Loading...
HomeMy WebLinkAbout20100145 Ver 1_Application_20100224 STATE OF NORTH CAROLINA R DEPARTMENT OF TRANSPORTATION BEVERLY EAVES PERDUE EUGENE A. C t7R?L IR. GOVERNOR SECRETARY "'"'+++YYY February 22, 2010 Ms. Amy Euliss NC DENR Division of Water Quality 585 Waughtown Street Winston-Salem, NC 27107 Mr. Andrew Williams US Army Corps of Engineers 6508 Falls of the Neuse Suite 120 Raleigh, NC 27615-6814 (Two Copies) Subject: Guilford County, Rambling Road (SR 2295) Project Number # 7B.204111 To Whom It May Concern: 1®0145 The North Carolina Department of Transportation (NCDOT) proposes to remove sediment at the inlet and outlet end of a pipe on Rambling Road (SR 2295) in Guilford County. The sediment will be removed in order to restore stream flow to conditions prior to the sediment build up. This activity will result in permanent impacts to Moores Creek. The NCDOT anticipates that the activity will be authorized under Nationwide Permit (NWP) 3 and 33. This application is intended as a request for written authorization from the US Army Corps of Engineers for the Nationwide 3 and 33. This package is also being forwarded to the NC Division of Water Quality for written authorization as prescribed under General Water Quality Certification #3687 (NW 3) and #3688 (NW 33). The following information is being provided to satisfy conditions of the Nationwide Permit and General Water Quality Certification. i, P.O. Box 14996 Greensboro, NC 27415-4996 Telephone No. (336) 334-3192 Fax No. (336) 334-3637 PROJECT INFORMATION Road Name SR Number Project Length miles Classification Rambling Road SR 2295 N/A Subdivision River Basin: DWQ ID Water Quality Designation % Impervious Surface Cape Fear 16-11-3 WS-Ill; NSW N/A Buffer Rules'* Buffer Rule Conditions (where applicable) Yes Jordan Lake Buffer n Protected Species Present Mapped Historic Pro ertiesc CAMA AEC Essential Fishery Habitat No No No No 'Separate documentation attached as needed: See the attached Endangered Species.Review Sheet for further information: 'When Applicable - See the attached Historic Review Letter for further information SEDIMENT REMOVAL Site Station N/A Stream Type Perennial Existing Stream 5 to 10 feet Proposed 5 to 10 feet Width Stream Width Construction Dewater stream to allow removal of Dewatering Pump around utilizing sandbags Method sediment in the dry by using a trackhoe or Device' with filter fabric backhoe and transporting sediment offsite Burial Depth N/A E/C Plan NIA Date Construction As soon as practicable Duration one week Date Impacts ft. Approximately 20 total linear feet of permanent stream impacts. Special Conditions Restoration Plan Within 15 working days of the project completion any disturbed area adjacent to the stream will be restored and seeded. RCP = reinforced concrete pipe; CMP = Corrugated metal pipe; CMPA = Corrugated metal pipe arch; E/C = Erosion control. 'A less intrusive dewatering device may be used in lieu of the one proposed. MINIMIZATION INFORMATION Impacts will be minimized by strict enforcement of Best Management Practices for the protection of surface waters and wetlands, restrictions against the staging of equipment in or adjacent to waters of the US, and coordination (including a pre-construction meeting) with the Division Environmental Officer. MITIGATION INFORMATION Stream mitigation is not anticipated, as the impacts to any individual stream do not exceed 150 feet Wetland mitigation is not anticipated, as wetland impacts do not exceed 0.10 acres and do not occur in a unique natural wetland. APPLICATION INFORMATION Enclosed please find the Pre-construction Notification Form and supporting documentation for the above referenced project. If you have any questions or need any additional information, please contact Jeremy DeLapp (336) 375-5475 or Jerry Parker at (336) 256-2063. Your time and effort are appreciated. Sincerely, (:;visi .on Engineer, Division 7 Enclosures CC: Tim Powers, Bridge Maintenance NCDOT Barry Harrington, NCDOT S. Lane Hall, NCDOT 020 WA7F9 y I 1 > Ir®?I o < Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN Form A. Applicant Information 1. Processing la. Type(s) of approval sought from the Corps: ? Section 404 Permit ? Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 3 and 33 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ? Yes ® No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: El Yes ® No For the record only for Corps Permit: ? Yes ®No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ®No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes ® No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Rambling Road 2b. County: Guilford 2c. Nearest municipality / town: Summerfield 2d . Subdivision name: N/A 2e . NCDOT only, T.I.P. or state project no: 76.204111 3. Owner Information 3a . Name(s) on Recorded Deed: 3b . Deed Book and Page No. 3c . Responsible Party (for LLC if applicable): 3d . Street address: 3e . City, state, zip: 3f. Telephone no.: 3g . Fax no.. 3h . Email address: Page 1 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ® Agent ? Other, specify: 4b. Name: J. M. Mills 4c. Business name (if applicable): Division Engineer NCDOT Division Seven 4d. Street address: P.O. Box 14996 4e. City, state, zip: Greensboro, NC 27415 4f. Telephone no.: 336 334-3297 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Jerry Parker 5b. Business name (if applicable): Division Environmental Supervisor 5c. Street address: P.O. Box 14996 5d. City, state, zip: Greensboro, NC 27415 5e. Telephone no.: 336 256-2063 5f. Fax no.: 5g. Email address: Page 2 of 10 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification I a. Property identification no. (tax PIN or parcel ID): N/A 1 b. Site coordinates (in decimal degrees): Latitude: See attached USGS map Longitude: - (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Moores Creek 2b. Water Quality Classification of nearest receiving water: WS-III ; NSW 2c. River basin: Cape Fear 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Residential Subdivision 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 60 3d. Explain the purpose of the proposed project: Removal of accumulated sediment at the outlet and inlet end of one of the culverts to allow for increased stream flow 3e.. Describe the overall project in detail, including the type of equipment to be used: The site will be de-watered and then by use of a backhoe and/or trackhoe, sediment will be removed and transported offsite. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: ? Yes ®No ? Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? El Preliminary ? Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ? Yes ® No ? Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 21b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number- Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number- (PER) or (Corps-404,10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) Sediment ® PER ® Corps S1 ® P ? T Removal at inlet Moores Creek INT ®DWQ 5 to 10 ft 10 end S2 El P El T Sediment removal at outlet end Moores Creek E] PER ? INT E] Corps El DWQ 5 to 10 ft 10 S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T El PER ? Corps ? INT ? DWQ ? PER ? Corps S5 ? P ? T ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 20 linear ft 3i. Comments: Page 4 of 10 PCN Form -Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed. impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 41. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWC) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ?Tar-Pamlico ? Other: Jordan Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. Be. 6f. 6g. Buffer impact number- Reason Buffer Zone 1 impact Zone2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary (T) impact required? ?Yes B1 ?P?T ? No ?Yes B2 ?P?T ? No ?Yes B3 ?P?T El No 6h. Total buffer impacts 6i. Comments: Page 5 of 10 PCN Form - Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization Ia. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Impacts will be minimized by utilization of Best Management Practices and by performing work in the dry. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Best Management Practices will be utilized during construction. Pre-construction meeting with Environmental Superevisor will take place prior to commencing construction 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ® No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ®No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, pennittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ? No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Comments: All work will be performed in the streambed and will result in no increase ? Yes ® No in stormwater flow within the buffer area. 2. Stor mwater Management Plan 2a. What is the overall percent imperviousness of this project? N/A % 2b. Does this project require a Stormwater Management Plan? ? Yes N No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Proposed work will be in the stream to restore to flow capacities prior to sediment build up. Stormwater flow should not increase more than the original flow prior to the build up. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? N DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? N/A ? Phase II ? NSW 3b . Which of the following locally-implemented stonmwater management programs El USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes H No attached? 4. DWQ Stormwater Program Review ? Coastal counties ? HOW 4a . Which of the following state-implemented stormwater management programs apply ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b . Has the approved Stormwater Management Plan with proof of approval been ? Yes N No attached? 5. DWQ 401 Unit Stormwater Review 5a . Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b . Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 8 of 10 PCN Form -Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federaUstate) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ? Yes ? No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ®No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. NA Page 9 of 10 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ®No impacts? ? Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? US Fish and Wildlife Web Site 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habit ? Yes ®No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? N/A 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? National Historic Register Web Site 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? NC Floodplain Mapping Information System C5 J.M. Mills Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only a an authorization letter from the applicant is provided.) Page 10 of 10 PCN Form -Version 1.3 December 10, 2008 Version N.C. D.O.T. BRIDGE MAINT. DEPT. EROSION CONTROL SEQUENCE COUNTY Guilford PIPE NO. 2184 S.R. No. 2295-Rambling Rd Lat-36-08-52N Location-0.3 north of Sr 2269-Alcorn Rd Br. No. NA Long.79-55-53W PROJECT No. 7B.204111 DESCRIPTION: Removal of sand from inlet and outlet ends of pipe to allow for better streamflow Note: All Erosion Control devices & proper installation plus maintenance of erosion control will be performed by using - NCDOT Best Management Practices for Construction and Maintenance Activites Manual 1 Using sandbags wl filter fabric-construct impervious dam upstream and at inlet end if existing pipe with stream flow. 2 Pump stream into north pipe. 3 Using backhoe-clean out inlet and oulet ends of south pipe-Some manuel shoveling will be required. 4 If necessary for access-pump water from excavation into a silt bag 5 Remove sandbags to let stream flow into both pipes APPROXIMATE PROJECT START DATE NA PREPARED BY _ Alan Levers TSIII APPROVAL f TRANSPORTATION SUPE ?VIS-O17/ III / /2 ,'ti?i DIV. BRIDGE ENG. DATE 1219/2009 DATE ?Z ?7 C 7 DATE COUNTY Guilford S.R. No. 2295- Ramblina Rd BRIDGE No 2184 SEOUENCEI Using sandbags wl filter fabric-construct impervious dam upstream and at inlet end If existing pipe with stream flow. Pump stream into north pipe. LEGENDS _ ., .. SANDBAGS . trees.... COUNTY Guilford S.R. No. 2295-Rambling Rd BRIDGE No NA SEQUENCE2 3 Using backhoeclean out inlet and oulet ends of south pipe-Some manuel shoveling will be required. 4 If necessary for access-pump water from excavation into a silt bag "'yW'' -`VJ' "'W' -,W" pump 11 o backhoe To Sr 2269 0 sandbags silt bag LEGENDS gar trees SEQUENCE 3 COUNTY Guilford PIPE'NO. 2184 S.R. No. 2295-Rambling Rd SEQUENCES Remove sandbags to let stream flow into both pipes 1 r o .a y/ ,! ";?., +, OR p \? as .+>aMAPRE LL". +' ° r Ig _' ". ' ?/ IVR ? R° E SUM FIELD ? Rp or p '.xQ rPx ° $ a? `? 'I o I\ '.'FOUR EDARS c.z WOR 1 s , I ;ry ? ? , 68 C BRIETpN ° r ., ? T ? ? ??I I n ? / g 7FE EDGE' CDLTON DR RO `? / _ _ _ b k -_ xu p KINROSS DR t / _ RD '.p z ?` "1 27310 ° EAS7RIDGE RD{ pKBANK I o? -I /,' RD RE : ?eD . 27358" - _ RD BUNCH gJ2 o P- ???// /? / ?- t m N?1Y l --I 4Bi15 BOL ?' \ '' a ,6tft MQq ? a $ f .t, ? ?,` w ? J.. fH V t . RIDGE ?p yy' ?p°+q 9 Y .DE y v-.Z' 9049 ;m I v ° ? RD j ??'?'c ?? e [i S 2.?+ / I Onx Fo AK 9 p P H w a1 x P ' g. N I y . ?I ,OPO . V2.1 c0 c. : BUdE r o of RP\l f O '{- ° '^f k 7 kp`? 5E GP?Vf f a = DEER D 0.L tR RIDGEjM;m ?E RI P ex ! 4. Y 'N'l 9 P {l ! 1 f y P s ?G r: "Y i ?,D3+f t q? / ° oe WT f r AS RfT LN ee ';? + .(NF's yC2 x 11 / "` ;o [D f `a l>RUE EED DR ?., ? /)/t ° . Goa uT i J T ?°..`c-?'t,'?+ n fOME o 1 iIM DR xo 4 y?GH E 9 t-?? ? ?1 rF y/?/4'I ti0 ?? "fi. ?yR? c+Q BER pEGZ '£???? yG L i ', Ip ? ? aFWLEMPN r? 1? ? H y Y tr V 1 ??\/? -r'ie ? fxx I d?"?ooe r i.{S ocT`" .( f .r ; H \ f cI v /s s '\W ?' .e^ /* '°x P 90 Q? 3 ', *i ?.a / $ fi 3 e E ? 2/ O x I +"?? c--?.-g- ox'v y ' N ,r 3w rs aT 2- xJ' {[?II// s / ?" GUILFORD v y xrT ,T , t? k?' ?'E 1 ? ?? {i (/ l I t « ti q .. f` I ? ? f 1r ? \ LARfl Y51N k+Y" oN QO Y?, ?"w! . H ry'sgF.,?P v ' '? ? I o I f \ y `,? ? BEV i4 ?,? "? , <qr , t;,?pa s. \ ^,i? P q TING tV kykl + ? //. mlD SCH cH I ? w 4'4 ? ? n'x,Fa' NE 9 0....4{ 44Y hJtA n:.?k% M Y NGRTHWEST 0 f Y t 3if yC .} Yea Op4 / o G) q w A R\ A ?n '` HIGH scH. Oci yr - 9 3 s /? ?r/a iSry' p 3 1 4, /OE t s ra t 4 o /? ?i 2 2 A i? ?.? qOC s 1p'w I\ 1 f d CT tR D` RD v V LC)RN ?. o i, i xR rr d, qop ,i r B w } k a BPITTDN -? GREB N i of ?a?? l w co V rr ?? y R '` s i T W'^ n`v` ?ia?o ?q ??44++y,Ay,???? F. d c^•: G'. G019 tRIpG w 1 O In ?s O ' }y "e o \ Aa ?Y'",% Arc f,P,y? r t'`xf. m f ?LN E?QJ I? @? ?f(p `T i.?°3v Q? \ an?G ?:? eo"a '? X e cn[sT DR. I.? HMC AMO / \ f ? I / l po F o ? I o ? e? V ? RDCAS LE ? iR0 v 00JPN4. ?EEk p P<J o OREEC> :OREST CT. TANYA IN E?St`Ra ??, 27235oc sp 9 p \ ER OUAIm CR I t? £ p OA F aF ?7 7P E li /h v I a J S'<1 LL 27409 9i D D. POBERI ;H wr D so DR F V4L / OGGING/ O Rambling Road -Upstream view from road Rambling Road- Inlet view from upstream side Rambling Road- Downstream view from road - Rambling Road- Outlet view trom downstream siae