Loading...
HomeMy WebLinkAbout20021069 Ver 1_Complete File_20020705F W A TE Michael F. Easley, Governor ?0?0 9p6 William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources 7 Alan W. Klimek, P.E. Director > Division of Water Quality o ? DWQ Project No.. 02 10q County: Applicant: _NC. 'DO"f C S }? es Project Name: Date of Issuance of 401 Water Quality ertification Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, MQp-Ae t??3E5` , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the ap roved plans and s e if-A tons, and other supporti aterials. Signature: ? Date: 29Z Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional 1, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncwetlands/ W AT ?RpG C/ July 8, 2002 Jackson County DWQ Project No. 021069 SR 1390 (Pine Mountain Road) APPROVAL of 401 Water Quality Certification with Additional Conditions Mr. C. R. Styles, P.E., District Engineer NCDOT P.O. Drawer 250 Bryson City, NC 28713 Dear Mr. Styles: You have our approval, in accordance with the attached conditions and those listed below, to impact a total of 80 linear feet of unnamed tributaries to Tuckasegee River in order to improve SR 1390 (Pine Mountain Road) in Jackson County. The project should be constructed in accordance with your application dated June 26, 2002 (received July 5, 2002). After reviewing your application, we have decided that this fill is covered by General Water Quality Certification No. 3375 corresponding to the U.S. Army Corps of Engineers Nationwide Permit Number 14. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit unless otherwise specified in the Water Quality Certification. This approval is only valid for the purpose and design that you described in your application except as modified below. If you change your project, you must notify us, in writing, and send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre or stream impacts exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. 2. 4. NCDOT shall implement Best Management Practices for the Protection of Surface Waters (NCDOT March 1997) and Sedimentation and Erosion Control Guidelines for Sensitive Watersheds (15A NCAC 4B .0024) prior to any ground-disturbing activities to minimize impacts to downstream aquatic resources. Temporary or permanent herbaceous vegetation shall be planted on all bare soil within 10 days of ground-disturbing activities to provide long term erosion control. If deemed applicable by the NC Wildlife Resources Commission, in-stream work and land disturbance within the 25-foot wide buffer zone are prohibited during the trout spawning season of October 15 through April 15, or other conditions as determined by NCWRC, to protect the egg and fry stages of trout from sedimentation during construction. Where practicable, storm water should be directed to buffer areas or retention basins and must not be routed directly into streams. Mowing of existing vegetated buffers is strongly discouraged, so that they may be utilized for storm water sheet flow. The pipes required for this project shall be installed in such a manner that the original stream profiles are not altered (i.e. the depth of the channel must not be reduced by a widening of the streambed). Existing stream dimensions are to be maintained above and below locations of each culvert. The Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mall Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncwetlands/ culvert shall be installed one foot below the stream to allow for fish and other wildlife movement. If any of the existing pipes are perched, they shall be removed and replaced, and installed correctly. 5. All work shall be performed during low flow conditions. 5. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 7. The presence of equipment in the channels must be minimized. Under no circumstances must rock, sand or other materials be dredged from the wetted stream channel under authorization of this permit, except in the immediate vicinity of the culverts. 8. Use of rip-rap for bank stabilization is to be minimized; rather, native vegetation is to be planted when practical. If necessary, rip-rap must be limited to the stream bank below the high water mark, and vegetation must be used for stabilization above high water. 9. Riparian vegetation must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. 10. Upon completion of the project, the NCDOT shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the NC Division of Water Quality upon completion of the project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Ms. Cynthia Van Der Wiele at 919.733.5715 or Mr. Mike Parker of the Asheville Regional Office at 828.251.6208. Sincerely, M-LI . Klime E Attachment Pc: Wilmington District Corps of Engineers John Hendrix, USACE Asheville Field Office NCDWQ Asheville Regional Office Central Files File Copy 021069 d.w SU?TFv -?] ?yJ STATE or NORTH ?A0?I,NA E! DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY LYNDO TIPPETT GOVERNOR SECRETARY June 26, 2002 U. S. Army Corps of Engineers Regulatory Branch 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 Attention: Mr. John Hendrix NCDOT Coordinator Subject: Proposed Construction of SR 1390 (Pine Mountain Rd.) in Jackson Co. State Project No.6.962024B (DWQ Minor Permit Fee $200.00) Dear Mr. Hendrix: The North Carolina Department of Transportation is proposing to grade, drain, base and pave primarily along the existing roadway of SR 1390, Piney Mountain Road in Jackson County. In order to construct this project in accordance with our current secondary road standards, and due to the replacement of two (2) pipe culverts in unnamed tributaries to Tuckasegee River (DEM CLASS B), we are requesting authorization under Section 404 of the Clean Water Act. I am sending a straight-line diagram with our proposed erosion control and construction limits at various sites along this project. In addition, a typical section of the road, drawings for the culvert replacements in the unnamed tributaries to Tuckasegee River, general notes and standards on erosion control measures, and a marked County Map are enclosed. We propose to install the new culverts slightly below the existing stream bed elevation where bedrock is not encountered to minimize impact to Wildlife habitat and allow the existing stream gradient to remain as unchanged as physically possible. The best management practices will be used to minimize and control sedimentation and erosion on this project. The construction foreman will review all erosion control measures daily to ensure sedimentation and erosion controls are being effectively controlled. If the planned devices are not functioning as intended, they will immediately be replaced with better devices. The silt fences and other erosion control devices will be in place prior to pipe installation and will remain in place until the project is stabilized. r P.O. Box 250, Bryson City, NC 28713 Phone (828) 488-2131 Mr. John Hendrix Page 2 June 26, 2002 By copy of this letter I am asking Mr. Owen Anderson, Habitat Coordinator Western Mountain District, of the NCWRC to comment directly to you concerning the 404 Nationwide permit request. Also by copy of this letter, I am requesting authorization to proceed under Section 401 of the Clear Water Act from Division of Water Quality. In addition, I am asking Mr. Anderson and Mr. Ed Ingle, Area Roadside Environmental Engineer (NCDOT), to comment directly to me concerning this permit request. We would like to begin construction as soon as possible. If further information is required, please advise. Your early review and consideration will be appreciated. Yours t I , C. R. St es, E. District Engineer CRS: jbs Atta. cc: Mr. R. G. Watson, P. E., Division Engineer Mr. Mark Davis, Division Environmental Officer Mr. E. L. Ingle, Area Roadside Environmental Engineer Mr. Owen Anderson, Habitat Coordinator W. Mtn. Dist., NCWRC Mr. John Dorney, Water Quality Certification Unit, DWQ P.O. Box 250, Bryson City, NC 28713 Phone (828) 488-2131 ?OF WA T??Q ?O CIO r o ? Pre-Construction Notification (PCN) Application Form For Section 404 and/or Section 10 Nationwide, Regional and General Permits, Section 401 General Water Quality Certifications, and Riparian Buffer and Watershed Buffer Rules This form is to be used for projects qualifying for any of the U.S. Army Corps of Engineers' (USACE) Nationwide, Regional or General Permits as required by Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act, and for the North Carolina Division of Water Quality's (DWQ) associated General 401 Water Quality Certifications. This form is also to be used for any project requiring approval under any Riparian Buffer Rules implemented by the N.C. Division of Water Quality. This form should not be used if you are requesting an Individual 404 Permit or Individual 401 Water Quality Certification. The USACE Individual Permit application form is available online at http://www.saw.usace.army.miI/wetlands/Perm app.htm. The USACE is the lead regulatory agency. To review the requirements for the use of Nationwide, Regional or General permits, and to determine which permit applies to your project, please go to the USACE website at http://www.saw.usace.army.mil/wetlands/regtour.htm, or contact one of the field offices listed at the end of this application. The website also lists the responsible project manager for each county in North Carolina and provides additional information regarding the identification and regulation of wetlands and waters of the U.S. The DWQ issues a corresponding Certification (General or Individual), and cannot tell the applicant which 401 Certification will apply until the 404 Permit type has been determined by the USACE. Applicants are encouraged to visit DWQ's 401/Wetlands Unit website at http://h2o.enr.state.nc.us/ncwetland s to read about current requirements for the 401 Water Quality Certification Program and to determine whether or not Riparian Buffer Rules are applicable. The applicant is also advised to read the full text of the General Certification (GC) matching the specific 404 Permit requested. In some cases, written approval for some General Certifications is not required, provided that the applicant adheres to all conditions of the GC. Applicants lacking access to the internet should contact DWQ's Central Office in Raleigh at (919) 733-1786. Trout Waters Coordination - Special coordination with the North Carolina Wildlife Resources Commission (NCWRC) is also required for projects occurring in any of North Carolina's twenty-five counties that contain trout waters. In such cases, the applicant should contact the appropriate NCWRC regional coordinator (listed by county on the last page of this application). Page l of 12 CAMA Coordination - If the project occurs in any of North Carolina's twenty coastal counties (listed on the last page of this application) the applicant should also contact the North Carolina Division of Coastal Management (DCM) at (919) 733-2293. DCM will determine whether or not the project involves a designated Area of Environmental Concern, in which case DCM will act as the lead permitting agency. In such cases, DCM will require a Coastal Area Management Act (CAMA) Permit and will coordinate the 404/401 Permits. USACE Permits - Submit one copy of this form, along with supporting narratives, maps, data forms, photos, etc. to the applicable USACE Regulatory Field Office (addresses are listed at the end of this application). Upon receipt of an application, the USACE will determine if the application is complete as soon as possible, not to exceed 30 days. This PCN form is designed for the convenience of the applicant to address information needs for all USACE Nationwide, Regional or General permits, as well as information required for State authorizations, certifications, and coordination. Fully providing the information requested on this form will result in a complete application for any of the USACE Nationwide, Regional or General permits. To review the minimum amount of information that must be provided for a complete PCN for each USACE Nationwide permit, see Condition 13, 65 Fed.Reg. 12893 (March 9, 2000), available at http://www saw usace army mil/wetlands/nwpfinalFedRe .pdf. Processing times vary by permit and begin once the application has been determined to be complete. Please contact the appropriate regulatory field office for specific answers to permit processing periods. 401 Water Quality Certification or Buffer Rules - All information is required unless otherwise stated as optional. Incomplete applications will be returned. Submit seven collated copies of all USACE Permit materials to the Division of Water Quality, 401/Wetlands Unit, 1650 Mail Service Center, Raleigh, NC, 27699-1650. If written approval is required or specifically requested for a 401 Certification, then a non-refundable application fee is required. In brief, if project impacts include less than one acre of cumulative wetland/water impacts and less than 150 feet cumulative impacts to streams, then a fee of $200 is required. If either of these thresholds is exceeded, then a fee of $475 is required. A check made out to the North Carolina Division of Water Quality, with the specific name of the project or applicant identified, should be stapled to the front of the application package. For more information, see the DWQ website at http://h2o.ehnr.state.nc.us/ncwetiands/fees.htmi. The fee must be attached with the application unless the applicant is a federal agency in which case the check may be issued from a separate office. In such cases, the project must be identifiable on the U.S. Treasury check so that it can be credited to the appropriate project. If written approval is sought solely for Buffer Rules, the application fee does not apply, and the applicant should clearly state (in a cover letter) that only Buffer Rule approval is sought in writing. Wetlands or waters of the U.S. may not be impacted prior to issuance or waiver of a Section 401 Water Quality Certification. Upon receipt of a complete application for a 401 Certification, the Division of Water Quality has 60 days to prepare a written response to the applicant. This may include a 401 Certification, an on-hold letter pending receipt of additional requested information, or denial. Page 2 of 12 Office Use Only: USACE Action ID No. DWQ N 0 2 10 6 9 Form Version April 2001 If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. I. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Section 10 Permit ® 401 Water Quality Certification ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: NC DOT - DISTRICT ENGINEER: C. R. Styles, P. E. Mailing Address: P O Drawer 250, Bryson City NC 28713 Telephone Number: 1-828-488-2131 Fax Number: 1-828-488-3518 E-mail Address: rstyles@a dot state nc us 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: N/A Company Affiliation: N/A Mailing Address: N/A Telephone Number: N/A E-mail Address: N/A Fax Number: N/A Page 3 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Widening of SR 1390, (Piney Mountain Road) in Jackson County. 2. T.I.P. Project Number (NCDOT Only): 6.962139 3. Property Identification Number (Tax PIN): 4. Location County: Jackson Nearest Town: Dillsboro Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): From Asheville take I-40 West and exit off at exit 27 onto US 19-74. Go approx 27.0 miles on US 19-74. Take a right onto SR 1388 then take an immediate left onto SR 1390 This is the project. 5. Site coordinates, if available (UTM or Lat./Long): 35D 23' 19.29"N 83D 16' 53.08"W (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Farmland and Forestland 7. Property size (acres): 8. Nearest body of water (stream/river/sound/ocean/lake): Unnamed Trib to Tuckasegee River (DEM CLASS B). 9. River Basin: Little Tennessee (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o enr state nc us/admin/maps/.) Page 4 of 12 Describe the purpose of the proposed work: To widen and pave SR 1390 to meet current NCDOT standards This includes cuttinand filling earthwork where needed replacing old drainage structures that are inadequate and making the road safer by widening shoulders and chang,ina the road profile. 10. List the type of equipment to be used to construct the project: Track Hoes Back Hoes Dump Trucks Bulldozers Manual Labor, etc. 11. Describe the land use in the vicinity of this project: Rural woodland some Residential IV. Prior Project History if jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. No prior permits have been applied for this project. V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: No additional permit requests are anticipated VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Wetland Impacts Page 5 of 12 Wetland Impact Site Number dicate on ma i Type of Impact* Area of Impact acres Located within 100-year Floodplain** es/no Distance to Nearest Stream linear feet Type of Wetland*** n N/A N/A N/A N/A N/A N/A h ;zed clearing grading, fill * List each impact separately and identify temporary impacts. Impacts include, but are not hmtted to. mec an excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at httv://www.fema.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond. Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: 0 Total area of wetland impact proposed: 0 2. Stream Impacts, including all intermittent and perennial streams h id Perennial or Stream Impact Site Number indicate on ma Type of Impact* Length of Impact linear feet Stream Name** t Average W of Stream Before Impact Intermittent? leasespecify) 1 Culvert replacement 60' Unnamed Trib. to Tuckasegee River 1.5' Perennial 2 Culvert Replacement 20' Unnamed Trib. to Tuckasegee River 1 Perennial _J . ..?... .wln -A oM;at-A rir rnn . u?....? . •? ???-' '- r -r- " List each impact separately and identify temporary impacts. impacts inciuae, out are rtoL ttutncu LV. dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and afler, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usps.gov. Several internet sites also allow direct download and printing of USGS maps (e.g., wwNv tonozone.cont, wvvw mapguest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 80' Page 6 of 12 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. e of Waterbody T O en Water Impact Site Number on ma t di i Type of Impact* Area of Impact acres (if Name of applicable) Waterbody yp lake, pond, estuary, sound, bay, ocean, etc. e ca n N/A N/A N/A N/A N/A is 4-A r,• fill PYrnvntinn. dredging. List each impact separately and identify temporary impacts. impacts tnciuuc, UUL tt,V 11V1 .1 flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): N/A Size of watershed draining to pond: N/A Expected pond surface area: N/A VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Impacts cannot be avoided Culverts must be extended in order to gain the necessary width to construct SR 1390 to current NCDOT standards All pipe replacements will be placed below the existin stream bed gradient so natural substrate can be re-established. Page 7 of 12 VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o enr state nc us/ncwetlands/strmp,ide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A Page 8 of 12 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at littp_//h2o enr state nc us/wiy/index.htin. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ® If you answered "yes", provide the following information: Page 9 of 12 Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation 1 3 2 l.S Total * Zone 1 extends out 30 feet perpenoicuwar from near vanK v, cnannc , additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. The existing compacted gravel roadway acts as an impervious surface Paving of the roadway should eliminate sedimentation from fines associated with gravel surface treatment. The roadway surface will be approximately 40% of the right-of-way area Stormwater will be diverted through settling, basins or grass lined buffers prior to entering streams (See erosion control plan). XII. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. No wastewater will be generated from the project Page 10 of 12 XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). C Applicant/Agent's Signature Date ' (Agent's signature is valid only if an authorizatio n le er from the applicant is provided.) US Army Corps Of Engineers Field Offices and County Coverage Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell Union US Army Corps of Engineers Avery Clay Jackson Polk Watauga 151 Patton Avenue Buncombe Cleveland Lincoln Rowan Yancey Room 208 Burke Gaston Macon Rutherford Asheville, NC 28801-5006 Cabarrus Graham Madison Stanley Telephone: (828) 271-4854 Caldwell Haywood McDowell Swain Fax: (828) 271-4858 Catawba Henderson Mecklenburg Transylvania Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham Wilson US Army Corps Of Engineers Alleghany Edgecombe Lee Stokes Yadkin 6508 Falls of the Neuse Road Ashe Franklin Nash Surry Suite 120 Caswell Forsyth Northampton Vance Raleigh, NC 27615 Chatham Granville Orange Wake Telephone: (919) 876-8441 Davidson Guilford Person Warren Fax: (919) 876-5283 Davie Halifax Randolph Wilkes Page 11 of 12 Washington Regulatory Field Office Beaufort Currituck Jones Pitt US Army Corps Of Engineers Bertie Dare Lenoir Tyrrell Post Office Box 1000 Camden Gates Martin Washington Washington, NC 27889-1000 Carteret* Green Pamlico Wayne Telephone: (252) 975-1616 Chowan C Hertford de H Pasquotank Perquimans *Croatan National Forest Only Fax: (252) 975-1399 raven y Wilmington Regulatory Field Office Anson Duplin Onslow US Army Corps Of Engineers Bladen Harnett Pender Post Office Box 1890 Brunswick Hoke Richmond Wilmington, NC 28402-1890 Carteret Montgomery Robeson Telephone: (910) 251-4511 Columbus Moore Sampson Fax: (910) 251-4025 Cumberland New Hanover Scotland US Fis US Fish and Wildlife Service Raleigh Field Office Post Office Box 33726 Raleigh, NC 27636-3726 Telephone: (919) 856-4520 h and Wildlife Service / National IV US Fish and Wildlife Service Asheville Field Office 160 Zillicoa Street Asheville, NC 28801 Telephone: (828) 665-1195 [arine Fisheries Service National Marine Fisheries Service Habitat Conservation Division Pivers Island Beaufort, NC 28516 Telephone: (252) 728-5090 North Carolina State Agencies Division of Water Quality 401 Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Telephone: (919) 733-1786 Fax: (919) 733-9959 Division of Water Quality Wetlands Restoration Program 1619 Mail Service Center Raleigh, NC 27699-1619 Telephone: (919) 733-5208 Fax: (919) 733-5321 CAMA and NC Coastal Counties State Historic Preservation Office Department Of Cultural Resources 4617 Mail Service Center Raleigh, NC 27699-4617 Telephone: (919) 733-4763 Fax: (919) 715-2671 Division of Coastal Management Beaufort Chowan Hertford Pasquotank 1638 Mail Service Center Bertie Craven Hyde Pender Raleigh, NC 27699-1638 Brunswick Currituck New Hanover Perquimans Telephone: (919) 733-2293 Camden Dare Onslow Tyrrell Fax: (919) 733-1495 Carteret Gates Pamlico Washington NCWRC and NC Trout Counties Western Piedmont Region Coordinator Alleghany Caldwell Watauga 3855 Idlewild Road Ashe Mitchell Wilkes Kernersville, NC 27284-9180 Avery Stokes Telephone: (336) 769-9453 Burke Surry Mountain Region Coordinator Buncombe Henderson Polk 20830 Great Smoky Mtn. Expressway Cherokee Jackson Rutherford Waynesville, NC 28786 Clay Macon Swain Telephone: (828) 452-2546 Graham Madison Transylvania Fax: (828) 506-1754 Haywood McDowell Yancey Page 12 of 12 1 J' '?\\ .\?? ,(f y" !? 1 \16?=y7?' i'll 'mss )\. Or "le fC,1^. ?'?,S-,)• , •,,,, ' ! ?" J'',V/ ?ti...J ? l ,y t_ ?``•,``?1 \/ Il _i•t_?I 1t 1 / (? ? c r//r. . ?? 11 / ?r?,l- r ? r? r' .11 ??_ / / ????•?? ,) Il? +!/? ?. i ) ) J - ?\\\/} ? r 1 / . • Imo! ? -? % ? ' +/ ?%J(- ?/`?-' i• a? ?` -?1i?g_ - ? <-?? t ?. ??''`'' %?,..? ?: _- _.._ f ??__, \,%, r • // %!• ? ? .? o • •.\ \ .., _ _? I,`,, mob-/ r_ _ ?, ? j `.?% ? ? ' \l>i / + f?-. ?r..._ _ ? \ y???/•- - =??r.??l ? l ?- "t't (i (_--- .r1`•? •?? \?,, 0? j-? ?l l ? J i??t"-'('lit _ ?,?'..,, -, ?''/!)? ? _ ? ??' •\, \i' i I. I' f I ,I, S I (`• .`\_ \i i / ' ''l," I r. ?`'//?` j ^?//`?? '\ / \" ?r/ I`,'f '1 t ,' J??""!I) ` `, '?? / % ! ,-•? O (\.?\ V ?? (? I, / `- -/uO+ ;~ -- A? .f? / / r?' / ?J?,..????\?t-? _.,?,•t ,C.41 ( k$ f k??r 1 ?/ "1 % \' ? `\'4 i\ ,?\\' `.? \\-- ? r?' Y -` ?i 14 ) ???} j ',)?? ti l,?',` .) :1??t, /? l/ /.••?:._? 11` 1 •,\ (\\ ?,, ?.' \?.")' , I\?.r _J \ ?.,J \\; `` •1 ` I •I, \ r I 1 dpi ?+?.,? ?? t \, \ ?? r.?,l • j1 , 1 ? ?, . ! r .., - ?` O ? 1. % /1 ?'i ? ? - I I' \ •1 1, 1 ?/i _ _?? ir `•\` t / /'I?,? r ? . ) 1 ) l _'`_' , r / ?,,• ) i 1 , , ? \ ` '? I I ``=: % ll' •• -rte" _ n J?/i i?f?i,,) l` `?' •~\ f'\p/`C l;' % ?,! .?,1\.\` \. ?i.'?,•f r/rl'/ ?`il? /, li \, `,, ?p .o` ,?I t/1. I,? i ), r'? i rl ? i.i/ `-,,•' `\C'- .J)?, /'`' i i , j!" / ? / 't •c• r ... '`' ? Ian ,• ,? 1' ? -?••'Y •) ' .? ?/ Zl.` '-Log ?Oavill 3• 1'J' '" I? l l?\?`?\I??'1,\ - _ ??' ,'.I ? -'??i/J - ?i ? 1 ?%,•'.•?L/+ 1 ? I ?' '?YZt, 'r.., / Ilk 4 8 >?, ?)O fir' :- \ .T t ' ' rt 1' ,`? tl•! ??, till ?, -?.,? •• i III 1 '? ( ?'. \YT\?1 I " -` I -? ??-?i ?J3 C4L 17'30" 292 293 29400)r,•.E. RC I MILE QCO FEET Heavy-duty ......... , Medium-duty .... r,;. ETP ILI.. KENTUCKY Light-duty .•.... cr,- M0. Coovright (C) 1997, Maplech, Inc. 13 ? m- Ii ?. s a Ii Ii El 471 1ieJ.. ?a ate' .? o Ice.) \ w' ?? '3 I? .r \ , tI ? I? I? I? ? _ _ ,QOM ----------- ;I Co. ROAD NAME P' c ea/? S.R. U - W.0 FROM E?? o /?.¢ ye T ?? 5 7a ADDITION IMPROVEMENT TO bE PAVED P POLES TO BE MOY-0- T. POLES TO 8E MOVED ° R /W WIDTH SCALE i50, 1; c /3,? yid \ 7-o \ I 3' TYPICAL SECTION ID' 18' Paur%??v r ISSHOR - II u\ A I ---- cO % FO.1/I CHa NNE L I 4. i ?I A .NOR:N'LU CROWN = 1/4" PER FT., SLTEREL. = 10 °'o B SIIDR SLOPE = 1" PER FT., N'LkX. ROLLOVER = 6°'0 C CUT SLOPE: 1:1 OR AS SLOPED STAKED D : FILL SLOPE: 1 1/2:1 NyL-kY. FOR SOIL OR AS SLOPED STAKED EROSION CONTROL' DETAILS AND SPECIFICATIONS ,Std. # 245.03 nP, scriotiott a=b_Q1 TSD Temporary Silt Ditch .............................. 245.05 Temporary Diversion ............................. T D 893.01 Temporary Silt Fence ...................... 890.05 Temporary Slope Drain with Earth Berm ••.....•., '- `- 245.01 Silt Basin Type A .........................-••• --01 245.02 Silt Basin Type B ......•••••••••••• 892.04 Temporary Rock Silt Check Type-A .......... 895.10 Temporary Rock Silt Check Type-B ••.•,•......? 892.01 Temporary Rock Sediment Dam Type-A ........... . 892.02 Temporary Rock Sediment Dam Type-B •.- 897.01 Rock Pipe Inlet Protection Type-A ........... :6 a? 897.02 Rock Pipe Inlet Protection Type-B ••••..•..... r . 894.01 .... Rock Silt Screen ..................... ................... 245.04 Stilling Basin .........................:... Rock Inlet Protection: E] -. OR A M --A 896.01 . Type A ............................... B .. OR B • B ) 896.02 ......... ...................... Type C .. pR C ?J 896.03 ............................... Type C 12 March, 1992 ? :?Ilradd .t?l'1 1'111 111 t. 1 1 t l 1 . 1 . , , . /'1 1 „ ? . C t .. ' l t j +' + 1 Q ' coritrol of Adddts,L net , , + . . • Slope St ho!1,1110-111,„i.,•1.•.••t? • i . s•Br1d?e'.,"• 1'x,:1::•1 . ,'. • .'1 1.• , . , , , t , . • ..• %! ?;+i,•?r., ? ?'J, 1. VeCt .•1 1'i 1'1 , .. 1 ? . ,,1 . 1 . , 1 • .. 1 . `• c u '. ;? , t +..•: '? 1' f` ?' /;? 1 ' ,' C?j l ll7 ' I' 0.1'0 Wodd TLAepllun0 (jr.TelLrrupll Palo , 1 , .... , . Towel pole wid Line. , ? . , 1 , , , , . --? '•'P p tver Pole .b 1 E, 12, 11 C • ti(l)1Vllly LII11itt1,1 1.i,• ? 1 ....:... • .. , ; ... ' Guard Ruil 1 ?`•.1 1 ; , 1 1 1 1 , 1 . • • • • . • 1 • ... S?nitar3ll Sewer.liine. • ;f 1 , Water Line ?'1 1 : 1 1 . , 1 1 , 1 ; • • 1 1 , . . • . . 1 Ge8 Lilly. .'? ,•1 1 ,r, , ; ,'. 1 ? . , . . , ; 1 r l+ilul'Usi;u I. ;C15'FI G ;,• , cllalll Lilll•: 1' eii Ce' • , + , • + + + , , • • • ? .... . woven WiCd'Fer1CG 1 , + t ' ' . • _ r ReroI;estitt!?1 •, / 1 1 1 • 1 , • 1 1 • , , , . . . , . , . . ISO •Teillpot'l11'y Silt Ditch . • • , ` ' Tet?ipot'I -VgiltI- ciit.`us 1,1,,..;,1.,.•,+ 'Tentpot•at?y.Slol?e'bt'?><it?' 1.1 1 •', • , , , 1 1 • .. .. • . ',BC11sh blurI;Ilil''1?1X1,1'1 1'1 1 1 , / 1 . 1 , 1r? . . ' n Silt Check Dani 1?q)o A•14•1 1 1 1 1 1 1 1 1 1 1 1,; Slit Clieck Dam lWe,13 '.Slit Bashi '1-pd'A' 1 , ? ;.a'1 .,,`1 '1 1 ... 1 • . ? .. ._r. 1 . SLID DaS16 ' ypd 17 1 1 .. • . 1 .'! + . 1 Rod( Silt Chetk Dam 1:3e?tl?I? L)e?'n? l 1 ( 11 ( ( 1 1 1'? i •,. tom. 1 ? ? + + + ? ? ? . lumps S lone Dii`ch clieck , , , : , . ? • . '' 4 . ni n vi + n - 6 1 1 '. ..fir • .7_Jf_ .S'/ti,Y /'rJ/L 5/L % vim'/J, •? C.?ff,?C,1C?.J? ,EVERY STD/?) E'I/E?iT /I.V-v G?LE,JiV61J v!/T CviS'?? ?5:5)GF f: 3, ,vd r rJ S C/1 C E NJ F ^• 3 Op EROSIO ?I 7' ell 3 (S. <s ESL 0N LY ' ,i (E,vG7:U 4? »/S7'?/,CBE ??,?= P V , v - To A N ?X.,9/? ,CAA/I?/Z 5 X45 ?9vq/o?v L??e 0 ?- f OD p o . Qo,c /9Z /VC o , a \ L`X?S ,q5 EC I 1 a?oo 0 T ,4go,66y. T c FA•?e/ 0 c?2;s?op•?p? G% /c%P-S NC OZ O w?; ><,?iee, NC s 51 16.9 Sonre.eScT ZAhe LA 0 1 1 E I t Y r I? chA??cs,?'cl? ?eXl 5? D0 z? o'- iu Y' L, 9 -Aoo kcr- IN E I t p,??y -..V, /3,"A?T ?1. .sy / v,V, Nc O/P ,S ?a. B f 9 5- /o ? G a ?cc?l.?c c R/c? ?v /a 0 ,Veed /O POST 17,2,4'196=° Ef'Itei•^e? i s fl- . 5"4 O = S' S0 -XI 2c/, ec? ?y ?.0 7 XAY 1'10 r c ? 5 i oo :.T'.7 P1... L . S{rAN /p/ .S o ?tp-seT .C??, O 0 ?,goP e D 3 s I f ' J I 4 r, t 3 i ? /8 C P ?Pe `n /e s I? i -?-5 ?f v t /o moo 7,L z> ?I ? • io foo 0 0 • IS ? Rup sed ?v0jG; ?? tvi?z d 5 0-,*' G Z3 E, ?ieYy. ,elcl D 3 9 oo i f X23 ?o e/ it C "'ley A/C / yQ0 , I &A, C f? r ?zsRose RVEle JAI 7? -+-5 0 l- 3 Po 430A //6 ? y .v%/lsbd,?o?, NC I iz r -?--5 I I z/ 76 I gel ?d D ti v ? v v I Pl z3 00 I I L:3: 0 i8 MAC -«-5 0 ?- ? goo /U ?z 30 10- 00 25 ,? o O --51 i i TI ?Ay Dyy?? NeGv??? mkcl,- .001 I z5 fo0 IvAly ,?qe S ld. • ??i eR? A(C ?z 35-,*ao ® ?? ADD 1 e o dA,4gd e. i?c /so?? 3'?Z7 I?lcvy. 7'? W, • /7 i ' I1` I Spa ,3 ? + Z 5 ? ,?o +' %J r r w 30 f5O ?5 30 Gov 30 goo - :.•Ti.7k ` - ?35.,Zoa Z,-) *VU ' - _ = . j. -`?•?•M•%tiyti?L_1.tn:...i.tKU#l?y?'.t'.Stb..? POLE DATA MR1 61-0.3447 i ECT !_!lLe _._s2 1,390 couNTY _-- Sheet ----____-- of ER OF POLE LINE _/?Ai?!f/a`i/???'9-- -T G'o=-------------------------------------- PO Lit our. ?rlou CrHTtn P1ltr tllf ROAD Wore ?nou ctwrte 1'110/tCT bier. CeNT904 h.Olnet Arlan MOVINd ON NUM¦01 lie T. LT. Ft r. LT. TIT. S?`BD P G"y w.;e es 23 20 ' Svc w?2c5 C21 ,2.4 «7 y?E r7 s- 3310 w a ?z? /,2 // S vv?G? w?ePs z 5 C<?o<i/ n 4 4) i ? 0 h-Ux; V 2, STA. 21 t3S •. i SIM EcM= I PIPE..0'X ?o" CmP Sim 85° • it /^'I r' V I 0 nanu'r? /; rte' 36" C P 8S? \ 1 Fr . _ C7r - ? Ro• tl / I I I I 7',r7'Xj• 1 j LJ I I I fi - -L! ?.!?._ ? ' 1 .Ld - ? -c am-TE L-_- ' ---I Y! r- --- t - ---- ---i-- -- -- ---' - --- ? ? - ------- i -Ft - -- r-- `-? 1 _ II + I L --- i 11 - - - 14 -- - - -r-- ' r - - I , ???} - o r Gr: fo 1 r - -- - f - - t- - -- - }- - i - + T 1 - I I - - - -r- --1 = _- -I --? I - - '-- T I I I 1 I ? I I i _ - •?? ? ---? i I.1 -- i f i ti I -?- "rN: 9 STA. 54 Hw-i 5 Z l X151 Plm. 25 •of /B''cmF qQw !t5' - PROP06m ;?:' PIPE SS' of 29 ",Y ?8 ?? Si?I 2 5 Rao''. /Deco A-mW ENE ? I y pRoP Check dams cis Rey u ited Ex, sT,Nq /5" CC Y) p PROP. g rX3r,Y2 F T• of ? ? . ( L' F_YIs?,,?JG , 5 "GmP C7R v P 30 R i5"cn?P L7?'?ve pipe , GR J ?u ? U ? TYPE -B C ' ? R c 2 ?e x,sT,? r -- I - I ? ? /? EyI sT„? G 2 5? o F /77e nl D?T? N Prop R. p R,p ?' 1 u Add /s„cn?,? [??? P,?? ? Cla - 8 P 6P Pvc4 1 I ' A . I - - ,, - -- i ?I r - T - - - t , - f , - -- - I-i-?- I r j I I I ? ? - _ H I, - - -? , _ . - 7 , - I -- G -- A 7rTW - rN 6 keiatlj V4 Lit. A .4l Mk - O JO i-14 -4 , - !----1-ri - -- -I ?- -? -?-- `- - - - -- ? I 1 I I ? I 1 i ! I I I - - 6, 1 P - ? T T _^ - I ?_ ' I I i -- t - - ? - ---?-- I I --? !