Loading...
HomeMy WebLinkAbout20020200 Ver 1_Complete File_20020208----?F W A TF9 ? O ?O G O -? Gregory J. Thorpe, Ph.D. Acting Director Division of Water Quality February 25, 2002 Guilford County DWQ Project 9 02-0200 APPROVAL of Randleman Lake Buffer Rules Mr. Lenwood E. Smith, II Division Environmental Officer NCDOT, Division 7 1584 Yanceyville Street Greensboro, NC 27415 Dear Mr. Smith: You have our approval, in accordance with the attached conditions, to widen NC-68 from SR 1556 to SR 1958 as you described in your application dated February 7, 2002. After reviewing your application, we have decided that this fill is covered by the Randleman Lake buffer rules (15A NCAC 213 .0250). In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Coastal Stonnwater, Non-Discharge and Water Supply Watershed regulations. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us and send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Dorney at 919-733-1786. Attachment cc: Raleigh Corps of Engineers Winston-Salem DWQ Regional Office File Copy Central Files Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Sincerely, pfeg i J. Thorpe Ph Wetlands/401 Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Ph: (919) 733-7015 Fax: (919) 733-6893 .ANA NCDEhR Customer Service 1 800 623-7748 ' v J STATE OF NORTH CAROLINA MICHAEL F. EASLEY 1584 YAN'CEYVILLE STREET, GREENSBORO, NC 27415 GOVERNOR February 7, 2002 NC DENR Division of Water Quality DEPARTMENT OF TRANSPORTATION 1650 Mail Service Center Raleigh, NC 27699 ATTN.: Ms. Cynthia Van der Wiele Wetlands/401 Unit Dear Ms. Van der Wiele LYNDo TIPPEYF SECRETARY SUBJECT: Guilford County, Improvement of NC-63 from 600'S of SR 1556 to 1700' N of SR 1958, T.I.P # U-4433 Please find seven (7) copies a Pre-Construction Notification Application package attached as notification for impacts to Randleman Buffers. This project was discussed with Bob Zarzecki on February 1, 2002. It was agreed by both parties that no practical alternative was available to maintain diffuse flow. The highway is being widened by removing medians and adding 2-feet of pavement on each side of the existing travel lanes; therefore, no funds are available for acquisition of additional right-of-way to be used for construction of stormwater treatment facilities. No ditch or shoulder work will occur near the subject channel. If you have any questions or need any additional information, please contact Tim Jackson at (336) 256-0553 or Len Smith at (336) 312-8387 Your time and effort are appreciated. Sincerely, Lenwood E. Smith, II, PWS Division Seven Environmental Officer cc: Mr. Tim Jackson, P.E., NCDOT PRONE 336-334-3192 FAX 336-334-3637 Office Use Only: Form Version October 2001 USACE Action ID No. DWQ No. t) 0 F) 0 1 If any particular item is not applicable to this project, please enter "Not Applicable" or "NIA" rather than leaving the space blank. 1. Processing 1. Check all of the approval(s) requested for this project: ? Section 404 Permit ? Section 10 Permit ? 401 Water Quality Certification ® Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: N/A 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of unpacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: Mr. J.M. Mills P.E Division Engineer - Division 7 Mailing Address: P.O. Box 14996 Greensboro NC 27415 Telephone Number: (336) 334-3192 Fax Number: (336) 334-3673 E-mail Address: mmillsoa dot state.ne.us 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Lenwood E. Smith 11, PWS Company Affiliation: North Carolina Department of Transportation Mailing; Address: P.O. Box 14996 Greensboro NC 27415 Telephone Number: (336) 312-8387 Fax Number: E-mail Address: lesmithCadot.state.ne.us Page 1 of 8 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Improvement of NC-68 from 600'S of SR 1556 to 1700' N of SR 1958 2. T.I.P. Project Number or State Project Number (NCDOT Only): U-4433 3. Property Identification Number (Tax PIN): N/A 4. Location County: Guilford Nearest Town: High Point Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): From I-40 take exit 210 onto NC- 68 Proceed approximately 1750 feet north to SR 1958 (Triad Center Drive). The pipe inlet is located north of SR 1958, the outlet is located south of SR 1958. 5. Site coordinates, if available (UTM or Lat/Long): See the attached USGS map. (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Maintained right-of-way 7. Property size (acres): N/A 8. Nearest body of water (stream/river/sound/ocean/lake): Deep River 9. River Basin: Cape Fear (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://li2o.eiir.state.nc.us/admin/naps/.) 10. Describe the purpose of the proposed work: Widen, and improve intersections, signage and drainage on a portion of NC-68. Page 2 of 8 11. List the type of equipment to be used to construct the project: Road construction equipment trackhoe grader, backhoe and bulldozer). 12. Describe the land use in the vicinity of this project: Maintained right-of-way. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. N/A V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 3 of 8 1. Wetland Impacts Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** es/no Distance to Nearest Stream linear feet Type of Wetland*** N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For darns, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-500-358-9616, or online at httn:/hvuw. Tema. gv. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater(saltwater nnarslt, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: N/A Total area of wetland impact proposed: N/A 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number indicate on ma Type of Impact* Length of Impact linear feet Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? leasespecify) N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated np-rap, darts (separately list impacts due to both structure and flooding), relocation (include linear feet before and afler, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straiglttcning, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS traps are available through the USGS at 1-800-358-9616, or online at w-\v,v.usgs.gov. Several intcrnet sites also allow direct download and printing of USGS traps (e.g., -w w.lopozone.conn, www.mapqucst.com, ctc.). Cumulative impacts (linear distance in feet) to all streams on site: N/A Page 4 of 3 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bullchcads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): N/A Size of watershed draining to pond: N/A Expected pond surface area: N/A VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The road is being widened and improved to increase traffic safety and bring the highway unto current construction standards. All activities are occurrint, within the existing right-of-way. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors Page 5 of 8 including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at littp://ii2o enr.state nc us/ncwetlands/strm?-,ide.htmi. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Impacts will be less than 150 feet-, therefore mitigation is not anticipated. 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at hup://ii2o.cnr.st.itc.iic.ii-,/%?rp/index.litm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A Page 6 of 8 IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 213 .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify Randleman )? Yes ® No ? If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation 1 280 3 N/A 2 240 1.5 Total 520 ' "Lone I extends out 30 fast perpendicular from near bank of channel; 'Lone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Page 7 of 8 Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. N/A XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. XII. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No ? Is this an after-the-fact permit application? Yes ? No ? XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 8 of 8 ??``'?'?'' J ? T'S1+\ ? •1?a?_?/ • ., ? ?<? ?? ?_ •J, fry ,;`??? _1?. `,? ?,??_` ,1r/ It /? ?? _?` lr ?1 ? \? ?j • ?' ? I U?/C"?( -f I I \`?j ?t \ ' /? ? ?-Y' ? ,' _- _ , ?\ 1 ?/?? ?/ \ •'i ? , 1 1 t ?{ ?.1? 1(INi r ;f j? J )VRT N.? \ ' 11 ', '? `' t , i +- I 1 ; ?','l +...y. ;\ f' J? v \ '. tf"y#` _•-rn -` , •ti l * r, ? ? ; !' .Frl -`nd311ip,. ?,\ 1\; I\ ?!1` ( L, v1 , \ i.. ) I \ '? ^ _ ., ?, it?/_-"?/J, / =ji 0-0 J r /J) t I ?4 itLs Gz? 11\ c Ul Sm t3M 95 !• , •/-'i? O ° ( n' ? \ ?.??--, \ -\??J) ?'?? \ ``.:) gam, ?9??•? ? , ?ti 7; ° ? •7 - ? \`./????7? \ \ } ? •? L ?! IJ?a`F _{?_^????? \ J?}?/t ? 5?? 3 ?` ??9 7 /• l%?__ \.:.,?*.\? `_,?`?J'''`-;1?_- ? ?;??/??"'?: ( ,n?? ??_''` ?1?? -,..fit I ?, ?i +-?,?It'- Iw ? _:. I:s ??,.?•'?/ ??\\is; 11,1 tf •/ :\. ?? - /f?\ - •(' i?l -\ ?-Z;? e!.!?. ?.y. ??s',_• ri?^ '1?" \?ti:?J• l .,/i ?, i-- ??`/IL? °\+•f - ..: ?I?/',?^ ??.,•Cil??l= %_ AirlF\•'?O,p? • XV,\'t'' 41 I J IA7 Name: GUILFORD Location: 17 592880 E 3993928 N Date: 2/6/2002 Caption: Location of the Randleman Buffer Impact for U-4433 Scale: 1 inch equals 2000 feet Copyright (C) 1997, Maptech, Inc. REPLACE ME IAL vrrZ)tI DLVInJ WITH WOODEN OFFSET BLOCKS. ?}- REPLACE MISSING/BROKEN REFLECTORS (D 4- /n i II cn II /// F ?L` ?2f80.73 -L- I? o I f00.00 -Y12 /?' II = cn qq 1 a / (D / IX N, ?? / s l ?ll 1 ?? ill N ? " • it 1 '_ :- 11 y _J - r XIS ING GO AR -'? C A? -1 P?11 Pavement Removal L 3 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY 1584 YANCEYVILLE STREET, GREENSBORO, NC 27415 GOVERNOR February 7, 2002 NC DENR Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699 ATTN.: Ms. Cynthia Van der Wiele Wetlands/401 Unit Dear Ms. Van der Wiele U LYNDo TIPPETT SECRETARY SUBJECT: Guilford County, Improvement of NC-68 from 600'S of SR 1556 to 1700'N of SR 1958, T.I.P # U-4433 Please find seven (7) copies a Pre-Construction Notification Application package attached as notification for impacts to Randleman Buffers. This project was discussed with Bob Zarzecki on February 1, 2002. It was agreed by both parties that no practical alternative was available to maintain diffuse flow. The highway is being widened by removing medians and adding 2-feet of pavement on each side of the existing travel lanes; therefore, no funds are available for acquisition of additional right-of-way to be used for construction of stormwater treatment facilities. No ditch or shoulder work will occur near the subject channel. If you have any questions or need any additional information, please contact Tim Jackson at (336) 256-0553 or Len Smith at (336) 312-8387 Your time and effort are appreciated. Sincerely, Lenwood E. Smith, II, PWS Division Seven Environmental Officer cc: Mr. Tim Jackson, P.E., NCDOT PHONE 336-334-3192 FAX336-334-3637 Office Use Only: Form Version October 2001 USACE Action ID No. DWQ No. `!-- If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing 1. Check all of the approval(s) requested for this project: ? Section 404 Permit ? Section 10 Permit ? 401 Water Quality Certification ® Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: N/A 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NC)ARP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? H. Applicant Information 1. Owner/Applicant Information Name: Mr. J M Mills P E Division En¢ineer -Division 7 Mailing Address: P.O. Box 14996 Greensboro NC 27415 Telephone Number: (336) 334-3192 Fax Number: (336) 334-3673 E-mail Address: mmills e,dot state nc us 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Lenwood E. Smith 11, PWS Company Affiliation: North Carolina Department of Transportation Mailing Address: P .O. Box 14996 Greensboro NC 27415 Telephone Number: (336) 312-8387 Fax Number: E-mail Address: lesmithgdot state nc us Pagel of 8 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Improvement ofNC-68 from 600'S of SR 1556 to 1700' N of SR 1958 2. T.I.P. Project Number or State Project Number (NCDOT Only): U-4433 3. Property Identification Number (Tax PIN): N/A 4. Location County: Guilford Nearest Town: High Point Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): From I-40 take exit 210 onto NC- 68 Proceed approximately, 1750 feet north to SR 1958 (Triad Center Drive). The pipe inlet is located north of SR 1958, the outlet is located south of SR 1958. 5. Site coordinates, if available (UTM or Lat/Long): See the attached USGS map. (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Maintained right-of-way 7. Property size (acres): N/A 8. Nearest body of water (stream/river/sound/ocean/lake): Deep River 9. River Basin: Cape Fear (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://l12o.enr.state.nc.us/admin/maps/.) 10. Describe the purpose of the proposed work: .Widen, and improve intersections, signage and drainage on a portion of NC-68 Page 2 of 8 11. List the type of equipment to be used to construct the project: Road construction equipment (trackboe,grader backhoe and bulldozer 12. Describe the land use in the vicinity of this project: Maintained right-of-way. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. N/A V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 3 of 8 1. Wetland Impacts Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** es/no Distance to Nearest Stream linear feet Type of Wetland*** N/A * List each impact separately and identify temporary impacts. Impacts include, but are not turutea to: mecnanuzca ctranng, giauu,g, ,u,, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at ]http:/hvww. fema. <; ov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: N/A Total area of wetland impact proposed: N/A 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number indicate on ma Type of Impact* Length of Impact linear feet Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? leasespecify) N/A * List each impact separately and identity temporary impacts. impacts mcruae, OaL are I1al 11MILLU lu. Cuivca w win w?w.uaw dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net losstgain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included ?* Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at %v-,ti v.uses.2ov. Several internet sites also allow direct download and printing of USGS maps (e.g., wNvw.topozone.cout, vo w.manquest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: N/A Page 4 of 8 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. N/A _? ?__ tS ,..7 R11 ov nn..nf:nn Arnrl mini * List each impact separately and identity temporary impacts. tmpacis lnduue, uuL are not lLrwtW flooding, drainage, bulkheads, cte. I...11 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): N/A Size of watershed draining to pond: N/A Expected pond surface area: N/A VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The road is being widened and improved to increase traffic safety and bring the highway up to current construction standards All activities are occurring within the existing right-of-way. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors Page 5 of 8 including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://l12o.enr.state.nc.us/tiewetiands/strmy,ide.litnil. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Impacts will be less than 150 feet, therefore mitigation is not anticipated. 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at thttp://h2o cnr state nc ushN rt)/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A Page 6 of 8 IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA. document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify Randleman )? Yes ® No ? If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation 1 280 3 N/A 2 240 1.5 Total 520 * Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Page 7 of 8 Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 213 .0242 or .0260. N/A XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. XH. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. X1II. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No ? Is this an after-the-fact permit application? Yes ? No ? XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 8 of 8 7 CD I 2+80.73 -L- +00.00 -Yl2 - u < 1? cn CD II u' o `I w ? II c? WITH WOODEN OFFSET BLOCKS. REPLACE MISSING/BROKEN REFLECTORS AA la / C9, V I 0 J?•- I - GUp?O?pZL XIS ZNG R U 711 i ? n !!! 11 r Pavement Removal Ir o :`` 11 I( 11 1 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY 1584 YANCEYVILLE STREET, GREENSBORO, NC 27415 GOVERNOR February 7, 2002 NC DENR Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699 ATTN.: Ms. Cynthia Van der Wiele Wetlands/401 Unit Dear Ms. Van der Wiele LYNDO TIPPETT SECRETARY SUBJECT: Guilford County, Improvement of NC-68 from 600'S of SR 1556 to 1700' N of SR 1958, T.I.P # U-4433 Please find seven (7) copies a Pre-Construction Notification Application package attached as notification for impacts to Randleman Buffers. This project was discussed with Bob Zarzecki on February 1, 2002. It was agreed by both parties that no practical alternative was available to maintain diffuse flow. The highway is being widened by removing medians and adding 2-feet of pavement on each side of the existing travel lanes; therefore, no funds are available for acquisition of additional right-of-way to be used for construction of stonnwater treatment facilities. No ditch or shoulder work will occur near the subject channel. If you have any questions or need any additional information, please contact Tim Jackson at (336) 256-0553 or Len Smith at (336) 312-8387 Your time and effort are appreciated. Sincerely, Lenwood E. Smith, II, PWS Division Seven Environmental Officer cc: Mr. Tim Jackson, P.E., NCDOT PHONE 336-334-3192 FAX 336-334-3637 L. Office Use Only: ?? Form Version October 2001 USACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing 1. Check all of the approval(s) requested for this project: ? Section 404 Permit ? Section 10 Permit ? 401 Water Quality Certification ® Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: N/A 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: Mr. J M Mills P E Division Engineer - Division 7 Mailing Address: P.O. Box 14996 Greensboro NC 27415 Telephone Number: (336) 334-3192 Fax Number: (336) 334-3673 E-mail Address: mmillsDaa dot state nc us 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Lenwood E. Smith II PWS Company Affiliation: North Carolina Department of Transportation Mailing Address: P.O. Box 14996 Greensboro NC 27415 Telephone Number: (336) 312-8387 Fax Number: E-mail Address: lesmithndot state nc us Pagel of S L III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Improvement of NC-68 from 600'S of SR 1556 to 1700'N of SR 1958 2. T.I.P. Project Number or State Project Number (NCDOT Only): U-4433 3. Property Identification Number (Tax PIN): N/A 4. Location County: Guilford Nearest Town: Hiph Point Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): From I-40 take exit 210 onto NC- 68 Proceed approximately 1750 feet north to SR 1958 (Triad Center Drive). The pipe inlet is located north of SR 1958, the outlet is located south of SR 1958. 5. Site coordinates, if available (UTM or Lat/Long): See the attached USGS map. (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Maintained right-of-way 7. Property size (acres): N/A 8. Nearest body of water (stream/river/sound/ocean/lake): Deep River 9. River Basin: Cape Fear (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.ne.us/admin/maps/.) 10. Describe the purpose of the proposed work: .Widen, and improve intersections, signage and draina?eu on a portion ofNC-68 Page 2 of 8 11. List the type of equipment to be used to construct the project: Road construction cguipment (trackhoe grader, backhoe and bulldozer) 12. Describe the land use in the vicinity of this project: Maintained right-of-wU. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. N/A V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: N/A VI. Proposed Impacts to Waters of the United States/Waters of the State it is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 3 of 8 1. Wetland Impacts Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** es/no Distance to Nearest Stream linear feet Type of Wetland*** N/A fil * List each impact separately and identify temporary unpacts. Impacts include, but are not lumted to: mechanized cleanng, grading, 19 excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. * * 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://vvww. fema. gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: N/A Total area of wetland impact proposed: N/A 2, Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number indicate on ma Type of Impact* Length of Impact linear feet Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? (please seci N/A -A . * List each impact separately and identify temporary impacts. Impacts include, but are not lunited to. culverts and associat np-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. * * Stncam names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usgs.Rov. Several intemet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, vwwwmapquest.coni, etc.). Cumulative impacts (linear distance in feet) to all streams on site: N/A Page 4 of 8 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. N/A dr d • List each impact separately and identify temporary impacts. Impacts include, but are not ltmtted to. fill, excavation, a Ong, flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): N/A Size of watershed draining to pond: N/A Expected pond surface area: N/A VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The road is being widened and improved to increase traffic safety and bring the highway up to current construction standards All activities are occurring` within the existing right-of-way. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors Page 5 of 8 including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state,nc.us/iicwetiands/strmizide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Impacts will be less than 150 feet, therefore mitigation is not anticipated. 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at httn://h2o enr.stite.nc.u-/wrp/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A Page 6 of 8 IX. X. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA - document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233 (Meuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify Randleman )? Yes ® No ? If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation 1 280 3 N/A 2 240 1.5 Total 520 * Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Page 7 of 8 Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. N/A XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. XH. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No ? Is this an after-the-fact permit application? Yes ? No ? XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 8 of 8 2+80.73 -L- +00.00 -Yl2 - CD D CD II II ? (D II II c,a 0 I? II w ? II II ?' ? 1 l WITH WOODEN OFFSET BLOCKS. REPLACE MISSING/BROKEN REFLECTORS C o %% 30o F o; 1( v ' ? /?T G :? ?? ,• '' Cps 151 GVpRO?pZL I Q _f "XNO .- - ' " tfr N_ tP ' !! C' REMOVE E Pavement Removal r ?t v '?T 3 STATE OF NORTH CAROLINA DEPARTN MNT OF TRANSPORTATION MICHAEL F. EASLEY 1584 YANCEYVILLE STREET, GREENSBORO, NC 27415 GOVERNOR February 7, 2002 NC DENR Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699 ATTN.: Ms. Cynthia Van der Wiele Wetlands/401 Unit Dear Ms. Van der Wiele LYNIIO TIPPETT SECRETARY w. in SUBJECT: Guilford County, Improvement of NC-68 from 600'S of SR 1556 to 1700' N of SR 1958, T.I.P # U-4433 Please find seven (7) copies a Pre-Construction Notification Application package attached as notification for impacts to Randleman Buffers. This project was discussed with Bob Zarzecki on February 1, 2002. It was agreed by both parties that no practical alternative was available to maintain diffuse flow. The highway is being widened by removing medians and adding 2-feet of pavement on each side of the existing travel lanes; therefore, no funds are available for acquisition of additional right-of-way to be used for construction of stonnwater treatment facilities. No ditch or shoulder work will occur near the subject channel. If you have any questions or need any additional information, please contact Tim Jackson at (336) 256-0553 or Len Smith at (336) 312-8387 Your time and effort are appreciated. Sincerely, Lenwood E. Smith, II, PWS Division Seven Environmental Officer cc: Mr. Tim Jackson, P.E., NCDOT PHONE 336-334-3192 FAX336-334-3637 ', ® Y.orm Version October 2001 Office Use Only: U )0 USACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or "NIA" rather than leaving the space blank. 1. Processing 1. Check all of the approval(s) requested for this project: ? Section 404 Permit ? Section 10 Permit ? 401 Water Quality Certification ® Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: N/A 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? H. Applicant Information 1. Owner/Applicant Information Name: Mr. J M Mills P E Division Engineer - Division 7 Mailing Address: P.O. Box 14996 Greensboro NC 27415 Telephone Number: (336) 334-3192 Fax Number: (336) 334-3673 E-mail Address: mmills(a?dot state nc us 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Lenwood E. Smith, II, PWS Company Affiliation: North Carolina Department of Transportation Mailing Address: P .O. Box 14996 Greensboro NC 27415 Telephone Number: (336) 312-8387 Fax Number: E-mail Address: lesmith@dot.state.ne.us Pagel of 8 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Improvement of NC-68 from 600'S of SR 1556 to 1700'N of SR 1958 2. T.I.P. Project Number or State Project Number (NCDOT Only): U-4433 3. Property Identification Number (Tax PIN): N/A 4. Location County: Guilford Nearest Town: High Point Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): From I-40 take exit 210 onto NC- 68 Proceed approximately 1750 feet north to SR 1958 (Triad Center Drive). The nine inlet is located north of SR 1958 the outlet is located south of SR 1958. 5. Site coordinates, if available (UTM or Lat/Long): See the attached USGS map. (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Maintained right-of-way 7. Property size (acres): N/A 8. Nearest body of water (stream/river/sound/ocean/lake): Deep River 9. River Basin: Cape Fear (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 10. Describe the purpose of the proposed work: .Widen, and improve intersections, signae and drainage on a portion of NC-68 Page 2 of 8 11. List the type of equipment to be used to construct the project: Road construction equipment (trackhoe grader, backhoe and bulldozer 12. Describe the land use in the vicinity of this project: Maintained right-of-wu. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. N/A V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 3 of 8 1. Wetland Impacts Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** es/no Distance to Nearest Stream linear feet Type of Wetland*** N/A * List each impact separately and identify temporary impacts. impacts include, out are nol linuLLu Lo: VILA I-sized 61Li.LL,L6, banaaU,b, aaay excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online atlittv://Nv\v\v.fenii.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: N/A Total area of wetland impact proposed: N/A 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number indicate on ma Type of Impact* Length of Impact linear feet Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? leasespecify) N/A • List each impact separately and identity temporary impacts. impacts include, UUL an; 11VL 11LLULLU LV. LULYL LO ULU au?wauaw aaY aul , dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightcning, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ?* Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at v.uses.Rov. Several intemet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, vvrNrw.1n3pquest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: N/A Page 4 of 8 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Waterbody Name of (if applicable) Type of Waterbody lake, pond, estuary, sound, ( bay, ocean, etc. N/A dr d List each impact separately and identify temporary impacts. Impacts include, but are not limited to. fill, excavation, a 61 51 flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): N/A Size of watershed draining to pond: N/A Expected pond surface area: N/A VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The road is being widened and improved to increase traffic safety and bring the highway up to current construction standards All activities are occurrinn within the existing right-of-way. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors Page 5 of 8 including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http•//h2o enr state nc.us/ncwetlands/strmgide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Impacts will be less than 150 feet, therefore mitigation is not anticipated. 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at hup•// i2o cnr.state nc.ii4NN-rh/index.litn,. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A Page 6 of 8 IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA. document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify Randleman )? Yes ® No ? If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation 1 280 3 N/A 2 240 1.5 Total 520 * Zone 1 extends out 30 feet perpendicular from near bans: of channel; cone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Page 7 of 8 Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. N/A X1. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. XH. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. X1U. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No ? Is this an after-the-fact permit application? Yes ? No ? XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 8 of 8 '2+80.73 -L- +00.00 -Yl2 - CD WITHvWOODEN OFFSET BLOCKS. REPLACE MISSING/BROKEN REFLECTORS II ? ? I ? Z I O tl ? cn II - cn l cD /// F VLL `",/,;/ 30, AA z8 o ??? 711 fir/ i -\ D f ? vll o ?` 11 cn 11 _ ./ -/ ? ??• ??-? / ? / / ,.?' / ///? \N `? `• 11 ?.• -- --///?? of U?1Z -Ao C? ,o?E EXZS?ING Pavement Pemovol ?' aA7Eo? STATE OF NORTH CAROLINA DEPART MNT OF TRANSPORTATION MICHAEL F. EASLEY 1584 YANCEYVILLE STREET, GREENSBORO, NC 27415 GOVERNOR February 7, 2002 NC DENR Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699 ATTN.: Ms. Cynthia Van der Wiele Wetlands/401 Unit Dear Ms. Van der Wiele LYNDo TIPPETT SECRETARY SUBJECT: Guilford County, Improvement of NC-68 from 600'S of SR 1556 to 1700'N of SR 1958, T.I.P # U-4433 Please find seven (7) copies a Pre-Construction Notification Application package attached as notification for impacts to Randleman Buffers. This project was discussed with Bob Zarzecki on February 1, 2002. It was agreed by both parties that no practical alternative was available to maintain diffuse flow. The highway is being widened by removing medians and adding 2-feet of pavement on each side of the existing travel lanes; therefore, no funds are available for acquisition of additional right-of-way to be used for construction of stonnwater treatment facilities. No ditch or shoulder work will occur near the subject channel. If you have any questions or need any additional information, please contact Tim Jackson at (336) 256-0553 or Len Smith at (336) 312-8387 Your time and effort are appreciated. Sincerely, Lenwood E. Smith, II, PWS Division Seven Environmental Officer cc: Mr. Tim Jackson, P.E., NCDOT PHONE 336-334-3192 FAX 336-334-3637 1k, t Office Use Only: Form Version October 2001 ® ,U USACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing 1. Check all of the approval(s) requested for this project: ? Section 404 Permit ? Section 10 Permit ? 401 Water Quality Certification ® Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: N/A 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? H. Applicant Information 1. Owner/Applicant Information Name: Mr. J M Mills RE, Division Engineer - Division 7 Mailing Address: P.O. Box 14996 Greensboro NC 27415 Telephone Number: (336) 334-3192 Fax Number: (336) 334-3673 E-mail Address: mmills@dot.state.nc.us 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Lenwood E. Smith II PWS Company Affiliation: North Carolina Department of Transportation Mailing Address: P.O. Box 14996 Greensboro NC 27415 Telephone Number: (336) 312-8387 Fax Number: E-mail Address: lesmith dot state nc us Pagel of S t III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Improvement of NC-68 from 600'S of SR 1556 to 1700'N of SR 1958 2. T.I.P. Project Number or State Project Number (NCDOT Only): U-4433 3. Property Identification Number (Tax PIN): N/A 4. Location County: Guilford Nearest Town: Hieh Point Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): From I-40 take exit 210 onto NC- 68 Proceed approximately 1750 feet north to SR 1958 (Triad Center Drive). The pipe inlet is located north of SR 1958, the outlet is located south of SR 1958. 5. Site coordinates, if available (UTM or Lat/Long): See the attached USGS map. (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Maintained right-of-way 7. Property size (acres): N/A 8. Nearest body of water (stream/river/sound/ocean/lake): Deep River 9. River Basin: Cape Fear (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at littp://li2o.enr.state.nc.us/admin/maps/.) 10. Describe the purpose of the proposed work: .Widen, and improve intersections, signage and drainage on a portion of NC-68 Page 2 of 8 11. List the type of equipment to be used to construct the project: Road construction equipment (trackhoe ader backhae and bulldozer) 12. Describe the land use in the vicinity of this project: Maintained right-of-way. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. N/A V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 3 of 8 1. Wetland Impacts Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** es/no Distance to Nearest Stream linear feet Type of Wetland*** N/A * List each impact separately and identity temporary impacts. impacts mcruae, our MU uoL 1UWUXi w. 1LL"L« L2.%.., %..?,,,b, EIL-5, 1-1 excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://tvww. Tema. oov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: N/A Total area of wetland impact proposed: N/A 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number indicate on ma Type of Impact* Length of Impact linear feet Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? leasespecify) N/A * List each impact separately and identify temporary impacts. Impacts include, but are not lumted to. culverts and assocrat np-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at %,?tivwusgs.goy. Several intemet sites also allow direct download and printing of USGS maps (e.g., w«Nv.topo7one.co111, wN"V,n1,1j)luest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: N/A Page 4 of 8 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. N/A t? _a 1:11 ...: '4 '1_;n * List each impact separately and identity temporary impacts. impacts include, our are not uutucu to: It ?nw?au?==, W Y4s • v+ flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): N/A Size of watershed draining to pond: N/A Expected pond surface area: N/A VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction teelmiques to be followed during construction to reduce impacts. The road is being widened and improved to increase traffic safety and bring the highway up to current construction standards All activities are occurring, within the existing right-of-way. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors Page 5 of 8 including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o enr state.nc.us/ncwetiands/strmaide.htmi. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Impacts will be less than 150 feet, therefore mitigation is not anticipated. 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at lhun:/ni2o enr.state.nc.ns/Ni-rp/index.htn,. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A Page 6 of 8 IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA - document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify Randleman )? Yes ® No ? If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation 1 280 3 N/A 2 240 1.5 Total 520 s Gone I ex'tcntls out 3U Met perpenaicular arum uraf uwm ut Wiiuulca, I-UItGi L. VALWJUa wa additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Page 7 of 8 Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 213 .0242 or.0260. N/A XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. XH. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. XIH. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15ANCAC 2H.0500) or any Buffer Rules? Yes ? No ? Is this an after-the-fact permit application? Yes ? No ? XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 8 of 8 )2+80.73 -L- ,-f00.00 -Y12- CD II II ? 0 II II 0 I? II W ? 1 l CD WITHvWOODEN OFFSET BLOCKS. REPLACE MISSING/BROKEN REFLECTORS ?11, C m cL /// 300 F oc.,1/l AAJ) r- i 2 i {, v n ' ? / / , Dom,.. / / / ??.. -' ? ?? / / / /? .•?' / III -'? 11 pc ' ?R pZL . .?._ SANG Gup'? C ????O\jE EXI Pavement Removal T M `;'UE o 02 t1? STATE OF NORTH CAROLINA DEPART MNT OF TRANSPORTATION MICHAEL F. EASLEY 1584 YANCEYVILLE STREET, GREENSBORO, NC 27415 GOVERNOR February 7, 2002 NC DENR Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699 ATTN.: Ms. Cynthia Van der Wiele Wetlands/401 Unit Dear Ms. Van der Wiele LYNDo TIPPETT SECRETARY SUBJECT: Guilford County, Improvement of NC-68 from 600'S of SR 1556 to 1700' N of SR 1958, T.I.P # U-4433 Please find seven (7) copies a Pre-Construction Notification Application package attached as notification for impacts to Randleman Buffers. This project was discussed with Bob Zarzecki on February 1, 2002. It was agreed by both parties that no practical alternative was available to maintain diffuse flow. The highway is being widened by removing medians and adding 2-feet of pavement on each side of the existing travel lanes; therefore, no funds are available for acquisition of additional right-of-way to be used for construction of stormwater treatment facilities. No ditch or shoulder work will occur near the subject channel. If you have any questions or need any additional information, please contact Tim Jackson at (336) 256-0553 or Len Smith at (336) 312-8387 Your time and effort are appreciated. Sincerely, Lenwood E. Smith, II, PWS Division Seven Environmental Officer cc: Mr. Tim Jackson, P.E., NCDOT PHONE 336-334-3192 FAX336-334-3637 6 Office Use Only: Form Version October 2001 USACE Action ID No. DWQ No,.-, If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. I. Processing 1. Check all of the approval(s) requested for this project: ? Section 404 Permit ? Section 10 Permit ? 401 Water Quality Certification ® Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: N/A 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? H. Applicant Information 1. Owner/Applicant Information Name: Mr. J M Mills P E Division Engineer - Division 7 Mailing Address: P.O. Box 14996 Greensboro NC 27415 Telephone Number: (336) 334-3192 Fax Number: (336) 334-3673 E-mail Address: mmills(a)dot state ne us 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Lenwood E. Smith 11, PWS Company Affiliation: North Carolina Department of Transportation Mailing Address: P.O. Box 14996 Greensboro NC 27415 Telephone Number: (336) 312-8387 Fax Number: E-mail Address: lesmithCa dot state nc us Page 1 of 8 F III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Improvement of NC-68 from 600'S of SR 1556 to 1700'N of SR 1958 2. T.I.P. Project Number or State Project Number (NCDOT Only): U-4433 3. Property Identification Number (Tax PIN): N/A 4. Location County: Guilford Nearest Town: High Point Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): From I-40 take exit 210 onto NC- 68 Proceed approximately 1750 feet north to SR 1958 (Triad Center Drive). The pipe inlet is located north of SR 1958, the outlet is located south of SR 1958. 5. Site coordinates, if available (UTM or Lat/Long): See the attached USGS map. (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Maintained right-of-way 7. Property size (acres): N/A 8. Nearest body of water (stream/river/sound/ocean/lake): Deep River 9. River Basin: Cape Fear (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://112o enr state nc.us/admin/maps/.) 10. Describe the purpose of the proposed work: Widen and improve intersections, signage and drainage on a portion of NC-68 Page 2 of 8 11. List the type of equipment to be used to construct the project: Road construction equipment (trackhoe, grader backhoe and bulldozer) - - 12. Describe the land use in the vicinity of this project: Maintained right-of-way. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. N/A V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 3 of 8 1. Wetland Impacts Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** es/no Distance to Nearest Stream linear feet Type of Wetland*** N/A d' fill, * List each impact separately and identify temporary impacts. Impacts include, but are not lumted to, mechanized clearing, gra excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. * 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (MIA), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at kitty://mr\v. fema. ov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: N/A Total area of wetland impact proposed: N/A 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number indicate on ma Type of Impact* Length of Impact linear feet Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? leasespecify) N/A * List each impact separately and identity temporary impacts. Impacts mcluae, Out are mUl 1111111u1 W. trulvcl W ULU u?av?.u.w L.1-k" dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ?* Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at ww,v.usgs.-ov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topwone.com, v,'Nvw.mapquest.cont, etc.). Cumulative impacts (linear distance in feet) to all streams on site: N/A Page 4 of 8 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. N/A dr d List each impact separately and identify temporary impacts. Impacts include, but are not hmrtcd to. fill, excavation, a 6, flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): N/A Size of watershed draining to pond: N/A Expected pond surface area: N/A VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The road is being widened and improved to increase traffic safety and bring the highway up to current construction standards All activities are occurring within the existing right-of-way. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors Page 5 of 8 including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ilcwetiands/strm.izide.litnil. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Impacts will be less than 150 feet, therefore mitigation is not anticipated. 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at littp:020.enr.state. nc.usAwp/index.litm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A Page 6 of 8 IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA . document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 213 .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify Randleman )? Yes ® No ? If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation 1 280 3 N/A 2 240 1.5 Total 520 * Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Page 7 of 8 Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. N/A XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. XH. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No ? Is this an after-the-fact permit application? Yes ? No ? XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 8 of 8 D WITH WOODEN OFFSET BLOCKS. REPLACE MISSING/BROKEN REFLECTORS CAD ,, '/ II cn o/// I ??//13OOF??-? 2+80.73 -L- ?I ?•' o 0 +00.00 -Y12 - 1 I W ? ?? ` 1_4 c CD -r / i ©1 0? I'v ,{ a r) Dom,. "' ? D I / i - ./ ''? ?' ,, '.? / / / / ..?' ?.•'- /// N' ? 111 ? i ?- ? r' f 11 ova .- ?' _` SING Ovp.R XZ ?` __ ???,OVE E Pavement Removal