Loading...
HomeMy WebLinkAbout20020620 Ver 1_Complete File_20020423 ?:;v rIor VViliiam G. ncss J• . Secretary Department of EEnvironment and P;atural Resources Gregory J 7h-) r Ph.D. ,ctiny Director Division of Water Quality 1, DWQ Project No.: 0ZO Kl??O County: Applicant: Project Name: S - 5-9 :S Date of Issuance of 401 Water Quality Certifica ion: 11 , y-,Z5-02 Certificate of Comoletion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-160. This form spay be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, NK V-A lE . , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other sup rting materials. Signature .? Registration No. Date 'OV A A WNCDENR Division of Water Quality 1650 Mail Service Center Raleieh, NC 27609-1650 Weflands/401 Unit: (919) 733-1786 Fax: (919) 733-6893 e 0 C9:2 a- '47 01P r Li4 Ing STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY P. O. Box 25201, Raleigh, NC 27611-5202 LYNDO TIPPETT GOVERNOR PHONE: 919-733-2520 SECRETARY Mr. John Thomas U. S. Army Corps of Engineers Raleigh Regulatory Field Office 6508 Falls of Neuse Road, Suite 120 Raleigh, NC 27615 June 20, 2003 ? if ??E'?U/ x'01 680Up JUG 5 ?003 V'? RQUALI Subject: PERMIT MODIFICATION COE Action ID#: 200220927, DWQ Project No.: 020620 Nationwide Permit #14, add Nationwide Permit #33 SR 1529B (Blackberry Road) Watauga County, North Carolina DOT Project Number: 6.752054T (DWQ Permit Fee: $475) Dear Mr. Thomas: The NC Department of Transportation has partially completed the previously permitted activity on SR 1529B (Blackberry Road) in Watauga County. However, a permit modification is needed to construct the previously proposed new alignment section near station 103+00 on the Watauga/Caldwell county he. Although the roadway will be shifted at this location, the existing curve will remain unchanged to facilitate driveway access to a few houses in the area (See attached diagram). The original application requested authorizatio dd 80'x 60" C with a concrete headwall at station 103+00 on the auga/Ca ell county a nment shift. Due to constructability issue the roposed pipe si as ch ed to 100'x 72". tal new impacts not previously permitted will c al 20 linear feet. Due to the rain events over the past several months, we ll also need to dewater this area during construction. We are proposing a fabric lined 130-foot long diversion channel with a few large rocks on top to help hold it on place. The diversion will be filled in by the roadway construction after the new pipe is installed. Construction of this project will require impacts to waters of the United States in the Yadkin River Basin. The wet cross line at station 103+00 carries an unnamed tributary to the Yadkin P. O. Box 250, N. WILKESBORo, NC 28659 PHONE (336) 667-9111 FAx (336) 667-4549 r•, Mr. John Thomas SR 1529B (Blackberry Road MODIFICATION) Page 2 June 20, 2003 River (Class: C, Trout). This project was inspected for the presence of threatened and endangered species on April 4, 2002 and June 12, 2003. The subject project will have no effect on any federally listed endangered plant or animal species. The NCDOT Historical Architecture Section has reviewed this project and determined that there are no NR/SL/DOE properties along this roadway that will be impacted by the proposed project. The modifications proposed in this application should not remove or degrade existing water quality uses. Any widening of the existing roadway will be directed away from any adjacent creek whenever possible with minimum fill placed in any buffer area. The proposed pipe size is the minimum necessary to create a safe roadway. By utilizing the erosion control measures outlined in the attachments to this application, downstream water quality standards will be protected. Attached is a Preconstruction Notification Form, plan sheets with proposed erosion control measures, a marked county map, a marked topography map and photographs. By copy of this letter, it is requested that Mr. Ron Linville, Mountain Region Coordinator, with the North Carolina Wildlife Resources Commission comment directly to you concerning the 404 Nationwide Permit application with a copy sent to me. By copy of this letter, I am forwarding seven (7) copies of this application package to Cynthia Van Der Wiele, NCDENR, Division of Water Quality,-401/Wetland Unit, for her review. It is requested that any comments related to the 401 certification be forwarded directly to me with a copy sent to the US Army Corps of Engineers. We would like to begin construction as soon as possible. If further information is required, please let me know. Your early review and consideration will be appreciated. Sincerely, Heath Slaughter Division Environmental Officer Enclosures cc: John Thomas, US Army Corps of Engineers (1 additional copy) Ron Linville, Western Piedmont Region Coordinator, NCWRC Cynthia Van Der Wicle, Division of Water Quality (7 copies) Mike Parker, Division of Water Quality R. C. McCann, PE, Division Engineer Kipp Turner, PE, District Engineer Kevin Whittington, County Maintenance Engineer Heath Slaughter, Division Environmental Officer Neil Trivette, Roadside Environmental Field Operations Engineer Office Use Only: Form Version April 2001 USACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing Check all of the approval(s) requested for this project: ® Section 404 Permit ? Section 10 Permit ® 401 Water Quality Certification ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: NW #14 modification, addition of NW #33 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: North Carolina Department of Transportation Mailing Address: P O Box 250, North Wilkesboro, NC 28659 Telephone Number: (336) 903-9236 Fax Number: (336) 903-9239 E-mail Address: hslaughter@dot.state.nc.us 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Heath Slauahter, Division Environmental Officer Company Affiliation: North Carolina Department of Transportation Mailing Address: P. O. Box 250, North Wilkesboro, NC 28659 Telephone Number: (336) 903-9236 Fax Number: (336) 903-9239 E-mail Address: hslaughter@dot.state.nc.us Page 3 of 12 111. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: SR 1529B Blackberry Road 2. T.I.P. Project Number or State Project Number (NCDOT Only): 6.752054T 3. Property Identification Number (Tax PIN): N/A 4. Location County: Watauga Nearest Town: Blowing Rock Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): From Blowing Rock, travel north on the Blue Ridge Parkway. Turn left at the Aho exit Turn left onto SR 1530. Turn left onto SR 1529B and travel back under the BRP Travel for approximately 1.3 miles on SR 1529 to the beginning of the project The project ends near the Watauga/Caldwell co. line. 5. Site coordinates, if available (UTM or Lat/Long): 103+00 DD: 36.1180°N 81.6313° W (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Residential/Farm 7. Property size (acres): Approximately 11.8 acres (Whole Project) 8. Nearest body of water (stream/river/sound/ocean/lake): UT to Yadkin River (Class: C, Trout). 9. River Basin: Yadkin (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) Page 4 of 12 10. Describe the purpose of the proposed work: Grade drain base and pave existing road. Realign short section near station 103+00 11. List the type of equipment to be used to construct the project: Trackhoe/backhoe, dump trucks and motor grader. 12. Describe the land use in the vicinity of this project: Residential/Farm IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Previously issued permits authorized 133 linear feet of piping impacts, 100 feet of rinran and 25 feet of gabions for the entire project. This modification only applies to station 103+00 where we are requesting an additional 20 feet of pipe and the diversion channel. Original application date: 4/15/02 COE Action ID#: 200220927 DWO Project # 020620 V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 5 of 12 1. Wetland Impacts Wetland Impact Area of Located within Distance to Site Number Type of Impact* Impact 100-year Floodplain** Nearest Stream Type of Wctland*** indicate on ma acres es/no linear feet N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized cieanng, grading, nu, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at httn'//w-,%-,v.femi.f ov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog etc.) List the total acreage (estimated) of existing wetlands on the property: 0 acres Total area of wetland impact proposed: 0 acres 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number (indicate on map) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? (please specify) Station 130+00 Pipe Addition Requesting additional 20 feet Yadkin River 3 feet Perennial * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditchingistraightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at ,.v w.uses.aov. Several Internet sites also allow direct download and printing of USGS maps (e.g., www.tofbzone.com, wN w.man uest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 201n. 11. of additional pipe. Page 6 of 12 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name Wate) (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. 103+00 Diversion Channel 0.009 UT to Yadkin River Stream * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: till, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Since this is an existing road the maintenance impacts are unavoidable. Realigning the road and adding the wet cross line at station 103+00 will increase public safety. The remaining project impacts are minor in nature and should not remove or degrade existing water quality uses. Pine sizes used will be the minimum necessary to create a safe roadway. All appropriate BMPs will be used during construction Page 7 of 12 VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strmgide. html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A. Stream impacts will not exceed 150 linear feet on any one water body. Page 8 of 12 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at littT)://li2o.cnr.stite.nc.us/iv-m/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ® If you answered "yes", provide the following information: Page 9 of 12 Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone' Impact (square feet Multiplier Required Mitigation 1 3 2 1.5 Total • Zone I extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. N/A XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. All annronriate best management practices for sediment and erosion control will be implemented during construction XII. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No Page 10 of 12 XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). G za?o Applicant/Agents Signat? Date (Agent's signature is vali only if an authorization letter from the applicant is provided.) US Army Corps Of Engineers Field Offices and County Coverage Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell US Army Corps of Engineers Avery Clay Jackson Polk 151 Patton Avenue Buncombe Cleveland Lincoln Rowan Room 208 Burke Gaston Macon Rutherford Asheville, NC 28801-5006 Cabarrus Graham Madison Stanley Telephone: (828) 271-4854 Caldwell Haywood McDowell Swain Fax: (828) 271-4858 Catawba Henderson Mecklenburg Transylvania Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham US Army Corps Of Engineers Alleghany Edgecombe Lee Stokes 6508 Falls of the Neuse Road Ashe Franklin Nash Surry Suite 120 Caswell Forsyth Northampton Vance Raleigh, NC 27615 Chatham Granville Orange Wake Telephone: (919) 876-8441 Davidson Guilford Person Warren Fax: (919) 876-5283 Davie Halifax Randolph Wilkes Washington Regulatory Field Office Beaufort Currituck Jones US Army Corps Of Engineers Bertie Dare Lenoir Post Office Box 1000 Camden Gates Martin Washington, NC 27889-1000 Carteret* Green Pamlico Telephone: (252) 975-1616 Chowan Hertford Pasquotank Fax: (252) 975-1399 Craven Hyde Perquimans Wilmington Regulatory Field Office Anson Duplin Onslow US Army Corps Of Engineers Bladen Harnett Pender Post Office Box 1890 Brunswick Hoke Richmond Wilmington, NC 28402-1890 Carteret Montgomery Robeson Telephone: (910) 251-4511 Columbus Moore Sampson Pitt Tyrrell Washington Wayne Union Watauga Yancey Wilson Yadkin *Croatan National Forest Only Page I 1 of 12 `•J .S IIR: n 111 N y? J 111 NATIONAL i 3l F 4 X. Z •.y 130. ? ? '?. ,. I f J \ 1 ? 1 e / t ? / 4 ?• •1 C A L D W E L L C O U N T Y 1 u P-r 7 7 ?J -DO • 1210 IJb 1110 I ?\ 11^ - 11 PJ ,? ,? IM0 O \ 100 I KEY TO COUNTY ROAD NUWERS S N T r w NO: A vYvc..v- - a •iv • r - . i vY"b'-k ..- --V Copy I-,-: ®2000 Maps a la carte. lns.-/ - -i7- - -- - pozone.cam?,? =? -= T in qumf M Target is 36.11800N, 81.6313°W - GLOBE quad jguad Infol t --, 0 500 1000 1500 2000 meters i - I r . i miles 0 0.5 1.0 http:/hvw-vv.topozonc.com/print.asp?z=17&n=3997015&e=443188&s=25&u=1 6/16/03 ? x?'s-?+' ?U " C ?vt P n? C4 "CIMP o = - 3 ll? a v 'I lk ` O ?Ct Z?l I fi tiL n? .Z1 a? c•q V •.v?vi ?.L Y1J11\1Vi ffl.? I 4? al ?''i i yl C a ?? t??l ry Vi J1Q yJVVJ ZZI ?V 4 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action ID. 200220927 County Watauga GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Property Owner/Agent: NCDOT/SR 1529B/6.752054T Address: Attn: Mr. R.C.McCann, P.E., Division Engineer Post Office Box 250 North Wilkesboro, North Carolina 28659 Telephone No.: (336) 667-9111 Size and Location of project (waterway, road name/number, town, etc.): SR 1529B, from the existing pavement south to the county line, east of Blowing Rock, North Carolina. The project is located adjacent to, and below the headwaters of, the Yadkin River and four of its unnamed tributaries. Description of Activity Mechanized landclearing, excavation and the discharge of fill material associated with the replacement of a 40-foot long 60" corrugated metal pipe (CMP) at Station 23+50 with one line of a 50' long 72" CMP, the replacement of one line of 40-foot long 24" CMP at station 32+00 with one line of 50' long 36" CMP, the replacement of one line of 30-foot long 24" CMP at Station 39+00 with one line of 50' long 36" CMP, the replacement of one line of 40' long 72" CMP at Station 54+75 with one line of 60' long 95" X 67" corrugated steel pipe arch (CSPA) with a concrete headwall, the replacement of a 8740' long 18" CMP at Station 79+70 with a 60' long 18" CMP, the replacement of a 40' long 120" X 72" CSPA at Station 97+40 with a 60' long 128" X 83" CSPA with a concrete headwall and the addition of an 80' long 60" CMP with a concrete leadwall at Station 103+00. Gabion baskets will be installed from Station 96+62 to 96+87 for streambank stabilization, impacting 25 linear feet of streambank. The project will impact 158 linear feet of previously unimpacted stream channel for culvert installation and will involve the placement of riprap along 100 linear feet of stream bank for bank stabilization at eight separate crossings. CONDITION: All recommendations in the attached letter, from the North Carolina Wildlife Resources Commission dated April 15, 2002, are hereby incorporated as special conditions of this permit. X Section 404 (Clean Water Act, 33 USC 1344) only. Section 10 (River and Harbor Act of 1899) only. Section 404 and Section 10. 14 Nationwide General Permit. Any violation of the conditions of the Regional General or Nationwide Permit referenced above may subject the permittee to a stop work order, a restoration order, and/or appropriate legal action. This Department of the Army Regional General/Nationwide Permit verification does not relieve the undersigned permittee of the responsibility to obtain any other required Federal, State, or local approvals/permits. The permittee may need to contact appropriate State and local agencies before beginning work. Regulatory Project Manager Signature Date 3 May 2002 Expiration Date- May 2004 SURVEY PLATS, FIELD SKETCH, WETLAND DELINEATION FORM, ETC., MUST BE ATTACHED TO THE FILE COPY OF THIS FORM, IF REQUIRED OR AVAILABLE. • ? \O?U? .h,QG O 'C William G. Ross Jr., SecretaryNorth Carolina Department of Environment and Natural Resources Gregory J. Thorpe, Ph.D. Acting Director Division of Water Quality April 25, 2002 Watauga County DWQ Project No. 020620 SR 1529B (Blackberry Road) APPROVAL of 401 Water Quality Certification with Additional Conditions Mr. Heath Slaughter, Division Environmental Officer NCDOT Division 11 P.O. Box 250 North Wilkesboro, NC 28659 Dear Mr. Slaughter: You have our approval, in accordance with the attached conditions and those listed below, to impact 258 linear feet of Yadkin River and its unnamed tributaries in order to improve SR 1529B (Blackberry Road) in Watauga County. The project must be constructed in accordance with your application dated April 15, 2002 (received April 23, 2002). After reviewing your application, we have decided that this fill is covered by General Water Quality Certification No. 3375, corresponding to the U.S. Army Corps of Engineers Nationwide Permit Number 14. In addition, you must acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit unless otherwise specified in the Water Quality Certification. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the DWQ in writing and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. 1. NCDOT shall use Best Management Practices for the Protection of Surface Waters (NCDOT March 1997) and Sedimentation and Erosion Control Guidelines for Sensitive Watersheds (15A NCAC 413 .0024) must be implemented prior to any ground-disturbing activities to minimize impacts to downstream aquatic resources. Temporary or permanent herbaceous vegetation shall be planted on all bare soil within 15 days of ground-disturbing activities to provide long term erosion control. 2.1n-stream work and land disturbance within the 25-foot wide buffer zone are prohibited during the trout spawning season of October 15 through April 15, or other conditions as determined by the North Carolina Wildlife Resources Commission, to protect the egg and fry stages of trout from sedimentation during construction. NCDWQ recognizes the trout buffer zone encroachment (if allowed by NCWRC) at the following locations: ¦ Sta. 23+50 to Sta. 28+00 • Sta. 39+00 to Sta. 41+50 ¦ Sta. 96+50 to Sta. 98+50 North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncwetlands/ 3. Riparian vegetation must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. 4. NCDOT is encouraged to use existing on-site vegetation and materials for stream bank stabilization and to minimize the use of rip rap. 5. The pipes shall be designed and constructed so that it can be installed one foot below streambed grade to enable waters to transport sediment and ensure passage of all aquatic life. The dimension, pattern, and profile of the stream and floodplain above and below the structure shall not be modified by widening the stream channel or reducing the depth of the stream. 6. All work shall be performed during low flow conditions. 7. Heavy equipment must be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into the stream. 8. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 9. Upon completion of the project, the NCDOT shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the NC Division of Water Quality upon completion of the project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Ms. Cynthia Van Der Wiele at 919.733.5715 or Ms. Jennifer Frye of the Winston-Salem Regional Office at 336.771.4600. ly, Attachment cc: Wilmington District Corps of Engineers Jean Manuele, USACE Raleigh Field Office NCDWQ Winston-Salem Regional Office Central Files File Copy ,'r TopoZone - The Web's Topographic Map Page I of 2 Target is 36.11800N, 81.6313OW - GLOBE quad rQuad Infol 07 )j a la catte Inc Copyilght(D2000 )A J Q1, 17N It, 0 A, z 77, It 41 'ju E, rv r 9. NVATA VA 1. D V V :zz, 7 1. NO 'Ail 7 W4 500 1000 1500 2000 meters I I . . . . I - - . - , - , I , , , , 0.5 1.0 miles I I I I I I I I I http://-vvNv,,v.topozone.com/print.asp?z= I 7&n=3997015&e=443188&s=25&u.=1 0? \14 A 7-?q Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources 0 7 Gregory J. Thorpe, Ph.D. Acting Director Division of Water Quality April 25, 2002 Watauga County DWQ Project No. 020620 SR 1529B (Blackberry Road) APPROVAL of 401 Water Quality Certification Nvith Additional Conditions Mr. Heath Slaughter, Division Environmental Officer NCDOT Division 11 P.O. Box 250 North Wilkesboro, NC 28659 Dear Mr. Slaughter: You have our approval, in accordance with the attached conditions and those listed below, to impact 258 linear feet of Yadkin River and its unnamed tributaries in order to improve SR 1529B (Blackberry Road) in Watauga County. The project must be constructed in accordance with your application dated April 15, 2002 (received April 23, 2002). After reviewing your application, we have decided that this fill is covered by General Water Quality Certification No. 3375, corresponding to the U.S. Army Corps of Engineers Nationwide Pernlit Number 14. In addition, you must acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit unless otherwise specified in the Water Quality Certification. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the DWQ in writing and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC "H .0506 (h) (6) and (7). Forthis approval to be valid, you mustfollow the conditions listed in the aitached certification and any additional conditions listed below. 1. NCDOT shall use Best Management Practicesfor the Protection of Surface lVaters (NCDOT March 1997) and Sedimentation and Erosion Control Guidelines for Sensitive Watersheds (15A NCAC 4B .0024) must be implemented prior to any ground-disturbing activities to minimize impacts to downstream aquatic resources. Temporary or pernianent herbaceous vegetation shall be planted on all bare soil within 15 dtivs of ground-disturbing activities to provide long term erosion control. 1 Iii-strearn. work and land disturbance within the 25-foot wide buffer zone are prohibited during the trout spawning season of October 15 through April 1-5. or other conditions as determined by the North Carolina Wildlife Resources Commission, to protect the egg and fry stages of trout from sedimentation during construction. NCDWQ recognizes the trout buffer zone encroachment (if allowed by NCWRC) at the following locations: • Sta. 23+50 to Sta. 28+00 • Sta. 39+00 to Sta. 41+50 • Sta. Q6+50 to Sta. 09+iQ North Carolina Dvision of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree 13?vcl., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), hrp:1/h2o.en r. state. nc- us/ricwetlands/ 3. Riparian vegetation must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. 4. NCDOT is encouraged to use existing on-site vegetation and materials for stream bank stabilization and to minimize the use of rip rap. 5. The pipes shall be designed and constructed so that it can be installed one foot below streambed grade to enable waters to transport sediment and ensure passage of all aquatic life. Tile dimension, pattern, and profile of the stream and floodplain above and below the structure shall not be modified by widening the stream channel or reducing the depth of tile stream. 6. All work shall be performed during low flow conditions. 7. Heavy equipment must be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into the stream. 8. All mechanized equiprnent operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 9. Upon completion of the project, the NCDOT shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to tile 40I[Wetlands Unit of the NC Division of Water Quality upon completion of the project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Ms. Cynthia Van Der Wiele at 919.733.5715 or Ms. Jennifer Frye of the Winston-Salem Reuional Office at 336-771.4600. Attachment cc: Wilmington District Corps of Engineers Jean Manuele, USACE Raleigh Field Off-ice N_CVW_Q_ Winston--Salem R-ional Office Central Files File Copy 51A4 STATE OF NORTH CAROLINA APP 9 o DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY P. 0. Box 25201, Raleigh, NC 27611-5202 LYNDO TIPPETT GoVERNOR P110NE: 919-733-2520 SECRETARY April 15, 2002 Mrs. Jean Manucle 0 2) U. S. Army Corps of Engineers Raleigh Regulatory Field Office Suite 120 6508 Falls of Neuse Road , , Raleigh, NC 27615 Subject: Nationwide Permit 914 SR 1529B (Blackberry Road) Watauga County, North Carolina -------------- ProjectNumber: 6.752054T (DWQPermitFee: $475) Dear Mrs. Manuele: The NC Department of Transportatioa is scheduled to grade, drain, base, and pave primarily along the existing roadway of SR 1529B (Blackberry Road) in Watauga County. A short section of the existing roadway will be placed on a ne?v alignment near station 103+00 on the Watauga/C a] dwell county line in order to eliminate a sharp curve. Although the roadway will be shifted at this location, the existing curve will remain unchanged to facilitate driveway access to a few houses in the area (See attached diagram). Tile total project length is approximately 2 miles. This project will require the replacement of six (6) wet cross lines as well as the addition of one (1) other wet cross line as shown below: 1) Replace existing 40' x 60" CMP at station 23+50 with a 50' x 72" CMP. 2) Replace existing 40' x 24" CMP at station 32+00 with a 50' x 36" CMP. 3) Replace existing 30'x 24" CMP at station 39+00 with a 50' x 36" CMP. 4) Replace existing 40' x 72" CMP at station 54+75 with a 60'x 95"x 67" CSPA with a concrete headwall. 5) Replace existing 87'x 18" CMP at station 79+70 with a 60'x 18" CMP. 6) Replace existing 40'x 120"x 72" CSPA at station 97+40 with a 60'x 128"x 83" CSPA with a concrete licadwall. 7) Add an 80'x 60" CNIP with a concrete headwall at station 103+00 on the Watauga/Caldwell county line to accommodate the alignment shift at tile same location. Gabion baskets will be installed from 96+62 - 96+87 for stream bank stabilization. Miscellaneous rip-rap impacts will total 100 linear feet or less. Gabion basket impacts: 25 linear feet. New stream impacts = 258 linear feet. P. 0. Box 250, N. WILKESBORo, NC 28659 PHONE (336) 667-9111 FAx (336) 667-4549 Mrs. Jcan Manuele SR 1529B (Blackberry Road) Page 2 April 15, 2002 Construction of the project will necessitate impacts to waters of the United States in the Yadkin River Basin. The wet cross lines at stations 23+50, 54+75 and 97+40 carry the Yadkin River. The remaining wet cross lines carry different unnamed tributaries to the Yadkin River (Class: C, Trout). The Division I I Environmental Officer inspected this project for the presence of threatened and endangered species on April 4, 2002. The subject project has been determined to have no effect on any federally listed endangered plant or animal species. According to the NCDOT web site, the NCDOT Historical Architecture Section has reviewed this project and determined that there are no NR/SL/DOE properties along this roadway that will be impacted by the proposed project (see attaclunent). Since this is an existing roadway, the modifications proposed in this application should not remove or degrade existing water quality uses. Any widening of the existing roadway will be directed away from any adjacent creek whenever possible with minimum fill placed in any buffer area. Pipe sizes used will be the minimum necessary to create a safe roadway. By utilizing the erosion control measures outlined in the attachments to this application, downstream water quality standards will be protected. Attached is a Preconstruction Notification Form, plan sheets with proposed erosion control measures, a marked county map, a marked topography map and photographs. By copy of this letter, it is requested that Mr. Ron Linville, Mountain Region Coordinator, with the North Carolina Wildlife Resources Commission comment directly to you concerning the 404 Nationwide Permit application with a copy sent to me. Please note that a trout buffer zone encroachment variance will be requested from stations 23+50 - 28+00, 39+00 - 41+50 and 96+50 - 98+50. By copy of this letter, I am forwarding seven (7) copies of this application package to Cynthia Van Der Wicle, NCDENR, Division of Water Quality, 401/Wetland Unit, for her review. It is requested that any comments related to the 401 certification be forwarded directly to rne with a copy sent to the US Army Corps of Engineers. We would like to begin construction as soon as possible. If further information is required, please let me know. Your early review and consideration will be appreciated. Sincerely, 4- Heath Slaughter Division Environmental Officer Enclosures Mrs. Jean Manuele SR 1529B (Blackberry Road) Page 3 April 15, 2002 cc: Jean Manuele, US Army Corps of Engineers (I additional copy) Ron Linville, Western Piedmont Region Coordinator, NCWRC Cynthia Van Der Wiele, Division of Water Quality (7 copies) Matt Gantt, PE, Land Quality Section R. C. McCann, PE, Division Engineer Martin Bolick, District Engineer Johnny Brown, County Maintenance Engineer Heath Slaughter, Division Environmental Officer Neil Trivette, Roadside Environmental Field Operations Engineer Office Use Only: Form Vcrsion April 2001 09 USACE Action ID No. DWQ No. 2 0, if any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing I . Check all of the approval(s) requested for this project: Z Section 404 Permit r_1 Section 10 Permit Z 401 Water Quality Certification F-1 Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: NW#14 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: F-1 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: E] 11. Applicant Information 1. Owner/Applicant Information Name: North Carolina Department of Transportation Mailing Address: P. 0. Box 250, North Wilkesboro, NC 28659 Telephone Number: (336) 903-9236 Fax Number: (336) 903-9239 E-mail Address: lislau ghtcr@adot. state. ne. u s 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Heath Slaughter, Division Environmental Off icer Company Affiliation: North Carolina Department of Transportation Mailing Address: P. 0. Box 250, North Wilkesboro, NC 28659 Telephone Number: (336) 903-9236 Fax Number: (336) 903-9239 E-mail Address: hsl aughter@dot. state. ne.us Page 3 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 1 I by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full- size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: SR 1529B Blackberry Road 2. T.I.P. Project Number or State Project Number (NCDOT Only): 6.752054T 3. Property Identification Number (Tax PIN): N/A 4. Location County: Watauga Nearest Town: Blowing Rock Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): From Blowing Rock, travel north on the Blue Ridge Parkway. Turn left at the Aho exit. Turn left onto SR 1530. Turn left onto SR 1529B and travel back under the BRP. Travel for approximately 1.3 miles on SR 1529 to the beginning of the protect The project ends near the Watauga/Caldwell co. line. 5. Site coordinates, if available (UTM or Lat/Long): 23+50 UTM• 17 443574E 3999027N, 54+75 UTM: 17 443154E 3998356N 97+40 UTM: 17 443209E 3997147N (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Residential/Farm 7. Property size (acres): Approximately 11.8 acres 8. Nearest body of water (stream/river/sound/ocean/lake): Yadkin River and UTs (Class: C, Trout) 9. River Basin: Yadkin (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://l12o.enr.state.nc.us/adniin/naps/.) Page 4 of 12 10. Describe the purpose of the proposed work: Grade drain base and pave existing road. 11. List the type of equipment to be used to construct the project: Trackhoe/backhoe, dump trucks and motor grader. 12. Describe the land use in the vicinity of this project: Residential/Farm IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. N/A V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 5 of 12 1. Wetland Impacts Wetland Impact Area of Located within Distance to Site Number Type of Impact* Impact 100-year Floodplain** Nearest Stream Type of Wetland*** indicate on ma acres es/no linear feet N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, till, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http:/Av%v\v.fema.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: 0 acres Total area of wetland impact proposed: 0 acres 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Length of Average Width of Perennial or Site Number Type of Impact* Impact Stream Name** S:ream Before Intermittent? (indicate on map) (linear feet) Impact (please specify) Station 23+50 Pipe 10 feet Yadkin River 5 feet Perennial Replacement Station 32+00 Pipe 10 feet UT# 1 to Yadkin River 2 feet Perennial Replacement Station 39+00 Pipe 20 feet UT# 2 to Yadkin River 5 feet Perennial Replacement Station 54+75 pe 20 feet Yadkin River 7 feet Perennial Rep a Station 79+70 Pipe _ 27 feet UT## 3 to Yadkin River 2 feet Perennial Replacement Station 97+40 Pipe 20 feet Yadkin River 7 feet Perennial Rep cement Station 103+00 Pipe Addition 80 feet UT# 4 to Yadkin River 2 feet Perennial Station 96+62 - Gabion basket 25 feet Yadkin River 7 feet Perennial 96+87 installation Miscellaneous All of the above rip-rap 100 feet or All of the above 2 - 7 feet Perennial placement for less total stabilization * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.us<?s.eov. Several Internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, wAv\v.mapquest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 258 In. ft. of new permanent impacts. Page 6 of 12 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. N/A List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Since this is an existini road, the maintenance impacts are unavoidable. Realigning the road and adding the wet cross line at station 103+00 will increase public safety. The remaining project impacts are minor in nature and should not remove or degrade existing water quality uses. Pipe sizes used will be the minimum necessary to create a safe roadway. By utilizing the erosion control measures outlined in the attachments to this application, downstream water quality standards will be protected. All appropriate BMPs will be used during construction. Page 7 of 12 VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available, at http://l12o.enr.state nc.us/ncwetlands/strnigide.litml. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. No wetlands will be impacted Stream impacts will not exceed 150 linear feet on any one water body. Page 8 of 12 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at littp//li2o cnr.st ite.iic.tis/%N,!V/ilidex.litm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ® If you answered "yes", provide the following information: Page 9 of 12 Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation 1 3 2 1.5 Total * "Lone 1 extends out 30 feet perpendicular from near bank of cnannei; Lone [ extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 213 .0242 or.0260. XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. All annronriate best manauement practices for sediment and erosion control will be implemented during construction XII. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. A XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No Page 10 of 12 XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). (6-1e-) Z Applicant/Agent's Signatukf Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) US Army Corps Of Engineers Field Offices and County Coverage Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell US Army Corps of Engineers Avery . Clay Jackson Polk 151 Patton Avenue Buncombe Cleveland Lincoln Rowan Room 208 Burke Gaston Macon Rutherford Asheville, NC 28801-5006 Cabarrus Graham Madison Stanley Telephone: (828) 271-4854 Caldwell Haywood McDowell Swain Fax: (828) 271-4858 Catawba Henderson Mecklenburg Transylvania Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham US Army Corps Of Engineers Alleghany Edgecombe Lee Stokes 6508 Falls of the Neuse Road Ashe Franklin Nash Surry Suite 120 Caswell Forsyth Northampton Vance Raleigh, NC 27615 Chatham Granville Orange Wake Telephone: (919) 876-8441 Davidson Guilford Person Warren Fax: (919) 876-5283 Davie Halifax Randolph Wilkes Washington Regulatory Field Office Beaufort Currituck Jones US Army Corps Of Engineers Bertie Dare Lenoir Post Office Box 1000 Camden Gates Martin Washington, NC 27889-1000 Carteret* Green Pamlico Telephone: (252) 975-1616 Chowan Hertford Pasquotank Fax: (252) 975-1399 Craven Hyde Perquimans Wilmington Regulatory Field Office Anson Duplin Onslow US Army Corps Of Engineers Bladcn Harnett Ponder Post Office Box 1890 Brunswick Hoke Richmond Wilmington, NC 28402-1890 Carteret Montgomery Robeson Telephone: (910) 251-4511 Columbus Moore Sampson Pitt Tyrrell Washington Wayne Union Watauga Yancey Wilson Yadkin *Croatan National Forest Only Page 11 of 12 Y ?O to U 01 ? C N ?j m• x c CL v Qi ti ca m m C; O m co o? d) ti y m w m m T t r- o O T- C M N O o W N C) N N r=, j5 >- cu LL U j y U U N SJ Z O n- Q ? U m C U o ? T Z` ti m O c ? O Z ? w w W W j w w w w w w w w w w w w w w w W w w W W W W W W W W W W w w W W H J ~ ~ ~ ~ ~ W W W W W w w W w W W w W W W W W w W w W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W w W w w W W W W W W W W J J J :: J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J J a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a. a W O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O ZE U U U Z; U U U U U U U U U 0 U U U U U U U U U U U U U U U U U U U 0 U U O co o 0 o m O 0 0 0 O 0 O O m m m o co o O O m o 0 0 0 0 0 0 0 0 0 0 0 O U 0 CD o m m O °o O m m o 0 0 0 0 0 0 0 0 0 o 0 m m m m m m o m m o 0 0 o o m m o 0 0 0 0 0 0 0 0 0 0 0 0 0 N •- N N N r N N N N N N N N _ o _ N N N N N N N N N N N N N N N N N O] 1- O O c (T) O O O Q7 O m QI N co LO O r- O m m o O O O O O O O O O O O m m m m m o o co o o m m m m o o 0 0 o o m m o o m m m m m m m m m m o o m m o o m m m m m m o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o m m N m N N N N N N N N N N N N N N N N N N N m N U O ° J r r r r >- r r r r r r r r >- >- r r >- r r r r r r r r r r r r r r r r r r a Z LL O w o >- >- >- r r >- >- >- >- >- r r r r r r r r r r r r r r r r r r r r r r r r r r a Q ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ ¢ O z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z S w Q a z z z z z z z z z z z z z z z z z z z z z z z Z z z Z z z Z Z z z z z z O O U J a z O r r r r r r r r r r r r >- r r r r r r r r r r r r r r r r r r r r r r r U IL LL O w z z z r r r z r z z z z z z z z z z z z z z z z r z r z z r r r z z r r LL a a r r r ¢ ¢ ¢ r a r r r r r r r r > r r r r r > > ¢ > ¢ > > ¢ ¢ ¢ r r ¢ ¢ a z z z z z z z z z z z z ti ? r r r r r r r r r r r r w a Q N N N N N N "I " N N N N N N N N N N N N N N N N N U N C1 CO O N M N N m ¢ m V ¢ co CO Q ?D m U U N ^ Q O m O M Cl) 1? O Q ¢ ¢ N m O N O O O N M V c0 V O O V N m m In m M V 0.l O N V m m m O M (Y N N N M M M M M M M O LA N N to N V t2 ?2 N M M M M M 1n m O O a m M In u7 M 1n In to m m m m m m m m co m m m m m m m m m m m m m m O m m m rn rn rn m m rn m rn rn m rn m m v o m m m rn m m m m 0 0 0 m 0 m > m > a > m > a _ m > m > > > > m > m _ m > m > m > ? ? ? ? > > = U L L L L L L L L L L L L L N m : CJ m « m m m ?n m m m m m m m m m m m m m m m m ro m m m m m m m m m m m N N N N N N N N N N N N h 3: 3: M M M M 7 M (h M M M M M M O ( N N N N N N N N N N N N N N N N N N N N N N N v Cl) O m j U C U +m m N c U { ? a a ? mN m G G cn H y m Z m cp N O Z c) c 135 ?M 1.9 ?aC, ? I,K1 i?lv ._._._._._•... •1 i U_GY ' Q 1612 IY] - J•- 13 IY•y ' 1 \ ' 1 ?IYJ7 ?? t ? w NOF Ip0 IMS 103 KEY TO COUNTY ROAD NUUCERS S c 1 O Ci ,Ay r 4 }p \ ' 1357 • \ C A L D W E L L C O U N T Y J PrIl h ! ^, L" j' i azl N }J - 1.3 130] ulp 32I 1M Ilaz J N -V? no / Y [} &COM Target is UTM 17 443156E 3998356N - BOONE quad LQuad Info ?y: topazone.?lU11?,,:J'i? i, ? ? `1 ?I•l\??• ' .._??'i??/??/i rr.\ t,//, / j,/ - ?J- - -- _ a I' ' . f I =_ ` _ . ;(] _r _ VCopyright®2000Maps alacarte,Inc. , ?i. ?rvr% r'?- _ : i? `??\ \ t? rr i ' 1 I ' '?% I \; 't?/ '• •:rfJ,i !? r I ,., r. ?? - 777 - ?'; ? _ \ 1, •' ;, { _ _?' ? ' ` .f,= _?? • /?/r Nl _ - .p+', ??." •?+. .•? .'r 1 C i/ , •% J' J / jar-'-` 1 -'t_ ? ? I\ ? ,'•/J ?.; ,. ?- _!1) .l \°?' t} _ ? / L?/nF: `t:if??/?--_? f 1`.?:I ', '} ?? y' ?`\ t??.' ;: ?--•r` ti, '•,'}r? Jl,?? 'r.; l_ _t /' r `?,? ?, M?r Cem?\t`??,/, i Y/•?` ?..!? r _?ll'? i 1•ft r/ _/ ?'Y._l?,tt y t) it '' `\.'\ -='?`It t, ?'• '. '\ ?_,{\ _ •?\• r r .:J:. / , •?'-ff.? ??t /r 5? C, it ??Y7 ,;, l?\ .' j l /'' II C I Hwy' , _ i1'r?_ :• `_ r`? -" ...v ,' `'t^•'?I`I' r/1rfP'`•\?:t_?![' ?J '`?`?- !?`JIl _v ?,,t ?, 51,'J? \\ r ` :. _??' is ? •,t`? .. `?:'. ,\ ? '•\''. ?. • r J ? i_,,-? r` ' ?ti ? ?1 , ,.w.,,;5'.`?C'+ Trw ?' `' n4. \?. ?' 1, r'; J Ir/j-.,_./.' / f• .?? __ ',•.?. I ( i ;4\ G4/r ??CE rCCft3;^:r-` ?? ????e"i? - ..:--. ' -?? r? t \r f.; ` / %•_ it, ,?: -::. _ ' / }J '• S (`t %• r?.`?? ?r.f ,Jr;^ {•I ,-_.l?(( y? _ J,t •-?/`?_ rLl- 11}•ai;_ - 1 f`d 'li 41 . J ?,'., ? ,`•_!(i ??;?.J1 •r,.?Jr. ,?? \? ?,`•,?l-4?, j?lJ I(r'fr; - I ?r?..; _ ?{,???Qr ?'} ? ' a ? _ s,? ?; f`./ ?i- _ (? ?_'/f',J ?I.\? .?,,?. ?'1 \ ,c!!' 'T ? I ./ ,r r; ,. ? •? \, }:'14.1 _J ,\ 11ti• ? ? J =/?''1`,??'?lJ ?,..`?. ? ?,:•g, ::rte J- ?I`'I 'I I:? II ••?, ? ` \ ?? ?}1???` ,/? i ,y? _ t f f:;:fit ? , , ,•`^., ?' i I ? • t J/. 't '?----?'.-` ??: ti. /ZI.. l!1 41111., lei r 3r!7j } 1, `J'c f/// ? I?/( ll?j?ty' \".•,• ?%i ";:.'? ? J.J? }^?ii? / •'? ?i f+-( J,..??.? ? ,i;tPr ilk{ I , i ? lyl,. t ? ? `1 a` ??. - ? 'f?( `'• 1, ?, ?/?r 1 ,,{ .` '` 1 •• \ ?(?I y?,' ??''? ?rJ 1 •'C}??? , 5/ ,}'',\ 1 - } \•J `? 1J T ? i / J ` II ?f i , /' S 'J ? 1 1? ? _1?\ ''? ? __ 1 ? rJ'F- \,: :J?/?1J?Ct ?•._/c??-?_'l??r?16t'K? i? I!( ,?I; ., _ .I .1 ?;- ?.??' •r• l !?4 II?f1 i, %// J+r. (' ? ? 1 -r ?.L,. \ ? t? ll? ?- `t• ?\\_?Zl.,?. ?',.It',?, 1.\•., lk: i ?r ?_' }} -,,j j ``'If ? fr`) \ ??.'??+?., ?•? ?-l F,l,, ?. } , ti• ' ??,,? , 5(t /•1 ' -. , tl'i-??i?i\):7i %.1~ t'!J ? I; ????, `}•1'•t 1 '?...i ?•`:`,.c;'4LY ?•\t``?`? ? - :`?'!7 4' `` ?t.??l???lt t•`L •;?:..4 - ? r/ :'?,? J(i?r\' \li„5 !f j`? `'?\ l? , j ? ?,•?' . 1?'?•.T l -`?-ti` ? \; ? 4 t\ 1`^ `' NVATA Afi a02)J j? Si( , P ?• ?I, `? `r ?i'I /' _ t / ^ { 11 7- 0 500 1000 1500 2000 meters t r I - i - I miles o 0?5 i 0 http://www.topozone.com/print.asp?z=17&n=3998356&e=443156&s=25 3/13/02 North Carolina Department of Transportation Erosion and Sedimentation Control Plan Project: 7?Z0.54/ Road: B ?C? PYt? ' County: w c, Prepared by: Date: Z - OZ Approved by. Date: County Maintenance Eng?neer , . . Date: District Engineer Date: Roadside Encironmenud Engineer ' Std. r Descrintion SvmboI 1630.03 Temporary Silt Ditch 'I S D 1630.05 Temporary Diversion Q- TD 160-5.01 Temporary Silt Fence 1622.01 Temporary Slope Drain - -- ®? ?- 1630.01. Silt Basin Type-A 1630.02 Silt Basin Type-B 1633.01 Temporary Rock Silt Check Type-A 1633.02 Temporary Rock Silt Check Type-B, 1634.01 Temporary Rock Sediment Dam Type _4 Q 1fi34.02 Temporary Rock Sediment Dam Type-B 1635.01 1635 02 Rock Pipe Inlet Sediment Trap Type Rock Pipe Inlet Sediment Trap Type-B - B ; • . 1636.01 Rock Silt Screen • 1630.04 Stilling Basin ???,,, ???,,, Rock Inlet Sediment Trap: M A) 1632.01 Type _4 .or A 1632.02 Type-B B FE1 or g) 1632.03 Type-C C o or C) 868.01 Rip Rap J j R R\\ j Pipe Outlet Ener-D,Disipator .. Ditch Liner Pipe Outlet orlnlet Stabilization NOTE: Silt Basin Type B: YxYby 6' long unless otherwise noted by Engineer GENERAL NOTES ON EROSION CONTROL Silt Basin Type B's will be constructed to the dimension of six feet by three feet by three feet unless otherwise noted on the plans. Where slope protection treatment is required, Section 868 and Section 1042 of the 1990 Standard Specifications for Roads and Structures will be followed. Any material obtained from the project must be clean before being placed. Generally, the order of installation of the erosion control measures will be as follows: Temporary Silt Basins shall be installed before clearing and grubbing begins. Silt Fences and Temporary Silt Ditches shall be installed after clearing and before grading. Temporary Stone Ditch Checks shall be installed as soon as ditchline is established. Pipe Outlet and Inlet, Protection will be done as soon as the pipe is installed. Seeding and other permanent erosion control measures are to be implemented as soon as practical. PIPE INSTALLATION 1. Install erosion control devices. In streams, where necessary, rock silt screens will be used and installed prior to pipe replacement or any work being done to channel. 2. Remove material and existing pipe while limiting, as much as possible, material and sediment from entering a stream and/or escaping from project. 3. Prepare pipe foundation while again taking care to limit, as much as possible, material and sediment from entering a stream and/or escaping from project. Where possible, new grade will be below existing stream bed. If needed, bedding material will be clean stone. 4. Place the new pipe and compact backfill. 5. Install slope protection on outlet and inlet ends of pipe. Also complete installation of erosion control measures and perform maintenance as needed on existing measure. 6. Establish permanent vegetation as soon as possible. 7. Remove rock silt screens as soon as possible after vegetation is established. Prior to removal of rock silt screens any accumulated silt must be removed. DITCH LINER REQUIREMENT ROAD NAME: SR1529B, BLACKBERRY ROAD, WATAUGA COUNTY STATION STATION RT/LT TYPE LINER REQUIRED 6+50 54+75 RT. RIP RAP 38+00 39+00 LT. RIP RAP 48+60 59+25 LT. RIP RAP 68+00 96+00 LT. RIP RAP 4+ MA 0 Q U ll/ _ III ? I r iQ l8 s1?'I J? 4 X-C f ?dfar I Q ,/ - x?x2 134s;,j L3q c i- 3 lop' H i !J - t n rv oY,CTl-.c ?1 `/n r, Dlerr,y /C ?i?la7aU.?G CO. lJ l (r„r 0400 6-U-f' 2() 400 E ().p Pf X52 1 N 0 N F. W Z 0 p 'Tt n 3 r I I v, T N I n C C T1\ I C C n ;> S9o C C /K T\ n / \ /T [iw,r?1 f'??? ?. r•1? A'rn? 4tQ= MAT H 0 I- W W Z 6i 0 l? ! i ?I f a Q' "l m?.an (/N n C C C > 5 90 C / C C / C I C > SY?C n l\ n ? ?,l?-ten ran ?,F re / 22" r N 0 W W t ITI, 9 fa?4 0- 14tiM ?Q C I C C C I- C C > s9o C C m C C n n ? rn /5 fZD f ri?i?J? _30' of /y,, '// ? f y -' V 7 I m C C N O Ml W W 1 ?o 1 1 I I 0 t- Z? A 3 n P-pe J ? W T j ?xis?irJa y0' o? t<b " cr?P e ! P.) o ?ooleN Cm P i \ „/?fi?aPn ??r recomm,,u??o?o,1 C C C C i \ Q LD JO a??Titi?, ?D /Q' ir•9P J ?r r? apt a1 Z,9 % l n o 1r ?? P U ra n?` n ? J w r? C N 0 W W M o? /R" ?`I l cow Cm? 7 5 Jo C 0 n W Z 34 A i > Sao C C 5,, 11r ?,mP ? Zo 0 at2° WET 32 f00 ,FX?s?i? ?/D' o ? 2 y„ -GM f? ?o ?P ren??Ce?D G?? SDI Q rZ 34 " Zr C C >590 C C n, O ti W t n n C C Q MAT !'AL uL A_ Er _ 9+00 r 30n' o f 2,V' C?NI to 1" Ar ?-aAIIfff/ LA Jr? ' I-J o? 36 „ C C 59'0 C C 36 fy0 EXiS??? 3n' o? /r4" p ?P rfT ?Q? zo/ 50" rjas?til C C >Sio L C N O CJ? W s h 44t MATCH y 49o Ew i //o' o c /S A -- ?? /? rrtl a?tdl w/y0' n l8" Dl?,i1 !-L?2.E 4 Q 71,(.3 21 > sqo /3/ 9 ` o 18' Q Z. 6 P P/V ?8 c .r-.?41 o f e x?sr,:.r.{ C m p e-, m 4/ OaM - ? Jas ?J C -,- is i t P MAT H IN ,fs N 3940 1 Q W W Z N ct?aa O W W z C C C C G X C C i C C L C C I c c C C L.. C C C C C C N > 5,go > s9o ss+aaaa 0 •N Lai N W C Z C N C . C I i! cf a C t? ' ? FIAT 0 r ca Rl b 3 > Sye _o T Ll, T off' a"X 97 A IT - C oa??D p,?1 'I -A 1'fr' I mFN r ?d 7 .') _LINE t \11 // s"`/fps // 03 64 64M j 18lq-tzs- r M, C rye a[ _ v 4 J°? 0 ti W w 75Z r vcry 7'x3 x MAT IN A a?ri.? E-0-790- N/I s r. 1 ReL? 'A nRm 95? Q ? L39'e R r A o p fi 3 i9 (_iH ? TD h P /-?n?? rQrX R1 T wllr 2" c r L 31n a MATC 1D 1 C\4 ti W Z 74tgM- MAT L.. C 7 Sfo 71 Lg2m- C C C C C C C C > VD ' A C i MATC 0 n Q ?o 3 /o t00 Ey'st,Nq y?' o rn7 ?? hP re Ala, _0 w/ rnntc?Y Ci?1P -6-o" T Is" IT- h 0 r Y9 n! C5 W i cn > 59o 776 >x-f, r 1 Tcur p?f7 ex?sji.?q GM p 1 c. )y -1 so "VV S"D' J 18" ??-- ALT nndd r n? P fo rl Q) C, J jB" m P @ s?? 75t DD I m ?r N 0 >590 r, W W Z > SYo C C C n C C Dave WFT C C 0 Q TTI EN7raN(r 5+014V-Te Creck DtveloarArdf I mo"CmP P AP I? Ifj A CJ ?U 6P 11et0 /?? -eyir??.,- nor-rte-t oX ? P?Oe 5I -)? Faite 1,3 O ciri 1 I- L-Li W Z ai > 590 M A ?' x3 XZgaSia ? i &iiolm 43% i i I i C C 964 L)D 7p cm ,,o ?o ?° rc nl? (e P J U? N O I-- 41 Zzn .A > 590 P > 5 90 °n. +f?JlllD MAT xis;i?,/p' ar 89465 lB" GI'hP ?o ?ir reel rr,? N O O ti W 1-37, A n / / "t '!? LCXrS?InH 7? r oT 120' X 72 arcl, 13/oe to Iie redlara wl/ /Z F" X 93'1 /5/7- ?,,4, (INS ...? ri a P 1- orNrnrni ? ;off s ? R s MAT L I !N r 'gyp N O N W T l?• 7y' ?0 6P 6u;1? (JJaf aY? For moK Iallfr&A1ro1) nn Oh affim hew r C IM NNtrw, P (XPIGI L /?!te l0 J '; D. P. = /O Z + 70 s3 = izg + ?y.9y C cpl u.dl cou,?r) 8 W gfou?-- 0. Co . Ad?tQ RD' o 6o,f /02 + 20 A 17: c"&O CI?1 f? f Co'?trc?P A41". 11 ID Ai I ? ?-CtoMlrl4Flj d otj . K nc ?: 11 6114 cvtry 75 1-37, x3`12 ? 1 ? 1-?c.S/r1 e v / loo 4oo 44 S?' o t l ?'. t Y L C MAT E? a IN 0 3 0 Ll„ i Q ?O x ?o ?r zoo in l ? E ?I • ? o i 1 l ,101HLSIQ 3\009 1066 fTfi9S9Z999 xvd ZT 5T ZOOZ/CT/CO m -? V e 1 Y COO 0 ?•0 OL 4 . . O ? o d 71 P; k ,. b? i 3 a vl -a a coo in IDIHIsia HN009 IOM tTfi599Z8Z8 xvd ZT:9T ZOOZ/CT/CO v 0 ?o 0 0 ? 04 1 I N • xi _ ! I \ J' 'J TS?? l i•\ `a ^I d • i ~ 5% d v Ni ? 'i 1 1 Cl J? 1 \ V V \ \ y \ \ N -` Q 1 ` V 1 1 r A ,T7 r 1 r 10 1 1J ?L fl I c.?l L ?C v i) 0 "I ...... ... I to 0 y I , r i 1 1 r T\ v V V ,1 n F? ? o 1.r W GIB CkN V. f C ' `b t/ ?'n°'g ?. 1 C = l? G •w. LU LAJ llj ? ?-U; 41 ' I L14 L;.L e a? ?,` . r ? oN .`? e -,1 - z - a I I 1 1 CL- 1 I ? I ?y V1' O a7! 01 LA I Ct. t11 l,i? I t I ? ?: V r, ?. a L " - -- - _ t- !D -7 ------------ : H _ - ----------- - - - 4p0-- -'- 7 7 _ .. - 1 r T - T M -6- J 3 ------ --- - - - --- - -- _.. _: 1 _ t , - - C v : _ _ _ _: -- - "- -- - " - " - - - ------- ------- --------- l - - i i _t y j " - _ - - - - 17 17 - ------------ ._.._ _ .. - rJ/\??.L ? /J ,/C ?Y ?<pT/?-t-F-Y1C ?ly if? Q vf?? i i _ - L _ r i { ;D- -?ctr?cr-`? ?a?? • IBS.,,-,??_ l _ __:__..-__ - - - - f} _:. - - -- -- - ----------- Y t -- --' -;98 - a t ' - 1 - - - - ! ------ ------------ - - ?: -- - - - l_ T I -7 1 ? - :_ I i - • .._ ... ...... - - ---- ._. . t . I - -- ...... - -._+ ... o . 77 -? I y ,? -- - ? ???- - - -- - ----- - - -- - - - - - ---- '- -- - . --- ---------- - - ---------- I - _. - -- D,D ?i ?.. - ` : - - . - - - -- } i i 1 ------ ----- .. . - ?? 1 ft FILE COPY TO: Jean Manuele, USACOE Raleigh Regulatory Field Office FROM: Ron Linville, Regional Coordinator Habitat Conservation Program DATE: April 25, 2002 SUBJECT: North Carolina Department of Transportation (NCDOT), NCSR1529B, Yadkin River and Unnamed Tributaries Yadkin River, Watauga County NCDOT proposes to grade, drain, base, and pave primarily along the existing roadway of Blackberry Road. Biologists with the North Carolina Wildlife Resources Commission are familiar with habitat values in the area. These comments are provided in accordance with the provisions of the Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661-667d) and the North Carolina Environmental Policy Act (G.S. 113A-1 through 113A-10; NCAC 25). NCDOT proposes to replace and upsize several existing culverts while completing the project. Headwalls will be added at two locations where CSPAs will be installed. Miscellaneous riprap impacts are indicated to be 100 linear feet. Total new stream impacts will be 258 linear feet. Gabions will be used from Station 96+62 to 96+87 to provide streambank stabilization. These Yadkin headwaters support populations of brook trout. Based on our review of the submittal and our knowledge of trout in the area, we will not object to the project provided the following conditions are implemented: 1. Instream work and land disturbance within the 25-foot wide buffer zone are prohibited during the brown and brook trout spawning season of October 15 through April 15 to protect the egg and fry stages of trout from off-site sedimentation during construction. NCSR1529B, Blackberry Road 2 Apri125, 2002 2. The use of riprap and gabions in channel should be avoided to the extent practicable. Neither material should interfere with aquatic life passage during low flow conditions. 3. Culverts 48" or larger should be buried approximately F into the streambed. Culverts less than 48 inches in diameter should be buried to a depth equal to or greater than 20% their size to allow for aquatic life passage. The dimension, pattern, and profile of the streams should not be modified by widening the stream channel or reducing the depth of the stream. Previously disturbed floodplains and streams should be restored to natural geomorphic conditions whenever practicable. 2. If any concrete will be used, work must be accomplished so that wet concrete does not contact stream water. This will lessen the chance of altering the stream's water chemistry and causing a fish kill. 3. Heavy equipment should be operated from the bank rather than in the stream channel in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into the stream. 4. Stringent erosion control measures should be installed where soil is disturbed and maintained until project completion. 5. Temporary or permanent herbaceous vegetation should be planted on all bare soil within 5 days of ground disturbing activities to provide long-term erosion control. We encourage NCDOT to utilize onsite vegetation and materials for streambank stabilization when practicable. Thank you for the opportunity to review and comment on this project during the early planning stages. If you have any questions regarding these comments, please contact me at 336/769-9453. Cc: Cynthia Van Der Wiele, DWQ Heath Slaughter, DOT Marella Buncick, USFWS O? http://www.topozone.com/print.asp?z=17&n=3998366&e=443153&s=25 4/15/02 TopoZone - The Web's Topographic Map Page 1 of 1. 3. 5. 2. 4. 6. Photo #1- Inlet view of pipe at station 23+50 on SR 1529B, Blackberry Road, Watauga. Photo #2 - Inlet view of pipe at station 39+00 on SR 1529B, Blackberry Road, Watauga. Photo #3 - Inlet view of pipe at station 54+75 on SR 1529B, Blackberry Road, Watauga. Photo #4 - Inlet view of pipe at station 97+40 on SR 1529B, Blackberry Road, Watauga. Photo #5 - Upstream view of Yadkin River at station 97+40. Gabion baskets will be placed in this location. Photo #6 - Downstream view of Yadkin River at station 97+40. _ . ^ rx