or.0260. N/A XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. The existin ravel base averages 20 feet in width and the proposed pavement width is 20 feet. There will not be an increase in impervious acreage as a result of this project being constructed. All appropriate BMP's for sediment and erosion control will be adhered to during project construction. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. 8 of 9 Stanly County SR 1432 (Gold Hill Road) XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (I 5A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ? No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o enr state nc us/ncwetlands. If no, please provide a short narrative description: XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). ' ? Lj Z U U? Applicant/Agent's Sign ure ` Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) 9 of 9 _ • o N F?OAO O ,5? p a / ¢ •?. Ci /Sq N _ 9 p / yo b sy p . N PAULS ,y RD CROSSING PpGEAS ?¦ _ - + cp e Ne;v Bethel Luth Q rl V 1-0 me 90 ?? ?(: 4 y N isq?o FFk Bethel 2U h ?l o sited x101 •?Chrisf 4 4 s°Nrgy NO i, m O O . PO ? ? fSq ?4?gJ ON!/g pH QO J ? C) Rp40 fJ Q OQ" C - ?q / e° gFFk RD cy? q W y QO p `?' p p? / „ S 2/ p N ` i j '7 r t q PLEASANT Jr?.? 4l i C VY 20? Qo ? PtgTOS nD EXI E3TS Q _ : FINGER F?NC?q 73 RpAo F?NpEq E E CON RD Rp AU i `?i • ??\ ^ 593 'SIB 32 j6old Hill Road) <:. .?. ___. _. ?..1 .__-_ _. ._ ,1...:,r_?.?-?- "?titi-.777.E ?.Ca., . - •? - _ ••- - _ T W ?l Name: RICHFIELD Location: 035° 24'48.37" N 080' 19'51.57" W Date: 5/11/2005 Caption: SR 1432 (Gold Hill Road) Scale: 1 inch equals 1333 feet Stanly County Secondary Road Improvements Copyright (C) 1998, Maptech. Inc. Stanly County SR 1432 (Gold Hill Road) Legend Q permit site • P_ Prepared by: North Carolina Department of Tramportatlon t.. B. Thompson Environmental Unit. Division 10 Dale: May 20, 2005 This map Is Intended for Internal DOT use only. For all other uses, no warranties of any sort, Including accuracy, nmess, or merchantability accompany this product. 0 435 870 1,740 2,610 3,480 SR 1432 (Gold Hill Road) Inlet of Existing Pipe SR 1432 (Gold Hill Road) looking north Y $n r hr . ?7 SR 1432 (Gold Hill Road) looking south c.L,: d t? u ? ? ~ Y w - y = w 0 s ? O r W ? D -1 m - - r_ L CE) m D • v L i u u v v u r,r ? v C7 m u, v v ti . . CDi o m D m •• D rl :i 0 0 z z A r O D r m T D zZ l L I. I =' IJ ?f I..r ? Y) o /a 1? U f C) CD / = O N A t ^ Z x G1 N m L! ?'OO -cp 0 apps ? ..: , 'w \?r r1°I=IDI1, m L D mo m < " m m m r I ? ? O :a Z 9 m c z o? m? U Q7 w 0 N m ?m a u, rm -i;ou n C n n u n u n u ? m N J W O N N cq D a y N D n # _ALI n Z I A U O =o - n o D y i ?? p m g z N I ? t O z 0 a } Z w^7 LL O z m W to O N u i t7 ++ Cl) _ a0 N o Q O O F- 4 N N O : O U It y r a Q N N Z O u II U a 4 I t _I U 4 Z ? p r? C\j o rn r O n v 'l 4 lU m m ? a R ' w R w J ? F- ? j . rn wm z O a t u 1 7- ? _ ? f fl 0 ? l1 `I :J t ? V ] Q 4 ? I ? G II I ' ?? r.1? ? ? l?u pf_, D I O115y7d-Sl •4 •.? _ ? I©f, ?• /VVd a3SOdO2ld _ .ce•sri 'n3?3' ? ? C1? ------------- 1S3UJ - C(O ?? ? f:J? f;J? Mid adSOdOiid ?- x v l1 . ` u ? i x ? _ - ?^ CL Q F i O fn % Z © -y+ (V m LL + f 1 (l? ..I ( (p t F- r'1 OL:. w i.1 J U z a U) a t 1 <..? d Q y .?• ?, w r U) ! ?'J w rn F- -•-._ 0 m ? ( L, D U w 1 I ,f z i ?- r.? • 1 5 i ;i J J Q ^ _ ? o r N ? V N j Z 11 Q a u Q 0 to IX w rn am ?° U w z 7 X N fl 0 L . N 0 O G ? U a ? s z } O Z LU w z z w 0 f- a F- U 1 N J U ? _ o ?... C? 4 e', ?l,YtF n ?j re O m o J at ?J i ? L i1? } O zz a w? w a w o z z M Us 'D °a o N F- a N O i Q? socjo?jcj i Cp -1 ? C1? \ v c ° it ?? ?Sp \ \ \ _? u II o w a x a _, `mast ?;o (1? \ /' I / i N (31 ON3 ax-xli?x_x f.1? 'u aN9k?_ fix- - OR.. w I r x I \).1? UL u 4 xll 1 ir I 0I o ? I v o? r 'O 3dld ?115V1d ,S h Y U O m W .- Z ' Z O O y O ? O ct: LL m N a? - W p> N = Ll_ I - O a: co m in o 7 U } W Z 7 N Qz: Q O J U ? J o o Ln ct: o ,. N (\j j o w ? a cr- cr g u t? w ° N ? m Ia. i a m z i w w u ii I I? v u 1 1 Z / I I /I / O Z V) I Z I U Q W } J N u r O O 7 W twi.o _ ¢ Q Z J O: ^ J N / r Z? O } M O ¢ N 000 m ~ O / Q• n =? t7 J Z a0 lyJ O } W Ut O 1` ?C 0 j Z]? Co N 0 N CO / al m / a1J n O_ O O / m W ?-- 0 0 K O ' (D Q W u In O J F-- z co co O co U) _ O W O K 7 = ¢ rn U F ? J + U ?v (n O U U II / i1 Z X a Q 1/+? I X 3110H 3,Ia0LV I 3a I Ir ? ? 3ainn ,aa J L_,ao ? / r i?tno?tEJ z c) w roi I°Iag? I / w 50 r" r w x I ° s + r tTOei " co 1 W 1 tai w az% a _.. >. - ?_-. w N a o + ? / / ? w \ \ ? ? ?L;11" .?rk'kl OS'161'A313 ??3d?rJZl [ ?? ?f_O „ 1s3dj O ?? ? a fit>>?a , ,'` /' w 4 ?dO?d ? X / X W Z Q co LLJ 2 H N ? M Q ? H r N O U ' Z EL d -"- - ?? -r`te' ? n _ -• / f? ? ? _ _ fa? I I ? ? _ - o ? 5 7- C3 r M X + / X in M o ? O / r x x ? i o W ^ V I¢ / o I iU to Z Z V) ? ¢ v 0 ? r 1a4 M O a m U - O W N O r? O o 2 ci,-) O ? J m 0 l7 h v Of W e N 00 J W m J Q N 2k Q H I"' N N O ¢ C ('1 O ' ?D Q N g O 0 O ? q of n N .N-? d aN0 A r .- 11 II II 11 II 11 II U( a am F W-' m 0 z in - N L O O W 2 g o n i z O N z W O J 4 V ? W O O J N O 03 CC O O N D W O O W i u° Z co co a00 z a) 03 7 0 O ? U 5 U CO O Q? \ x v X N ?\ D X V ? U' X z n Q U? x m \ z X K ZD z a ?-+ Z \ Q a v + t J O J U ?w Z ? o in x X z z m a z _ - ll F a _T NV8 a a i I N\ r - ?F. dO28d a3SO ?II ay x Y x cx zw x x U) ° E Z m / / O N rn N H z N O U O 0 Z W W 0 0 O W IL U) O CL a O 0 0: m a a z 0 N W J (aD C) 0 O c m ' O O p' N N W N N Z m m 0 0 0 D 5 U m N N