Loading...
HomeMy WebLinkAbout125 Michael Lee LaneNCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary July 30, 2009 Larry Daragjati 322 Arlene Street Staten Island, NY 10314 BASIN: Neuse River Buffer Determination (15A NCAC 2B .0233) Tar-Pamlico Buffer Determination X (15A NCAC 2B .0259) Project Name: 125 Michael Lee Lane Location/Directions: located south of Leggett Road Subject Stream: UT to Tar River TPBRR0#09-106 Edgecombe County Date of Determination: 7/22/09 Feature(s) Not Subject Start @ j Stop@ Soil Survey USGS A Sub ect X To o X B X X C X X D X X E X X F X X G X X H X X I X Throughout X X ro e Explanation: The feature(s) listed above has or have been located on the Soil Survey of Edgecombe County, North Carolina or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each feature that is checked "Not Subject" has been determined not to be a stream or is not present on the property. Features that are checked "Subject" have been located on the property and possess characteristics that qualify it to be a stream. There may be other streams located on your property that do not show up on the maps referenced above but, still may be considered jurisdictional according to the US Army Corps of Engineers and/or to the Division of Water Quality. North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Phone (919) 791-4200 Internet: www.ncwaterquality.org 1628 Mail Service Center Raleigh, NC 27699-1628 FAX (919) 788-7159 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper N"" oni?etthhCarolina Naturally Customer Service 877-623-6748 During the site inspection you inquired about crossing the stream/buffer (Feature I) to access your property on the opposite side of the stream. Lauren Witherspoon indicated that the if the crossing impacted equal to or less than 25 LF of stream channel perpendicularly then it would be considered Exempt from the buffer rules and does not require DWQ notification. DWQ also observed that heavy equipment was used in Zone 1 of the riparian buffer to create a drainage towards the stream. This constitutes a violation of the Tar-Pamlico River Riparian Buffer Rules. You said that you would backfill and stabilize this area to its original grade within the week. Lauren Witherspoon agreed that if this work was performed within the week then no further action would be taken concerning this matter. This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWQ or Delegated Local Authority that a surface water exists and that it is subject to the buffer rule may request a determination by the Director. A request for a determination by the Director shall be referred to the Director in writing c/o Cyndi Karoly , DWQ Wetlands/401 Unit, 2321 Crabtree Blvd., Raleigh, NC 27604-2260. Individuals that dispute a determination by the DWQ or Delegated Local Authority that "exempts" a surface water from the buffer rule may ask for an ad judicatory hearing. You must act within 60 days of the date that you receive this letter. Applicants are hereby notified that the 60-day statutory appeal time does not start until the affected party (including downstream and adjacent landowners) is notified of this decision. DWQ recommends that the applicant conduct this notification in order to be certain that third party appeals are made in a timely manner. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This determination is final and binding unless you ask for a hearing within 60 days. The owner/future owners should notify the Division of Water Quality (including any other Local, State, and Federal Agencies) of this decision concerning any future correspondences regarding the subject property (stated above). This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the Division of Water Quality (Central Office) at (919)-733-1786, and the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-876-8441. rRespectfully, yY , Lauren C. Witherspoon Environmental Senior Specialist CC: Wetlands/ Stormwater Branch, 2321 Crabtree Blvd, Suite 250, Raleigh, NC 27604 RRO/SWP File Copy TerraServer Image Courtesy of the USGS Page 1 of Send To Printer Back To Terra5erver Change to 11x17 Print Size Show Grid Lines Change to Landscape ZUSGS 6 km NE of Rocky Mount, North Carolina, United States 01 Jul 1977 75 ---?-. r-- ?. t • r ?? t • Lail ¦ ?- P J IL L le 11 •? T } 1270 0` 200M 0, , 200yd Image courtesy of the U.S. Geological Survey © 2004 Microsoft Corporation. Terms of Use Privacy Statement 'i 'C? U-rC1, 1 ^ http://terraserver-usa.com/PrintImage. aspx?T=2&S=11 &Z=18&X=629&Y=9957& W=1 &a s=%7cRockv+... 7/l oo nno .tie ppB f a A ,ram rl W I<E3 �s 'yl t l AaA ..�•� Fkv St vim, i B AaFi`. e AaA S' E ..j StB i WkB AaA f P aA 1 , t z �; ' �'• AaAAa SiBAaA ��, Wk AaA A� _._ n r o, We t StB .f DgAWkB WkB `-; W e~ W k8 AaA WkB DgA Q �NKp' AaA StB 97 CeB� Sty`'."'"•--•'''..Y",r-- • Tj WkB 'a8 81 6t6 �N Sib Cc J ✓ �o J. 4_r_ _ AaA *---�� C /,, WkBRo Wk6 A x� e � f WkS WkB bc,� f w WkB ' �n 1 V kP �s ' k a7aB : i"aB WkB # F <fi • '� � r -CeB ... ;: • , : _ - ,r.-..'.'`,.,,,.,� . Wh AaA r , WkB S .. All"i _ '� AaraB AaA WkB P11 f _ AaA0. ���€3 � .y ,` f r� �� DPB ,t. - Qi AaA ,, €x ; kx 1h Vui3 ((Joins upper right) WkBY- 1 Y I, t' —7 / 5 000 4 000 3 0( 1