Loading...
HomeMy WebLinkAbout20020443 Ver 1_Complete File_20020321 T STATE OF NORTH CAROLINA = -?.._.- i 1=TLAfms (rwn? DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY P. O. Box 25201, Raleigh, NC 276 1 1-5202 LYNDO TIPPETT GOVERNOR PHONE: 919-733-2520 SECRETARY 2002 March 15, 2002 Mrs. Jean Manuele U. S. Army Corps of Engineers 020443 Raleigh Regulatory Field Office 6508 Falls of Neuse Road, Suite 120 Raleigh, NC 27615 Subject: Nationwide Permit #3 & #33 Pipe #2292 on SR 1848 Surry County, North Carolina Project Number: 5.7452 (No DWQ Permit Fee Required) Dear Mrs. Manuele: The NC Department of Transportation is scheduled to replace Pipe 92292 on SR 1848 in Surry County with a new pipe at the same location. No detour is proposed. The existing structure is a 40'x 72" CMP. The proposed new structure is a 50'x 72" CMP with a concrete headwall. Miscellaneous rip-rap impacts will total 40 linear feet or less. New stream impacts = 50 In. feet. Please note that there is a significant amount of riparian disturbance at this site (see attached photos). Most of this disturbance falls well beyond DOT's right-of-way limits. DOT forces did not conduct this activity. Photo #2 illustrates the current pipe as perched on the outlet end. We will correct this deficiency at the time of construction. The replacement of the deteriorating pipe with the proposed new pipe will require temporary dewatering. An impervious sandbag dice will be constructed approximately 20 feet upstream of the existing culvert to create a small pool. Clean water will temporarily be pumped around the construction area and will be discharged into a buffer area located approximately 90 feet downstream of the sandbag dike. Any dirty water located inside the construction area will be pumped into a silt bag. The dewatered area will total approximately 360 square feet or 0.008 acres. Once the new structure is in place, the impervious dike will be removed and preconstruction streambed elevations will be restored. P. O. Box 250, N. WILKESBORO, NC 28659 PHONE (336) 667-9111 FAx (336) 667-4549 Mrs. Jean Manuele Pipe #2292 on SR 1848, Surry Page 2 March 15, 2002 Construction of this project will necessitate impacts to waters of the United States in the Yadkin River Basin. The pipe in question carries an unnamed tributary to Big Creek (Class: C). The Division 11 Environmental Officer reviewed this project for the presence of threatened and endangered species on March 14, 2002. The subject project has been determined to have no effect on any federally listed endangered plant or animal species. Historic compliance work will be scheduled and concurrence with the State Historic Preservation Office will be obtained if required. Since this is an existing pipe, the modifications proposed in this application should not remove or degrade existing water quality uses. By utilizing the erosion control measures outlined in the attachments to this application, downstream water quality standards will be protected. Attached is a Preconstruction Notification Form, plan sheets with proposed erosion control measures, a marked county map, a marked topography map and photographs. By copy of this letter, it is requested that Mr. Ron Linville, Mountain Region Coordinator, with the North Carolina Wildlife Resources Commission comment directly to you concerning the 404 Nationwide Permit application with a copy sent to me. We would like to begin construction as soon as possible. If further information is required, please let me know. Your early review and consideration will be appreciated. Sincerely, 7? J47/-ez- Heath Slaughter Division Environmental Officer Enclosures cc: Jean Manuele, US Army Corps of Engineers (1 additional copy) Ron Linville, Western Piedmont Region Coordinator, NCWRC Cynthia Van Der Wiele, Division of Water Quality (2 copies) R. C. McCann, PE, Division Engineer Heath Slaughter, Division Environmental Officer Neil Trivette, Roadside Environmental Field Operations Engineer Dennis Bennett, Bridge Maintenance Engineer .-O Office Use Only: Form Version April 2001 USACE Action ID No. DWQ No. 02 0 443 If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Section 10 Permit ? 401 Water Quality Certification ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: NW #3 & NW #33 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: North Carolina. Department of Transportation Mailing Address: P O Box 250, North Wilkesboro NC 28659 Telephone Number: (336) 903-9236 Fax Number: (336) 903-9239 E-mail Address: hslaughter(a dot.state.nc.us 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Heath Slaughter Division Environmental Officer Company Affiliation: North Carolina Dtartment of Transportation Mailing Address: P O Box 250, North Wilkesboro NC 28659 Telephone Number: (336) 903-9236 Fax Number: (336) 903-9239 E-mail Address: hslaughter@dot-state,ne.us Page 3 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Pipe #2292 on SR 1848 2. T.I.P. Project Number or State Project Number (NCDOT Only): 5.7452 3. Property Identification Number (Tax PIN): N/A 4. Location County: Surry Nearest Town: Mt. Airy Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): From Mt. Airy. travel east on NC 103 Turn right onto SR 1787 Turn left on SR 1788. The pipe is on SR 1848 near its intersection with SR 1788. 5. Site coordinates, if available (UTM or Lat/Long): UTM: 17 546161E 4041343N (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Residential/Farm 7. Property size (acres): Approximately 0.03 acres. 8. Nearest body of water (stream/river/sound/ocean/lake): UT of Big Creek (Class: C) 9. River Basin: Yadkin (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/mgps/.) Page 4 of 12 10. Describe the purpose of the proposed work: Upgrade existing stream crossing. 11. List the type of equipment to be used to construct the project: Trackhoe/backhoe and dump trucks. 12. Describe the land use in the vicinity of this project: Residential/Farm IV. Prior Project History if jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. N/A V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 5 of 12 1. Wetland Impacts Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** es/no Distance to Nearest Stream linear feet Type of Wetland*** N/A * List each impact separately and identify temporary impacts. Impacts mclude, but are not limited to: mechanized cieanng, graamg, un, excavation, flooding, ditching(drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at httu://www.fem&gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: 0 acres Total area of wetland impact proposed: 0 acres 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number (indicate on map) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? (please specify) Pipe # 2292 Pipe Replacement 10 feet UT of Big Creek 4 feet Perennial Pipe # 2292 Temporary Dewatering 90 linear feet or 360 square feet UT of Big Creek 4 feet Perennial Miscellaneous Pipe # 2292 rip-rap placement for 40 feet or less UT of Big Creek 4 feet Perennial stabilization * List each impact separately and identify temporary impacts. Impacts mclude, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net losstgain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usgs.gov. Several Internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.MMuest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 501n. ft. of new permanent impacts. Page 6 of 12 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. N/A * List each impact separately and identity temporary impacts. impacts mciuae, out are not nnuteu w: un, ux avtuiun, tkedv ag, flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once -the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The existing pipe must be replaced due to its condition The replacement hive length will be the minimum needed to create a safe crossing By utilizing the erosion control measures as shown in the attached drawings adverse impacts to streams in the area will be minimized. Page 7 of 12 VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/newetlands/strm ig de.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A Page 8 of 12 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at htw://h2o.enr.state.nc.us/wn)/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ® If you answered "yes", provide the following information: Page 9 of 12 Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation 1 3 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from near bank of channel; "Lone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. All appropriate best management practices for sediment and erosion control will be implemented during construction. XH. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 21-1.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No Page 10 of 12 XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Applicant/Agenfs Signature d Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) US Army Corps Of Engineers Field Offices and County Coverage Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell US Army Corps of Engineers Avery Clay Jackson Polk 151 Patton Avenue Buncombe Cleveland Lincoln Rowan Room 208 Burke Gaston Macon Rutherford Asheville, NC 28801-5006 Cabarrus Graham Madison Stanley Telephone: (828) 271-4854 Caldwell Haywood McDowell Swain Fax: (828) 271-4858 Catawba Henderson Mecklenburg Transylvania Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham US Army Corps Of Engineers Alleghany Edgecombe Lee Stokes 6508 Falls of the Neuse Road Ashe Franklin Nash Surry Suite 120 Caswell Forsyth Northampton Vance Raleigh, NC 27615 Chatham Granville Orange Wake Telephone: (919) 876-8441 Davidson Guilford Person Warren Fax: (919) 876-5283 Davie Halifax Randolph Wilkes Washington Regulatory Field Office Beaufort Currituck Jones US Army Corps Of Engineers Bertie Dare Lenoir Post Office Box 1000 Camden Gates Martin Washington, NC 27889-1000 Carteret* Green Pamlico Telephone: (252) 975-1616 Chowan Hertford Pasquotank Fax: (252) 975-1399 Craven Hyde Perquimans Wilmington Regulatory Field Office Anson Duplin Onslow US Army Corps Of Engineers Bladen Harnett Pender Post Office Box 1890 Brunswick Hoke Richmond Wilmington, NC 28402-1890 Carteret Montgomery Robeson Telephone: (910) 251-4511 Columbus Moore Sampson Pitt Tyrrell Washington Wayne Union Watauga Yancey Wilson Yadkin "Croatan National Forest Only Page 11 of 12 17 107235 • J 11 ` ! S-A r ` `?cr 179] }c?? rs u/ I ? at•\ o. C\t•T S•rye -,?.Q (??` 49 ` 179: 1-.1_ iFi O $OIM fuNINC.) SE :l.~' I]9I h \.$ 179t a 32 al9 .. 221 . P. 1,373 .6 1795 Ea 7.1 I - ` • ? a 332 ' f '°?s a•T, ` :.?:?< ..; ? T. AIRY ti. F1Sti y 17e7 e 1448 •° y-eo •v S ? ' S 1_a ev9 4 ': / / 92 P.6,86 ' ' lw4 J I?? Iex4 F/ ?o ?y / 1?ea 70v 1790 .v -1 !a 1628 Boy. 9 ' nob 'J S ? - •FAS YLY' G 2289 •• )2 3 / a ?} e7 lee (] Y.2 N i:. \ 2284 178 1 0 '21 9l - u],? P'In. 1671 '? •v° 1]es ? / Ridg H ° . 88 UiROC1C \0 4T. ?1 Wood- -+b 799 ?• i .4 I 691 F J - (s _ 3 4,5, Il01 Age J •? •, DNIN?I j? • .45 •. -- .. 17 -; H14 pi4 S FA - t. ,92 J 89 FF'S 1907 'As •? ..9 Sl Cr. pp :I ,v ,7 r. 1e : lOp 14sa - •! ° _ ']v .z P O IIII?F??.AFNNS???t ,3 ?° FAS _ ?' ve7 \?•leo6 .a `•.``,' 1862. 31 !d( r o Sheiron - j x2,329/ 2280 1898 o 21 \ )ti 1 le-?x .7 "iM •9u h °'/O?iM(I :f: -•?.: Twm 22.22 a: .1 2 1808 I _ ANNERIOW 4? I 0 ?? 1.7 1804 89 ^` ne t Iv7 `I .p ? ? ws, c°"R+cl leis •J - :?:? 1 ^? L >_ s2 \ F. loos •I `, 1.0 ?? ;Ill ! 7 P. 1.029 1815 P?OO IeOt .?O I ,? '6 lalb 1ti Westfield 1FA 89 j H LLY VIEW t AP ?.; P I • ?- I V / FORE?T-HIGHLAND ?S ARK ~ t4? r I tr 19422 P23? - FAP \ 1UMNG.1 ? ? Wm9' ,? < 1818 - ' lets o 'f 3356 \- POP, I,6a7 Q1 1 JS ,} 1814 N`% ; ° ? 1 ?. 2282 J., I??Iu???{ v ? F°'t\' ? _1 - 1.11/ 1,.. -yio•.? IIo 1 3lL / o? / ?G C ( I f C? .2223 1e1s ee 1 ? elz C. v t Mf. Ai ?? s 1 ?y .91 I whirs •`? S rrr ^ \ 'a ; ti, } \ ,(/ '\ 1oe 001 ... \ / '.:? a '? `. F<3 Ploieu Airport Ie7i Ie74 1!333 y .I 2.5 333 14122 b \ ,?? 30 1. ? 1 TQ ? 377 ? `Iex] 823 1809 IB]I ,le .( 'at]/ , 'o• ; ., /? 1690 .2{.I .1012 ,' 1\ I 3i s s e7e 1601 ,26 I 33 ?2 8i K, S nom' ° % ; lq " o1? 2207 22091` "O \ 70__7 i ..15 'O ?$]S p ;]? 5•' •;\`. 'y,P ?NF '\ "\ /?117d• .,1]114 4813 :.C .Q 1 b ? ,? XS 3££ a 2?2^16 j ? -' xo a y'P? ?! 7x19}% 7 Iel2 . lelx ,? .. 7 y 3,? 128- 2626 T 1.229 1.122 y 1 =Y %! 1 a 2203 \??"?"'? , 163 .T 5 -? >• tURN9r .'y 2026N b 121 7011 C' o I •;w 1412 I - 59 J .29 300__ 29? 2~€ 7.79 n ~., X 6t^ ' ; cr. 219 p F!•1 .? :Y ". 7215_ Y 7079 g •-:1( ? ( iQ ` 1813 7• ?..OYpD?\ 9 ? . b2^ba? 20]0 / E ?91j ,'.- r?2p[n? ri_-C158 ? v•'' nl 19422 e 156 ?2'9 44 22217, TOTT::' 1 16 v/ IG.7-- Q eYr.< :118 KNOB `- --0 .\ "?l • 4 201. . _! ArprOf '?]U/_ J ti 7174.2 " t? 601 1 2216 I ? ?? 712 1 _ .. 2C 701 ] 1 v i ..: ' 12,. ' a 'Pc H'• /?f,- ' 4'• .? i Dieo) , 'eo9 1ev 102 h 330 ,118 rzos ,'.r:7o1 f 220] 4' x0x4 9 ?• 701 74x7. w7 w.r 710]' < v -?( 05 \ b /0 71_7 I ? e J 71 / PILOT MOUNTAIN - • :-'I \, f/3 9 b 10]2 A h Hill \ I1 q } (1 ^ro?. _ POP, 1,090 720 IC]7 ?? ~! ' • :t 104] 707eV r 9 J I \- I - .•,`' .a IFAS 268 TO 27 221] c 61? b _ 2 20]] x•]0]4 2019 1 U G 3 ` j 7 , \.\ 1I1100 1"'? x714 220. 1 '034 1 l 135 2024 n?? I 7279 \\ 2212 i/3 ' 70,7 345' `^? ; , \\?ira u ?' I 1 `•• , 71 2?9] 20]9 - ?-, \ \, C?? r ?/ t - \ 127. y? f I 0 :70] H `20]3 .1 uH . 7 3 J C5 s¢ 71]2 'a < ?. '7 9 71741 138 26 14 2 9 601I _Zx7?: 11x1 326:• .1 C77 ? p/ 2090 220]6' 70 .) } $ ?Gh`LL\a N N 7077 / 20.0.-. 20 \ \ t 7 •; a 1 41\re9 ` .n : a M1 a Le \ b ' 329 1 144 - , 2761 ' 11 ? 0 2200 13 \3 •-103.. . 'D 2946 ./ : 70.7 / 2034 277 203 L0 N 208 1 ` 22x4 a 2221 16 ?- \,-• PCross.l .g 20]7 7 \ .} 7096 3 208] I ZDas ?76 Q?\ .') 2018 •' SS?J S 48 lT2 v .7 .4 6 i FAS .2 R?Le 10ss ' Y P139 ?S 5 FA$ ?? ? ? a Cre<?S ;1 e/S /? •o' ?,?`I 22x8 \ OOOI ,2090 7036 .. "' ,?r los]- q 7 34 .) 227 .6 .6 22]x7 .? 1 I.0 2059.5 `? 'G: PILOT 20 . 720 268 .7 2277 bin M '.Ln lose ELEMYT1,6e0 C44 6 :y 4in? Ca Cr.? 7148 3t ,• .Q 1226 3194 ?/ ;. 2 8e '.N .y •2038 157 140 8 2.Z4 •2137 7086 .a .. x221 22x9 7o a ??• 2o I. 66 C opelan H 2 2? r r?-:1 Ina ` / 7 2441 .6 7776 e 2]23 ?`127s ?`• l 'J' .d \? IO 1 bi '6 ?x 7x ° u •? P J oa ?I } o b 3 ] 4 2037 447'0 ! '0 ' ?pG 24431r ' ?' S2 /I 141 , r o 22ol .11 A / P348 J , 57 ° 50 2001 b 164 Sla^/ 6 , .] / e I S A 'O m79.7 \• i 29.9 ? I 000 24! 4! 2x . ?71 ?? 1G1v. 22» 2078 / i xou 7 2r? - "Q v 2082 a \ ! y 34! - - -i (.U 324 70 t.6 1 2245; 7 .9 ` 2]]I ??'• 22x1 1 n 7? y 't !? ?F ? 53 x081 •? x094 1 ? '2 2-37_ t.9 ? P\ /, a ' .?I F•• 152 \ 200 2441 5 z ae 324?J T •? C349 C9ndi f ? 52 ' ?0?9 a ' D ? ?Z.v 79.7 .a 2 y ' 2 ] 1 8 _ 142 7065 266 162 /T 7x79 2.9 Sloom' 975 5977, 200 .2 J J ' IO7e \?' ! '6 lobe I 72]7 g ~ IS]G ]1 OxWH 2067 °yF >IF 519419 a '146 72711 1210 ' 19 2 2975 \ wI WA] `?? 207] 1 Rockford r Y.4DKIN 2:L7, :ox F. ?P16 c Id4. r - _, ?i t -N 1J J^i 1 V?1VL,Vi1V - l i1V - VV v 1 vYvbawYauv --t, --a----- .com Target is UTM 17 546161E 4041343N - CLAUDVILLE quad (Quad Infol 5? f: f• ie, .0 i http://www.topozone.com/print.asp?z=17&n=4041343&e=546161 &s=25 3/15/02 0 5w 1000 1500 2000 meters I - ' - t - ' miles 0 0.5 1.0 CULVERT CONSTRUCTION SEQUENCE LPLACE PROPER EROSION CONTROL DEVICES (SILT BASINS, TEMP. DIVERSION, SILT FENCE ECT.) 2.CONSTRUCT IMPERVIOUS DIKE UP STREAM TO CREATE SMALL POOL (DO NOT DIG A HOLE) SO WATER CAN BE PUMPED AROUND CONSTRUCTION AREA DOWN STREAM. (THIS WILL BE CLEAN WATER) ANY UNCLEAN WATER FROM INSIDE CONSTRUCTION AREA WILL BE PUMPED INTO A SILT BAG. 3. TAKE OUT EXISTING PIPE 4.CONSTRUCT PIPE 5.REMOVE IMPERVIOUS DIKE 6.COMPLETE ROADWAY (THIS INCLUDES SEEDING AND MULCHING) 00 rl- Of N (D F- W n n n- W W W > O U J Z J W U) W x O W LL- (D W J Z J J a 0 Q W S z O Q W J mco rn? w A V Q W U Q w N w a W m Q W N U z O_ Q U W N N a J U r,r W F- Q W Of U 0 W 0 z w O U wQ ?CL W U O O 3;: Ln W >x H N W ~ J ? z_ III w w O J J W W O D M M ? J ? J Q O H 0 a w S W H w U Z O U r, 0 ti N O I- w O Ln N 0 N CLQ O ?? O Z0? ? ?Zo CO) A W U a LL Of Z U) W F- Q O J W CO \ - W D Cl) o a? W -? Q CC) W W n- F- a w Vn w F- V) w ? U O N h z? O W aN??e J ON~? CO U Q ? ? O w as A -7 to) \ w w m z \ Q 1 z V) \ o 'awl' I' 1 ? 'I 'I 1 , J N TopoZone - The Web's Topographic Map Page 1 of 2 OzO Isom Target is UTM 17 546161E 4041343N - CLAUDVILLE quad [Quad Infol miles http://www.topozone.com/print.asp?z--17&n=4041343&e=546161&s=25 3/15/02 0 500 1000 1500 2000 meters, 1 ! _ ' , „ 1. 3 5. 2. 4. 6. Photo #1- Inlet view of Pipe #2292 on SR 1848, Surry County. 120443 Photo #2 - Outlet end of Pipe #2292 on SR 1848, Surry County. Photos 3 - 6 - Preconstruction riparian disturbance. Please note that most of this disturbance falls outside of DOT's right-of-way. DOT forces did not conduct this activity. .. AA7E o? ?s 0 2 0 4 4 3 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY P. O. Box 25201, Raleigh, NC 276 1 1-5202 LYNDO TIPPETT GovERNOR PHONE: 919-733-2520 SECRETARY March 15, 2002 Mrs. Jean Manuele U. S. Army Corps of Engineers Raleigh Regulatory Field Office 6508 Falls of Neuse Road, Suite 120 Raleigh, NC 27615 Subject: Nationwide Permit 93 & 933 Pipe #2292 on SR 1848 Surry County, North Carolina Project Number: 5.7452 (No DWQ Permit Fee Required) Dear Mrs. Manuele: The NC Department of Transportation is scheduled to replace Pipe #2292 on SR 1848 in Surry County with a new pipe at the same location. No detour is proposed. The existing structure is a 40'x 72" CMP. The proposed new structure is a 50'x 72" CMP with a concrete headwall. Miscellaneous rip-rap impacts will total 40 linear feet or less. New stream impacts = 501n. feet. Please note that there is a significant amount of riparian disturbance at this site (see attached photos). Most of this disturbance falls well beyond DOT's right-of-way limits. DOT forces did not conduct this activity. Photo #2 illustrates the current pipe as perched on the outlet end. We will correct this deficiency at the time of construction. The replacement of the deteriorating pipe with the proposed new pipe will require temporary dewatering. An impervious sandbag dice will be constructed approximately 20 feet upstream of the existing culvert to create a small pool. Clean water will temporarily be pumped around the construction area and will be discharged into a buffer area located approximately 90 feet downstream of the sandbag dilce. Any dirty water located inside the construction area will be pumped into a silt bag. The dewatered area will total approximately 360 square feet or 0.008 acres. Once the new structure is in place, the impervious ddce will be removed and preconstruction streambed elevations will be restored. P. O. Box 250, N. WILKESBORO, NC 28659 PHONE (336)667-9111 FAx (336)667-4549 Mrs. Jean Manuele Pipe #2292 on SR 1848, Surry Page 2 March 15, 2002 Construction of this project will necessitate impacts to waters of the United States in the Yadkin River Basin. The pipe in question carries an unnamed tributary to Big Creek (Class: C). The Division 11 Environmental Officer reviewed this project for the presence of threatened and endangered species on March 14, 2002. The subject project has been determined to have no effect on any federally listed endangered plant or animal species. Historic compliance work will be scheduled and concurrence with the State Historic Preservation Office will be obtained if required. Since this is an existing pipe, the modifications proposed in this application should not remove or degrade existing water quality uses. By utilizing the erosion control measures outlined in the attachments to this application, downstream water quality standards will be protected. Attached is a Preconstruction Notification Form, plan sheets with proposed erosion control measures, a marked county map, a marked topography map and photographs. By copy of this letter, it is requested that Mr. Ron Linville, Mountain Region Coordinator, with the North Carolina Wildlife Resources Commission comment directly to you concerning the 404 Nationwide Permit application with a copy sent to me. We would lice to begin construction as soon as possible. If further information is required, please let me know. Your early review and consideration will be appreciated. Sincerely, ;70 Heath Slaughter Division Environmental Officer Enclosures cc: Jean Manuele, US Army Corps of Engineers (1 additional copy) Ron Linville, WesternPiedmont Region Coordinator, NCWRC Cynthia Van Der Wiele, Division of Water Quality (2 copies) R. C. McCann, PE, Division Engineer Heath Slaughter, Division Environmental Officer Neil Trivette, Roadside Environmental Field Operations Engineer Dennis Bennett, Bridge Maintenance Engineer Office Use Only: Form Version April 2001 USACE Action ID "No. DWQ No. 0 2 0 4 4 3 If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing Check all of the approval(s) requested for this project: ® Section 404 Permit ? Section 10 Permit ? 401 Water Quality Certification ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: NW #3 & NW #33 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? H. Applicant Information . 1. Owner/Applicant Information Name: North Carolina Department of Transportation Mailing Address: P O Box 250, North Wilkesboro NC 28659 Telephone Number: (336) 903-9236 Fax Number: (336) 903-9239 E-mail Address: hslau hter dot.state.nc.us 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Heath Slaughter Division Environmental Officer Company Affiliation: North Carolina Department of Transportation Mailing Address: P O Box 250, North Wilkesboro, NC 28659 Telephone Number: (336) 903-9236 Fax Number: (336) 903-9239 E-mail Address: hslgWhter@dot.state.nc.us Page 3 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Pipe #2292 on SR 1848 2. T.I.P. Project Number or State Project Number (NCDOT Only): 5.7452 3. Property Identification Number (Tax PIN): N/A 4. Location County: &M Nearest Town: Mt. Airy Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): From Mt. Airy, travel east on NC 103 Turn right onto SR 1787. Turn left on SR 1788. The pipe is on SR 1848 near its intersection with SR 1788. 5. Site coordinates, if available (UTM or Lat/Long): UTM: 17 546161E 4041343N (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Residential/Farm 7. Property size (acres): Approximated 0.03 acres. 8. Nearest body of water (stream/river/sound/ocean/lake): UT of Big Creek (Class: C) 9. River Basin: Yadkin (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) Page 4 of 12 10. Describe the purpose of the proposed work: UpgLqde existing stream crossing. 11. List the type of equipment to be used to construct the project: Trackhoe/backhoe and dump trucks. 12. Describe the land use in the vicinity of this project: Residential/Farm IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. N/A V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. paae 5 of 12 1. Wetland Impacts Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** es/no Distance to Nearest Stream linear feet Type of Wetland*** N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized cleanng, grading, nti, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://www.fema.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: 0 acres Total area of wetland impact proposed: 0 acres 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number indicate on map) ( p) Type of Impact* Length of Impact (I feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? (please specify) Pipe # 2292 Pipe Replacement 10 feet UT of Big Creek 4 feet Perennial Pipe # 2292 Temporary Dewatering 90 linear feet or 360 square feet UT of Big Creek 4 feet Perennial Pipe # 2292 Miscellaneous rip-rap placement for stabilization 40 feet or less UT of Big Creek 4 feet Perennial * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net losstgain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usgs.aov. Several Internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.co www.magquest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 50 In. ft. of new permanent impacts. Page 6 of 12 3. Open water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: till, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The existing pipe must be replaced due to its condition The replacement pipe length will be the minimum needed to create a safe crossing By utilizing the erosion control measures as shown in the attached drawings adverse impacts to streams in the area will be minimized. Page 7 of 12 VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or. equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strrnizide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A Page 8 of 12 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at bqp://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify V Yes ? No ® If you answered "yes", provide the following information: Page 9 of 12 Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation 1 3 2 1.5 Total * Zone I extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. All gppropriate best management practices for sediment and erosion control will be implemented during construction XH. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A XM. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Z Is this an after-the-fact permit application? Yes ? No Page 10 of 12 X [V. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Applicant/Agent's Signature d Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) US Army Corps Of Engineers Field Offices and County Coverage Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell US Army Corps of Engineers Avery Clay Jackson Polk 151 Patton Avenue Buncombe Cleveland Lincoln Rowan Room 208 Burke Gaston Macon Rutherford Asheville, NC 28801-5006 Cabarrus Graham Madison Stanley Telephone: (828) 271-4854 Caldwell Haywood McDowell Swain Fax: (828) 271-4858 Catawba Henderson Mecklenburg Transylvania Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham US Army Corps Of Engineers Alleghany Edgecombe Lee Stokes 6508 Falls of the Neuse Road Ashe Franklin Nash Surry Suite 120 Caswell Forsyth Northampton Vance Raleigh, NC 27615 Chatham Granville Orange Wake Telephone: (919) 876-8441 Davidson Guilford Person Warren Fax: (919) 876-5283 Davie Halifax Randolph Wilkes Washington Regulatory Field Office Beaufort Currituck Jones US Army Corps Of Engineers Bertie Dare Lenoir Post Office Box 1000 Camden Gates Martin Washington, NC 27889-1000 Carteret* Green Pamlico Telephone: (252) 975-1616 Chowan Hertford Pasquotank Fax: (252) 975-1399 Craven Hyde Perquimans Wilmington Regulatory Field Office Anson Duplin Onslow US Army Corps Of Engineers Bladen Harnett Pender Post Office Box 1890 Brunswick Hoke Richmond Wilmington, NC 28402-1890 Carteret Montgomery Robeson Telephone: (910) 251-4511 Columbus Moore Sampson Pitt Tyrrell Washington Wayne Union Watauga Yancey Wilson Yadkin *Croatan National Forest Only Page 11 of 12 104 U` 107 _ 235 Jl '' 1 SuI r 1 I Ar?4 1?.--? Ie 7 e 's y ? pill a Gt ^i ? Springs r I°40 t7oz d SALEM 9 ` w ? v 16 i leia a. a ? Sole NPIn+C.I la ¢ ? .i a? 4q1 ° ?.6 n91 1114 t793 32 ale .! 631 221 ??. 1P. 1.171 1 PS rv .b 1791 .a ` 1.1 1+. ''' 1 s•?. :.vs?:?i T. AIRY q. F y ne7e le. .a yls9 .D S .S 17?9a e99llrr` ?'?' '-• ? // P,6,86 -? I79a '2 a16I! 92 . {? < \??Y, / 1716 r 789 1790 'p 1+93 b 3a17?_ ?d\ '? , 7 E Y I Ilve <O 1628 eOT. / [J ' 2 9 )2 ? 31 ? / a ??. t7 lee 1 3.11 \ Pe4 ?• a `\,? ? B n8. n ` a• 7 3 .4 nee neb a Ve ' m .1 H 197 / -R''idl!g 8 0 L 88 LAi ROCK; 'r wood- ~,1 799 ' .4 's. 897 F `?^A J? s -- Ville 1e01 279 I . ? A$ a Ut8PK1 T? ? ?' Y I7 Jd o lags I FA.9 :I P. .92 ??c 89 F!'' 180] /.p FAS '? ..j ??` leglg Ct. 108. ` N + 1 ' A$ I ? ? :.: ?. 90 FAS ?7 176] \^Ie06 31 ]9 r D ?" ??. ? rf Shelron y i? 1?ao 1601 o 21 y ? 1e_?] ) 1,719 •.?•, FAr "` "ililfli ` Town nee ° : U .I ? leoa j) 1801 89 ,:Y - ANNERTOW 0 1004 117 17. less '.7 ;'? ;u 1.0 is e t 1805 •I 1 ,' to ° i 2' .6 '6 1e1e 18011 Westfield Z f 89 H LLY VIEW lell 8 _I V \ FORE$T-HIOHLAN_ ql r? _ F AP Il AI AUNINC.1 I WW' I`• a 1619 I1611 1156 1 'POI. 1,647 I L \` - :? .7 1914 `1911 M1 .'1 0 Iw`II?,pU6 IIW ? / a ° r / !' J 1 / IlyUlf???f Sty' ?` Cl. --'• • 1110 I 7 ?. 'IU i ? Q ,?lll ??,E ex]I 1 1815 "`?alz ^,I ` I -eek 1 Mt Ai I i • b ` 8{ ry `> \ .' : y }'? 6011 I White ? Suf 79 J Air Phan Port 1e2? lei. 18131 -3 0 1? .r 53 11 U6 b'Q :?/ ) :9]2 '1822 921 Ifi09 1931 183 'I 878 F I M1 'l'' let _Z •2/ : 3.i a / 16 1601126 .4 11833 3+t-_: 2 81 cr K, - 11 -o ? ? eon •:?15 <o 03 a ui S zIOZ .? =o ??Fi .( JIIxd9 271 19x5 ' IC 'J '? 6 4 42 a 113 1 5 (flKs O / %- . "J ' 2028 1063 I i9 1815 1p I9?xl 57 'i' :.r57 \ 3Ti ., / 12aj 2207 ?:?. 1112 2026 i , Cr. Ng b 13 2012 929 59 MTN. 30 2 01;1 L1111 r 19 2259 28 ! 2 17 F>`S .4 2215 2029 O ' 1?01 1605 ??\ -? x017 Fla( I ^ "?M9 ?° ?? 1913 "p9uaoi =,s. 2070 ' 2027 1291 0158 a ., „ 1561 B 44 =2?7 TOTT \ 16 -' 6TI.? 221° KNOB :2_O v ` ?rvY 2028 `. ' AiPrOt Fri J 1' =121.1' 601 1 3211 I \. ') .NH ... 1{x121 20y.x01= .Q .y IO2 1 9 1819 .18 7 7 330 03 , 05 ; 118 =201 '_?': 201 Y x0_/ 7s b ,?, x02 /xOx=-W(w.v =1 ?' - , 1127 ' =toy . :oat' \ ,.0 4 .a 20x2 W? / < r - PILOT MOUNTAIN :'?`y?:.• i? 1, FAS 9 \ 6 2013 7 .Q C, Alh Hill POP, 1,090 :IOa ?, b \ 1 7 ` 20q 2025 2071 a 2038 4 ^ r_, .9 1 ?/ I >`>`' t?s IFAS 268 \ it ... TO 0=17 c a '' A 2 2021 h.M x021 =019 2211 =?06 O. L 2 34 14 I.a `I?35 .. .a 2011 ^` \?. ij20242 ' ` 45 \ I 7 2212 9 10p]_'F J ) .) ? 1 7:' ?.F V I 2718 -7 \ I I `' 6 . 2I 3 2013 / :039 Aii \ 7227 / .yf :207 B .I u .7 8 2039 -- .CS \ 8ea? 2?Oy ) 20]5 213] .'ct. . 134y 1. 3 138 , 601( 7727. 2222 326 037 , P, 1090 2076` x07 ,? 2011 ? 268 2 148 i ? - \ h`LL`t / I04o ? ? J ••'a ? =ou _. 2018 L6 \ b _ .9 2]09 ?? N N 2037 ?1 / t \069 101 1x82 ,] 2x22 O x200 13 1? 'D2038 / Sxi D T. 2o!a 277 ?2830 ?7 2os6 17 5 2,05 222. o. 2721 ? Level 2037 ?' S 12011 276 Q` 55 !'7 v 16 cross ,Z ? ? ? IOe6 2097 9 20q " -TT2 b 3 .7 a l 6'3 FAS .2 2101 R?'YGR^ ,?-\ 2a1J,' PI39 ?S Creek .7 fjS / 1100 s }\\ F.2. R 2086 7 2]Se ,, 227 .6 6 2227'1 N j 0 2059.5 `2 'C,1 P0.0T = J 1717 268 7 22x7 MTN, '?)1 •, a -Z242%a I z °8 ',`\, S.Finrv Cabin Cr. 7118 2078 ? ELEV. 2,1,0 4 4 J6 677 .Q 1223 40 8 ` .a 2x56 -/71/ ?J3Z .1 .`. a ." 66 x771£ '( 2239 .? ?!' 2oae x066 ?` 9y ? ° 10638 7 1061 ` ,6 223. x:Jl C-Pelandi f ?•.? ' \I L / 2726 ,q 2211 ?Sxls 1 '4 171' "8 .6 .5 2014 x0 7 9r 7060 .9 22 zm .] vim/ 226 ? ? , '? 1 00 o lq r N ?. ? 7 "' 344.31 , .7 2209 `P P348 ., .1 47n X141 F- 52 ;!; 17 164 S 2087 200 2038 I 1080 •? ;'w', I 200 O, 2733 i J KngNI°"'' 2 qq I 3331 7f 2067 32 2082 ' 1.0 • " •? 34! 1.4 3?3 ..? 1.0 22]6 230 `-\ 7 .9 'Y. 2272 2246 .1 1778 2221 1 fn w v ?, ,, m? y 53 2061 \ 1079 ?4 5 ! - 1i:; / 2089 n? „ C349 canA1 152 4 s'' "?I .4 'B a i .D 2067 142 1 N ' 1161 38 2070 x065 2 c 6 1232 / ' ` 1230 Siloc" 2075 2q7 3 ? . ,11 ' 16 1"62 J' s =z3c 0 2076 J 3Ln( zxll 'B ?- ,t 7.9 71 xol 2067 oea '?2!' A ' / - ,'?'' `?• Oc+F P? '?ERti" s;;ocl9; '146 C^ °A ' 192 IO]S zo77 1 RAILWAY q 1 Rockford 1 1?7a \ 2012 Y.4 DKIN = - t- - - ??. ? Ff^,RSY - --a- - -- - Tman com monow, Target is UTM 17 546161E 4041343N - CLAUDVILLE quad rQuad Infol J N? t41;_ 1 r /.. 4 0 a hnp://www.topozone.com/print.asp?z=17&n=4041343&e=546161&s=25 3/15/02 0 500 1000 1500 2000 meters 1 - , - - I - 0 0.5 1.0 miles t CULVERT CONSTRUCTION SEQUENCE LPLACE PROPER EROSION CONTROL DEVICES (SILT BASINS, TEMP. DIVERSION, SILT FENCE ECT.) 2.CONSTRUCT IMPERVIOUS DIKE UP STREAM TO CREATE SMALL POOL (DO NOT DIG A HOLE) SO WATER CAN BE PUMPED AROUND CONSTRUCTION AREA DOWN STREAM. (THIS WILL BE CLEAN WATER) ANY UNCLEAN WATER FROM INSIDE CONSTRUCTION AREA WILL BE PUMPED INTO A SILT BAG. 3. TAKE OUT EXISTING PIPE 4.CONSTRUCT PIPE 5.REMOVE IMPERVIOUS DIKE 6.COMPLETE ROADWAY (THIS INCLUDES SEEDING AND MULCHING) J J m 00 a - o a w N O ?- Z O W Ln W Q W :2 rr W W W J w > (n 0 p7 n J ? U Z _ LL V) LL. X O ? W ? Ln L 0 ? O W S w J z c 00 r- rr Ln O F- W O Ln N A W U Q W Z rr, W I- a w m a w F- L/1) U z 0 Q U_ w N Q J U W a w U 0 W 0 z W O U wQ Cl? CL WU o, ?g-o w >x N w J ? Z - M M N O H W w W w O J J w LO ?n IZ: O H Z ti Zo ? e ? .4 Q 14 ai A J J Q p W Q U W Q = W W N w Of U W Z I- O Q U o? Oo ' Q w V Q O W Of . t- N W O Ln N 3- O J w m - W p] a? J Q W W W " CL N W w ? V za 0 N ?+ a N z? O Oy ? C) ? n 00 I i N I o \ cn z ' D z Co m \ , D 1 C-) _ (n m r D o D r