December 20, 2002
Orange County
DWQ Project No. 021697
APPROVAL OF 401Water Quality Certification and ADDITIONAL CONDITIONS and Neuse River Buffer
Rules
Mr. J.M. Mills, P.E., Division Engineer
NCDOT, Division 7
PO Box 14996
Greensboro, NC 27415
Dear Mr. Mills:
You have our approval, as described in your application dated September 27, 2002, and in accordance with the
attached conditions and those listed below, to place fill material in 34 linear feet of streams, and temporary fill in 30
linear feet of streams for the purpose of widening and paving SR 1518 in Orange County. The project shall be
constructed in accordance with your application dated September 27, 2002. After reviewing your application, we
have decided that this fill is covered by General Water Quality Certification Number 3375. This certification
corresponds to the Nationwide Permit 14 issued by the Corps of Engineers. This approval is also valid for the Neuse
River buffer rules (15A NCAC 2B .233). In addition, you should acquire any other federal, state or local permits
before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge
and Water Supply Watershed regulations. This approval will expire when the accompanying 404 permit expires
unless otherwise specified in the General Certification.
This approval is valid solely for the purpose and design described in your application (unless modified below).
Should your project change, you must notify the DWQ and submit a new application. If the property is sold, the
new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying
with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total
impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as
described in 15A NCAC 2H .0506 (h) (6) and (7). ). This approval shall expire with the corresponding Nationwide
Permit expires or as otherwise provided in the General Certification. For this approval to be valid, you must follow
the conditions listed in the attached certification and any additional conditions listed below.
1. Stormwater shall be directed to provide sheetflow at nonerosive velocities through the protected stream buffers.
Upon completion of the project, the NCDOT shall complete and return the enclosed "Certification of
Completion Form" to notify DWQ when all work included in the 401 Certification has been completed. The
responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the Division of
Water Quality upon completion of the project.
A minnak
N. C. Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699-1650 (919) 733-1786
Customer Service: 1 800 623-7748
\N A ] Michael F. Easley, Governor
`OHO RQG William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
r Alan W. Klimek, P.E. Director
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must
act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which
conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O.
Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for
a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you
have any questions, please contact John Hennessy at 919-733-5694 or Steve Mitchell at 571-4700.
Sincerely,
Attachment
cc: Wilmington District Corps of Engineers
Corps of Engineers Raleigh Field Office
DWQ Raleigh Regional Office
File Copy
Central Files
a Ili , P.E.
c:\ncdot\SR 1518\wqc\021697wgc.doc
A*
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY 1584 YANCEYVILLE STREET, GREENSBORO, NC 27415
GOVERNOR
September 27, 2002
MEMORANDUM TO: Mr. John Hennessy
Wetlands/401 Unit
FROM: C.N. Edwards C,,?G
District Engineer, District 1, Division 7
2002
WA ol lift 1TV
LYNDO TIPPl
SECRETARY
021697
SUBJECT: Payment Information - Water Quality Certificate for0range County,
Tilley Road (SR 1518)
In accordance with General Statute 143-215.3D(e) the following information if being provided to
facilitate payment of fees associated with the appropriate Water Quality Certificate:
• Certificates being requested: #3375 (NWT 14) and #3366 (NWT 33)
• Work Order Number : 6.502083T
• Amount of fee: $200
PAYMENT
RECEIVED
PHONE 336-334-3192 FAX 336-334-3637
.4.
?a
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY 1584 YANCEYVILLE STREET, GREENSBORO, NC 27415
GOVERNOR
September 27, 2002
Mr. John Thomas
U.S. Army Corps of Engineers
Regulatory Field Office
6508 Falls of the Neuse Road, Suite 105
LYNDO TIPPETT
SECRETARY
Raleigh, North Carolina 2761 021697
(Two Copies)
Mr. John Hennessy
Wetlands/401 Unit
NC DENR Division of Water Quality
1650 Mail Service Center
Raleigh, NC 27699
(Seven Copies)
SUBJECT: Orange County, Upgrade of Tilley Road (SR 1518) from an unpaved secondary road
to a paved secondary road. State Project Number: 6.502083T
To Whom It May Concern:
The North Carolina Department of Transportation (NCDOT) proposes to upgrade Tilley Road (SR
1518) from an unpaved to a paved secondary road to reduce future maintenance needs and increase
traffic safety. This activity will result in impacts to a stream due to the replacement and extension of
a crossline pipe to facilitate travel lane and shoulder widening. The NCDOT anticipates that the pipe
replacement activity will be authorized under Nationwide Permit (NWT) 14 and the dewatering
operation will be authorized under NWP 33. This application is intended as a request for formal
written authorization from the USACE for dewatering activities occurring under NWP 33. This
application is also intended as request for written authorization from the NC Division of Water
Quality to replace the pipe under General Water Quality Certificate # 3375 (NWT 14). The
following information is being provided to satisfy Nationwide Permit Condition 13 (Federal Register
January 15, 2002) and Condition 1 of General Water Quality Certificate # 3375.
PHONE 336-334-3192 FAX 336-334-3637
PROJECT INFORMATION
Road Name SR Number Project Length
(miles) Classification
Tilley Road 1518 0.62 Rural
River Basin: DWQ
ID Water Quality
Designation % New Impervious
Surface
Neuse 27-2-21-3 WS-II NSW 0
Buffer Rules' Buffer Rule Conditions (where applicable)
Neuse Exempt
Protected Species
Presentb Mapped Historic
Pro ertiesc CAMA
AEC Essential Fishery
Habitat
No No No No
'Separate documentation attached as needed: ° See the attached Endangered Species Review Sheet for turther
information: ° When Applicable - See the attached Historic Review Letter for further information
PIPE REPLACEMENT INFORMATION
Site 1(7+20) Stream Type Perennial
(Station)
Existing Pipe 56' long 36"RCP Proposed 80' long 73" X 55"
Pie CMPA
Construction Pump around with on-site detour Dewatering ABC aggregate
Method Device*
Burial Depth 1' below streambed E/C Plan 8-22-02
Date
Construction As soon as practicable Duration 4-weeks
Date
Impacts ft.) 24'-enclosure; 10'-rip-rap dissipaters;30'-temporary
Special Project located in the Neuse River Basin. This project constitutes a road
Conditions crossing that impacts less than 40 linear feet of riparian buffer, and is therefore
in accordance with 15A NCAC 2B .0233 6 is exempt from the Buffer Rules.
Restoration Within 15 working days of the of the pipe replacement all cofferdams will be
Plan entirely removed and natural stream contours will be restored and seeded.
Temporary silt screens placed in intermittent channels will be cleaned and
removed following vegetation establishment.
RCP = reinforced concrete pipe; CMP = Corrugated metal pipe; CMPA = Corrugated metal pipe arch; E/C =
Erosion control. *A less intrusive dewatering device may be used in lieu of the one proposed.
-2-
MINIMIZATION INFORMATION
Impacts will be minimized by strict enforcement of Best Management Practices for the protection of
surface waters and wetlands, restrictions against the staging of equipment in or adjacent to waters of
the US, and coordination (including a pre-construction meeting) with the Division Environmental
Officer.
MITIGATION INFORMATION
Stream mitigation is not anticipated, as the impacts to any individual stream do not exceed 150 feet
Wetland mitigation is not anticipated, as wetland impacts do not exceed 0.10 acres and do not occur
in a unique natural wetland. Riparian buffer mitigation is not required as the impacts are less than
40-linear feet.
APPLICATION INFORMATION
Enclosed please find the Pre-construction Notification Form and supporting documentation for the
above referenced project. If you have any questions or need any additional information, please
contact Chuck Edwards at (336) 570-6833 or Len Smith at (336) 256-2063. Your time and effort
are appreciated.
Sincerely,
_j
Mills, P.E.
Division Engineer, Division 7
cc: Mr. Lenwood E. Smith, II, PWS, Division Environmental Officer
Mr. C.N. Edwards, P.E., District 1 Engineer CJ,
Mr. John Howell, County Maintenance Engineer, Orange
Mr. Donald Pearson, Area Roadside Field Operations Engineer.
Mr. Buddy Garraed, Grade Crew Foreman
Mr. J.L. Cornell, Bridge Maintenance Supervisor
09lZ?-/oZ
-3-
Office Use Only: Form Version May 2002
USACE Action ID No. DWQ No.021697
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
1. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ® Riparian or Watershed Buffer Rules
? Section 10 Permit ? Isolated Wetland Permit from DWQ
® 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: NWP 14 and 33
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete
section VIII and check here: ?
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ?
H. Applicant Information
Owner/Applicant Information
Name: Mr. J.M. Mills, P.E, Division Engineer - Division 7
Mailing Address: P.O. Box 14996
Greensboro NC
Telephone Number: (336) 334-3192 Fax Number: Q36) 334-3673
E-mail Address: mmillsndot.state.nc.us
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: Not Applicable
Company Affiliation:
Mailing Address:
Telephone Number: Fax Number:
E-mail Address:
M. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Tilley Road (SR 1518)
2. T.I.P. Project Number or State Project Number (NCDOT Only): 6.502083T (Non-TIP_
3. Property Identification Number (Tax PIN): Not Applicable
4. Location
County: Orange Nearest Town: Hillsborough
Subdivision name (include phase/lot number): Not Applicable
Directions to site (include road numbers, landmarks, etc.):
The project is north of Hillsborough. From I:85 / I:40 go north on Sr 1009 ( Old N.C. 86)
which turns into N.C Hwy 86 and go 2.51 Miles until you get to N.C. Hwy 57, turn right at
the stop light and go 8.8 miles until you get to the caution light which is N.C.Hwy 157 turn
left and go 1.5 miles Turn left on to SR 1517 (Laws Store) Then go 1.8 miles SR 1518
(Tilley Road) will be on the left.
5. Site coordinates, if available (UTM or Lat/Long): See the attached USGS Mo.
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres): Not Applicable
7. Nearest body of water (stream/river/sound/ocean/lake): UT to North Fork Little River
8. River Basin: Neuse
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Agriculture
Page 2 of 8
10. Describe the overall project in detail, including the type of equipment to be used:
The project will involve paving a_n unpaved secondary road and bringing the travel lane,
shoulders ditchlines, and drainage structures up to current standards. Travel lane widening
will not be required to bring the road up to current standards. Standard shoulder widths will
be 6'-8' with deviations shown on the attached site plan. Ditch widths will vary based onsite
conditions. Proposed right-of-way width is illustrated on the attached site plan. Equipment
used will be standard road construction equipment trackhoe, grader, backhoe, and
bulldozer.
11. Explain the purpose of the proposed work: To upgrade an unpaved secondary road to a
paved secondary road. Paving and widening are beingL conducted to reduce future
maintenance costs, bring the road up to current construction standards, and increase traffic
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
Not Applicable
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
Not Applicable
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
Page 3 of 8
1. Provide a written description of the proposed impacts: Permanent stream impacts will
result from channel enclosure and placement of rip-rap energy dissipaters. Temporary stream
impacts will result from placement of cofferdams (perennial streams) and siltscreens. Silt
screens placed in intermittent channels will be cleaned and removed following's vegetation
establishment.
2. Individually list wetland impacts below:
Wetland Impact
Site Number
indicate on ma
Type of Impact* Area of
Impact
acres Located within
100-year Floodplain**
es/no Distance to
Nearest Stream
linear feet
Type of Wetland***
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For darns, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMAapproved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at http://www.fema.Qov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property: Not Applicable
Total area of wetland impact proposed: Not Applicable
3. Individually list all intermittent and perennial stream impacts below:
Stream Impact
Site Number
(indicate on ma
Type of Impact* Length of
Impact
linear feet)
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
leasespecify)
1
Pipe replacement 24(en)
30(tmp)
10 UT to North Fork Little
River
2.0'
Perenial
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.usgs.gov. Several intemet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com,
?vww.mapquest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 24'- enclosure (en),
10'- rip = (rp) 30'- temporary (t"),
Page 4 of 8
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below:
Open Water Impact
Site Number
indicate on ma
Type of Impact* Area of
Impact
(acres) Name of Waterbody
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
5. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): Not Applicable
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.): Not Applicable
Size of watershed draining to pond: N/A Expected pond surface area: N/A
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
Pine replacement activities are necessarv to increase travel lane and shoulder width to current
construction standards. Impacts will be minimized by strict enforcement of Best Management
Practices for the protection of wetland and surface waters, restrictions against the staging of
equipment in or adjacent to waters of the US, and coordination (including a pre-construction
meeting) with the Division Environmental Officer.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
Page 5 of 8
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http: //h2o. enr. state. nc.u.s/ncwetlands/strmgide. html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offske), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
A fmdin ofg?msignificant impact is anticipated; therefore, a mitigation plan is not provided.
Cumulative impacts are less than 150 feet. The maximum amount of permanent impact to a
single stream is 34' linear feet. No Outstanding Resource Waters, federally protected species
or their habitats, or essential fishery habitats occur in the project area. The project is located
in a High Quality Water.
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to determine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information:
Amount of stream mitigation requested (linear feet): Not Applicable
Amount of buffer mitigation requested (square feet): Not Applicable
Amount of Riparian wetland mitigation requested (acres): Not Applicable
Amount of Non-riparian wetland mitigation requested (acres): Not Applicable
Amount of Coastal wetland mitigation requested (acres): Not Applicable
Page 6 of 8
IX. Environmental Documentation (required by DWQ)
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes N No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No N
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No N
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify Neuse )?
Yes N No ? If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* s carpe feet Multiplier
i
Mitigation
1 N/A 3
2 N/A 1.5
Total N/A
* Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
Page 7 of 8
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or.0260.
Mitigation is not required. The perpendicular impacts will be less than 40'; therefore, this
activity is considered exempt from the buffer rules (15A NCAC 02B .0233 [61)
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
The existing travel lane is 20-feet. The proposed travel lane is 20-feet. The proposed rihg t-of-
wax is 60-feet. The percent new impervious surface (relative to the right-of-way) is 0%_
Because the percent new impervious surface is less than 30% stormwater controls are not being
provided
XU. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
Not Applicable
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 211.0500) or any Buffer Rules?
Yes ? No ?
Is this an after-the-fact permit application?
Yes ? No ?
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
This project is located immediately downstream from Bridge No. 26 which is being replaced
under TIP No B-3497 (State Project No. 8.2501501). A copy of the mussel survey conducted for
this project will be forwarded to the Division of Water Quality upon receipt at the Division.
is valid only if an authorization letter from the applicant id provided.)
Page 8 of 8
NATURAL RESOURCE EVALUATION SHEET
State Project # SR Number Road Name county Investigator(s)
S o 2 j 7t*?"25- 1518 Tilley Road Orange Len Smith
Date: River Basin: Water Quality Designation Buffer Rules (Type)
04/08/02 Neuse WS-H NSW Neuse
Primary Land Use Percent Residential Percent Agricultural Percent Unmaintained
Agriculture 10 80 10
Anticipated Permits or Consultations High Quality or Rare Wetlands Federally Threatened or Endangered
Species
NWT 14 & 33, Buffer rules. No No
Tomes of Unmaintained Upland Properties
Community Type Dominant Trees Dominant Shrubs Dominant Herb(s)
Pine forest loblolly pine eastern red cedar, sweet
gum Japanese honeysuckle
Floodplain forest sweet gum, tulip tree ironwood Japanese honeysuckle, weak
sedge, sessile-leaved bellwort
Waters of the US
Streams
ST Stream Name Perennial or
Intermittent Ave. Wdth
(OHWM) Ave. Dpth
(OHWM) Ave. Wdth
OB Ave. Dpth
OB DWQ ID.
07+00 UT Little RiNorthver Fork perennial 2.0' <0.5' 2.5' 2.0' 27-2-21-3
ST = Station, OHWM = Measurements made from Ordinary High Water Marker, TOB = Measurements
made from the Top of the Bank
Wetlands
ST Within 100-year
Floodplain Distance to
Nearest Stream
linear feet
Cowardin Classification
Dominant Plants
N/A
Open Water
ST Name of Waterbody
if applicable) Type of
Waterbod M.M. Name of Waterbody
if applicable) Type of Waterbody
N/A
General Notes/Comments:
08/16/02
Division Environmental Officer Date
ENDANGERED SPECIES REVIEW FOR DIVISION 7
DISTRICT 1
State Project # SR Number Road Name County
6.502083T 1518 Tilley Road Orange
Alamance County
No Endangered or Threatened Species are listed.
Orange County
River Basin: Neuse
Bald Eagle (Haliaeetus leucocephalus). Cane Creek (Cape Fear Basin) Area.
Is the activity within the primary or secondary zone Yes ? No
Cmnnth rnneflnwer (Frhinnrea laevivata) Mav be surveved for from June to September
Habitat Survey Date Investigator(s) Man-hours Comments/Findings
No 04/08/02 Len Smith 0.5
Mirhnnx'c gmmnr (Rhvc mirhavriil Mav he surveved for from Mav to October
Habitat Survey Date Investigator(s) Man-hours Comments/Findings
No 04/08/02 Len Smith 0.5
Cmall Whc rlerl Pnonnin (kntrin medanlnidrA Mav surveved for from Mav to June
FHabitat Survey Date Investigator(s) Man-hours Comments/Findings
No 04/08/02 Len Smith 0.5
RM rnrknA-A WnnAneAker (Pirnida.c hnranlis)
Habitat Survey Date Investigator(s) Man-hours Comments/Findings
No 04/08/02 Len Smith 0.5
Dwarf Wedge Mussel (Alasmodonta heterodon) - Neuse Basin
Habitat Survey Date Investigator(s) Man-hours Comments/Findings
See Comments
James spinymussel (Pleurobema collina) - Roanoke Basin
Habitat Survey Date Investigator(s) Man-hours Comments/Findings
N/A
General Notes/Comments: This proiect is located immediately downstream from Bridge No. 26 which is
being replaced under TIP No B-3497 (State Project No. 8.2501501). A cony of the mussel survey
rnnrl„rtP.d fnr this nrniert will he fnrwarded to the Division of Water Oualitv upon receipt at the Division
,,. v1/ 08/16/02
Environmental Officer Date
NCDOT
HAZARDOUS SPILL BASIN CHECKLIST
Division Seven County Orange _ Project ID: 6.502083T
River Basin Neuse Bridge No: N/A
Route 1518 Stream UT to North Fork Little River
Water Quality Criteria
Yes No
Stream Crossing Blueline on USGS Z ?
ORW ?
WSI ?
WS II, III, or IV Crossing Within 0.5 mi. of W.S. Critical Area ?
Roadway Criteria
Route Designation
Yes No
Arterial Urban ? 19
Arterial Rural ? Z
Additional Site Information:
Yes
Is a Hazardous Spill Basin Required? ?
No
Criteria Based Upon NCDOT "Best Management Practices for the
Protection of Surface Waters" (March, 1997).
?? • 6
z
v
EASEMENT
Zont? 1
7+80
... , 4 -BRACH
\7+80 2 00? 1. _
50'
6+50'
30'
6+40 R?rnOYE F-=x1sr1N 6-
n4
Site # I MELVIN L. PARKER
SR 1518 330-5
TILLEY ROAD
Scale V = 50' TEMPORARY SILT FENCE -H--?+-
NEUSE RIVER BASIN
TEMP. ROCK SEDIMENT DAM
HIGH QUAILITY WATER TYPE - B
?fl lc - ? ? o Z. TEMPORARY ROCK CHECK BASIN
TYPE - B
SILT BASIN TYPE - B
TYPICAL CROSS SECTION (NTS) RIP-RAP WITH LINER
50'
?'ER4iA.?'F,?iT DI2??L`'AGE Z%, "r?c.? .i-
?'x S ??` 8o`oF '73"X ss'"CmPA
.00
September 27, 2002
Site 1 (Station 7+20)
Construction Sequence and Erosion Control Plan for Replacement of
Pipe with Pipe using an On-site Detour - Orange County, SR 1518
Work to begin as soon as practicable following authorization.
Construction is. anticipated to take 4 weeks.
1. Install a rock silt dam (underlain by plastic) downstream of the work area to prevent
incidental sediment loss.
2. Install ABC aggregateor a less intrusive dewatering device to allow dewatering of the
work area.
3. Install pumps to divert flow around the work area.
4. Place a temporary extension at one end of the existing pipe to allow a travel lane
shift.
5. Place a temporary detour over the temporary extension.
6. Opposite the detour, remove existing RC pipe to at least the centerline of the
roadway.
7. Excavate to sufficient depth to allow burial of the pipe to 1', place base stone, and 1
section of 20' long 73" X 55" CM pipe arch.
8. Backfill the new section of pipe and place rip rap only as needed.
9. Place the temporary detour over the new sections of pipe.
10. Remove remaining sections of pipe.
11. Excavate to sufficient depth to allow burial of the pipe to 1', place base stone, and 2
sections of 20' long 73" X 55" CM pipe arch.
12. Backfill the new sections of pipe and place rip rap only as needed.
13. Remove the dewatering device and restore the natural stream contours.
14. Place final roadway in desired location.
15. Notify landscape department for final seeding.
16. Silt fences to be placed as site conditions require.
17. A 10' X 15' dirt bag will be used to remove excess water in the hole where the new
pipe is being replaced.
18. Site conditions and weather may alter these plans.
19. A method less intrusive than a pump around system may be utilized if site conditions,
allow.
FIN
<-, 0> nEl
r
C:
r-
c:
v
_ Cro
C?
i
Lo.
c
?
n
D ?-.
? O
O
C?
C/)
N
jr
V?
co
c?
?- a
D ?6
U
-? m
(A
x'
U)
Ul
P
W
f
0
O O
i 1 p tf ?/,?
. ?. 1 ' Lattisritle t;roet i/ I _? r
L it /
it:
wl-
01518 Stts_a -`
gem `? \7
? b F ( i
U ._ f
- ? -,? L I T T L E R
Littkiii u•r
8°W Ch
Name: CALDWELL Location: 17 674607 E 4008999 N
Date: 8/16/2002 Caption: Location of the permitted activity - SR 1518
Scale: 1 inch equals 2000 feet
copyright ((;) 1991, Maptech, Inc.
J a 'a-
1
1` °`OT•., a .'- "'-. i. ??."' •.,.?
?J
d Iy
4- 1
?, t
1 r= a
,
P
7
z: f
tz '411
p - ?K. w` irA,
k
t ., t
View of the existing pipe inlet - SR 1518.
View immediately upstream from the existing pipe - SR 1518.
to
c , ' r
r`F?y? •
3p ?
? `...r _? s.al9yq
s '. _ Imo''#YV`?T
f
View o f the existing pipe outlet - SR 1518.
1
It 'r
'
- '3 ?
? `ri'bF R? ?`t• ? - tK?y 1Q-?i `.hrl
? 1
!Kk a
AC ?
?
?r
fY
? 5r"t' S a
t' ? ??
?
,,y? Ys' ati
View immediately downstream from the existing pipe - SR 1518.
N ?
X U
C
H
U
Q W
IT
H
U-
9 v
_ c.
aoW
® ca
j5 O r
O N
N
}
U.
m
t m
?e
Qcc
oo 'Q
"a
O ?
Z co
C H H F- F- F- I_ " H F- F- ?_ r N h- F H H H W H H I_ H H- Z H H F- H F- H F H F F-
W cL (n - w
Z C C LL' Q' C R' C F- LL' C w w C 0' (n
C
C
C
C
D:
C
w W W .
w w W W W W W W W W W W Z W W C W. w w W
a W
a W W
a w
d w
a w
a w
a w
a w
a w
d w
d w
a
?.z
g o a
J n.
J a.
_1
¢ a.
J a
J
¢ a
J-
Q a
J
g n.
J
g a
J
Q a
J
g a
J n.
J
a a
J
q a
J
g a
J
a w
0
w a
J'
q a
J a
} a
J a
J a
J J J ?
d J J J J J J J J J J
,;!p m
?
w
W
W g
W
w d
w x
w a
W a'
W a
W ?
w
w ?
w a
w
w
a ?
w
w
w
w
w
w
w
w
?
w
0
?w
w0
o
w0
w0
o
w?
w?
w ? ? ? ? ? ? ? 0 0 ?
W W 0
W 0
W 0
W 0
LU }
t- 0
W 0
W a.
O 0
W ?
W 0
W ?
W W w W W W W W W W W W W
."•;?.
' =
CO W
LL W
LL W
LL W
U_ W
U. w
U. W
LL W
LL W
LL LL LL LL LL LL LL W LL X LL LL LL LL LL LL LL LL LL U- LL LL LL LL LL
,,
Z
3 J U U LL LL LL LL lL LL LL LL LL lL LL lL LL a
LL
LL
o.
LL
LL
LL
LL
LL
?
LL
LL
lL
LL
LL
LL
LL
LL
LL
LL
,
C
FR- O
g .
?- _
?-
t-
r
?
?
?-
?
F-
r
z
?
z
-
z
F-
z
i-
z
F-
z
o
E-
z
-
z
-j
z
z
z
z
z
z
z
z
z
z
w
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
;a
k w z
w z
w z
W z
w z
w z
w z
w z
w z
w w w w w w w W
a w w m w w w w w w w w w w w w w w w
O W 0 0 0 0 0 W 0 0 0 0 0 0 0 0 0 0
?-•'" 0 0 0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
U 0
U 0
U 0
U 0
U n 0
0
0
0
U
U
U
U
U
U
o
u
U
0
0
0
U
G
O
- W 0 0 0 } } } r r r o r r w
z r } } } } Q } r }
a r
a r
¢ r
a r
a r
a r
a r
a
v, o ¢ ¢ a s a a a a a a Q ¢ a a a ¢
2 a a a ¢ ¢ a z ¢ ¢
Z
2
2
2
0
' [ 0 0 0 0 0 0 O O O O 0 0 0 0 0 0 O m
w O O O O O
a F.. 0
a 0
n 0
a 0
n 0
CL 0
m 0
(L 0
a 0
a 0
a
C a a a a a a a a a a a a a 4 d a
s a
s w a
s s
s n.
s n.
= = ¢ s .
s s .
= s x s x x x
z x s x s x = s x x x x s x s x z
?
' 0 ? ? 0 a 0 0 a 0 ? ? 0 0 0 0 ? ? ? ? 0 ? 0 0 0 0 0 0 0 0 0 0 a 0
w ?
w ?
w 0
w
W W w w w w W w W W W W w W W w w W w W W W w W
> w
> w
> w
> w
> w
> w
> w
> w
> > > > >
> > > > > > > > > > > > > > > > > > > > > > >
- - - - - - - - - - - -
w -
W -
W
?r lLl cu W W W W W W W W W w w w w w w
U w
U w
U w
U w
U w
U W
U
W
U
W
W
W
W
W
U
W
U
W
U
W
U
w
U
U
U
U
w
W w
W w
W w
W w
W W W W W W W W ui W w W w W w W w W w W w W W W W W W W W W w W w W w W w W W W W W W W W W
? a C C d' C a' Q.' ?' 0.' ? C a' R' ? ? ? ? C C C C C C C ? C Q' C C
w ?
w C
w C
w ?
w C
w ?
w ?
w C
w
w w w w w w w w w w w w w w w w w w w w w w w w
z w
z w
z w
z z z z z z z z z z
O z
o z
0 z
0 z
0 z
0 z
0 z
0 z
0 z
0 z
0 z
0 z
0 z
0 z
0 z
0 z
0 z
0 z
0 z
0 z
0 z
0 z
0 z
0 0 0 0 0 0 0 0 0 0 0 0 0 0
z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z
w W w w w w w w W w w w w w w w
O w
O w
O w
O W
O W
O W
O W
O W
O W
O W
O W
0 W
0 W
0 W
0
O
0 o
0 0
0 0
0 0
0 0
0 0
0 0
9 0
0 0 0
0 0
9 0
0 0
0 0
? J ? 0 W 0
9 ?
S O
Z D
> O
> ?
> a 0
? a
¢ 0
> 0
> 0
> 0
>
ak- Z > » > > > > » il :3 0
? ?
cn w S S) c a g Q
cn
co
Cl) (1) 0) cn U) Cf) co U) rn co cn U)
cn
a
<n
M
j
A
?
w
a
a
X
a
• W a a a a a ? a a 0: m it
z z z w
r cr
z X
z z z z z z Lj
r z z z 0
z z 0
z z z -
z Z
z z z z z z z z z z z z }
Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z z Z Z Z Z Z Z Z
Z Z Z Z Z
z z z z z z z z z z z
.;
" z
0 z
0 z
0 z
o z
0 z
0 z
0 z
0 z
0 z
0
z
0
z
0
z
0
z
0
z
0
z
0
W
z
O
z
O
w
z
0
z
0
0
o
o
W
0
O
o
O
IO
O
O
O
t= ! F= F- H- E= t= ?_ ?_ ?= F= ?- f - I- -- W ?- t= w I= i= i= f= w f= t
I it ;t , f-
'C:: 0 ?0 ? D O ? ? O D O ? D D ? ? O
' U ? D U 0 ? ? 0 ?? U
0 D ? I? O
z 0
z 0
z ?
z
O
z
W:
W Z z z z z
0 z
0 z
0 z
O z
O z
O z
O z
O z
o Z
.0 !z
i0 Z
0 -0
iw z
o z
O O
m z
o z
0 z
0 z
o z
l0 m z
0 z
o z
0 O 0 0 0 0
• 0
U 0
U 0
U 0
U U U U U U U U C .)
= o
i U
= U
?= U
= a
0 U
?_ U
_ a
? U
_ U
_ U
_ U
?_ U
?_ a U
_ U
_ U
_ U
_ U
_ U
_ U
_ U
_
_ _
t - _
F _
t _
F-
, _
I- _
F- =
H =
F =
E- =
F-
F- =
F- E- F- O F- F- O F t t t t O F- F- I- F_ I_ t_ F- H
CL F _
3 _
?
' ?
I ?
I ? =
I 0
o
; ,
oz z
o '?
? ? ?
,
cn
cn
co .
cn
.
W
!cn
,cn
cn
cn
w
CO
w
C
w
y
w
cb
w
(n
w
0
w
cn
w
?
cn
w
cn
w
in
cn
w
.cis
w
cn
w
cn
w
U
w
?
;cn
w
,n
w
cn
:w
u)
w
cn
w
w
:W
cn
?w
U)
,w
•` w
r w
r w
r w
>- w
r ;w
•r w
r w
r } r r r r r r r r r r r r r r r r ?r r Ir r ,r r
t? O N O O CO CO N CA h- m
O m m N f` O ¢
O
O CO
tl')
OD W
M O
M) W
LD t'-
N
O
N
w
N
n
M
QI
M
O
w
O
Un
0
r
w
?[7
T
O
N
: ? '
. O T
r M O O
M 'M M
r N
U) Of
CO tt)
Cl) r
1A to
M s?
(h a
M M
M 0 co O M a0 CO
N M
0') w
N 0
M 0
N t-
N r
r M
T M
r M
T t-
T
r
W)
r
M
r
_ N N N N r T T r r T r T T N (O M r
W
U W
U W
U W
U W
U W
U W
U
W
W
W
w
W
W
W
W
W
W
W 0
w 0
m 0
w 0
w ?
m ?
C ?
Q? ?
x O
c ? ?
w J
J J
J J
J J
J J
J J
J J
J
-
O Z Z z z Z Z z C9 C9 C9
z 0
z a
z 0
z 0
z 0
z C)
z O
z O
z 0 0 0 0 0 0 0 0 0 0 0 w W w
3 w w? w w
.:?.' a ¢ ¢ ¢ a
r ¢ z z ¢ ¢ LL LL LL LL LL LL LL
J LL
J LL
J LL
J LL
J
`,,:.:' 2 < < < 4 J J J J J J
5
5
5 V1
¢ fn
a m
a Cn
a (n
a to
a (n
a
?' g g g g g g g o 0 0 0 0 0 0 0 0 0 0 >
?
>
>
c9
5
c9
>
c
>
c9
c
c9
c9
c9
c9
0
0
0
U
U
U
U
a
r ¢
r a
T ¢
r a
T ¢
T a
T r r T r r r T T ?"' c
N 9
N N N ?
N N ?
N N N N N ('?f M M M C?] M M
O
CL
Q
7
U)
'o
L
co
N
m
CL
a)
c
C
N
Q-
U)
O
U
C
m
m
O
.a
rn
O
CL
O.
V)
C
0
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
DWQ Project No.: • 0' 0 9 51
Applicant:
County:
Project Name: _ '1e «-4--:21 K-d- ( C?- (5-( Q
Date of Issuance of 401 Water Quality Certification: If t
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and
any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North
Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be
returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to
send certificates from all of these.
Applicant's Certification
I, , hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting mat rials.
Signature: Date:
Agent's Certifi atio
I, , hereby state that, to the best of my abilities, date care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature:
Engineer's Certification
Partial Final
Date:
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature Registration No.