Loading...
HomeMy WebLinkAbout20020814 Ver 1_Complete File_20020522? \NATF Michael F. Easley, Governor 0?0 RpG William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director > Division of Water Quality o ? DWQ Project No.: n2c%1,4 County: Applicant: M .-r- a r pns . ?.?. O,= Project Name: SR 12St Ct yksrNwr- Raz Date of Issuance of 401 Water Quality Certification: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, AIIA--k hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved ans a d e ations, and other suppopng materials. Signature: Date: Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), hftp://h2o.enr.state.nc.bs/ncwetlands/ O?O? \ NA T ?94G r Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality July 2, 2002 Haywood County DWQ Project No. 020814 SR 1251 (Chestnut Park Road) APPROVAL of 401 Water Quality Certification with Additional Conditions Mr. C. R. Styles, P.E., District Engineer NCDOT P.O. Drawer 250 Bryson City, NC 28713 Dear Mr. Styles: You have our approval, in accordance with the attached conditions and those listed below, to impact 25 linear feet of an unnamed tributary to Richland Creek in order to improve SR 1251 (Chestnut Park Road) in Haywood County. The project should be constructed in accordance with your application dated May 17, 2002 (received May 22, 2002). After reviewing your application, we have decided that this fill is covered by General Water Quality Certification No. 3375 corresponding to the U.S. Army Corps of Engineers Nationwide Permit Number 14. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit unless otherwise specified in the Water Quality Certification. This approval is only valid for the purpose and design that you described in your application except as modified below. If you change your project, you must notify us, in writing, and send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre or stream impacts exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. 1. NCDOT shall implement Best Management Practices for the Protection of Surface Waters (NCDOT March 1997) and Sedimentation and Erosion Control Guidelines for Sensitive Watersheds (15A NCAC 4B .0024) prior to any ground-disturbing activities to minimize impacts to downstream aquatic resources. Temporary or permanent herbaceous vegetation shall be planted on all bare soil within 10 days of ground-disturbing activities (due to the presence of B waters) to provide long term erosion control. 2. Where practicable, storm water should be directed to buffer areas or retention basins and must not be routed directly into streams. Mowing of existing vegetated buffers is strongly discouraged, so that they may be utilized for storm water sheet flow. 3. The pipes required for this project shall be installed in such a manner that the original stream profiles are not altered (i.e. the depth of the channel must not be reduced by a widening of the streambed). Existing stream dimensions are to be maintained above and below locations of each culvert. The culvert shall be installed one foot below the stream to allow for fish and other wildlife movement. If the existing pipe is perched, it shall be removed and replaced, and installed correctly. 4. All work shall be performed during low flow conditions. 41t North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.ne.us/ncwetlands/ 5. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 6. The presence of equipment in the channels must be minimized. Under no circumstances must rock, sand or other materials be dredged from the wetted stream channel under authorization of this permit, except in the immediate vicinity of the culverts. 7. Use of rip-rap for bank stabilization is to be minimized; rather, native vegetation is to be planted when practical. If necessary, rip-rap must be limited to the stream bank below the high water mark, and vegetation must be used for stabilization above high water. 8. Riparian vegetation must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. 9. Upon completion of the project, the NCDOT shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the NC Division of Water Quality upon completion of the project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Ms. Cynthia Van Der Wiele at 919.733.5715 or Mr. Mike Parker of the Asheville Regional Office at 828.251.6208. Sincerely, Attachment Klimek, P.E. Pc: Wilmington District Corps of Engineers John Hendrix, USACE Asheville Field Office NCDWQ Asheville Regional Office Central Files File Copy 020814 ? ST?+rt o Mwn STATE OF NORTH CAROLINA -, vl MAY 2 2 DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY LYNDO TIPPETT GOVERNOR SECRETARY r__- - ISI S U. S. Army Corps of Engineers Regulatory Branch 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 May 17, 2002 FILE COPY Attention: Mr. John Hendrix Subject: Proposed Construction of SR 1251 in Haywood Co. State Project No. 6.942144(DWQ Minor Permit Fee $200.00) Dear Mr. Hendrix: The North Carolina Department of Transportation is proposing to grade, drain, base and pave primarily along the existing roadway of SR 1251, Chestnut Park Rd. in Haywood County. In order to construct this project in accordance with our current secondary road standards, and' due to the extension of one (1) pipe culvert in an unnamed tributary to Richland Creek (DEM Class B), we are requesting authorization under Section 404 of the Clean Water Act. I am sending a straight-line diagram with our proposed erosion control and construction limits at various sites along this project. In addition, a typical section of the road, drawings for the culvert extension in the unnamed tributary to Richland Creek, general notes and standards on erosion control measures, and a marked County Map are enclosed. We propose to install the new culvert slightly below the existing stream bed elevation where bedrock is not encountered to minimize impact to Wildlife habitat and allow the existing stream gradient to remain as unchanged as physically possible. The best management practices will be used to minimize and control sedimentation and erosion on this project. The construction foreman will review all erosion control measures daily to ensure sedimentation and erosion controls are being effectively controlled. If the planned devices are not functioning as intended, they will immediately be replaced with better devices. The silt fences and other erosion control devices will be in place prior to pipe installation and will remain in place until the project is stabilized. P.O. Box 250, Bryson City, NC 28713 Phone (828) 488-2131 Mr. John Hendrix Page 2 May 17, 2002 By copy of this letter I am asking Mr. Owen Anderson, Habitat Coordinator Western Mountain District, of the NCWRC to comment directly to you concerning the 404 Nationwide permit request. Also by copy of this letter, I am requesting authorization to proceed under Section 401 of the Clear Water Act from Division of Water Quality. In addition, I am asking Mr. Anderson and Mr. Ed Ingle, Area Roadside Environmental Engineer (NCDOT), to comment directly to me concerning this permit request. We would like to begin construction as soon as possible. If further information is required, please advise. Your early review and consideration will be appreciated. Yours truly, J t.in) C. R. Styles, P. E. District Engineer CRS/JLW atta. cc: Mr. R. G. Watson, P. E., Division Engineer Mr. Mark Davis, Division Environmental Officer Mr. E. L. Ingle, Area Roadside Environmental Engineer. Mr. Owen Anderson, Habitat Coordinator W. Mtn. Dist., NCWRC Mr. John Dorney, Water Quality Certification Unit, DWQ P.O. Box 250, Bryson City, NC 28713 Phone (828) 488-2131 Office Use Only: O O Form Version April 2001 USACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing 1. Check all of the approval(s) requested for this project: N Section 404 Permit Section 10 Permit N 401 Water Quality Certification Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: 14 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: E] II. Applicant Information 1. Owner/Applicant Information Name: NC DOT - DISTRICT ENGINEER: C. R. Styles, P. E. Mailing Address: P. O. Drawer 250, Bryson City, NC 28713 Telephone Number: 1-828-488-2131 Fax Number: 1-828-488-3518 E-mail Address: rstyles(a?dot.state.nc.us 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: N/A Company Affiliation: N/A Mailing Address: N/A Telephone Number: N/A E-mail Address: N/A Fax Number: N/A Page 3 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Widening of SR 1251, (Chestnut Park Road) in Haywood County. 2. T.I.P. Project Number (NCDOT Only) ??????????????????????????????????? 3. Property Identification Number (Tax PIN): 4. Location County: Haywood Nearest Town: Waynesville Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.):SR 1251, Chestnut Park Road off of US 74 in Haywood County. 5. Site coordinates, if available (UTM or Lat/Long): 35D 29' 51"N 83D 00' 12"W (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: RPc;e1Pntln1 anti Forestland 7. Property size (acres): 1.18 9. 8. Nearest body of water (stream/river/sound/ocean/lake):An unnamed tributary to Richland Creek (DEM CLASS B). River Basin: French Broad River Basin (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) Page 4 of 12 Describe the purpose of the proposed work: To widen and pave SR 1251 to meet current NCDOT standards This includes cutting and filling earthwork where needed, replacing old drainage structures that are inadequate, and making the road safer by widening shoulders and changing the road profile. 10. List the type of equipment to be used to construct the project: Track Hoes, Back Hoes, Dump Trucks, Bulldozers, Manual Labor, etc. 11. Describe the land use in the vicinity of this project: Rural woodland, some Residential IV. Prior Project History if jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. No prior permits have been applied for this project. V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: No additional permit requests are anticipated. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Wetland Impacts Page 5of12 Wetland Impact Site Number (indicate on map) N/A Type of Impact* N/A Area of Impact (acres) N/A Located within 100-year Floodplain** (yes/no) N/A Distance to Nearest Stream (linear feet) N/A Type of Wetland*** N/A :-.,J..Ao l.,,t - „mot Gm;teri to me chanized clearing. grading, fill, * List each impact separately and idemny temporary ILIUM. w. Lil y- ua .. y -- --- ---- - excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. * * 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://www.fema.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: 0 Total area of wetland impact proposed: 0 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number (indicate on map) I Type of Impact* Culvert replacement Length of Impact (linear feet) 25' Stream Name** Unnamed trib. to Richland Creek Average Width of Stream Before Impact Perennial or Intermittent? (please specify) Perennial t t't d to culverts and associated rip-rap. k List each impact separately and identify temporary impacts. Impacts include, but are not pm e dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain). stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditch ing/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usgs.gov. Several intemet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.mapquest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 25' Page 6 of 12 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number (indicate on map) N/A Type of Impact* N/A Area of Impact acres) ( N/A Name of Waterbody (if applicable) N/A Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) N/A A b t I' mited to: fill excavation dredging- List each impact separately and identify temporary impacts. Impacts mclu e, ut are no flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pona, local stormwater requirement, etc.): N/A Size of watershed draining to pond: N/A Expected pond surtace area: N/A VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Impacts cannot be avoided Culverts must be extended in order to gain the necessary width to construct SR 1251 to current NCDOT standards All pipe replacements will be placed below the existing stream bed gradient so natural substrate can be re-established. Page 7 of 12 VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification* of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.ne.us/ncwetlands/stnngide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a .description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A Page 8 of 12 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at http•//h2o.enr.state.nc.us/wrp/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ® If you answered "yes", provide the following information: Page 9 of 12 XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes F? No Is this an after-the-fact permit application? Yes E] No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Applicant/Agent's S' nature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) US Army Corps Of Engineers Field Offices and County Coverage Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell Union US Army Corps of Engineers Avery Clay Jackson Polk Watauga 151 Patton Avenue Buncombe Cleveland Lincoln Rowan Yancey Room 208 Burke Gaston Macon Rutherford Asheville, NC 28801-5006 Cabarrus Graham Madison Stanley Telephone: (828) 271-4854 Caldwell Haywood McDowell Swain Fax: (828) 271-4858 Catawba Henderson Mecklenburg Transylvania Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham Wilson US Army Corps Of Engineers Alleghany Edgecombe Lee Stokes Yadkin 6508 Falls of the Neuse Road Ashe Franklin Nash Surry Suite 120 Caswell Forsyth Northampton Vance Raleigh, NC 27615 Chatham Granville Orange Wake Telephone: (919) 876-8441 Davidson Guilford Person Warren Fax: (919) 876-5283 Davie Halifax Randolph Wilkes Page 11 of 12 ' \ n 1198 II97 19 Aj- ?zf \ 1.30 1236 h ?0L. ? CkcsncAf f z3 1206 \ .1 12_03 \ 99 ` 1201 Co % WoOJ 1767 , t , o \\ WOO .161 I T?e6 \ • / , 11--f (A) E? v 1161 Sr. pin // WAYNESVILLE lets a r 6z1 . . \ 1 / - - \ 1266 / 1.16 I 1179 L 1776 ?\ \ nn LJ\ \ 1176 ? \ J I \ p \ \ 0% ------- 1176 1177 \ -_--_ It \ 1176 1173 .3e 06 \ I •\ , , • \ 1173 \ / I I \ H..N-.W /' I .50 I 1Fii g5 / r / ,160 / //I • - 1,66 1 n 3 ? / \\ 74 1171 •? I \ 1160 /• \ -- --\ / ) t766 % 1 / 0 1 16 I 23 1 1170 :y, 167.36 i 1 7 2 3 \ i \' \ \: •SL: dl/ \-=•` I i--/--- ` 1769 .95 I i I -- . I / 67 I \ \ / ..-.. -..- '\ ` .-: ?? -- ? 1161 /l ? ? •\ V• ;? '\ ••' -\ ,/ ?..-..? 1766.16 ?..-'? .._ •\ I \ ?r-J- ? \ I 1165 I /I I \\ 1 j1243 1739 C i •. 1 \ 1.72 / `-' 1162 `1163 ^.6 .- i^ ./• I \ \ / L ?•'/ 1 1263 1 \ -- ? J \ ? 'S1 / / - lla9 1169' 11 f •? \ ? -9- •- Sp/rxEax n Isar •.? : ??` 1241^ 1150 ( I ?S / r'\) ?J IISI // / ,i // ' w nay • b \ l- 1,39 • •\ 1148: ` . , / 1140 • 1221 272 \ 1752 X47 1136 ! ,' ' \ . 'T" 1271 •' 1}36 1142 ?e 'Aa:R6!tX41."^'-...,. _. .? ?•4 x'?fM.1M°`4-_!a7i?ili'nG3kC1dM1zalb4s HAZELWOOD QUADRANGLE 5 C-- NORTH CAROLINA ,??o??lb? 7.5 MINUTE SERIES (TOPOGRAPHIC) 175-NE 315 800000 FEET • • 317 • •18 8 -5,30? „e FEET ?/ F`:r r ? ?/- - _% % rte! a.?j?''?- ? / J cv? L\? ???ty - `rJ {? '?` ? - ?l :/r ?• v4 -A' 1 !? _ V.- Z c it --? J L y. ( OV, Yll 7. s,b r? .? •r 3928 n.a...-.o / . ^ .? •ti' ?• l? • c fir, • • a 0 r azelwo? n lie. r , ` s1 ._i . ?r t -48M-R.72 1 2e- m f? ???° • ice'/ ' { / _ I "1 `?t t(? '• '• i•-? w •.Fatrvte Z1t \it ?•, /? ?L? t '? , yf, E ' ..\ . 3/? % c_ 3027 i• ro ` ice/ j r ?b% ?. v /?Hyatt??: 'reek z(-,., J s \N AY ,• I? y-4 [ fit; ; '+ ` `? zB ,1 1i° ' i ; • . ree - ..i /.,?? . \ _ ?` _ =? ?.fK ?J ??'_ U • 1 __ _ 'P7•• ' I `•• • • 3926 . 1rX1,1-e .. ??..:??..? } ,. L ' ?? `>; ,•' s? ? .- ?• 1 ! 1, i?? 74•ti? 1722 ZIP' t 27.x.. BFl G B ???4•• ??..i 1 '` f1: ?`??.?i?l?v? ? `a: i ?11t• . f ,,'1 .i +? )•? ?• it '-2191 { ?. _'•`-?...? l^ ?,• • , a ? b ! pCE /`: ?? \ ?`-"o• _?_.?.• .. -Y.•i u ??r. ?/ , 3025 Y r, pt '~'r Park ?J???6y a ?[yn'4 ?'f• ?v?-^-._/, `) '/ ( ir: .? ?Y 1110 . !ri. Copyright (C) 1997, fVlaptech, Inc. ??ffGf?JnG?/ Co. ROAD NAME - S.R. FROM Zz i'-0/ ll yo.o" ADDITION IMPROVEMENT TO PE PAVED 2 P. POLES TO BF MOVED D T POLES TO Er- MOVED RT/W WIDTH -50, SCALE Dr?-\c- 7- (7--O1 i. 9? 5- 3 :s:....._..s?.. •»::. - -?•:;::,?+.?!ust::c=:a:?t??`';S?':?+=:?3??'>?b?:Y:1e?•vti 'x?r4%,it?=. TEY-P STONE DITCH CHECK .. ROCK. SILT CHECK DPIm SILT BASIN.- B TEMP SLOPE DR- IN TEMP SILT DITCH H RT H EMBANKMENT SILT BEN CE. FIBERGIASS ROVING RIP RAP 1 1, WP T S13 EGil • DESIGN FOR SILT BASIN 600 CUBIC FEET PER ACRE CHECKED EVERY'STORMEVENT AND CLEANED OUT WHEN HALF FULL _wy T TJ _5• C11 C E SILT BASIN - 1 LE\GTH OF DISTURBED AREA 100'• (S.B. 7) 3•A *\ 2 • 4I 2T SILT BASIN - 2 LENGTH OF DISTURBED AREA 200' ( S.B. 14) c-Rosto v Use o SILT BASIN - 3 f (S.B. 21) <s- LENGTH OF DISTURBED AREk 300' LENGTH OF DISTURBED AREA 400' SILT BASIN - 4' (S.B. 28) L??i y 13 ? rah N L,,,,rJrrr?j ???errv X?i' 27- O Yr )uolp- 74 6ol j v, ? ,? (lol. O 5+00 5+00 I I? I v ? h1D i T I 0+00 za: 'a 3 60 r i I 0+00 0 0 10+00 I ? i 0 '1 heo ore D H16- /30 -5A ""/w c" a wnyhesv?//?? q/L' 2878, O I 1 /?J.YIOiIT (301' ?ie? 1???? e.t i Co. f 7223 ??l?s ?1°?T ?c,1, I _ 5+-z6 b 1 Z 5+00 0 10+00 ' i i 0 43" ? ?? !b ?? WOE er $ ?+ea. \O ?¢. ?['.YnoJSC1 ?/?.n 8' y 51? 7+iS-74 Z.9 L- 641o 5 ?-zo 5+00 0 0 15+00 15+00 C O EROSION CONTROL DETAILS AND' SPECIFICATIONS 245.03 245.05 893.01 890.05 245.01 245.02 892.04 895.10 892.01 892.02 897.01 897.02 894.01 245.04 896.01 896.02 896.03 Temporary Silt Ditch ......... .................. TSD. Temporary Diversion ............................. - TD - Temporary Silt Fence ...................... --1 +1--H! Temporary Slope Drain with Earth Berm .......... F-- `- Silt Basin Type A ................................. -0 Silt Basin Type B ................. ............... ......... Temporary Rock Silt Check Type-A ....... ... Temporary Rock Silt Check Type-B ....... .....? Temporary Rock Sediment Dam Type-A ............ Temporary Rock Sediment Dam Type-B ... ® • • ' Rock Pipe Inlet Protection Type-A ....... .... ° Rock Pipe Inlet Protection Type-.B ........ .... Rock Silt Screen ................................... .......... Stilling Basin ......................................:. .. [Ed Rock Inlet Protection: OR ° A .............. A L ................. IJ -- Type A •• B ?? Type B ............................... B 0-- OR Type C ....... C ? .. OR -• C) ........................ 12 March, 1992 TEMPORARY SILT FENCE: is commonly used at the toe of a fill sectithe bo to m,, t off- A temporary silt fence site sedimentation. It is made of perme The able filter It fencer duce the water flow-While stretched and supported by steel posts. . The may also be used to divert water flow to to ensure there retaining the -sediment Y outlets. Silt fences need to be checked after each regular bars cant fences sh effectiveness all not be . They must be maintained on a regular a installed across streams, ditches, or waterways. AREAS OF USE: here sediment runoff can be stored and contained • toe of fill sections w At inside the project limits. DESIGN. CR?ERIA: Material Fabric steel posts length post spacing Wi_ th Wire Type 3 Class A 5 ft 10 ft. Without Wire Type 3 Class B 5 ft. 6 ft. maximum 17 March, 1992 jo:? . F C()? C? W? W ¢ W WC ? Ea ?F C C7 P2 W W ? D? z_ <z C F to W ? C3 O < F C7 o° Cr AD 2 a ?. a EO- Un u Cr L- C CsV F C 3 - a - ? UU C C.7 (I I ?E- w o °F 1-8-5 -3 W w --- W 3 z «: ? = ? z ? C W cl z _ ?- <<l/1 <rFC?C- Z_- N z W W <<>+ N<¢ ? <OC- C4N N U- 7 W} C ?7 OC C ?r ?LF ..: ? F ?G _ L ?0z C rW t/2 - Z --< Z= CL' ? Cn 04'UW?' G.?C?c? r U"C?FCr•FUV F3 O CL <e N?tn- C.. Ca 6 _ W Z Z -O (n OC-: ? < f Z' O : ;cw 1.. 0 I' -; w W z u I F-+ zj ?O? Lr ? .• Z. O U _J= O? C' G O z c (11 1 0 T N I c 18 March,1992 SILT BASIN TYPE-B: ugh A silt basin type-B is a temporary basin built to collect ditch withtits lowing ength be?ng at drainage way. The silt basin is built awe the base S silt basin is generally built in least 2 times the width of the basin typ conjunction with temporary rock silt checks and other devices that control or slow down water flow. This device must be monitored closely line and sedimentation is no regular basis until grass is established along, the longer a problem. AREAS of USE: • In conjunction with temporary rock silt checks and other devices used in drainage ditches. DESIGN CRITERIA: Width - variable Length - 2 times width Depth - 2 ft. minimum storage - 1800 cubic feet/acre (equals L x W x D) 23 March, 1992 DIN Z;m l U1 IlIN w - lill`: ? Illlli - V a = Illi ilil; ? o= m i. I1 _ i!III! - ?- z1 1 I - • < ! I?I i i III .-? ? LO .?_ co 11,1 r ? N z ?s _ ti?t l'J W .. ?..i C^ J ?• .? 11 - 11 11 !I'?? 1 = N a O Willi: - i ?ili1' z'?+ ? O (nervy In .* Q 24 March,1992 l O m mm 0 0? ROCK PIPE INLET PROTECTION TYPE-A: a 0 A rock pipe inlet protection type-A is a horseshoe shaped struc?e with taybu ltt--in pe- sediment storage area around the outsidat penlets no larger than 36 inches in rock pipe inlet protection shall be used pipe- diameter where it is receiving flow from several directions. The ttype-A o protect inlet drainage #57 stone inlet protection utilizes class-B stonblined ith #5 fore it enters rThey have a sediment storage pipe structures by trapping sediment pit which is designed by the same procedures as a silt basin. AREAS OF USE: • At inlets to pipes no larger than 36 inches in diameter where it receives flow from several directions. • In areas where it can be cleaned and maintained on a regular basis. DESIGN CRITERIA: • Structural stone - class-B stone • Sediment control stone - #5 or #57 stone • Sediment storage area - 1800 cubic ft./acre • Dam height - 3 ft. minimum 33 March, 1992 Q a c a q, r J C LL W Z <J F :2 < F W Z O j¢ a C4 ,s 0 U?aE-4 ° VFi oa'F1 2 W<¢ W O .; .? Z W U Q a to ca z a: O WO E-- V) W14?- FZCz..C. E-- C> WZ C.?U lJl O C fn Z.e 0 L7 G Z W r] F In C) 0 U C) . z to c- W <? ¢Z <V ON E-OZW W ZQC.? WUFZA WF.0..7 WZ EaN WE'0 GZ.1WZE-k1 Jz<E-- V VNimL) ]AIM-4 0 W Z ¢ <fn O W W C4 ?9 43 E- E-, C4 j W F U E Z Z Z cn ¢ O W V Z G V T W O W S 0 0 0 F O W O < O F Z G1 Vl u F U EO V) G 4 U 0 z M 0 c? 0 X LL r w i CL- I M 1 h- ? W ' > , u z 0 ' ' N Q J ? Q C ? Z z O O Q.. rT co f U o n W ? ` J C r O U z -I 0 W z z +?' J N N 0 0 4J c C C: O C r 0 N r N O z 0 J W L ? O w N Q L.LJ F -- O Z?m ..r m H U W f? w -z z Q.. Ci l i- Y U 1 O O ' Z Q 1- Z' ? :O I!=O :PC7 = . 34 March,1992 ROCK SILT SCREEN: elow ert k silt screen is a low-level dam structure to be used in o ed b brunning wvater A roc sites. Rock silt screens shall tream below the construction srt within the right-of- and shall be placed in the s easement boundary. The rock silt screen utilizes class Bstone liwith settle the largersedi way or or #57 stone to produce a ripple-effect in he eons Lion site. The trapped sediment particles transported in the stream from shall be cleaned out before the device is removed from the stream. AREAS OF USE: • In live streams below construction sites where construction occurs in or adjacent to the stream. • In live streams below a culvert construction site. • Where it can be cleaned before it is removed from stream. DESIGN CRITERIA: • Structural stone - class B stone • Sediment control stone - # 5 or n 57 stone • Dam height - 1.5 ft. minimum and 3 ft. maximum (shall not be higher than 1 ft. above normal flow of stream) 37 March, 1992 i Y 1 s S c U c N 7 o ?- N 0 a e - O O O F z ?4? < FWZ O?j<.:+L OE..O UjZZFO"'O NAG F< L• Lc. O<<Wcn zWUp O Z(n?CVG' O C1CW ..CL< pOCOGW E-N c W :a E G. Cz.G F0,3 Z' GC1C CO Z 7G'flZG1E? UO COUC) ZppZ . ON O CO-?Ga W .:FzW FWU WFOC3CZ,1WC3 ¢E.w L00 UZ,OUF° E-GO-' C7 = O W .4 C ? flJ C3 " W < U3 C. -3 - E- c_c`, FC?Z<ZZ4apCO ? G ZpOOU tnN?-GU N. G 38 a O 4 O O 3 LLI Z_ > T Z 0 LL x c i ? I f 1 W o N Z O ? J r LLI r JV^ C9? ?? N ? C N? U !' N 0 V W S O W N =. 6 •l. cr z w ,U L? U cn F-+ O Z Z_Z O ?? O CD C v ' Z l; L C. j F- . i???tl1. ? ? o D -- - n 7 March,1992 ^?r wct d Leo CtieS%to T ?9r? -Si?' /Z S/ sm fir` / STA. 3 ERAMH S M EXISIDU > 30' X 36" sirZ PROS > 65' X48' ? P ?nCG 1/00 ADO Sr aTw. 90° S.%r desi? ? I PB AP U 5G9?G /?=lO N g; Aj?k 1 41 "`y{ f1Y5e u.. I I 1 1 I t l I I I I ?: f I I I 1 , -f I f - ? i - I I -- i! I I I ! I i I I I f ! I I i ! I . i t : i I ! I I I 1 1 1 ? i I I I I I 1 1 1 I ' I I I T_? I i ' i I' I! I i l l ' I I ; I t i I i I I IT I I-= ----' , '4. I I I I I t i i t I I l l i l : I 1 1 I { _ - -- I I - -- I -- I ' l i I t 1 ' I I , I I tc i t ? j ,^ I' 1 1 '? i t I I l I , I'?-•-r?? $ I ' i I ? I I I I I I : ? I?! I I I I I I I , ( t 1 ' I I ? I I I I I I' 'IC i I 1 i I I I I s 1 I I I I ! 't 1 1 .i , 1 I I I --- ' I I I I 1 I i i ' , I 1 I ' t I i i T ? I I ? -i------- I? i?- ? -?j ---- ' I t _-?-- ' I tl l ! !I I I I I' I I ! t l " - ?C I? ' 1 1 1 1 I ! ;! I l lil i ! I 1 ! i 'I l 1 i ' i i i t '! 11 I 11 I 1 1 1 1 1 I l i t l I I I I !-I 1 1 I 1 I ?_' ! t - la I I I !II . I I II I ;I I I 'I '.I ! I I I I I I I I III I!' I ! I l f I 1 1 1 I I I . ? l - ! l i I I l l i i l ! I I I i t I I i I I I I I I .! I I I t 1 1 ! I ? ? ! 1 .I I I+ I I I I I I I I ' I I 1 1 I I I I I I I i I 1 I l t I I I 1 1 1 t ! I I I I i t I I ' t I I! I I I I 1 t l I f I I I 1 i I I I I I I l l t l t t I i I I I I ( ( I 1' I I 11 I 1 I I I - F TT T I t i ! I I I I I I ' '? ', I t 1 ' I I I I I ! I ' 1 1 1 I 1 1 I I I I i ! ! I ! 1 ! I I MEMORANDUM TO: John Dorney Regional Contact: Non-Discharge Branch WQ Supervisor: Date: SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name NCDOT - SR 1251 County' HAYWOOD Project Number 02 0814 yCounty2 _ C 0 , Recvd From DOT FILE 'Region Asheville Received Date 5/22/02 Recvd By Region Project Type Certificates Stream Stream Impacts (ft.) Permit Wetland Wetland Wetland Stream Class Acres Feet Type.. Type Impact Score Index Prim. Supp. Basin Req. Req. 14 rF- O Y O N F--F-5-16 r B F_ 40,305. F- ?- 25.00 Mitigation Wetland MitigationType Type Acres Feet Is Wetland Rating Sheet Attached? 0 Y 0 N Did you request more info? 0 Y 0 N Have Project Changes/Conditions Been Discussed With Applicant? 0 Y 0 N Is Mitigation required? 0 Y D N Recommendation: 0 Issue 0 ISSue/Cond 0 Deny Provided by Region: Latitude (ddmmss) 352951 Longitude (ddmmss) 830012` Comments: DOT imposes to replace and extend the existing 30' x 36" CMP culvert with a 55' x 48" culvert for the road widening project. The stream is a step nootype stream. Recommend issuance of WO Certification No. 3375, cc: Regional Office Central Office Page Number 1 _ 4S? 3 g) Z 4 wooc S IZ z's-az o rlage ec 12- Z- S`i`de ;, 0,70 7l <5?v??.'vi _ J Date: To: ? RO Steve Mitchell Project Name ?FRO Ken Averitte DWQ Project Number ?WaRO Deborah Sawyer County ?WiRO Joanne Steenhuis ?WS O Jennifer Frye FILE COPY RO Mike Parker - OMRO Pete Colwell r From: co, Telephone X9191 733- The file attached is being forwarded to you for your evaluation. Please call if you need assistance. ? Stream length impacted ? Stream determination ? Wetland determination and distance to blue-line surface waters on USGW topo maps ? Minimization/avoidance issues ? Buffer Rules (Neuse, Tar-Pamilco, Catawba, Randleman) ? Pond fill ? Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy ? Is the application consistent with pre-application meetings? ? Cumulative impact concerns Comments (k a 5' C l? u n n2 re oue S 14,7 Ak?av'a C ?aOnd y ? ?t'i?l 020 798' -5a.? c42#1J 1e kc&?; k5??1y Pee Ale, ', C4t0J44r