Loading...
HomeMy WebLinkAbout20052075 Ver 1_Complete File_20051117I STATE OF NORTH CAROLINA ?" l1 /VOV I wF OF ? /?) , ,?% ?Npsq SST ?tR 4? ' 7 ?MwA?RB DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY DIVISION OF HIGHWAYS LYNDO TIPPETT GOVERNOR SECRETARY November 10, 2005 U.S. Army Corps of Engineers Wilmington Regulatory Field Office Post Office Box 1890 -()5 2vn 7 5 Wilmington, North Carolina 28402-1890 ATTENTION: Mr. David L. Timpy NCDOT Coordinator SUBJECT: Nationwide 23 Permit Application for the Replacement of Bridge No. 35 over Panther Creek on NC 111, Duplin County. Federal Aid Project BRSTP-0111 (8), State Project No. 33284.1.1, TIP Project No. B-3836. The North Carolina Department of Transportation (NCDOT) proposes to replace Bridge No. 35 over Panther Creek on NC 111 in Duplin County. The contract will be implemented as a Division Purchase Order Contract (POC) project. The existing 3 span, 75.4-11 steel I-beam supported concrete deck bridge with 24.8 ft of clear roadway will be replaced with a longer bridge along the existing alignment. The proposed bridge will be 2 span, 105-ft steel H pile prestressed concrete cored slab bridge with 36 ft of clear roadway. Please find enclosed copies of the Programmatic Categorical Exclusion (PCE) document, hydrological report and half-size plan sheets. The structure will include two -13.5 ft travel lanes with 4.5-ft offsets. Approach work will consist of resurfacing and tying into the existing alignment for approximately 81 feet to the south and approximately 86 feet to the north of the existing bridge. The roadway approaches and bridge grades will approximately match existing elevations therefore there will be no reduction in vertical clearance. Guardrail will be installed where warranted and as depicted on the plan sheet. Traffic will be detoured along surrounding roads during construction. IMPACTS TO WATERS OF THE UNITED STATES This project is located in the Cape Fear River Basin within USGS hydrologic unit 03030007 (subbasin 030622). The proposed bridge replacement is located over the Panther Creek (DWQ Index No. 18-74-18) Class C Sw. Construction of the proposed project will result in 0.0 acres of wetland impacts and 12 ft of stream impacts as a result of widening the bridge. Bridge No. 35 is being constructed using top construction methods to avoid and minimize impact and therefore there will be no temporary impacts. Rip rap slope protection around the end bents is being proposed at a 2:1 slope to further minimize impacts. No permanent or temporary utility impacts are proposed with this project. BRIDGE DEMOLITION 124 Division Drive, Wilmington, NC 28401 PHONE: (910) 251-5724 FAX: (910) 251-5727 The existing deck and bridge railings are composed of concrete. The substructure is composed of steel I- beams. The Department will take every precautionary measure necessary to ensure that no components will be dropped into waters of the United States. The bridge will be removed using top down methods and NCDOT's Best Management Practices for Bridge Demolition and Removal will be followed. COMPENSATORY MITIGATION The Department has avoided and minimized impacts to jurisdictional resources to the greatest extent possible as described above. As a result of this effort, there no wetland impacts associated with this project, which is located in the Cape Fear River Basin within USGS hydrologic unit 03030007 (subbasin 030622), and therefore no mitigation is proposed. NATURAL AND HISTORIC RESOURCES FEDERALLY PROTECTED SPECIES Species with the federal classification of Endangered, Threatened, Proposed Endangered and Proposed Threatened are protected under provisions of Section 7 and Section 9 of the Endangered Species Act of 1973 as amended (16 U.S.C. 1531 et seq.). The United States Fish and Wildlife Service lists two federally protected species for Duplin County: American alligator (Alligator mississippiensis) and Red-cockaded woodpecker (Picoldes bbrealis). A Field and GIS Survey has been completed for this project and a determination of "No Effect" for the listed species is recommended. ANADROMOUS FISH Anadromous fish species have not been documented as occurring in the project area. However the project resides in the Coastal Plain physiographic province and anadromous fish have been documented in the extreme southern portion of Duplin County, therefore NCDOT's Stream Crossing Guidelines for Anadromous Fish will be utilized to ensure that the replacement of the bridge will not impede anadromous fish. HISTORICAL RESOURCES Pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservations Regulations for Compliance with Section 106 codified at 296 CFR Part 800, this project has been submitted for review for effects on historical and archeological resources. REGULATORY APPROVAL Section 404 Permit: This project is being processed by the Federal Highway Administration as a "Categorical Exclusion" in accordance with 23 CFR 771.115(b). Therefore we do not anticipate requesting an individual permit but propose to proceed under Nationwide 23 as authorized by a Nationwide Permit (67 FR 2020; January 15, 2002). Section 401 Permit: We anticipate 401 General Certification number 3403 will apply to this project. The NCDOT will adhere to all general conditions of the Water Quality Certification. Therefore, in accordance with 15A NCAC 2H, Section 0.500(a), we are providing two copies of this application to the North Carolina Department of Environment and Natural Resources, Division of Water Quality, for review. If you have any questions or need additional information please feel free to contact me at (910) 251-5724. Sinceely, XLI- Mason Herndon Division 3 DEO cc: w/attachment Mr. Brian Wrenn, Division of Water Quality (2 copies) 124 Division Drive, Wilmington, NC 28401 PHONE: (910) 251-5724 FAX: (910) 251-5727 CATEGORICAL EXCLUSION ACTION CLASSIFICATION FORM TIP Project No. State Project No. Federal-Aid Project No. B-3836 33284.1.1 BRSTP-0111(8) A. Project Description: (Include project scope and location and refer to the attached project location map.) This project proposes to replace bridge No. 35 on NC 111 over Panther Creek in Duplin county. The bridge will be replaced with a new 105-foot long bridge in approximately the same location and roadway elevations as the existing bridge. The roadway cross section of the new bridge will include two I 1-foot lanes with 6-foot offsets. Approach work will consist of resurfacing and tieing into the existing alignment. Guardrail will be installed where warranted. Traffic will be detoured along surrounding roads during construction. See attached map for project location. B. Purpose and Need: Bridge No. 35 has a sufficiency rating of 30.5 out of a possible 100. The deck and substructure of this 54-year old bridge are rated "structurally deficient". Thus, rehabilitation is not economically feasible. The replacement of Bridge No. 35 will result in elimination of restrictive weight limits and allow safer and more efficient traffic operation on this section of the highway. C. Proposed Improvements: Circle one or more of the following Type II improvements, which apply to the project: Modernization of a highway by resurfacing, restoration, rehabilitation, reconstruction, adding shoulders, or adding auxiliary lanes (e.g., parking, weaving, turning, climbing). a. Restoring, Resurfacing, Rehabilitating, and Reconstructing pavement (3R and 4R improvements) b. Widening roadway and shoulders without adding through lanes c. Modernizing gore treatments d. Constructing lane improvements (merge, auxiliary, and turn lanes) e. Adding shoulder drains f. Replacing and rehabilitating culverts, inlets, and drainage pipes, including safety treatments g. Providing driveway pipes h. Performing minor bridge widening (less than one through lane) 2. Highway safety or traffic operations improvement projects including the installation of ramp metering control devices and lighting. NGINEERING a. Installing ramp metering devices b. Installing lights c. Adding or upgrading guardrail d. Installing safety barriers including Jersey type barriers and pier protection e. Installing or replacing impact attenuators f. Upgrading medians including adding or upgrading median barriers g. Improving intersections including relocation and/or realignment h. Making minor roadway realignment i. Channelizing traffic j. Performing clear zone safety improvements including removing hazards and flattening slopes k. Implementing traffic aid systems, signals, and motorist aid 1. Installing bridge safety hardware including bridge rail retrofit 3O Bridge rehabilitation, reconstruction, or replacement or the construction of grade separation to replace existing at-grade railroad crossings. a. Rehabilitating, reconstructing, or replacing bridge approach slabs b. Rehabilitating or replacing bridge decks c. Rehabilitating bridges including painting (no red lead paint), scour repair, fender systems, and minor structural improvements O Replacing a bridge (structure and/or fill) 4. Transportation corridor fringe parking facilities. 5. Construction of new truck weigh stations or rest areas. 6. Approvals for disposal of excess right-of-way or for joint or limited use of right-of-way, where the proposed use does not have significant adverse impacts. 7. Approvals for changes in access control. 8. Construction of new bus storage and maintenance facilities in areas used predominantly for industrial or transportation purposes where such construction is not inconsistent with existing zoning and located on or near a street with adequate capacity to handle anticipated bus and support vehicle traffic. 9. Rehabilitation or reconstruction of existing rail and bus buildings and ancillary facilities where only minor amounts of additional land are required and there is not a substantial increase in the number of users. 10. Construction of bus transfer facilities (an open area consisting of passenger shelters, boarding areas, kiosks and related street improvements) when located in a commercial area or other high activity center in which there is adequate street capacity for projected bus traffic. 11. Construction of rail storage and maintenance facilities in areas used predominantly for industrial or transportation purposes where such construction is not inconsistent with existing zoning and where there is no significant noise impact on the surrounding community. 2 ETNERILL NGINEERING 12. Acquisition of land for hardship or protective purposes, advance land acquisition loans under section 3(b) of the UMT Act. Hardship and protective buying will be permitted only for a particular parcel or a limited number of parcels. These types of land acquisition qualify for a CE only where the acquisition will not limit the evaluation of alternatives, including shifts in alignment for planned construction projects, which may be required in the NEPA process. No project development on such land may proceed until the NEPA process has been completed. D Special Project Information: (Include Environmental Commitments and Permits Required.) Estimated Costs: Total Construction $348,000 Right of Way 0 Total $348,000 Estimated Traffic: Current - 2200 VPD Year 2010 - 4400 VPD TTST - 4 Dual - 3 Proposed Typical Cross Section: The approach roadway cross section will include two 11-foot lanes with 6-foot grass shoulders. The shoulder width will increase to 9-feet where guardrail is installed. Design Speed: 60mph Functional Classification: Division Office Comments: MAJOR COLLECTOR The Division 3 Construction Office concurs in the recommendation of replacing bridge No. 35 in the existing location and detouring traffic along surrounding roads during construction Bridge Demolition: Bridge No. 35 contains 6 spans totaling 76 feet in length. The bridge is composed of concrete deck, steel 1-beams, concrete cap and timber piles. The interior bent piles are submerged in Waters of the United States. Therefore, bridge No. 35 will be removed without dropping any of its components into Waters of the United States. ETPERILL NGIN ERING 3 E. Threshold Criteria The following evaluation of threshold criteria must be completed for Type II actions ECOLOGICAL YES NO (1) Will the project have a substantial impact on any unique or important natural resour ? ? X ? ce (2) Does the project involve habitat where federally listed endangered or threatened species may occur? ? X ? (3) Will the project affect anadromous fish? ? X (4) If the project involves wetlands, is the amount of permanent and/or temporary wetland taking less than one-tenth (1/10) of an acre and have all practicable measures to avoid and minimize wetland t ki b ? a ngs een evaluated? (5) Will the project require the use of U. S. Forest Service lands? ? X (6) Will the quality of adjacent water resources be adversely impacted by proposed construction activities? ? X ? (7) Does the project involve waters classified as Outstanding Water Resources (OWR) and/or High Quality Waters (HQW)? ? X ? (8) Will the project require fill in waters of the United States in any of the designated mountain trout counties? ? X ? (9) Does the project involve any known underground storage tanks (UST's) or hazardous materials sites? ? X ? PERMITS AND COORDINATION YES NO (10) If the project is located within a CAMA county, will the project significantly affect the coastal zone and/or any "Area of Environmental C " AEC ? ? X oncern ( ) (11) Does the project involve Coastal Barrier Resources Act resources? ? X (12) Will a U. S. Coast Guard permit be required? ? X (13) Will the project result in the modification of any existing regulatory floodwa ? ? X ? y N INEERING 4 (14) Will the project require any stream relocations or channel ? changes? SOCIAL, ECONOMIC, AND CULTURAL RESOURCES YES NO (15) Will the project induce substantial impacts to planned growth or land use for the area? ? X ? (16) Will the project require the relocation of any family or business? ? (17) Will the project have a disproportionately high and adverse human health and environmental effect on any minority or low-income o ulation? ? p p (18) If the project involves the acquisition of right of way, is the amount of ri ht of wa ac uisition considered minor? X? ? g y q (19) Will the project involve any changes in access control? ? (20) Will the project substantially alter the usefulness and/or land use of adjacent ro ert ? ? p p y (21) Will the project have an adverse effect on permanent local traffic atterns or communit cohesiveness? ? a p y (22) Is the project included in an approved thoroughfare plan and/or Transportation Improvement Program (and is, therefore in conformance with the Clean Air Act of 1990)? ? , (23) Is the project anticipated to cause an increase in traffic l ? ? vo umes (24) Will traffic be maintained during construction using existing X? ? roads, staged construction, or on-site detours? (25) If the project is a bridge replacement project, will the bridge be replaced at its existing location (along the existing facility) and will all construction proposed in association with the a ? bridge replacement project be contained on the existing facility? (26) Is there substantial controversy on social, economic, or ? a environmental grounds concerning the project? (27) Is the project consistent with all Federal, State, and local laws ? relating to the environmental aspects of the project? (28) Will the project have an "effect" on structures/properties ? eligible for or listed on the National Register of Historic Places? ETHERILL NGINEERI G (29) Will the project affect any archaeological remains which are X important to history or pre-history? ? ? (30) Will the project require the use of Section 4(f) resources (public parks, recreation lands, wildlife and waterfowl refuges, historic sites, or historic bridges, as defined in Section 4(f) of the U. S. Department of Transportation Act of 1966)? ? X ? (31) Will the project result in any conversion of assisted public recreation sites or facilities to non-recreation uses, as defined by Section 6(f) of the Land and Water Conservation Act of 1965, as amended? ? X ? (32) Will the project involve construction in, across, or adjacent to a river designated as a component of or proposed for inclusion in the Natural System of Wild and Scenic Rivers? ? X ? F. Additional Documentation Required for Unfavorable Responses in Part E (Discussion regarding all unfavorable responses in Part E should be provided below. Additional supporting documentation may be attached, as necessary.) To limit adverse effects on bussing routes, construction will be performed only during the summer months. NGINEERING 6 G. CE Approval TIP Project No. B-3836 State Project No. 33284.1.1 Federal-Aid Project No. BRSTP-0111(8) Project Description: (Include project scope and location. Attach location map.) This project proposes to replace bridge No. 35 on NC 111 over Panther Creek in Duplin county. The bridge will be replaced with a new 105-foot long bridge in approximately the same location and roadway elevations as the existing bridge. The roadway cross section of the new bridge will include two 11-foot lanes with 6-foot offsets. Approach work will consist on resurfacing and tieing into the existing alignment. Guardrail will be installed where warranted. Traffic will be detoured along surrounding roads during construction. See attached map for project location. Categorical Exclusion Action Classification: (Check one) X TYPE II(A) TYPE II(B) Approved: 27103 Date et eri Engineering, Inc. .14 ' ElVa to ?61ect Ma age , Bridge Maintenance Unit For Type II(B) projects only: Date Division Administrator Federal Highway Administration ETHERILL 7 NGINEERING • • J • .t • e • ? • ? I , BRIDGE ? - ? 1 ? ? ?V?IlrG " North Carolina Department Of Transportation Division of Highways Project Development and or Environmetnal Analysis Branc Duplin County Replace Bridge No. 35 on NC 111 Over Panther Creek B-3836 SCALE 2000:1 Figure ? m, U, Duplin County (Albertson Quad) Office Use Only: Form Version May 2002 USACE Action ID No. DWQ No. 2 0 0 5 2 0 7$ (If any particular item is not annlicable to this nrniect_ nlease enter "Nnt Annflenhla" nr "N/A" 1 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ? 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: NW 23 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information Owner/Applicant Information Name: _ H Allen Pope, P.E. Division 3 Engineer Mailing Address: North Carolina Department of Transportation 124 Division Dr. Wilmington N.C. 28401 Telephone Number:_ (9102251-5724 Fax Number: (910) 251- 5727 E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Mason Hemdon Company Affiliation:_ Division 3 Environmental Officer Mailing Address: North Carolina Department of Transportation 124 Division Dr. Wilmington N.C. 28401 Telephone Number: (910) 251-5724 Fax Number: (910) 251- 5727 E-mail Address:mherndon(a,dot.state.nc.us Page 5 of 12 III, Project Information Attach A vicinity j?ao early showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Replacement of Bridge No. 35 over Panther Creek 2. T.I.P. Project Number or State Project Number (NCDOT Only): B-3638 3. Property Identification Number (Tax PIN): N/A 4. Location County:_ Duplin Nearest Town: Beulaville Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): Bridge is located on NC 111, approximately 0.5 mi. N of SR 1707. 5. Site coordinates, if available (UTM or Lat/Long): 35.0408333° N 77.8203333° W (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): N/A 7. Nearest body of water (stream/river/sound/ocean/lake): Panther Creek 8. River Basin: Cape Fear (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.ne.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: The area surrounding the bridge is a small wooded area, utility corridor and agricultural fields. Page 6 of 12 10. Describe the overall project in detail, including the type of equipment to be used: The proposed project is to replace the existing 75 ft bridge with a 105ft prestressed cored slab bridge. Standard bridge construction equipment (crane and backhoe) will be used. 11. Explain the purpose of the proposed work: The existing bridge is structurally deficient and has a 30.5 sufficiency rating. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. N/A V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 7 of 12 1. Provide a written description of the proposed impacts: Impacts associated with this project include 12 ft of stream as a result of widening the bridge. 2. Individually list wetland impacts below: Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact (acres) Located within 100-year Floodplain** es/no Distance to Nearest Stream linear feet Type of Wetland*** N/A N/A N/A N/A N/A N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill; excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Map: (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, of online at http://www.fema.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: N/A Total area of wetland impact proposed: N/A 3. Individually list all intermittent and perennial stream impacts below: Stream Impact Site Number indicate on ma Type of Impact* Length of Impact linear feet Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? leasespecify) Sta. 10+35 Bridge 12 Panther Creek 15 ft Perennial * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usgs.gov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.mapquest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 12 Page 8 of 12 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Waterbod (if applicable) y Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. Pond Creation N/A If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Minimization was-incorporated into the design by the use of a longer bridee. Best Management Practices for the Protection of Surface Waters and Bridge Demolition and Removal will be implemented. Top down construction & 2:1 slopes on rip rap at end bents VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 9 of 12 USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strmgide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. The Department has avoided and minimized impacts to Jurisdictional resources to the greatest extent possible as described above. No wetland impacts are associated with this project therefore no mitigation is being proposed. This project is located in the Cape Fear basin within USGS hydrologic unit 03030007 (subbasin 030622). 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): Page 10 of 12 IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify N/A )? Yes ? No ? If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier uired Required Mitigation 1 3 2 1.5 Total Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. Page 11 of 12 If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. N/A XI. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. N/A XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A X11I. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). None Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 12 of 12 T 1!!4 -.t t7r 1.6 T ,- i 19ZQ w +,}, to /Vb•rt6an X' 1991 l 41 ? r Im Im 1P1Y V I I / - 1Cl1 lu n If r IA1P I lm / I O IW6 1149.4. 1l1Q Im • 11 1449/ \ , /..i I 16.W I I 143Q \ 14.4L Ch. I NIN _ \ ? ` • ? 0 h /' ? %'• 144a .1453 1 I 1444 " y - ..' * t Hebron \ ! 2 1. 1191 + (• „ ma•o" 11C6mp6Y 1701 40 1I9F I y MIS l ' u9i I ; LLI 1z44 /, uss Lean 1441 PIMM or 60" _ BMW, I Cnop61 \ " ILU / J O N 1414 1 (,?5 w Im . Im \ • Woo, ' '\ 1243 1.1 .• O '\ _ il J." 212 111! 1 . i ]Lit 1 4 i 1LL1 \ ? • ./ ? • , 1 12iRY ? _ ?. . . \ C6bNt Y I / .p \ 1213 , PHIA '• \ am •'\ /rrttlt -t ' l ' a. Cnu,6N I '• h \ ILU • Tl ' 1154 1 / / k: } lI1Q / \ / /. /1 / • ' ? ' ?? lzsa ? \ 1t It I M ` 1 \ n 1LT4 ^ ? ' • ? .. ? 1743 r '; ' n 1792 +. 1 BEULAALLE r•Jr POP. 1.110 '• ? 1114 '\ • \ \ 1 1141 '•• ?' -''\ \ ..,,. ? ? \ lzs , 6ria61 t ?•' / ?. 1192 ;.-? 14.41 I ? ?. \ ? """'y6 \ I • ; 6 ? r : ? . i -1? • 1 103 ?> \ 1 1 _ 1I3L 7 \ NNNvN16 j,1 ` 144Y, G SL>4 \ 1 G 1!!1 , 1442 / 144 1 I 1445 1495 ll3L ?. 1141 1443 • OLIN"" rsecre ' . p ?r i1L ,Jiiar .t r 1 A 1141 \, / - An " 112 • 1449 Code k " f 1 1414 1491 r or 6 1.6 ' - r .' : 14311 1444 L. \ - .\ I UI a+ Fork C?Wnthh j \ / ifu G / I 41 itu cot ? J .r Lym6n Y 1214 1 •J im 1245 1' 1 •\ • _ ? r, 1443 _ 1 1? ''? fWMN , \ \ ORB[NBVBRB POP, M1 t• O f 1 .I , to \ ti .. /} ; ? 1!411. 1li? ? V ••wirYl W W _ 1L1a CNn*wOn / . 1 ? \ 1413 ? •/• r t.6 1 1!1!! 28.5 ¦ • , i" Cem Pink Hill ?? . (><wh etln \ hxp " Lookout Tower y 14h k6 t i \ ` •.?M tir.'Ya.. -„ye • ? y ( , . /! I ? it .'? ? f ! 111 \ ./ \- --. ' - Subs o' ar ter. / LO r f - /, i r Rad, t Tome k x, . t , WaIde t ow 4 ? 0 .? _ .My„ / j 11 21.0 - BridgeIS \ ? .1 27,0 • +Yl • ' y Leo " .° ' ° •;?' Cem \ / 30... l rsmith? cn 01- Mir Name: ALBERTSON Location: 035.0408100° N 077.8205313° W Date: 11/10/2005 Caption: B-3836 Bridge 35 over Panther Creek on NC 111 In Scale: 1 inch equals 2000 feet Markers Name: Bridge 35 Short Name: Brdg35 Coordinates: 035.0408333° N, 077.8203333° W -tF.3 J .U U1-?L11V v 8 z N6 \ O co < .' + 0 o v ? a m rM m Im op to wits 33284 k o O o o O O O o m H H z c?cnm ?Hm n . n c> r ?LOZ 0.-00 n oom v aOn I? N 0) to 0 ° mO m m mao vv m M :U In - D p p r•i Q H H H H H 00 Z 0 C C) 0Z0 xO>ZrnZ z H H -70 H H m S p 7 Z L L H 2 n D 6{ N = v r Om = f a m n ? n f o o< N 0 a In o n v x m °H; ;U m m xH 111 0 Z m° P -0 m (D moo ,z < m n Z H C) r a < H no F-4 O m O --lo O H O Z O o Z Z 00 n u n u u n n n u N 0 N I.- \ L4 ? W O H. O o -J O 0 0 D o 0 0 N 0 O n T T ° m n N N x H D C f H n D D to 0 -im 7Nmf 0 D H HHp Dr?7 IDZ mOr7c ov wno m C, d a Z w'D H r= w m^' r rmvrx o Z 0 -4m m r n r r N C C) m Z X " H W a ? w ?N1 .{ II of + 0 0 TV N TO •I H r m N C-) D m r' .. 0 ?z u O V 7 c 00 m x tnOf -Imp nZm -4;m 0--U + p W H Z O -i O N r m? n= x ?m rHr x ? N Hw +rtim N wm xx o H H 0 (n m 0a: V) --4 H -n -+m m -- rrx " H(A a m m O N O 0 f<jrH O N n ' u o ° + 1 N ? ? ~O a o m C a? rn i ? Zm I 2 H M=? cZi Z -m{ rn M H M c?7? p to `I ?5 U \ ??00 o T a m rn W?Z O VO O c 2 !nR 12i1 Gi ?I y Icy ?rn io v m r --q - co N W 0? D H Z mom ;0 m ° z o G7 Z (n ao n#a 0 r N Zwr 2U1 + W f-r Z W ? m O x ? a m L W Z a Q (N, ° Z o CC) -b. Z 1-i x c) ; 0 i - Z m -+ n H W r i n m ? !-+ Z Ul C Z o .. 0 1 mHz c i H T ).mx p HH10 nrx m rz Nz Fom0 nv om+no '-n d?Dmz om mY?H O 0 O mW OD .0 tDn v 0 W rr z n H W N H ? M M w to O H O z ° N d 11 1 100.00' RIGHT WAY x omvD m• m r °rvm m m z ?a°o?n x Ln O x ZFZC D j m H II a> H o A twi z w Z o-coz toV1p0 r t o 0 o W r' L C ' v> 0 rn I ° -7,>-o 0 -z m n I ? - I 00 S H H 0H OOD II I 0 x `; nI I H PZ" ? Nom n r N n N m ° (J n m u I z x D to ° I I m I r tn f V) I v H H mI m ? H 2 .02 Hm r I V) n c> x0 I tDZ a' I DO C:: I IO Co L4 X I I I T °x z 0 I ? ° r J w I X mx rx ?n } ? w H r > V) \V _- ? C5 O I I W n? Z WIC H+ x M0 m V1 W k Ir)I k? F ?+ I n , 1 I i -4 \ \ N n m n ? m v Z LM N j o w v m A ?N m -1 co H K 00 < 0 < mm m x H + <n o H O ? I bd O m A I N H Z n 0(nm ono { V *r W I H m-n -u n x m m n -+ o v O ? O = ° z ° O T ?, N D -+ 1 n x A ° m n m n ; A o N m p D v n A o m z x ?L N W ° c 00 JN ; A n? O ? D r p O M + mt F.- L1 0 n I ?r C) r n N !n H H H .D D "0 H W 0 0 W m omzr x w-in" Z x--,, r"o00 pp z mpA? ODD H ? < I?NOA m mindO vv pm H v z Z H p m H -? N =?SOVwi m m 0 -- X Z n v xmn? ° p 7c z II II = ? 1 o tnc n 2 H A H m f tnl -o ; r zmH ? co n c I n m v i x ?-• Z n 1\In co T m ml D o m f H \rO HHr, AH O I 0 o on -4 H C z z Z ?1 VI n HO 0 mw rO H< 1 H m I (A M v I Roma to + OD I n *wo y m l I n d o oZ m c6 N L + n LA f?l \ \?O ) I LA r O 0 r m \ I ti I °o v O L'i I? \ -I ----------??- ------------- .? ro- lc6 rOo \ \ I \ C,p??'? I \ `\ I I ?J N 1 CD ` n L?1C; ca I I \? ?? 1 1 0 ?I o iN 10- I II r' I n I 1;? N m ~?\ TT Z I I z D CO I 0 I 0Nm _ = z ?nr In0 X _DV mgr r+ " .02 .02 I -D Fom I P H w + u 0 fD'> co Z D ?NUI, e'7 D -I -4 ID- M co x IFZ w I In .p r \ I I ' In , v I L; A D mr? m m I 0HN 0° z I m cn v T\ I m N I D 7Hc a m •HZ I H+Z J m D 0 ?7 I H Z ,O ?-• m m,_ m o N -q H S +;u m I r °cn 0 ?o V)+ v o'I„ czi I o m m op m -I I o O m O S D L11 1 O o n O u D x w c z n n H o - r ° -a -` m m 100.00' RIGHT OF WAY 0 O :0 W ?1 m p I W N n :E HZ -4 cncn r--n mH m Z v D zox mH Hoxx xx f ??xDH W? nxv 0u H H -IZm mm m?lmm fH ?° m .Tl D n n S m S D H H D H 0 H O m mo >V) mmr. AHC?1NHm rn ?Or yr-{ z - Z "1SX mr O1milnn ln(n OZ 0H D S o W j O X Z n m N n N M rm r D m A H H rx*7HN H m 00 H-'' W co z -? z N --l m O O 0 n to m fmHHi Dm =o A? Cm'1C mmm =0 z m z z zi m< -<=-Di m n H H H m m H HH? r? mO?? C O m n 0 HHX Z W" F) Z °m z m rnO r mz -vO V1 Az zz n <m 0m-< "< D Mom XH -1HH-I-HI nm D o o D o ff :S7 ? o? 0 ,p a? d r z n -1 A p clt o m D O mH ?-1 CpHnn rx N^'? -I m H D t1t W ?1 V1 H Z = x z m1n NN ?x>r n> r ° o D• Hm -u SOO T A m Om1n -n - ? OH N n xm H? ;gmm D D nH mv?D HH :n Zm m zN co ° o zH m N m .4-4-4 N m z m p 1 r to A o °x tn-+ v,rr.,m (/)m oooN cmmmv= nr m= D x (n< oz 14 Z n m Z z m O ?r D crr- Om W-D-1H .TjIO H Hn ?m z m x = S W xm mOO -iM N MHO ; O m 0, X D Z m r r Hm H= 00z .." IO n> cu C ; HO m m D n C am rA Cnn Om Z -q H m N C m n m o < r Vl -+p m ?7 ?7m N° 2 'D 0 D ;7 n r > -< H O N vm Hx ?mm O" C) .Zm7 m 0 O N H --4 Z m n S Wv rm imp VIZ 7c ?7 N N O p m z HHI r 70 m? oom°:U on -1 CD r m 'm Z r N? '9m mCW Cn Z A cM> Wmj -on 0 H< o o m m o z n N m HD zv NmH DQ O Z O H H z H Z r H ; Z H D rH t.Hn Om OW•'• HZ H m (;-) H Z 17 ?1 F"' °Dn ref°A H < Z0 n znN Hrn r n H n > m D. Co pZ M r) C OHZ 0ZN C)" Cr, 0 0 H r. D Z m 0 H m x m -'H VmIH Hm 0 Hr7i z w a\ W xm-1 ...x .n O m x n H O 0 D z m z mD i H H H m H z O rn . 0 " n m z m y x z m z o m L ? H 10 0 2 m m ly r O Vi ? Vb 2 m? x z H m mm x ?r 1 m o` a c T n- ?J uJ N Jo O ? v v P 2 p L W H N O 2 N I °s Cy 1 N A m DZ V ZN Iz x x Ind nH 3. N oNm ?? -I H m ONO NC IT1 N C) ?D71 D? N Pm" m 1-I m m Z ---I V) -I Z n D °s °n n r`-K rnv n N D mM 1Dg N m ?D m m m S Opp N 2 H-n x Z fm N N A? NN O H O m HN ? W G w H O GJ VIX I- -IH N m< r D N ,l o G.--1 i ra; L no (l a W D N = H O O S -FO ? N l\\\\ a p \ N N .D FT H N NIA -41 N m r ,. IV ? N ? X M N N W -I N I f w a N i I N nH A'm _^ N M N Iv a e H D? aY oj?w ? n D r N m I ?D o w D Da a n y m H .?.. z m o a - n - x E N H a w tD m? o v o o o m m ? n N D H u Z I r' Z 1 l7 O D Z v m w j I' N x v a x w a X ? N O 3„ 3„ ?r x m U' x n ?m I ?m ?rp a cn X? OO a m n Wr wH \ z m r N n 9„ N m 'o N x ? N x m -6" ° i m N O i ? r47 O A ? 1c: co H O O m Z vmm w -5 n r Im n °nx ° VI --I O a m m L- -J H C) N 9" 9" i r? ? n f -'?61 co VI w n rn- M0 Hz m H m ? cz I r ?n Ixo -I IV) m H I'-1=0 -#i > Z I n ? ° p H M z N F-I Z /Z 1-4 N y J C° 0 D 0 0 C ?T v rn ° 0 m i? m ? z i .-, m mi\ H H 2 ? r N N C T T ,Jp? ' rZ 31?-- N V O ?. J 50 P 3 p mao ro • ? II 0 o? m-4 0 0 ° mro ,, a m r C7 "O n NO 0 n Ro H m on ? ?c- 1-4 b- V) v / m LI I III II I I ..?1 1 I I I I I I 11 1I ' T T I I I I I, +I T I?I I I I till ' T I ' IjI I IlTI' I I I I tjl ? I I o T1 I ? I O I I ? ?7 Z I ' f N tj I D z IjI HZ O I I 1m TI i I 1 ? II I I ' Om V N? (n + j l o> m III 1 (7 I I I TD I v 1 1 T 1 IjI I I I?I I' I' 1 I I I tI1I j I I I I I ' -t- j I IjI I I ' I' I 1 I I III I I N I I 0 n ?? 0 i m o ) T-iTl ? I N a O s 0 i m N I a i m 0 ? o ? n ?z z ?m m -? <L v v m m lolo ,h 3 m? I z 2 m H mi\ MITI 1 ? MH ZL ? rr- l I w b c •o'' g c ,o•oZ?- n ?VJN?v 3maa 0 H V? . 2 ? 20 20 zmH DZ"0 Z'N Z m-I Inx mx °mm mH O oN M V' NN N(7 ° ?DZI v ic rn D'U Vl (l H mx> ?7 VI 110 V1 Z H Wm WZ H'n HZ H D D O ? p O H r n O rD { O> rx n V) m r m A 0 m X W D m m xvi v? rrl m z mx H H o Zc rrl z z o Zm v m *I-I °0 ?N n= 0o m z 7 H z 4 H Vl H zr m G7 H O G? n = D N mr M K D 4'-35 " mm 0 2'-6" -95? " MFOO pm --I m POUR 1 1 POUR 0 m o m -V r- I r.v0 a r° V o O m --??- cs ?-D L W H aW I p z in x D I tD A ! I ? r V1W ? N .?. ? N a V Io -I = n? v m r_ N ? N a H x r (n rri V) W ? N < p I V V1 N W N N i tD N t tn N ; N N a N nN V1 I V1 i cuH N D ? ? -1 a N D a ca cn , o I Waor N A O VI --I O I M fF) ° O R°rf=) rrrI V) 1'-61 2 aC) HD l- m " V) j I ro m II x m v D • C7 C- --I in I 0 H ? _ _ m m N = x i H O ?? D ` I I r 1 - _ N co O -1 v -1 \ cr) O N \ W C O a cn < d 1 ?' x ? O1 I 1 ? N H I I r , m 0 d a N P7 W - I -- a l N II A I I a p O W n _ , (7 a ! N I m N II x I O O It D a ° M mr o D v 0 I < r-?om ? = I I I ?/,? H 1 m N o I I I I // 1 I N? lJt V .?.. O I I / D \ Z m N 7tz; v a I, I I K A ^ I I W ? \ I ? N I \ I, I t , H(rO -u u H -00 0 ? H m m H n D ? O II 0 p m Ql w n fn \ I WH n x ' x X, r^" N ? x N O ^ O I O O-(m Oa ?7 e I II I x H n\ m I W Ln I :O z ' o c> N i D I ° a II 4 -1 , I? - b I I rl IN = A ? a m z vm Iw .. i c? vz H { O x x;,u v v n a rt? 30N3d IIIS AHVHOdW31 Od ONIMVNG ONVONV1s ucTIM 'HOI3TVN SAVMHOIH d0 NOISIAIO ,V, WA1 N03HS I'IIS S70H AN oaw31 NOIIV1NOdSNVN1 d0 'ld3G Nod ONIMYNO ONYONVIS HS11ON3 VNIdO 31Yi ON m D N m ..g ?A.1 E m . m x ,;, H N (7 -? r H D z cn v v) m H I r H m n 70 m -u i ? >I m I m m Z " H m m I v ml I m I I JI A Hr mn v? ENGLISH STANDARD DRAWING FOR STATE OF TEMPORARY ROCK SILT CHECK TYPE 'A' NORTH CAROLINA W g DEPT. OF TRANSPORTATION ro . DIVISION OF HIGHWAYS RALEIGH, N.C. IE V Z ? O y m f- -i o?y$ z z m of -- m r m m m o y S O'N 31V18 I g a? ?m ti g 3a ? m z ? 0 OZ I ? ?T Z ~ N Z m ? m m H Z H mr- I ',? N OI m ? o VI a ??° ? aQ m W pV O N O 2 ?' P R 2 $ cn m n m O m °s (Ti ;7 O -p? b o D D :U m D = -< m O cn Cy 1-+ .u ro m O N m O JC ?' m N W 7C m o ? = Z OTO yp z V •12z O Lj T.., aSs N y H a ?-? W O y1 Otl l1 ZZ y c fnry.?L'''?? ?' S xmLz T g AKi?o {n"m '"o .' F m y om y y LF i mr2 -ly j- ??= m _ w> 9oa r^oRID y s 2 u,Z ,mN~T z m ?N NULL aH STANDARD DRAWING FC TEMPORARY SILT FENCE x N h m -? o o N 0 Z x -, 0 m O Z m z N Q C 0 C) fin. g? H O + W ~ Z W z m Ln in (.AI N V O Z I co "A O I- I A W O Z Z l °. sII? ?? STATE OF NORTH CAROLINA DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH, N.C. og A i i i I I W H r o m x Z a j' to `r\ Ln x m m \ H H ? m H m n H v I \? I k I ? to ? I I I + O O ?- O I m O O --1 O Z n N I cu,n 0° .°Hm m >c) • H r?Z l O G0 °•°n I R, I N O o r^ I I N o Ir' I I I I V1W m I Im Nm? nr-° I I I i nc H I• r nz I + m °m I O+o ? I I I -v m O X I m rri (A tz pA m n I?a ?o D z I xH o D wr-x W I r z I cis " p o 1 N n-4 D I I r o r - I CD C, -4m r+, W I I O N m D r ) •-•' X;n p rn DIIC?D v m N~O + \ I p (@ '' v ^ ° + OD I Ncn o I -cnim? ? ?2r- ?I ?"N f ;U O.- W m H a 1 O n a m O O W o r v to r- 0 O D O \ ? I? I v H I? ? I I ? I Q?TyFP ? 0+ \ Z C) II v o co nm z ?z I D V) Dvl H H n r n v N v O?I I cn m W N 0 n r rte- V r I D .? W IDS _ W O T IN@ ,m r Ir Z _+ I ,v o o w m Z -4 c') (11 m N tU-4Z Dv M +D oPmm :'0 Ln o O m Lr, .n ?7 N O HZl'U'c --I-1 Z7 0 110 m vVl V1A DHH m H Z 3:DmD =xm H T? HHHCQ)ZZ m r TA I", ?1H mmfJnHO -irHZCVI VI D -4 m pm, -4 ZoHIWi c°)m z-'m lrna Z m H HDAm °mrmm m'T7nmmrr H m x nFmlzmH• v nmz zrr- n m m' oz cu% V> ? czi°ANVCn m H r?m?m rxil+mrHi mo?UiHCrH ammo w r4i m n?Z mmzzn nzmp-4 m c o voZO rr ?D< AOm 'U V) ADZ A Z ?7 N ?Dn N =Nr0 WHH<Hm cl Z N xz-I zmm', BA mzc)izm. v v D r p V'T-':12n DOHHm D H co rDm VZ1 Dor DH voxwxr- H mH O-IMMO"-71 m `- 1-i m.Zmi2 M v°JnrZ mZOO r*1 V1 2 fTNI -u, oZ5m O =I zrr-'z D lxr vm3; " mz-, Z 47m F. m "'omm mz-< s X( I CC) n m H SO ()nH=n p o 0N,, z ?mHmcvr < O m= m H?Zozmr- ::E Z z W m m m I z cu Q r 00 < m --I m O m mm m X Z m H v m cn m N ?m'" vnn HZr H n r m x vl m I r n z -Di N H H .Z7 I \ H Tn n v m' I 0 z ---rte I I + I O I I I I I I I I I I I I I I I I I I I I I I I I I I v mm H r x m n I? too, m H m W=Z omACD? O omVf ZOMO (A m-n cnmDm r -i-icntn F-I r AD cn O DH ccHn Z =m; HZG0 n '"(30 Z >"r DZ HvHCO - mz? ?or, P -Ir 0OH O 0m rDHH (n Z M nm AA ITI xD m mr-H.. co V) ` m ?? zH Z C7 0" F H m rrjO Hr j DH m H CD m D r- < m .M N C.M r ll? orA r- r H H < D T + H H N Z z co N It c' a In m m m ? -I ? o c ?d g ? O t °x O ? j rn ? z° r z 1 00 O O + O O 0 0 N + O O ?Q n I x 1 I 1 I I \ I I a I o II if 8+00 ? I I I 9+00 I I m I I S ° I I 0 ni 1 I I I / g I I 10+00 I 4l „+00 ? of y 1 i I ? o I i ' L I s I ?? I 12+00 W tt? O v? O 9 i z v v 9 is N I 13+00 s°pr O ? ?? f ?ybN ? b ? tro' r ? ?? 00 3 y 70 ; O z n c s g ? o A x j AD om z n ? C y n W ? ? m ? F o n r € I 3 n o ~ ' n1a ?nla nnn?? a ? ¦19 nli3 11Mn19