Loading...
HomeMy WebLinkAbout20020699 Ver 1_Complete File_20020506 ?Ya w STAii STATE: OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY P.O. BOX 25201, RALEIGH, N.C. 27611-5201 GOVERNOR January 10, 2005 North Carolina Division of Water Quality 401/Wetlands Unit 1621 Mail Service Center Raleigh, NC 27699-1621 Reference: DWQ Project No. 020699 NCDOT/SR 1559 Chatham County 512 A Dear Sir or Madam: LYNDO TIPPETT SECRETARY Attached is certification of completion for the work performed under the above referenced permit. The certification is signed by our field agent. If additional information is required please advise. Sincerely, Timothy Johnson P.E. Division Engineer Attachment cc: \I J. L. Picklesimer, PE PLS Barry Harrington Tim Welch, PE Art King File Y VV. DIVISION 8, 11. O. BOX 1067, ABERDEEN, NC 28315 Telephone: (910) 944-2344 Fax: (910) 944-5623 s State of North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross, Jr., Secretary Gregory J. Thorpe, Ph.D., Acting Director DWQ Project Nor C?c "` 1 I Applicant: Project Name: 4 0 • NC ENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES County: --C?-s 1 ?;1 ?l I'?? Date of Issuance of 401 Water Quality Certification: __` - /` I ___ Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27099-1 62 1. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1. - hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: _ ,, , _ Date:.- Agent's Certification hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: _ .?•!('?--?-- - -- Date:.---?`' / ?C? `?. r Engineer's Certification Partial Final 1. , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, gull time) the construction of the proiect.for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date Wetlands/401 I'nit 1650 Mail Servrcc Center Raleigh, North Carolina 27699-1621 Telephone 919-733-1756 FAX 733-9959 An Equal opportunity Affirmative Action Emt4o+cr 5017/, rccvcled/I01/8 post consumer paper A dµ ."rt STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY P.O. BOX 25201, RALEIGH, N.C. 27611-5201 LYNDO TIPPETT GOVERNOR SRIM MARY January 10, 2005 North Carolina Division of Water Quality 40] /Wetlands Unit 1621 Mail Service Center ' ?a Raleigh, NC 27699-1621-? U VLV? Reference: DWQ Project No. 020699 a 2005 NCDOT/SR 1559 Chatham County DENR. ,t Dear Sir or Madam:H Attached is certification of completion for the work perfonned under the above referenced permit. The certification is signed by our field agent. If additional information is required please advise. Sincerely, Timothy Johnson P.E. Division Engineer Attachment cc: J. L. Picklesimer, PE PLS Barry Harrington Tim Welch, PE Art King File DIVISION 8, P. O. BOX 1067, ABERDEEN, NC 28315 Telephone: (910) 944-2344 Fax: (910) 944-5623 y State of North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross, Jr., Secretary Gregory J. Thorpe, Ph.D., Acting Director bLt?r`? Applicant: Project Name: DWQ Project No.: Date of Issuance of 401 Water Quality Certification: 6TF!W,A NC ENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES County: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Appli,cant's Certification 1, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date,: _ Agent's Certification 1, C,cy/t q , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: /. el Date: Engineer's Certification Partial Final 1, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date Wetlands/401 Unit 1650 Mail Service Center Raleigh, North Carolina 27699-1 62 1 Telephone 919-733-1786 FAX 733-9959 An Equal Opportunity Affirmative Action Employer 501/c recycled/ 10°/v post consumer paper State of North Carolina Department of Environment and Natural Resources Division of Water Quality e?? 10 00% 10"k Adomom ;1k Michael F. Easley, Governor NC ENR William G. Ross, Jr., Secretary NORTH CAROLINA DEPARTMENT OF Gregory J. Thorpe, Ph.D., Acting Director ENVIRONMENT AND NATURAL RESOURCES May 9, 2002 Chatham County DWQ Project No. 020699 APPROVAL of 401 Water Quality Certification Mr. W.F. Rosser, P.E., Division Engineer NCDOT, Division 8 PO Box 1067 Aberdeen, NC 28315 Dear Mr. Rosser: You have our approval, in accordance with the attached conditions and those listed below, to place fill material in 60 linear feet of streams for the purpose of grade and pave SR 1559 in Chatham County. The project shall be constructed in accordance with your application dated April 29, 2002. After reviewing your application, we have decided that this till is covered by General Water Quality Certification Number 3375. This certification corresponds to the Nationwide Permit Number 14 issued by the Corps of Engineers. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit, unless otherwise specified in the Water Quality Certification. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the DWQ and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the conditions listed in the attached certification. 1.) Upon completion of the project, the NCDOT shall complete and return the enclosed "Certification of Completion Form" to notify DWQ when all work included in the 401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the Division of Water Quality upon completion of the project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. Wetlands/401 Unit 1650 Mail Service Center Raleigh, North Carolina 27699-1 62 1 Telephone 919-733-1786 FAX 733-9959 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post consumer paper State of North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross, Jr., Secretary Gregory J. Thorpe, Ph.D., Acting Director 1 ffl'?W'j • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact John Hennessy at 919-733-5694 or Steve Mitchell at 919- 571-4700. Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Raleigh Field Office DWQ Raleigh Regional Office File Copy Central Files c:\ncdot\5R 1559\wqc\02G699wgc.doc Sincerely, 61fl Gregory J. Thorpe, Ph.D. Acting Director Wetlands/401 Unit 1650 Mail Service Center Raleigh, North Carolina 27699-1621 Telephone 919-733-1786 FAX 733-9959 An Equal Opportunity Affirmative Action Employer 50%n recycled/ 10% post consumer paper nMAN[°? 020699 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY DIVISION OF HIGHWAYS LYNDo TIPPETT GOVERNOR SECRETARY April 29, 2002 Mr. Rob Ridings.. ?r!....( ??..._ U Division Of Water Quality 401 Wetlands Unit MAY - 6 1650 Mail Service Center Raleigh, NC 217699-1650 RNIU()R0(1P Dear Mr. Ridings: Subject: Chatham County - SR 1559A Emerson Cook Road In an effort to obtain the permits needed for pipe replacement and to pave and grade on SR 1559A in Chatham County, we are providing the pre construction notification application and the supporting materials. The project is on an intermittent stream that is outside of the critical habitat area for the Cape Fear Shiner. To our knowledge there are No High Quality Waters or Outstanding Water Resources occurring in the project area. We anticipate that these activities will be authorized under Nationwide Permit Number 14. Any detours required for this project will be done off site. This letter and a copy of the application materials will be submitted to N.C. Division of Water Quality, U.S. Fish and Wildlife Service, and U.S. Army Corps. of Engineers for approval. If you have any questions or comments, or need additional information, please contact our office at (910) 944-2344. Thank you for your cooperation in this matter. Sincerely, PAYMENT C *6 RECEIVED Art C. King Division Environmental Officer cc: W. F. Rosser, PE J. Picklesimer, PE B. F. Sloan File P.O. BOX 1067, ABERDEEN, NOR'nI CAROLINA 28315 Pf IONE (910) 944-2344 FAX (910) 944-5623 020699 - V-4 ' ?? \ r 1 EMERSO, Q 6K RD l t? C 1 A 0 0 N -l" i S' r' y .i W7')'' ITi I N ? A e _ ?1 3 I A N35&4F 3 F b _ ~? a C IO /'? l? 1? 1 ? 3•D'1'opoQuads Copyright 019991k1 orme Yarmouth, ME 040% Source Data: USGS r---1495 ft Scale: 1 :12,000 Detail: 13-6 Datum: WG884 Office Use Only: Form Version October 2001 020699 USACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing A 1. Check all of the approval(s) requested for this project: MAY - 6 Mil ® Section 404 Permit ? Section 10 Permit ILA" oRbUP ® 401 Water Quality Certification wA' ?, ?ITl' Sl=i 110N ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide #14 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: North Carolina Department of Transportation Mailing Address: W. F. Rosser, P.E., Division Enizineer North Carolina Department of Transportation Division 8 P.O. Box 1067 Aberdeen, North Carolina 28315 Telephone Number: 910-944-2344 Fax Number: 910-944-5623 E-mail Address: brosserna,dot.state. nc.us 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Benny F. Sloan Company Affiliation: NC Department of Transportation Mailing Address:1404 East Raleigh Street Siler City, North Carolina 27344 Telephone Number: (919)742-3431 Fax Number: 919-742-3986 E-mail Address: bfsloan(a dot. state. nc.us PAYMENT RECFIVFD -s- III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: SR 1559 A (Emerson Cook Rd) 2. T.I.P. Project Number or State Project Number (NCDOT Only): 6.522462 3. Property Identification Number (Tax PIN): 4. Location County: Chatham Nearest Town: Pittsboro Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): Travel east on US 64 towards Pittsboro. Make a left onto SR 1561. Travel north to SR 1346 Make a right and go 0.6 miles and make a left onto SR 1559A. 5. Site coordinates, if available (UTM or Lat/Long): N35°78'2.54" W79°17'3.51" (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing ofa distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Existing secondary road 7. Property size (acres): 8. Nearest body of water (stream/river/sound/ocean/lake): Dry Creek 9. River Basin: Cape Fear (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) -6- T 10. Describe the purpose of the proposed work: Pipe Replacement and grade and pave on SR 1559A in Chatham County. 11. List the type of equipment to be used to construct the project: Motor,grader, trackhoe, bulldozer, scraper, etc. 12. Describe the land use in the vicinity of this project: Residential/agricultural IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. - 7 - 1. Wetland Impacts Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** es/no Distance to Nearest Stream linear feet Type of Wetland*** None List eaca impact separately ana identity temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. " 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http:/hNlrly. fema sov. List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: Total area of wetland impact proposed: 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number indicate on ma) Tvpe of Impact* Length of Impact linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? lease specify) 1 Permanent Pipe 60' UT of Dry Creek 2' - 3' [ * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. •• Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usos.,ov. Several internet sites also allow direct download and printing of USGS maps (e.g., XNANNN tOpozone.CO(Ti, w w.mapquest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 60' -8- 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number (indicate on ma Type of Impact* Area of Impact (acres) Name Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. None * List each impact separately and identify temporary impacts. Impacts include. but are not limited to: fill, excavation, dredging, flooding, drainage. bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility. and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. N/A VIII: Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. -9- USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr. state. nc us/ncwetiands/strmgide. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://12o.enr.state.nc.us/iN-m/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): - 10- IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federaUstate/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet) Multiplier Required Mitigation 1 3 2 1.5 Total Lone l extends out 30 feet perpendicular from near bank of-channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. Jf buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 213 .0242 or.0260. XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. Neither the current impervious cover (gravel road bed) nor the new proposed impervious cover (asphalt pavement) will exceed 30% of the total site area Erosion control devices a ropriate to the site will be utilized on this project which may include silt fences. check dams and storm water retaining basins. XII. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes El No Is this an after-the-fact permit application? Yes ? No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) - 12 - t r ?a? ................. b 1 i i ?(?tnti Qp0 1 i? N?y ? 1 alb ? i i ? i ? DNP' o (D '13M - i i - ? w Lnaz C) m 0 -1 t n h A i ? D V 67 z i •' 0 ? 2 0 / N I I xr n a N I m n Z ) I \ ~ I I? ? j I 4 ,• II II I ? _ Gi I W I I ii I m i ?? I I H Z I i? I ?? z I O p? i N n ? l D i r m i i 1 U' > 0 Id o / o I j •I 'I T O A L A M A N C E C O U N T Y k b k i cr9.. a ?lm -- ----- ------ --- ------ 1707 1067 171 ..? `.I ' h I)•1 $W rh f9r}.'.w ^r -._ 1004 17.9 ` 749 Cn. -l5.9 1761 1337 3.0 / ]9= 1712 1 Q 1007 "yy, '950 13.2 1701 1177 " N6 _ / 743 l -M i A .•''1503 ' 1754 T 1 J 700 \, •4 ' I 11}1 1043 \ . 1771 1y 7 / 1506 1 1549 - ;-+ 1761 /. .?'.. l v5 IA> 1715 'H7 1144 /.t 1557 '_ y6 ??j???9u \ 1"?\ 9 ?-13M J ?? ??? 1546 1 707 \ 1334 \?/ ' \ . / ' ! I 1 K5 • 1007 17.2 1117 7.9 _r 1710 / 1746 1 lD , 15_]6 1 0 I y5e - - 13W 176o RNER 100+ 1566 .? N ' b y a / I 1172 :r y - 176 1 / M> we 1n2 'e 9«Ly / sa - - 1x9 - 91r.r , rlaw n ' JSOD- WOO* 01, 6 r 1112 ., ?. _ Ch, - 1 \ 1007 0 - Cm 10' I]=9 2,y?Gr 1004 .( 1729 ?• ' Er1mO1,s. v? ? 1676 1 (I 7Y7 9 '. ' J r 19? 6. 421 r ? - 15pp 3_ ? - ; _61 1I7=7 135 / 29 1.:-? ?. 506 151= Jfy4 \ ?? I / ?\ ,1612 ?I \ \ 509 1 9 1 / \ 1 O . , 1709 cro. \ / \ 1007 N1f10 1%9 _ '•+-17 i - ? lyy u. SUT - .. L _ n 1.6 I • ?2 ' L_ ?- - o : ti 15w 1 cn? 9!wrcnr 1 11 yl 1967• _ .L W C- \ SILER I CfTY - - ./- . 2117 22 1 L.J 5 2160 f ' I - o ? zz! 69 - 5,151 er Clry .?n1u9a / _ ?. ? -?DOr ?? , ? ? , I E+•norxtN - , 2 ? / Sar '.I.NO C/ ! 106 216.5 1 7 ?? ? 2nl y -_ '3.'S2 wi(JN 7:. 1 2110 15(16 ' 2- u00 / .'.J 1126 111)6 \ \/ 21,- ZZOS 9 111q' V724\ \ ?? -?i0 v L \V6 7 1 V 12 1rJp6 1\4}/? ; til 2 \ _ ' 1130 -.9 _<1 i6 ? ? 254 ?1 / h>6 \ 0 810 •2170 .. 2171 2"• \? J 113R I S.r•q? I \ 2119 1171 \' \ 1174 v ' 9 R-3 217-3 4 - ,I, - 1 2116 1 .n C,.- Ch. 1132. 1I}t r • 0 2,80 / 2 ? ?2 1176 ( Ilb S `' 2176 . ,6 ,. _ I 1 1,57 ' 21-5 oo* e1 ?? ' 1136 ~ 6 7 21? ' 9s . .? 1167 \ / \4 21.9 , I 9 1lw ? / •\ '\ _ _ .. $187 ? - ?I uo„ '. ? ? ?1C 2181 , 1 Cnn?+ I I I \ • b • 21? 5 _ ?._.? 1006 ..._ ' 1136 ._ ' \ ? ? T. / \i,.. ? .. '\ - _ `101t? •n «? C^. 2168 . 1 t: 579 15.2. Go- ? ? ? ? te ? '? ? ? ? -'? ? ? ? .r c. •-L- - N35? ? I / ?* I /, \ ??/ff ! _r--- ?? J s 11 ?E `SO, O OK RD \ j ??. ,13 rl ^- 1 r ? ? `0 35° 48'2.54" W79° IT 3.51 " 'r 1he?.eQ ?? ?? tC3 .1. O? SD ? ?` •?r i J r % N35P-430- 3-D TopoQuads Copyright C 1999 DeLorme Yarmouth, ME 040% Source Data: USGS 1 ----?4" ft Scale: I : 12,000 Detail: 13-6 Datum WGS91 a 5TN{ 0 2 0.6 9 9 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL. F. EASLEY DIVISION OF HIGHWAYS LYNDo TiPPETT 60VERNOR SF!C'RF.TARY May 3, 2002 ?? II I'+ Mr. Rob Riding Division of Water Quality 401 Wetlands Unit 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Dear Mr. Ridings: Enclosed is the permit application for the following project: Description: SR 1559A - Chatham County Work Order #: 6.522462 TIP Number: N/A Fee Category: $200.00 Please submit for automated payment. MAY - 6 :l1h1WNGROUP PAYMENT RECEIVED Sincerely, Art C. King Division Environmental Officer R V 9CC ?Ze U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Ill: 200200794 TIP No: State Project No: 6.522462 County: Chatham GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Applicant: North Carolina Department of Transportation fr - - it I (? `yr Address: W.F. Rosser, P.F,., Division Engineer North Carolina Department of Transportation a I IN Division 8 P.O. Box 1067 Aberdeen, North Carolina 28315 Telephone Number: (910) 944-2344 l&JOS (41tWit,` .....R Size and Location of project (waterway, road name/number, town, etc.): 44 linear feet of 48-inch RCP culvert at centerline station 15+30 on SR 1559 in an unnamed tributary to Dry Creek in Chatham County, North Carolina. Description of Activity: To replace 30 linear feet of existing 36-inch RCP culvert with 44 linear feet of 48-inch RCP culvert with,2 FES. Traffic will be detoured onto existing roadways during construction. All temporary fill is to be removed from the waterway in its entirety upon completion of the construction. Applicable Law: X Section 404 (Clean Water Act, 33 U.S.C. 1344) Section 10 (River and Harbor Act of 1899) Authorization: 14 Nationwide Permit Number Regional General Permit Number Your work is authorized by this Regional General (RGP) or Nationwide (NWP) Permit provided it is accomplished in strict accordance with the attached conditions and your submitted plans. If your activity is subject to Section 404 (if Section 404 block above is checked), before beginning work you must also receive a Section 401 water quality certification from the N.C. Division of Environmental Management, telephone (919) 733-1786. For any activity within the twenty coastal counties, before beginning work you must contact the N.C. Division of Coastal Management, telephone (919) 733-2293. Please read and carefully comply with the attached conditions of the RGP or NWP. Any violation of the conditions of the RGP or NWP referenced above may subject the permittee to a stop work order, a restoration order, and/or appropriate legal action. This Department of the Army RGP or NWP verification does not relieve the permittee of the responsibility to obtain any other required Federal, State, or local approvals/permits. The permittee may need to contact appropriate State and local agencies before beginning work. If there are any questions regarding this authorization or any of the conditions of the RGP or NWP, please contact the Corps Regulatory Official specified below. Date 12 June 2002 Corps Regulatory Official___Richard K__Skencer_ Telephone No._(910) 251-4172 Expiration Date of Veritication_ 12-June 2005 -__ CF: NCDOT, Art King (Division 8) NDDWQ, Cynthia Van Der Wield 5 ? V Zj - O -O r D z 2 C O W C r m C J I / I I I 1 J I ?; 'r ?A- 03 ? n =r I n 0 ca m m . ?v A Z P ?Q - I- I C c m n H I O Z N -1 m O `? I I- I I, l? '? ?, 11 m / ,.? ?l D ' I r / -i 11 > , I 11 Z I ?? n > ti7 7 v vi q m n o 0 9 a % f r, ? , ?y?\' `, ? ' /? ? ? 1 ?(? i r ` ' 1 ?? ? ?I?'' ? `?, '_? ,`y ,?`? N35 s' / I t \ C J ?? \ \ `?L I' / S` a 5 59A IRSO, C OK RD ? // ?? ?.r --?•-44,"- 1000' ?l r? l= ?'? ?! ???1?•1 ?? / 350 48'2.54" W79' I T 3.5I • / J I I , \ ''- N35'-4T 30" A4---- r 1 _ ...... _ ..,, .,... ,,,,.. -- ...... ?..-:.,,.•-' r--1495 R Scalc: l : 12,000 Detail: 13-6 D.rtum: NNGS3! 0 A L A M A N C E C O U N T Y ^I I 4 -- --------- - A7 _ 1' OJ'I ICI-x9 ?I IJ+9 '?Jil SO?,Cncyl.?.?• ,I T ?..-.-.-.- - - - \ - - .? IYf,/ yn9 .., Yf] u2 '?)SI ? \- Inl ?'? , ly,] 17ryy IL \ ?y, ?\ ?/ I rn ? JJ - _ -y F ice/ ] o ,?\ I,-..y_ m Lys '_3x Al zn gNEq '' lo}, - I+b - ? - ?'} lssa ' ? _? 1 _b, u y ?' m _ I ,I lyx 'S'z' ??I ?•M ` _ ?/ ? 151 \ ? 9 ?'? \ - CIO. "Lry II a: ?y \ y ":n 9 2 r ' ' c"'S j 21 _2 - ' C'. ` ,. R> ip? 21_5 \ ..T,- • I ? ' ,,d.J ']iii . _Iv ?-'__--'/f-- '-_.. // I' `, 5.. I •zi` -5 ?,, \S ( 1 ?a \ Ji 212, ?'- zlq ?? >_.l IRS . ?. __ ;•r,.,. Q Federal Register/Vol. G7, No. 10/Tuesday, January 15, 2002/Notices 2077 New York New York District Engineer, ATTN: CENAN- OP-R, 26 Federal Plaza, New York, NY 10278-0090 North Carolina Wilmington District Engineer, ATTN: CESAW-RG, P.O. Box 1890, Wilmington, NC 28402-1890 North Dakota Omaha District Engineer, ATTN: CENWO- OP-R, 106 South 15th Street, Omaha, NE 68102-1618 Ohio Huntington District Engineer, ATTN: CELRH-OR-F, 502 8th Street, Huntington, WV 25701-2070 Oklahoma Tulsa District Engineer, ATTN: CESWT-PE- R, 1645 S. 101st East Ave, Tulsa, OK 74128-4609 Oregon Portland District Engineer, ATTN: CENWP- PE-G, P.O. Box 2946, Portland, OR 97208- 2946 Pennsylvania Baltimore District Engineer, ATTN: CENAB- OP-R, P.O. Box 1715, Baltimore, MD 21203-1715 Rhode Island New England District Engineer, ATTN: CENAE-R, 696 Virginia Road, Concord, MA 01742-2751 South Carolina Charleston District Engineer, ATTN: CESAC- CG-P, P.O. Box 919, Charleston, SC 29402-0919 South Dakota Omaha District Engineer, ATTN: CENWO- OP-R, 106 South 15th Street, Omaha, NE 68102-1618 Tennessee Nashville District Engineer, ATl'N: CELRN-- OP-F, P.O. Box 1070, Nashville, IN 37202-1070 Texas Ft. Worth District Engineer, ATTN: CESWF- PER-R, P.O. Box 17300, Ft. Worth, TX 76102--0300 Utah Sacramento District Engineer, ATTN: CESPK-CO-K, 1325 J Street, CA 95814- 2922 Vermont New England District Engineer, ATTN: CENAE-R, 696 Virginia Road, Concord MA 01742--2751 Virginia Norfolk District Engineer, A'1'"T iN: CF.NAO - OP-R, 803 Front Street, Norfolk, VA 23510--1096 Washington Seattlo District Engineer, ATTN: CENWS- OP-RG, P.O. Box 3755, Seattle, WA 981'24-- 2255 West Virginia Huntington District Engineer, ATTN: CELRII-OR-F, 502 8th Street. IRrntington, WV 25701-2070 Wisconsin St. Paul District Engineer, ATTN: CF.MVP--- CO -R, 190 Fifth Street East, St. Paul, MN 55161-1638 Wyoming Omaha District Engineer, ATTN: CENWO- OP-R, 106 South 15th Street, Omaha, NE 68102-1618 District of Columbia Baltimore District Engineer, ATTN: CF,NAB- OP-R, P.O. Box 1715, Baltimore, MD 21203--1715 Pacific Territories (American Samoa, Guaro, 6 Commonwealth of the Northern Mariana Islands) Honolulu District Engineer, ATTN: CEPOI I- F..C-R, Building 230, Fort Shafter, Honolulu, HI 96858-5440 Puerto Rico & Virgin Islands Jacksonville District Engineer, ATI'N: CESAJ-CO-R, P.O. Box 4970, Jacksonville, FL 32202-4412 Dated: January 4, 2002. Approved: Robert H. Griffin, Brigadier General, U.S. Army, Directorof Civil Works. Nationwide Permits, Conditions, Further Information, and Definitions A. Index of Nationwide Permits, Conditions, Further Information, and Definitions Nationwide Permits 1. Aids to Navigation 2. Structures in Artificial Canals 3. Maintenance 4. Fish and Wildlife Il,'rvesting, Enhancement, and Attraction Devices and Activities 5. Scientific Measurement Devices 6. Survey Activities 7. Outfall Structures and Maintenance 8. Oil and Gas Structures 9. Structures in Fleeting and Anchorage Areas 10. Mooring BLIOJ's 11. Temporary Recreational Structures 12. Utility Line Activities 13. Bank Stabilization 14. Linear Transportation Projects 15. U.S. Coast Guard Approved Bridges 16. Retcnll Water From Upland Contained Disposal Arcas 17. Hydropower Projects 18. Minor Discharges 19. Minor Dredging 20. Oil Spill Cleanup 21. Surface Coal Alining Activities 22. Removal of Vessels 23. Approved Categorical Exclusions 24. State Administered Section 40.1 Programs 25. Structural Discharges 26. [Reserved] 27. Stream and Wetland Restoration Activities 28. Modifications of Existing Marinas 29. Single-family Housing 30. Moist Soil Management for Wildlife 31. Maintenance of Existing Flood Control Facilities 32. Completed Enforcement Actions 33. 'T'emporary Construction, Access and Dewatering 34. Cranberrv Production Activities 35. Maintenance Dredging of Existing Basins 36. Boat Ramps 37. Emergency Watershed Protection and Rehabilitation 38. Cleanup of Hazardous and Toxic Waste 39. Residential, Commercial, and Institutional Developments 40. Agricultural Activities 41. Reshaping Existing Drainage Ditches 42. Recreational Facilities 43. Stormwater Management Facilities 44. Mining Activities Nationwide Permit General Conditions 1. Navigation 2. Proper Maintenance 3. Soil Erosion and Sediment Controls 4. Aquatic Life Movements 5. Equipment 6. Regional and Case-by-Case Conditions 7. Wild and Scenic Rivers 8. Tribal Rights 9. Water Quality 10. Coastal Zone Management 11. Endangered Species 12. Historic Properties 13. Notification 14. Compliance Certification 15. Use of Multiple Nationwide Permits. 16. Water Supply Intakes 17. Shellfish Beds 18. Suitable Material 19. Mitigation 20. Spawning Areas 21. Management of Water Flows 22. Adverse Effects from Impoundments 23. Waterfowl Breeding Areas 24. Removal of Temporary Fills 25. Designated Critical Resource Waters 26. Fills Within 100-year Floodplains 27. Construction Period Further Information Definitions Best Management Practices (BMPs) Compensatory Mitigation Creation Enhancement Ephemeral Stream Farm 'T'ract Flood Fringe Floodway Independent Utility Intermittent Strearn Loss of Waters of the US Non-tidal Wetland Open Water Perennial Stream Permanent Above-grade Fill Preservation Restoration Riffle and Pout Complex 2078 Federal Register/Vol. 67, No. 10 /'Tuesday, January 15, 2002/Notices Single and Complete Project Stormwater Management bridges, culverted road crossings, water clone primarily to obtain fill for any o Stormwater Management Facilities Stream Bed intake structures, etc. ) and the placement of new or additional riprap t restoration activities. The discharge of o dredged or fill ruaterial and all related Stream Channelization protect the structure, provided the work needed to restore the upland must Tidal Wetland Vegetated Buffer permittee notifies the District Hngineer in accordance with General Condition be part of a single and complete project. '['his permit cannot be used in Vegetated Shallows Waterbody 13. The removal of sediment is limited to the minimum necessar to restore th conjunction with NWP 18 or NWP 19 to B. Nationwide Permits y e waterway in the immediate vicinity of restore damaged upland areas. This permit cannot be used to reclaim 1. Aids to Navigation. The placement the structure to the approximate dimensions that existed whe th historic lands lost, over an extended of aids to navigation and Regulatory markers which are approved by and n e structure was built, but cannot extend period, to normal erosion processes. This permit does not authorize installed in accordance with the re ui t f h further than 200 feet in anv direction from the structure. The placement of ri maintenance dredging for the primary f q remen s o t e U.S. Coast Guard (USCG) (See 33 CFR, chapter I, p rap must be the rninimurn necessary to purpose o navigation acid beach restoration. This permit does not subchapter C part 66). (Section 10) protect the structure or to ensure the safety of the structure All e t d authorize new strearn channelization or 2. Structures in Artificial Canals. Structures constructed in artificial . xcava e materials must be deposited and strearn relocation projects. Any work authorized by this permit must riot canals within principally residential developments where the connection of retained in an upland area unless otherwise specifically approved by the cause more than minimal degradation of water quality, more than minimal the canal to navigable water of the US has been previousl authoriz d ( 33 District I:ngineer wider separate authorization. Any bank stabilization changes to the flow characteristics of the str a i fl y e see CFR 322.5(8)). (Section 10) measures not directly associated with e m, or ncrease ooding (See General Conditions 9 and 21) (Sections '3. Maintenance, Activities related to: the structure will require a separate . 10 and 404) (i) The repair, rehabilitation, or authorization from the District Engineer. Note: This NWP authorizes the repair replacement of any previously (iii) Discharges of dredged or fill , rehabilitation, or replacement of any authorized, currently serviceable, material, including excavation, into all previously authorized structure or fill that structure, or fill, or of any currently waters of the US for activities associated does not qualify for the Section 404(f) serviceable structure or fill authorized with the restoration of upland areas exemption for maintenance. by 33 CFR 330.3, provided that the damaged by a storm, flood, or other 4. Fish and Wildlife Harvesting structure or fill is not to be put to uses discrete event, including the , Enhancement, and Attraction Devices differing from those uses specified or construction, placement, or installation and Activities. Fish and wildlife contemplated for it in the original permit or the most recently authorized of upland protection structures and minor dredging to remove obstructions harvesting devices and activities such as pound nets crab tra s crab dred i modification. Minor deviations in the ' in a water of the US. (Uplands lost as , p , g ng, eel pots, lobster traps, duck blinds clam structure s configuration or filled area including those due to changes in a result of a storm, flood, or other discrete event can be replaced without , and oyster digging; and small fish attraction devices such as open water materials, construction techniques, or a Section 404 permit provided the fish concentrators (sea kites, etc.). This current construction codes or safety uplands are restored to their original NWP authorizes shellfish seedin standards which are necessary to make pre-event location. This NWP is for the g provided this activity does not occur in repair, rehabilitation, or replacement are activities in waters of the US associated wetlands or sites that support permitted, provided the adverse with the replacement of the uplands.) submerged aquatic vegetation (including environmental effects resulting from The permittee must notify the District sites where submerged aquatic such repair, rehabilitation, or replacement are minimal. Currently Engineer, in accordance with General Condition 13, within 12-months of the vegetation is documented to exist, but may not be resent in a ive ) serviceable means useable as is or with date of the damage arid the work must p g n year. , This NWP does not authorize artificial some maintenance, but not so degraded commence, or be under contract to reefs or impoundments and serni- as to essentially require reconstruction. This NWP authorizes the repair commence, within two years of the date of the dama e The er itt h ld impoundments of waters of the US for th l , rehabilitation, or replacement of those g . p m ee s ou provide evidence, such as a recent e cu ture or holding of motile species such as lobster or the use of covered structures or fills destroyed or damaged by storms, floods, fire or other discrete topographic survey or photographs, to justify the extent of the proposed oyster trays or clam racks. (Sections 10 and 404) events, provided the repair, rehabilitation, or replacement is restoration. The restoration of the damaged areas cannot exceed th , 5. Scientific Measurement Devices, commenced, or is tinder contract to e contours, or ordinary high water mark, Devices, whose purpose is to measure and record scientific data such as staff commence, within two years of the date of their destruction or damage. In cases that existed before the damage. The District Engineer retains the right to Sages, tide gages, water recording devices, water quality testing and of catastrophic events, such as hurricanes or tornadoes, this two-year determine the extent of the pre-existing conditions and the extent of an improvement devices and similar limit may be waived by the District y restoration work authorized by this structures. Small weirs and flumes constructed primarily to record water Engineer, provided the permittee can demonstrate funding, contract, or other permit. Minor dredging to remove obstructions from the adjacent quantity and velocity are also h similar delays. Waterbody is limited to 50 cubic yards aut orized provided the discharge is limited to 25 cubic yards and further for (ii) Discharges of dredged or fill material, including excavation, into all below the plane of the ordinary high water mark and is limit d t th discharges of 10 to 25 cubic yards waters of the US to remove accumulated sediments and debri i th i i i , e o e amount necessary to restore the pre- provided the permittee notifies the District Engineer in accordance with the s n e v c n ty of, and within, existing structures (e.g., existing bottom contours of the waterbody. The dredging may not be "Notification" General Condition. (Sections 10 and 404) Federal Kegister / Vol. 67, No. 10 /'Tuesday, January 15, 2002/Notices 2079 ' G. Survey Activities. Survey activities including core sampling, seismic exploratory operations, plugging of seismic shot holes and other exploratory-type bore holes, soil survey, sampling, and historic resources surveys. Discharges and structures associated with the recovery of historic resources are not authorized by this NWP. Drilling and the discharge of excavated material from test wells for oil and gas exploration is not authorized by this NWP; the Plugging of such wells is authorized. Fill placed for roads, pads and otter similar activities is not authorized by this NWP. The NWP does not authorize any permanent structures. The discharge of drilling mud and cuttings may require a permit under section 402 of the CWA. (Sections 10 and 404) -7. Outfall Structures and Aaintenance. Activities related to: (i) Construction of outfall structures and associated intake structures where the effluent from the outfall is authorized, conditionally authorized, or specifically exempted, or are otherwise in compliance with regulations issued under the National Pollutant Discharge Elimination System Program (Section 402 of the CWA), and (ii) Maintenance excavation, including dredging, to remove accumulated sediments blocking or restricting outfall and intake structures, accumulated sediments from small impoundments associated with outfall and intake structures, and accumulated sediments from canals associated with outfall and intake structures, provided that the activity meets all of the following criteria: a. The perrrrittee notifies the District Engineer in accordance with General Condition 13; b. The amount of excavated or dredged material must be the minimum necessary to restore the outfalls, intakes, small impoundments, and canals to original design capacities and design configurations (i.e., de Nth and width); c. The excavated or ?redged material is deposited and retained at an upland site, unless otherwise approved by the District Engineer under separate authorization; and d. Proper soil erosion and sediment control measures are used to minimize reentry of sediments into waters of the Us. The construction of intake structures is not authorized by this NWP, unless they are directly associated with an authorized outfall structure. For maintenance excavation and dredging to remove accumulated sediments, the notification must include information regarding the original design capacities and configurations of the facility and ie presence of special aquatic sites e.g., vegetated shallows) in the vicinity of the proposed work. (Sections 10 and 404) 8. Oil and Gas Structures. Structures for the exploration, production, and transportation of oil, gas, and minerals on the outer continental shelf within areas leased for such purposes by the DOI, Minerals Management Service (MMS).'Such structures sliall riot be placed within the limits of any designated shipping safety fairway or traffic separation scheme, except temporary anchors that comply with the fairway regulations in 33 CPR 322.5(1). (Where such limits have riot been designated, or where changes are anticipated, District Engineers will consider asserting discretionary authority in accordance with 33 CFR 330.4(e) and will also review such proposals to ensure they comply with the provisions of the fairway regulations in 33 CPR 322.5(1). Any Corps review under this permit will be limited to the effects on navigation and national security in accordance with 33 CPR .322.5(f)). Such structures will not be placed in established danger zones or restricted areas as designated in 33 CFR part 334: nor will such structures be permitted in EPA or Carps designated dredged material disposal areas. (Section 10) ' 9. Structures in Fleeting and Anchorage Areas. Structures, buoys, floats and other devices placed within anchorage or fleeting areas to facilitate moorage of vessels where the USCG has established such areas for that purpose. (Section 10) , 10. Mooring Huovs. Non-commercial, single-boat, mooring buoys. (Section 10) 11. TernpororyRecreational Structures. Temporary buoys, markers, small floating docks, and similar structures placed for recreational use during specific events such as water skiing competitions and boat races or seasonal use provided that such structures are removed within 30 days after use has been discontinued. At Corps of Engineers reservoirs, the reservoir manager must approve each buoy or marker individually. (Section 10) .12. Utility Line Activities. Activities required for the construction, maintenance and repair of utility lines and associated facilities in waters of the US as follows: (i) Utility lilies: The construction, nrainten,urce, or repair of utility lines, including outfall and intake structures and the associated excavation, backfill, or bedding for the utility lines, in all waters of the tJS, provided there is no change in preconstruction contours. A "utility line'' is defined as any pipe or pipeline for the transportation of any gaseous, liquid, liquescent, or slurry substance, for any purpose, and any cable, line, or wire for the transmission for any purpose of electrical energy, telephone, and telegraph messages, and radio and television communication (see Note 1, below). Material resulting from trench excavation may be temporarily sidecast (up to three months) into waters of the US, provided that the material is not placed in such a manner that it is dispersed by currents or other forces. The District Engineer may extend the period of temporary side casting not to exceed a total of 180 davs, where appropriate. In wetlands, the top 6" to 12" of the trench should normally be backfilled'with topsoil from the trench. Furthermore, the trench cannot be constructed in such a manner as to drain waters of the US (e.g., backfilling with extensive gravel layers, creating a french drain effect). For example, utility line trenches can be backfilled with clay blocks to ensure that the trench does not drain the waters of the US through which the utility line is installed. Any exposed slopes and stream banks must be stabilized immediately upon completion of the utility line crossing of each waterbody. (ii) Utility line substations: The construction, maintenance, or expansion of a substation facility associated with a power line or utility line in non-tidal waters of the [IS, excluding non-tidal wetlands adjacent to tidal waters, provided the activity does riot result in the loss of greater than 1/2-acre of non-tidal waters of the US. (iii) Foundations for overhead utility line towers, poles, and anchors: The construction or maintenance of foundations for overhead utility line towers, poles, and anchors in all waters of the US, provided the foundations are the minimum size necessary and separate footings for each tower leg (rather than a larger single pad) are used where feasible. (iv) Access roads: The construction of access roads for the construction and maiilteuance of utility lines, including overhead power lines and utility line substations, in non-tidal waters of the US, excludin" non-tidal wetlands adjacent to tidal waters, provided the discharges do not cause the loss of greater than 1/ -acre of non-tidal waters of the US. Access roads shall be the minimum width necessary (see Note 2, below). Access roads must be, constructed so that the length of the road minimizes the adverse effects on waters of the US and as near as possible to preconstruction contours and 2080 Federal Register/Vol. 67, No. 10 /'Tuesday, January 15, 2002/Notices elevations (e.g., at grade corduroy roads or geotextile/gravel roads). Access roads constructed above preconstruction contours and elevations in waters of the US must be properly bridged or culverted to maintain surface flows. 't'ire term ''utility line'' does not include activities which drain a water o the US, such as drainage tile, or french drains; however, it does apply to pipes conveying drainage from another area. For the purposes of this NWP, the loss of waters of the US includes the filled area plus waters of the US that are adversely affected by flooding, excavation, or drainage as a result of the project. Activities authorized by paragraph (i) through (iv) may not exceed a total of 1/2-acre loss of waters of the CTS. Waters of the US temporarily affected by filling, flooding, excavation, or drainage, where the project area is restored to preconstruction contours and elevation, is not included in the calculation of permanent loss of waters of the US. This includes temporary construction mats (e.g., timber, steel, geotextile) used during construction and removed upon completion of the work. Where certain functions and values of waters of the US are permanently adversely affected, such as the conversion of a forested wetland to a herbaceous wetland in the permanently maintained utility line right-of-way, mitigation will be required to reduce the adverse effects of the project to the minimal level. Mechanized land clearing necessary for the construction, maintenance, or repair of utility lines and the construction, maintenance and expansion of utility line substations, foundations for overhead utility lines, and access roads is authorized, provided the cleared area is kept to the minimum necessary and preconstruction contours are maintained as near as possible. The area of waters of the US that is filled, excavated, or flooded must be limited to the minimum necessary to construct the utility line, substations, foundations, and access roads. Excess material must be reproved to upland areas immediately upon completion of construction. This NWP may authorize utility lines in or affecting navigable waters of the US even if there is no associated discharge of dredged or fill material (See 33 CFR part 322). Notification: TlIe permittee crust notify the District Engineer in accordance with General Condition 13, if any of the following criteria are met: (a) Mechanized land clearing in a forested wetland for the utility line right-of-way; (b) A Section 10 permit is required; (c) The utility line in waters of the US, excluding overhead lines, exceeds 500 feet; (d) The utility line is placed within a jurisdictional area (i.e., water of the US) and it runs parallel to a stream bed that is within that jurisdictional area; f (e) Discharges associated with the construction of utility line substations that result in the loss of greater than I/,o acre of waters of the US; or (f) Perranent access roads constructed above grade in waters of the US for a distance of rnore than 500 feet. (g) Permanent access roads constructed in waters of the US with impervious materials. (Sections 10 and 404) Note 1: Overhead utility lines constructed over Section 10 waters and utility lines that are routed in or under Section 10 waters without a discharge of dredged or fill material require a Section 10 permit; except for pipes or pipelines used to transport gaseous, liquid, liquescent, or slurry substances over navigable waters of the US, which are considered to be bridges, not utility lines, and may require a permit from tine USCG pursuant to section 9 of the Rivers and Harbors Act of 1899. However, any discharges of dredged or fill material associated with such pipelines will require a Corps permit under Section 404. Note 2: Access roads used for both construction and maintenance may be authorized, provided they meet the terms and conditions of this NWP. Access roads used solely for construction of the utility line must he removed upon completion of the work and the area restored to preconstruction contours, elevations, and wetland conditions. Temporary access roads for construction may be authorized by NWP 33. Note 3: Where the proposed utility line is constructed or installed in navigable waters of the US (i.e., Section 10 waters), copies of the PCN and MVP verification will be sent by the Corps to the National Oceanic and Atmospheric Administration (NOAA), National Ocean Service (NOS), for charting the utility line to protect navigation. . 13. Bank Stobilizotion. Bank stabilization activities necessary for erosion prevention provided the activity meets all of the following criteria: a. No material is placed more than the minimum needed for erosion protection; b. The bank stabilization activity is less than 500 feet in length; C. The activity will not exceed an average of one cubic yard per running foot placed along the bank below the plane of the ordinary high water mark or the high title line; d. No material is placed in any special aquatic site, including wetlands; e. No material is of the type, or is placed in any location, or in any manner, to impair surface water flow into or out of any wetland area; f. No material is placed in a manner that will be eroded by normal or expected high flows (properly anchored trees and treetops may be used in low energy areas); and, g. 'l'h , activity is part of a single and complete project. Hank stabilization activities in excess of 500 feet in length or greater than an average of one cubic yard per running foot may be authorized if the permittee notifies the District Engineer in accordance with the "Notification" General Condition 13 and the District Engineer determines the activity complies with the other terms and conditions of the NWP and the adverse environmental effects are minimal both individually and cumulatively. This NWP may not be used for the channelization of waters of the US. (Sections 10 and 404) 114. Linear'Fro nsportotion Projects. Activities required for the construction, expansion, modification, or improvement of linear transportation crossings (e.g., highways, railways, trails, airport runways, and taxiways) in waters of the US, including wetlands, if the activity meets the following criteria: a. This NWP is subject to the following acreage limits: (1) For linear transportation projects in non-tidal waters, provided the discharge does not cause the loss of greater than 1/2-acre of waters of the US; (2) For linear transportation projects in tidal waters, provided the clischarge does not cause the loss of greater than 1/3-acre of waters of the US. b. The permittee must notify the District Engineer in accordance with General Condition 13 if any of the following criteria are met: (1) The discharge causes the loss of greater than 1/1o-acre of waters of the US; or (2) 't'here is a discharge in a special aquatic site, including wetlands; c. The notification must include a compensatory mitigation proposal to offset permanent losses of waters of the US to ensure that those losses result only in minimal adverse effects to the aquatic environment and a statement describing how temporary losses will be minimized to the maximum extent practicable; d. For discharges in special aquatic sites, including wetlands, and stream riffle and pool complexes, the notification must include a delineation of the affected special aquatic: sites; e. The width of the fill is limited to the nrinimurn necessary for the crossing; f. This permit does not authorize stream channelization, and the authorized activities must not cause more than minimal changes to the hydraulic flow characteristics of the stream, increase flooding, or cause more Federal Register / Vol. 67, No. 10/Tuesday, January 15, 2002/Notices 2081 than minimal degradation of water quality of any stream (see General Conditions 9 and 21); g. This permit cannot be used to authorize non-linear features commonly associated with transportation projects, such as vehicle maintenance or storage buildings, parking lots, train stations, or aircraft hangars; and It. The crossing is a single and complete project for crossing waters of the US. Where a road segment (i.e., the shortest segment of a road with independent utility that is part of a larger project) has multiple crossings of streams (several single and complete projects) the Corps will consider whether it should use its discretionary authority to require an Individual Permit. (Sections 10 and 404) Note: Some discharges for the construction of farm roads, forest roads, or temporary roads for moving mining equipment may be eligible for an exemption from the need for a Section 404 permit (see 33 CFR 323.4). • 15. U.S. Coast Guard Approved Bridges. Discharges of dredged or fill material incidental to the construction of bridges across navigable waters of the US, including cofferdams, abutments, foundation seals, piers, and temporary construction and access fills provided such discharges have been authorized by the USCG as part of the bridge permit. Causeways and approach fills are not included in this NWP and will require an individual or regional Section 404 permit. (Section 404) . 16. Return Water From Upland Contained Disposal Areas. Return water from upland, contained dredged material disposal area. The dredging itself may require a Section 404 permit (33 CFR 323.2(d)), but will require a Section 10 permit if located in navigable waters of the US. The return water from a contained disposal area is administratively.defined as a discharge of dredged material by 33 CF'R 3212(d), even though the disposal itself occurs on the upland and does not require a Section 404 permit. This NWP satisfies the technical requirement for a Section 404 permit for the return water where the quality of the return water is controlled by the state through the Section 401 certification procedures. (Section 404) - 17, flydropotver Projects. Discharges of dredged or fill material associated with (a) small hydropower projects at existing reservoirs where the project, which includes the fill, are licensed by the Federal Energy Regulatory Commission (FF.RC) under the Federal Power Act of 1920, as amended; and has a total generating capacity of not more than 5000 kAV; and file pennittee notifies the District Engineer in accordance with the ''Notification'' General Condition; or (b) hydropower projects for which the FERC has granted an exemption from licensing pursuant to section 408 of the Energy Security Act of 1980 (16 U.S.C. 2705 and 2708) and section 30 of the Federal Power Act, as amended; provided the perrnittee notifies the District Engineer in accordance with the "Notification" General Condition. (Section 404) 18.:Minor Discharges. Minor discharges of dredged or fill material into all waters of the US if the activity meets all of the following criteria: a. The quantity of discharged material and the volume of area excavated do not exceed 25 cubic yards below the plane of the ordinary high water mark or the high tide line; b. The discharge, including any excavated area, will not cause the loss of more than 1/,o-acre of a special aquatic site, including wetlands. For the purposes of this NW-P, the acreage limitation includes the filled area and excavated area plus special aquatic sites that are adversely affected by flooding and special aquatic sites that are drained so that they would no longer be a water of the US as a result of the project; c. If the discharge, including any excavated area, exceeds 10 cubic yards below the plane of the ordinary high water mark or the high tide line or if the discharge is in a special aquatic site, including wetlands, the permittee notifies the District Engineer in accordance with the ''Notification" General Condition. For discharges in special aquatic sites, including wetlands, the notification must also include a delineation of affected special aquatic sites, including wetlands (also see 33 CFR 330.1(e)); and d. The discharge, including all attendant features, both temporary and permanent, is part of a single and complete project and is not placed for the purpose of a stream diversion. (Sections 10 and 404) 19. Minor Dredging. Dredging of no more than 25 cubic yards below the plane of the ordinary high water mark or the mean high water mark front navigable waters of the US (i.e., Section 10 waters) as part of a single and complete project. This NWP does not authorize the dredging or degradation through siltation of coral reefs, sites that support submerged aquatic vegetation (including sites where SLdimergecl aquatic vegetation is documented to exist, but may not be present in a given year), anadromous fish spawning areas, or wetlands, or the connection of canals or other artificial waterways to navigable waters of the US (see 33 CFR 322.5(,,)). (Sections 10 and 404) 20. Oil Spill Cleanup. Activities required for the containment and cleanup of oil and hazardous substances which are subject to the National Oil and Ilazardous Substances Pollution Contingency Plan (40 CF'R part 300) provided that the work is done in accordance with the Spill Control and Countermeasure Plan required by 40 CFR 112.3 and any existing state contingency plan and provided that the Regional Response Team (if one exists in the area) concurs with the proposed containment and cleanup action. (Sections 10 and 404) 21. Surface Coal Mining Activities. Discharges of dredged or fill material into waters of the US associated with surface coal mining and reclamation operations provided the coal mining activities are authorized by the DOI, Office of Surface Mining (OSM), or by states with approved programs under 'T'itle V of the Surface Mining Control and Reclamation Act of 1977 and provided the perrnittee notifies the District Engineer in accordance with the ''Notification" General Condition. In addition, to be authorized by this NWP, the District Engineer must determine that the activity complies with the terms and conditions of the NWP and that the adverse environmental effects are minimal both individually and cumulatively and must notify the project sponsor of this determination in writing. The Corps, at the discretion of the District Engineer, may require a bond to ensure success of the mitigation, if no other Federal or state agency has required one. For discharges in special aquatic sites, including wetlands, and stream riffle and pool complexes, the notification must also include a delineation of affected special aquatic sites, including wetlands. (also, see 33 CFR 330.1(e)) Mitigation: In determining the need for as well as the level and type of mitigation, the District Engineer will ensure no more than minimal adverse effects to the aquatic environment occur. As such, District Engineers will determine oil a case-by-case hasis the requirement for adequate mitigation to ensure the effects to aquatic systems arc minimal. In cases where OSM or the state has required mitigation for the. loss of aquatic habitat, the Corps may consider this in determining appropriate mitigation under Section 404. (Sections 10 and 404) 22. ilemovol of Vessels. Temporary Structures or minor clischar ;es of dredged or fill material required for the removal of wrecked, abandoned, or disabled vessels, or the removal of man- 2082 Federal Register/Vol. 67, No. 10/Tuesday, January 15, 2002/Notices made obstructions to navigation. This NWP does not authorize the rem l f within the forum prior to the discharge of bed and/or banks to restore or create O ova o vessels listed or determined eligible for l concrete, sand, rock, etc. This NWP does not authorize filled structural stream meanders; the backfilling of artificial channels and d i di h isting on the National Register of Fistoric Places unless the District members that would support buildings, building pads, homes house ads ra nage tc es; the removal of existing drainage t t h Engineer is notified and indicates that there is compliance with the ''Historic , p , parking areas, storage areas and other such structures, The structure itself s ruc ures; t e construction of small nesting islands; the construction of open Properties" General Condition. This NWP does not authorize mai t may require a Section 10 permit if located in water areas; the construction of oyster habitat over unvegetated bottom in tidal n enance dredging, shoal removal, or riverbank navigable waters of the US. (Section 404) waters; activities needed to reestablish snagging. Vessel disposal in waters of the US may need a permit from EPA 26. (Reserved] 27. Stream and Wetland Restoratio vegetation, including plowing or discing for seed bed preparation and the (see 40 CFR 229.3). (Sections 10 and 404) n Activities. Activities in waters of the US planting of appropriate wetland species; mechanized land clearing to remove 23. Approved Categorical Exclusions. associated with the restoration of former waters, the enhancement of de raded non-native invasive, exotic or nusiance Activities undertaken, assisted, authorized re ulated fund d g tidal and non-tidal wetlands and vegetation; and other related activities. This NWP does not authorize the , g , e , or financed, in whole or in part, by another riparian areas, the creation of tidal and non-tidal wetlands and ri i conversion of a stream to another Federal agency or department where that agency or department has par an areas, and the restoration and enhancement of aquatic use, such as the creation of an impoundment for waterfowl habitat, determined, pursuant to the Council on non-tidal streams and non-tidal open water areas as follows: This NWP does not authorize stream channelization This NWP does t Environmental Quality Regulation for Implementing the Procedural Provisions (a) The activity is conducted on: (1) Non-Federal public lands and . rio authorize the conversion of natural of the National Environmental Policy Act (NEPA) (40 CF'R part 1500 et se ) . private lands, in accordance with the terms and di io f wetlands to another aquatic use, such as creation of waterfowl impoundments q. , that the activity, work, or discharge is con t ns o a binding wetland enhancement restoratio where a forested wetland previously categorically excluded from , n, or creation agreement between the existed. However, this NWP authorizes the relocation of non-tidal wat environmental documentation, because it is included within a category of landowner and the U.S. Fish and Wildlife Service (FWS) or the Natural ers, including non-tidal wetlands, on the actions which neither individually nor cumulatively have a significant effect on Resources Conservation Service (MRCS), the National Marine Fisherie S i project site provided there are net gains in aquatic resource functions and the human environment, and the Office s erv ce, the National Ocean Service, or values. For example, this NWP may authorize the creation of a of the Chief of Engineers (ATTN: CECW- OR) has been furnished notice of the voluntary wetland restoration, enhancement and creatio ti n open water impoundment in a non-tidal emergent agency's or department's application for the categorical exclusion and , n ac ons documented by the NRCS pursuant to wetland, provided the non-tidal emergent wetland is replaced by concurs with that determination. Before NRCS regulations- or (2) Reclaimed surface coal i creating that wetland type on the project approval for purposes of this NWP of ' m ne lands, in accordance with a Surface site. This NWP does not authorize the relocation of tidal waters or the any agency s categorical exclusions, the Chief of Engineers will solicit public Mining Control and Reclamation Act permit issued by the OSM or th conversion of tidal waters, including id l comment. In addressing these comments the Chief of En ine e applicable state agency (the future t a wetlands, to other aquatic uses, such as the conversion of tidal wetlands , g ers may require certain conditions for reversion does not apply to streams or wetlands created, restored, or enhanced into open water impoundments. Reversion, For enhancement authorization of an agency's categorical exclusions under this NWP. (Sections as mitigation for the mining impacts, nor naturall due to h drol i , restoration, and creation projects d t d d 10 and 404) y y og c or topographic features, nor for a con uc e un er paragraphs (a)(3), this NWP does riot authorize any future 24. State Administered Section 404 Program. Any activity permitted by a mitipgation bank); or (3J Any other public, private or tribal discharge of dredged or fill material associated with the reversion of the area state administering its own Section 404 permit program pursuant to 33 U.S.C. lands; (b) Notification: For activities on an to its prior condition. In such cases a se a t it ld b 1344(8)-(l) is permitted pursuant to y public or private land that are not p ra e perm wou e required for any reversion For restoration section 10 of the Rivers and Harbors Act of 1899. Those activities that do not described by paragraphs (a)(1) or (a)(2) above the permittee must notif the . , enhancement, and creation projects d d d involve a Section 404 state permit are i l , y District Engineer in accordance with con ucte un er paragraphs (a)(1) and (a)(2), this NWP also authorizes any not nc uded in this NWP, but certain structures will be exempted by section General Condition 13; and (c) Plantin of onl nativ i future discharge of dredged or fill 154 of Pub. L. 94-587, 90 Stat. 2917 (33 g y e spec es should occur on the site. material associated with the reversion of the area to its documented prior U.S.C. 591) (see 33 CFR 322.3(8)(2)). (Section 10) Activities authorized by this NWP condition and use (i.e., prior to the 25. Structural Discharges. Discharges include, to the extent that a Corps permit is required, but are not limited restoration, enhancement, or creation activities) The reversion must of material such as concrete, sand, rock, etc., into tightly sealed forms or cells to: the removal of accumulated sediments; the installation re l . occur within five years after expiration of a where the material will be used as a structural member for stand d il , mova , and maintenance of small water control limited term wetland restoration or creation agreement or permit, even if the ar p e supported structures, such as bridges, structures, dikes, and berms; the installation of current deflectors; tine discharge occurs after this NWP expires, This NWP also authorizes the reversion transmission line footings, and walkways or for general navigation, enhancement, restoration, or creation of riffle and ool stream structur th of wetlands that were restored, t such as mooring cells, including the p e; e placement of in-stream habitat en ranced, or created on prior-converted cropland that has not been abandoned excavation of bottom material from structures; modifications of the stream , in accordance with a binding agreement Federal Register/Vol. 67, No. 10 / Tuesday, January 15, 2002/Notices 2083 between the landowner and NRCS or FWS (even though the restoration, enhancement, or creation activity did not require a Ser_tion 404 permit). The five-year reversion limit does not apply to agreements without time limits reached under paragraph (a)(1). The prior condition will be documented in the original agreement or permit, and the determination of return to prior conditions will be made by the Federal agency or appropriate state agency executing the agreement or permit. Before any reversion activity the permittee or the appropriate Federal or state agency trust notify the District Engineer and include the documentation of the prior condition. Once an area has reverted to its prior physical condition, it will be subject to whatever the Corps Regulatory requirements will be at that future date. (Sections 10 and 404) Note: Compensatory mitigation is not required for activities authorized by this MVP, provided the authorized work results in a net increase in aquatic resource functions and values in the project area. This NWP can be used to authorize compensatory mitigation projects, including mitigation banks, provided the permittee notifies the District Engineer in accordance with General Condition 13, and the project includes compensatory mitigation for impacts to waters of the US caused by the authorized work. However, this MVP does not authorize the reversion of an area used for a compensatory mitigation project to its prior condition. MVP 27 can be used to authorize impacts at a mitigation bank, but only in circumstances where it has been approved tinder the Interagency Federal Mitigation Bank Guidelines. 28. Modifications of Existing Marinas. Reconfiguration of existing docking facilities within an authorized marina area. No dredging, additional slips, clock spaces, or expansion of any kind within waters of the US, is authorized by this NWP. (Section 10) 29. Single-farrtilvHousing. Discharges of dredged or fill material into non-tidal waters of the US, including non-tidal wetlands for the construction or expansion of a single-fancily home and attendant features (such as a garage, driveway, storage shed, and/or septic field) for an Individual Pernlittee, provided that the activity meets all of the following criteria: a. 'fhe discharge does not cause the loss of more than IA-acre of non-ticlal waters of the US, including non-tidal wetlands; b. The permittee notifies the District Fngineer in accordance with the ''Notification'' General Condition; c. The permittee has taken all practicable actions to minimize the on- site and off-site impacts of the discharge. For example, the location of the home may need to be adjusted on- site to avoid flooding of adjacent property owners; d. The discharge is part of a single and complete project; furthermore, that for any subdivision created on or after November 22, 1991, the discharges. authorized under this 1vMP may not exceed an aggregate total loss of waters of the US of 1A acre for the entire subdivision; P.. Xn individual may use this NWT' only for a single-family home for a personal residence; f. This NWP may be used only once per parcel; g. This MVP may not be used in conjunction with NWP 14 or NWP 18, for any )arcel; and, h. Suficient vegetated buffers must be maintained adjacent to all open water bodies, strearns, etc., to preclude water quality degradation clue to erosion and sedimentation. For the purposes of this NVVP, the acreage of loss of waters of the US includes the filled area previously permitted, the proposed filled area, and any other waters of the US that are adversely affected by flooding, excavation, or drainage as a result of the project. This NWP authorizes activities only by individuals; for this purpose, the term "individual" refers to a natural person and/or a married couple, but does not include a corporation, partnership, or similar entity. For the purposes of this NMI, a parcel of land is defined as ''the entire contiguous quantity of land in possession of, recorded as property of, or owned (in any form of ownership, including land owned as a partner, corporation, joint tenant, etc.) by the same individual (and/or that individual's spouse), and comprises not only the area of wetlands souglct to be filled, but also all land contiguous to those wetlands, ownecl by the individual (and/or that individual's spous(') in any form of Ownership.- (Sections 10 and 404) 30. Moist Soil Management for Wildlife. Discharges of dredged or fill material and maintenance activities that are associated with moist soil nutnageritent for wildlife performed on nun-tidal Federally-owned or maua??ed, state-owned or managed property, and local government agency-owned or ncanaged property, for the purpose of continuing ongoing, site-specific, wildlife management activities where soil manipulation is used to manage habitat and fording areas for wildlife. Such activities include, but are not limited to: The repair, maintenance of replacement of existing water control structures; the repair or maintenance of dikes; and plowing or cliscing to impede succession, prepare seed beds, or establish fire breaks. Sufficient vegetated buffers must be maintained adjacent to all open water bodies, streams, etc., to preclude water quality degracation clue to erosion and sedimentation. This MVP does not authorize the construction of new dikes, roads, water control structures, etc. associated with the management areas. This NWP does not authorize converting wetlands to uplands, impoundments or other open water bodies. (Section 404) 31. Maintenance of Existing Flood Control Facilities. Discharge of dredge or fill material resulting from activities associated with the maintenance of existing flood control facilities, including debris basins, retention/ detention basins, and channels that (i) were previously authorized by the Corps by Individual Permit, General Permit, by 33 CFR 330.3, or did not require a permit at the time it was constructed, or (ii) were constructed by the Corps and transferred to a non-Federal sponsor for operation and maintenance. Activities authorized by this NWP are limited to those resulting from maintenance activities that are conducted within t-he "maintenance baseline," as described in the definition below. Activities including the discharges of dredged or fill materials, associated with maintenance activities in flood control facilities in any watercourse that has previously been determined to be within the maintenance baseline, are authorized under this NW. The MVP does not authorize the removal of sediment and associated vegetation from the natural water courses except to the extent that these have been included in the maintenance baseline. All dredged material must be placed in an upland site or an authorized disposal site in waters of the US, and proper siltation controls must be used. (Activities of any kind that result in only incidental fallhack, or only the cutting and removing of vegetation above the ground, e.g., Mowing, rotary Cutting, and chainsawing, where the activity neither substantially disturbs the root systent nor involves mer_hanized pushing, dragging, or other siutilar activities that redeposit excavated soil material, do not require a Section 404 permit in accordance with 33 CFR 323.2(d)(2)). Notification: After the maintenance baseline is established, and before any maintenance work is conducted, the permittee must notify the District I?ngiueer in accordance with the ''Notification" General Condition. The notification may be for activity-specific 2084 Federal Register/ Vol. 67, No. 10 /'Tuesday, January 15, 2002/Notices maintenance or for maintenance of the entire flood control facility by However, if one-time mitigation is required for impacts associated with activity subject to the terms and di submitting a five year (or less) maintenance activities, the District con tions of this NWP and the settlement agreement includin a maintenance plan. Maintenance Baseline: The Engineer will not delay needed , g specified completion date; or maintenance baseline is a description of maintenance, provided the District Engineer and the permittee establish a (ii) The terms of a final Federal court decision consent decree or settleme t the physical characteristics (e.g., depth, width, length, location, configuration, or schedule for identification, approval, develo ment constructio d , , n agreement resulting from an f design flood capacity, etc.) of a flood control project within which p , n an completion of any such required en orcement action brought by the U.S. under section 404 of the CWA and/or maintenance activities are normally mitigation. Once the one-time mitigation described above has been section 10 of the Rivers and Harbors Act of 1899; or authorized by NWP 31, subject to any case-specific conditions required by the completed, or a determination made th t lti ti i (iii) The terms of a final court District Engineer. The District Engineer a m ga ou s not required, no further mitigation will be required for decision, consent decree, settlement agreement, or non-judicial settlement will approve the maintenance baseline based on the approved or constructed maintenance activities within the i agreement resulting from a natural capacity of the flood control facility, ma ntenance baseline. In determining appropriate mitigation, the District resource damage claim brought by a trustee or trustees for natural resources whichever is smaller, including any areas where there are no con t t d Engineer will give special consideration (as defined by the National Contingency ruc s e channels, but which are part of the to natural water courses that have been included in the maintenance baseline Plan at 40 CFR subpart G) under section 311 of the Clean Water Act (CWA) facility. If no evidence of the constructed capacity exist, the approved and require compensatory mitigation and/or BMI' i , section 107 df the Comprehensive e constructed capacity will be used. The s as appropr ate. Emergency Situations: In emergency Environm ntal Response, Compensation and Liability Act (CERCLA or prospective permittee will provide documentation of the physical situations, this NWP may be used to authorize maintenance ti iti i Superfund), section 312 of the National M i characteristics of the flood control ac v es n flood control facilities for which no ar ne Sanctuaries Act (NMSA), section 1002 of the Oil Pollution Act of 1990 facility (which will normally consist of as-built or approved drawings) and maintenance baseline has been approved. Emergency situations are (OPA), or the Park System Resource Protection Act at 16 U.S.C. '19jj to the documentation of the design capacities of the flood control facility. The those which would result in an unacceptable hazard to life, a significant , extent that a Corps permit is required. For either (i), (pi) or (iii) above documentation will also include BtYlPs loss of property, or an immediate, , compliance is a condition of the NWP to ensure that the impacts to the aquatic unforeseen, and significant economic itself. Any authorization under this environment are minimal, especially in hardship if action is not taken before a NWP is automatically revoked if the maintenance areas where there are no constructed channels. (The Corps may maintenance baseline can be approved. In such situations, the determination of permittee does not comply with the terms of this N4VP or the terms of the request maintenance records in areas where there has not been recent mitigation requirements, if any, may be deferred until the emergency has been court decision, consent decree, or judicial/non-judicial settlement maintenance.) Revocation or modification of the final determination resolved. Once the emergency has ended, a maintenance baseline must be agreement or fails to complete the work by the specified completion date. This of the maintenance baseline can only be established expeditiously, and NWP does not apply to any activities done in accordance with 33 CFR 330.5. Except in emergencies as described mitigation, including mitigation for occurring after the date of the decision, below this NWP can not be used u til maintenance conducted during the decree, or agreement that are not for the , n the District Engineer approves the emergency, must be required as appropriate. (Sections 10 and 404) purpose of mitigation, restoration, or environmental benefit. Before reaching maintenance baseline and determines the need for mitigation and any re ional 32. Completed Enforcement Actions. A t any settlement agreement, the Corps g ny s ructure, work or discharge of will ensure compliance with the or activity-specific conditions. Once determined, the maintenance baseline dredged or fill material, remaining in place, or undertaken for mitigation provisions of 33 CFR part 326 and 33 CFR 330.6 (d)(2) and (e). (Sections 10 will remain valid for any subsequent , restoration, or environmental benefit in and 404) reissuance of this NW. This permit does not authorize maintenance of a compliance with either: (i) The terms of a final written Corps 33. Temporary Construction, Access and Dewatering. Temporary structures, flood control facility that has been non-judicial settlement agreement work and discharges, including abandoned. A flood control facility will resolving a violation of section 404 of cofferdams, necessary for construction be considered abandoned if it has the CWA and/or section 10 of the Rivers activities or access fills or dewatering of operated at a significantly reduced and Harbors Act of 1899; or the terms construction sites; provided that the capacity without needed maintenance being accom lished in a ti l of an EPA 309(a) order on consent associated primary activity is authorized p me y manner, Mitigation: The District Engineer will resolving a violation of section 404 of the CWA, provided that: by die Corps of Engineers or the USCG, or for other construction activities not determine any required mitigation one- a. The unauthorized activity affected subject to the Corps or USCG time only for impacts associated with maintenance work at the same time that no more than 5 acres of non-tidal wetlands or 1 acre of tidal wetlands; regulations. Appropriate measures must be taken to maintain near normal the maintenance baseline is approved. Stich one-time miti ation will be b. The settlement agreement provides f downstream flows and to minimize g required when necessary to ensure that or environmental benefits, to an equal or greater degree, than the flooding. Fill must be of materials, and placed in a manner that will not be adverse environmental impacts are no more than minimal both individ ll environmental detriments caused by the , erocled by expected high flows. The use , ua y and cumulatively. Such mitigation will unauthorized activity that is authorized by this NWP; and of dredged material nary be allowed if it is determined by the District En ineer only be required once for any specific reach of a flood control roject c. The District Engineer issues a ifi i l g that it will not cause more than minimal p . ver cat on etter authorizing the adverse effects on aquatic resources. Federal Register / Vol. 67, No. lo/Tuesday, January 15, 2002/Notices 20£35 Temporary fill must be entirely removed to upland areas, or dredged material returned to its original location, following completion of the construction activity, and the affected areas must be restored to the pre-project conditions. Cofferdams cannot be used to dewater wetlands or other aquatic areas to change their use. Structures left in place after cofferdams are removed require a Section 10 permit if located in navigable waters of the U.S. (See 33 CFR part 322). The permittee must notify the District Engineer in accordance with the "Notification" General Condition. The notification must also include a restoration plan of reasonable measures to avoid and minimize adverse effects to aquatic resources. The District Engineer will add Special Conditions, where necessary, to ensure environmental adverse effects is minimal. Such conditions may include: limiting the temporary work to the minimum necessary; requiring seasonal restrictions; modifying the restoration plan; and requiring alternative construction methods (e.g. construction mats in wetlands where practicable.). (Sections 10 and 404) 34. Cranberry Production Activities. Discharges of dredged or fill material for dikes, berms, pumps, water control structures or leveling of cranberry beds associated with expansion, enhancement, or modification activities at existing cranberry production operations provided that the activity meets all of the following criteria- a. The cumulative totay acreage of disturbance per cranberry production operation, including but not limited to, filling, flooding, ditching, or clearing, does not exceed 10 acres of waters of the U.S., including wetlands; b. The permittee notifies the District Engineer in accordance with the "Notification" General Condition. The notification must include a delineation of affected special aquatic sites, including wetlands; and, c. The activity does riot result in a net loss of wetland acreage. This NWP does not authorize any discharge of dredged or fill material related to other cranberry production activities such as warehouses, processing facilities, or parking areas. For the purposes of this N%VP, the cunnilative total of 10 acres will be measured over the period that this NW1' is valid, (Section 404) 35. Maintenance Dredging of Existing Basins. Excavation and removal of accumulated sediment for maintenance of existing marina basins, access channels to marinas or boat slips, and boat slips to previously authorized depths or controlling depths for ingress/ egress, whichever is less, provided the dredged material is disposed of at an upland site and proper siltation controls are used. (Section 10) 36. Boat Ramps. Activities required for the construction of boat ramps provided: a. The discharge into waters of the U.S. does not exceed 50 cubic yards of concrete, rock, crushed stone or gravel into forms, or placement of pre-cast concrete planks or slabs. (Unsuitable material that causes unacceptable chemical pollution or is structurally unstable is not authorized); b. The boat ramp does not exceed 20 feet in width; c. The base material is crushed stone, gravel or other suitable material; d. The excavation is limited to the area necessary for site preparation and all excavated material is removed to the upland; and, e. No material is placed in special aquatic sites, including wetlands. Another NMI, Regional General Permit, or Individual Permit may authorize dredging to provide access to the boat ramp after obtaining a Section 10 if located in navigable waters of the U.S. (Sections 10 and 404) 37. Emergency Watershed Protection and Rehabilitation. Work done by or funded by: a. The NRCS which is a situation requiring immediate action under its emergency Watershed Protection Program (7 CFR part 624); or b. The USFS under its Burned-Area Emergency Rehabilitation Handbook (FSH 509.13); or c. The DOI for wildland fire management burned area emergency stabilization and rehabilitation (DOI Manual art 620, Ch. 3). For all of the above provisions, the District Engineer must be notified in accordance with the General Condition 13. (Also, see 33 CFR 330.1(e)). (Sections 10 and 404) 38. Cleanup of Hazardous and Toxic Waste. Specific activities required to effect the containment, stabilization, or removal of hazardous or toxic waste materials that are performed, ordered, or sponsored by a government agency with established legal or regulatory authority provided the pertittee notifies the. District Engineer in accordance with the ''Notification" General Condition. For discharges in special aquatic sites, including wetlands, the notification must also include a delineation of affected special aquatic sites, including wetlands. Court ordered remedial action plans or related settlements are also authorized by this NWP. This NkVP does not authorize the establishment of new disposal sites or the expansion of existing sites used for the disposal of hazardous or toxic waste. Activities s undertaken entirely on a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) site by authority of CERCLA as approved or required by EPA, are not required to obtain permits under section 404 of the CWA or section 10 of the Rivers and Harbors Act. (Sections 10 and 404) 39. Residential, Commercial, and Institutional Developments. Discharges of dredged or fill material into non-tidal waters of the U.S., excluding non-tidal wetlands adjacent to tidal waters, for the construction or expansion of residential, commercial, and institutional building foundations and building pads and attendant features that are necessary for the use and maintenance of the structures. Attendant features may include, but are not limited to, roads, parking lots, garages, yards, utility lines, storrnwater management facilities, and recreation facilities such as playgrounds, playing fields, and golf courses (provided the golf course is an integral part of the residential development). The construction of new ski areas or oil and gas wells is not authorized by this NWP. Residential developments include multiple and single unit developments. Examples of commercial developments include retail stores, industrial facilities, restaurants, business parks, and shopping centers. Examples of institutional developments include schools, fire stations, government office buildings, judicial buildings, public works buildings, libraries, hospitals, and places of worship. The activities listed above are authorized, provided the activities meet all of the following criteria: a. The discharge does not cause the loss of greater than 1/2-acre of non-tidal waters of the U.S., excluding non-tidal wetlands adjacent to tidal waters; b. The discharge does not cause the loss of greater than 300 linear-feet of a stream bed, unless for intermittent strearn beds this criterion is waived in writing pursuant to a determination by the District Engineer, as specified below, that the project complies with all terms and conditions of this MVP and that any adverse impacts of the project on the aquatic environment are minimal, both individually and cumulatively; c. The permittee must notify the District Engineer in accordance with General Condition 13, if any of the following criteria are met: (1) The discharge causes the loss of greater than Vio-acre of non-tidal waters of the US, excluding non-tidal wetlands adjacent to tidal waters; or 20136 Federal Register/Vol. 67, No. 10/Tuesday, January 15, 2002/Notices (2) The discharge causes the loss of of any compensatory mitigation used to any open waters, including perennial of offset the loss of waters of the US (e include the installation, placement, or i intermittent streams, below the ordinar hi-li water mark (see Note below) or, .g., y 1/12-acre of emergent wetlands created construct on of drainage tiles, ditches, or levees; mechanized land clearing; , ; The discharge ge ca uses the loss of on-site); j. If there are any open waters or land leveling; the relocation of existing g greater than 300 l i near feet of streams within the project area the serviceable drainage ditches constructed i , intermittent stream bed. In such case, to permittee will establish and maintain, t be authorized the District Engineer must the maximum extent practicable n waters of the US; and similar o activities, provided the permittee determine that the activity complies , wetland or upland vegetated buffers com dies with the followin I g terms and with the other terms and conditions of the NWP, determine adverse next to those open waters or streams conditions: a. For discharges into non-tidal environmental effects are minimal both consistent with General Condition 19. Deed restrictions conservatio wetlands to improve agricultural individually and cumulatively, and waive the limitation on stream impacts , n easements, protective covenants, or other means of land conservation and production, the following criteria must be met if the permittee is an United prwrioceetid; ng before the permittee may pr preservation are required to protect and States Department of Agriculture (USDA) Program participant: d. For discharges in special aquatic i maintain the vegetated buffers established on the project site (1) The permittee must obtain a s tes, including wetlands, the . Only residential commercial and categorical minimal effects exemption, notification must include a delineation of affected special aquatic sites; , , institutional activities with structures minimal effect exemption, or mitigation exemption from NRCS in accordance e. The discharge is part of a single and on the foundation(s) or building pad(s), as well as the attendant featur with the provisions of the Food Security complete project; f. The permittee must avoid and es, are authorized by this NWP. The Act of 1985, as amended (16 U.S C. 3801 et seq.); minimize discharges into waters of the US at the project site to the maximum compensatory mitigation proposal that is required in paragraph (e) of this NWP (2) The discharge into non tidal wetlands does not result in the l f extent practicable: The notification, when required must include itt may be either conceptual or detailed. The wetland or upland vegetated buffer oss o greater than 1/2-acre of non-tidal l , a wr en statement explaining how avoidance required in paragraph (i) of this NWP will be determined b wet ands on a farm tract; (3) T}re permittee must have NRCS- and minimization of losses of waters of the US were achieved on the project on a case- y-case basis by the District Engineer for dd certified wetland delineation; (4) The permittee must im lement an site. Compensatory mitigation will normally be required to offset the los a ressing water quality concerns. The requi re d wetland o r upla nd vegetated p NRCS-approved compensatory i i ses of waters of the US. (See General b ufferi s part of th e overall m t gation plan that fully offsets wetland losses, if required; and Condition 19.) The notification must also include a compensator miti ation compensatory mitigation requirement for this NWP. If the project site was (5) The permittee must submit a y g proposal for offsetting unavoidable previously used for agricultural report, within 30 days of completion of the authorized work to the District losses of waters of the US, If an applicant asserts that the adve ff t purposes and the farm owner/operator used NWP 40 to authorize activities in , Engineer that contains the following rse e ec s of the project are minimal without waters of the US to increase production information: (a) The name, address, and telephone number of the permittee; (b) mitigation, then the applicant may submit justification ex lainin wh or construct farm buildings, NWP 39 cannot be used by the developer The location of the work; (c) A d p g y compensatory mitigation should not be i d f ' authorize a i additional activities. This is more than the acrea e limit for NWP 39 escription of the work; (d) The type and acreage (or square feet) of the loss requ re or the District Engineer s consideration; g impacts to waters of the US (i.e., the b of wetlands (e.g., 1/3-acre of emergent wetlands); acrd (e) The type acreage (or g. When this NWP is used in conjunction with any other MVP an com ined acreage loss authorized under NWPs 39 and 40 cannot exceed 1/2-acre, , square feet), and location of y , combined total permanent loss of waters see General Condition 15), Fo r id ti l compensatory mitigation (e.g. 1/3-acre of emergent wetland on a farm tract; of the US exceeding lho-acre requires that the perrrrittee notif c' the District r es en a subdivisions, the aggregate total loss of credits credits purchased from a mitigation y Engineer in accordance with General Condition 13; waters of US authorized by NWP 39 can not exceed 1/2-acre. This includes any bank ; or b. For discharges into non tidal h. Any work authorized by this NWP mu t t loss of waters associated with development of individual bdi i i wetlands to improve agricultural production, the following criteria must s no cause more than minimal degradation of water or more quality su v s on lots. (Sections 10 and 404) he met if the permittee is not a USDA than minimal changes to the flow Note: Areas where wetland vegetation is Program participant (or a USDA Program participant for which the characteristics of any stream (see General Conditions 9 and 21); not present should be determined by the presence or absence of air ordinary high proposed work does not qualify for i. For discharges causing the loss of water mark or bed and bank. Areas that are authorization under aragra h a p p of this Vio-acre or less of waters of the US, the waters of the US based on this criterion would require a PCN although water is NWP): (1) The discharge into non-tidal permittee must submit a report, within 30 days of completion of the work to infrequently present in the stream channel ( t f h wetlands does not result in the loss of , the District Engineer that contains the excep or ep emeral waters, which do not require PCNs) greater than 1/z-acre of non-tidal following information: (1) The name, address and tele hone number of th . 40. Agricultural Activities. Discharges f d d wetlands on a farm tract; (2) The permittee must notify the , p e permittee; (2) 'file location of the work; o re ged or fill material into non-tidal waters of the US, excluding non-ticial District Engineer in accordance with General Condition 13 if the discha (3) A description of the work; (4) The type and acreage of the loss of waters of wetlands adjacent to tidal waters, for improving agricultural roduction and , rge results in the loss of greater than 1/ia- f the US (e.g., VI 2-acre of emergent wetlands); and (5) The t e and ac p the construction of building pads for f b l acre o non-tidal wetlands; (3) The notification must include a yp reage arm ui dings. Authorized activities delineation of affected wetlands; and Federal Register/Vol. 67, No. 10/Tuesday, January 15, 2002/Notices 20137 (4) The notification must include a discharge qualifies for an exemption ditches to their original dimensions and compensatory mitigation proposal to offset losses of waters of the US; or under section 404(f) of the MA, even though a categorical minimal ff t configuration, which does not require a c. For the construction of building pads for farm buildin s the dischar e e ec s exemption, minimal effect exemption, Section 404 permit (see 33 CFR 3214(a)(3)). This NWP does not g , g does riot cause the loss of greater than 1 or mitigation exemption from NRCS pursuant to the Food Security Act of authorize the relocation of drainage ditches constructed in waters of the US h-acre of non-tidal wetlands that were in agricultural production prior to 1985, as amended, may be required. Activities authorized by para ra hs a ; the location of the centerline of the h d d December 23, 1985, (i.e., farmed wetlands) and th itt g p . through ci, may not exceed a total of/z- res ape rainage ditch must be approximately the same as the location e perm ee must notifv the District Engineer in accordance with acre on a single farm tract. If the site was used for agricultural purposes and the of the centerline of the original drainage di h General Condition 13; and farm owner/operator used either tc . This MVP does not authorize cf. Any activity in other waters of the US is limited to the relocation f paragraphs a., b., or c, of this NWP to stream channelization or stream relocation projects. (Section 404) o existing serviceable drainage ditches authorize activities in waters of the US to increase agricultural production or 42. Recreational Facilities. Discharges constructed in non-tidal streams. This construct farm buildings and the of dredged or fill material into non-tidal NWP does not authorize the relocation f greater than 300 exi ti o u e e , current landowner wants to use MVP 39 waters of the US, excluding non-ticlal wetlands adjacent to tidal waters for the ng serviceable onstrus e d tche s o to authorize residential, commercial, or industrial development activities in , construction or expansion of in non-tidal streams unless, for drainage waters of the US on the site the recreational facilities, provided the ditches constructed in intermittent non- , combined acreage loss authorized b activity meets all of the following tidal streams, the District Engineer y NWPs 39 and 40 cannot exceed 1/2-acre criteria: thi eri n t n l1e (see General Condition 15) (Section a. The discharge does not cause the D s trict En- ne er h as determ ned that 0 . 404) loss of greater than'/z acre of non tidal the project complies with all terms and 41. Reshaping Existing Drainage waters of the US, excluding non-tidal conditions of this NWP, and that any Ditches. Discharges of dredged or fill wetlands adjacent to tidal waters; adverse impacts of the project on the material into non-tidal waters of the US b The discharge does not cause the aquatic environment are minimal, both , excluding non-tidal wetlands adjacent loss of greater than 300 linear-feet of a individually and cumulatively. For to tidal waters, to modify the cross stream bed, unless for intermittent impacts exceeding 300-linear feet of sectional configuration of currently stream beds this criterion is waived in impacts to existing serviceable ditches serviceable drainage ditches constructed writing pursuant to a determination by constructed in intermittent non-tidal in waters of the US. The reshaping of the District Engineer, as specified streams, the permittee must notify the the ditch cannot increase drainage below, that the project complies with all District Engineer in accordance with the '' capacity beyond the original design terms and conditions of this NWP and Notification" General Condition 13; capacity. Nor can it expand the area that any adverse impacts of the project and '' drained by the ditch as originally on the aquatic environment are e. The term farm tract" refers to a designed (i.e., the capacity of the ditch minimal, both individually and parcel of land identified by the Farm must be the same as originally designed cumulatively; Service Agency. The Corps will identify and it cannot drain additional wetlands c. The permittee notifies the District other waters of the US on the farm tract, or other waters of the US), Engineer in accordance with the NRCS will determine if a proposed Compensatory mitigation is not required "Notification" General Condition 13 for agricultural activity meets the terms and because the work is designed to improve discharges exceeding 300 linear feet of conditions of paragraph a. of this NWP, water quality (e.g., by regrading the impact of intermittent stream beds. In except as provided below. For those drainage ditch with gentler slopes such cases, to be authorized the District activities that require notification, the , which can reduce erosion increase Engineer must determine that the District Engineer will determine if a , growth of vegetation, increase uptake of activity complies with the other terms proposed agricultural activity is authorized by paragraphs b., c., and/or nutrients and other substances by vegetation, etc.). aria conditions of the NWP, determine the adverse environmental effects are d. of this NWP. USDA Program Notification: The permittee must minimal both individually and participants, requesting authorization for notify the District Engineer in cumulatively, and waive this limitation discharges of dredged or fill material accordance with General Condition 13 if in writing before the permittee may into waters of the US authorized by greater than 500 linear feet of drainage proceed; paragraphs (c) or (d) of this NWI', in ditch will be reshaped. Material d. For discharges causing the loss of addition to paragraph (a), must notify the District En ineer in accord ith resulting from excavation may not be greater than Vio-acre of non-tidal waters g ance w General Condition 13 and the District permanently sidecast into waters but may be temporarily sidecast (up to three of the US, the permittee notifies the District Engineer in accordance with Engineer will determine if the entire months) into waters of the US, provided General Condition 13; single and complete project is authorized by this NWP Dischar es f the material is not placed in such a e. For discharges in special aquatic . g o dredged or fill material into waters of manner that it is dispersed by currents or other forces. The District Eii-ineer sites, including wetlands, the notification must include a delineation the US associated with completing required compensatory rnitigation are Wray extend the period of temporary sidecasting not to exceed a total of 180 of affected special aquatic sites; f. The discharge is part of a single and authorized by this NWP. However, total days, where appropriate. In general, this complete project; and impacts, including other authorized impacts under this N4VP, may not NkVP does not apply to reshaping drainage ditches constructed in g. Compensatory rnitigation will normally he required to offset the losses exceed the '/z-acre limit of this NWP. This MVP does not affect or oth i uplands, since these areas are generally of waters of the US. The notification , erw se regulate, discharges associated with not waters of the US, and thus no permit from the Corps is required or to the must also include a compensatory miti ati l ff h agricultural activities when the , maintenance of existing drainage g on proposa to o set aut orized losses of waters of the US. 20813 Federal Register/Vol. 67, No. 10 /'T'uesday, January 15, 2002/Notices For the purposes of this NWP, the term "recreational facility" is defined as a recreational activity that is integrated into the natural landscape and does not substantially change preconstruction grades or deviate from natural landscape contours. For the purpose of this permit, the primary function of recreational facilities does not include the use of motor vehicles, buildings, or impervious surfaces. Examples of recreational facilities that may be authorized by this NWP include hiking trails, bike paths, horse paths, nature centers, and campgrounds (excluding trailer parks). "Phis NWP may authorize the construction or expansion of golf courses and the expansion of ski areas, provided the golf course or ski area does not substantially deviate from natural landscape contours. Additionally, these activities are designed to minimize adverse effects to waters of the US and riparian areas through the use of such practices as integrated pest management, adequate stormwater management facilities, vegetated buffers, reduced fertilizer use, etc. The facility must have an adequate water quality management plan in accordance with General Condition 9, such as a stormwater management facility, to ensure that the recreational facility results in no substantial adverse effects to water quality. This NWP also authorizes the construction or expansion of small support facilities, such as maintenance and storage buildings and stables that are directly related to the recreational activity. This NWP does not authorize other buildings, such as hotels, restaurants, etc. The construction or expansion of playing fields (e.g., baseball, soccer, or football fields), basketball and tennis courts, racetracks, stadiums, arenas, and the construction of new ski areas are not authorized by this N4VP. (Section 404) 43. Storm water Monogernent Facilities. Discharges of dredged or fill material into non-tidal waters of the US, excluding non-tidal wetlands adjacent to tidal waters, for the construction and maintenance of stormwater management facilities, including activities for the excavation of stormwater ponds/ facilities, cletention basins, and retention basins; the installation and maintenance of water control structures, outfall structures and emergency spillways; aril the maintenance dredging of existing stormwater management ponds/facilities and detection and retention basins, provided the activity meets all of the following criteria: a. The discharge for the construction of new stormwater management facilities does not cause the loss of greater than '/,-acre of non-tidal waters of the US, excluding non-tidal wetlands adljacent to tidal waters; h. The discharge does not cause the loss of greater than 300 linear-feet of a stream bed, unless for intermittent stream beds this criterion is waived in writing pursuant to a determination by the District Engineer, as specified below, that the project complies with all terms and conditions of this NWP and that any adverse impacts of the project on the aquatic environment are minimal, both individually and cumulatively; c. For discharges causing the loss of greater than 300 linear feet of intermittent stream beds, the permittee notifies the District Engineer in accordance with the "Notification" General Condition 13. In such cases, to be authorized the District Engineer must determine that the activity complies with the other terms and conditions of the NWP, determine the adverse environmental effects are minimal both individually and cumulatively, and waive this limitation in writing before the permittee may proceed; d. The discharges of dredged or fill material for the construction of new stormwater management facilities in perennial streams is not authorized; e. For discharges or excavation for the construction of new stormwater management facilities or for the maintenance of existing stormwater management facilities causing the loss of greater than'/,o-acre of non-tidal waters, excluding non-tidal wetlands adjacent to tidal waters, provided the permittee notifies the District Engineer in accordance with the "Notification" General Condition 13. In addition, the notification must include: (1) A maintenance plan. The maintenance plan should be in accordance with state and local requirements, if any such requirements exist; (2) For discharges in special aquatic sites, including wetlands and submerged aquatic vegetation, the notification must include a delineation of affected areas; and (3) A compensatory mitigation proposal that offsets the loss of waters of the US, Maintenance in constructed areas will riot require mitigation provided such maintenance is accomplished in designated maintenance areas and not within compensatory mitigation areas (i.e., District Engineers may designate non- maintenance areas, normally at the cownstream end of the stormwater management facility, in existing stormwater management facilities). (No mitigation will be required for activities that are exempt from Section 404 permit requirements); f. The permittee must avoid and minimize discharges into waters of the US at the project site to the maximum extent practicable, and the notification must include a written statement to the District Engineer detailing compliance with this condition (i.e, why the discharge must occur in waters of the US and why additional minimization cannot be achieved); g. The stormwater management facility must comply with General Condition 21 and be designed using BMPs and watershed protection techniques. Examples may include forebays (deeper areas at the upstream end of the stormwater management facility that would be maintained through excavation), vegetated buffers, and siting considerations to minimize adverse effects to aquatic resources. Another example of a BMP would be bioengineering methods incorporated into the facility design to benefit water quality and minimize adverse effects to aquatic resources from storm flows, especially downstream of the facility, that provide, to the maximum extent practicable, for long term aquatic resource protection and enhancement; Ii. Maintenance excavation will be in accordance with an approved maintenance plan and will not exceed the original contours of the facility as approved and constructed; and i. The discharge is part of a single and complete project. (Section 404) 44. Mining Activities. Discharges of dredged or fill material into: W Isolated waters; streams where the annual average flow is 1 cubic foot per second or less, and non-tidal wetlands adjacent to headwater streams, for aggregate mining (i.e., sand, gravel, and crushed and broken stone) and associated support activities; (ii) Lower perennial streams, excluding wetlands adjacent to lower perennial streams, for aggregate mining activities (support activities in lower perennial streams or adjacent wetlands are not authorized by this NWP); arid/ or (iii) Isolated waters and non-tidal wetlands adjacent to headwater streaurs, for hard rock/mineral ruining activities (i.e., extraction of metalliferous orc;s from subsurface locations) and associated support activities, provided the discharge meets the following criteria: a. The mined area within waters of the US, plus the acreage loss of waters of the US resulting front support activities, cannot exceed V?-acre; b. The permittee must avoid and minimize discharges into waters of thL! Federal Register / Vol. 67, No. 10 / Tuesday, January 15, 2002/Notices 2089 US at the project site to the maximum extent practicable, and the notification complete mining operation can be authorized by this NWI' provided the waterbody, including those species that normally migrate throu h the area must include a written statement detailing compliance with this '/ -acre limit is not exceeded; and I. Notification: The permittee must g , sinless the activity's primary purpose is i condition (i. e., why the discharge must notify the District Engineer in to mpound water. Culverts placed in streams must be installed to maintain occur in waters of the US and why additional minimization cannot be accordance with General Condition 13. The notification must include: (1) A low flow conditions. 5 E i achieved); c. In addition to General Conditions description of waters of the US adversely affected by the roject (2) A . qu pment. Heavy equipment working in wetlands must be placed on t h 17 and 20, activities authorized by this p ; written statement to the District ma s, or ot er measures must be taken to minimize soil disturbance permit must not substantially alter the sediment characteristics of areas of Engineer detailing compliance with paragraph (b), above (i.e., why the . 6. Regional and Case-fay-Case Conditions. The activity must comply concentrated shellfish beds or fish discharge must occur in waters of the with any regional conditions that may spawning areas. Normally, the US and why additional minimization have been added by the Division mandated water quality management plan should address thes i t cannot be achieved); (3) A description of Engineer (see 33 CFR 330.4(e)), e mpac s; d. The permittee must implement measures taken to ensure that the proposed work complies with Additionally, any case specific conditions added by the Corps or by the necessary measures to prevent increases in stream gradient and water velocities paragraphs (c) through (f), above; and (4) A reclamation plan (for aggregate state or tribe in its Section 401 Water Quality Certification and Coastal Zone and to prevent adverse effects (e.g., head cutting, bank erosion) to upstream and mining in isolated waters and non-tidal wetlands adjacent to headwaters and Management Act consistency determination downstream channel conditions; hard rock/mineral mining only). . 7. Wild and Scenic Rivers. No activity e. Activities authorized by this permit must not result in adverse effects on the This NWP does not authorize hard rock/mineral mining, including placer may occur in a component of the National Wild and Scenic River System; course, capacity, or condition of navigable waters of the US mining, in streams. No hard rock/ or in a river officially designated by " ; f. The permittee must use measures to mineral mining can occur in waters of the US within 100 feet of the ordinary Congress as a study river" for possible inclusion in the system, while the river minimize downstream turbidity; g. Wetland impacts must be high water mark of headwater streams. ' '' is in an official study status; unless the compensated through mitigation The term s headwaters'' and "isolated " appropriate Federal agency, with direct appproved by the Corps; h. Beneficiation and mineral waters are defined at 33 CFR 330.2(d) and (e), respectively. For the purposes management responsibility for such river, has determined in writing that the processing for hard rock/mineral mining of this NWP, the terra ''lower perennial stream" is defined as follows: "A stream proposed activity will not adversely affect the Wild and Scenic River activities may not occur within 200 feet of the ordinary high water mark of an in which the gradient is low and water designation, or study status. Information y open waterbody. Although the Corps velocity is slow, there is no tidal on Wild and Scenic Rivers may be does not regulate discharges from these influence, some water flows throughout obtained from the appropriate Federal activities, a CWA section 402 permit the year, and the substrate consists land management agency in the area may be required; mainly of sand and n1ud." (Sections 10 (e.g., National Park Service, U.S. Forest i. All activities authorized must and 404) Service, Bureau of Land Management, comply with General Conditions 9 and C. Nationwide Permit General U.S. Fish and Wildlife Service). 8. Tribal Rights. No activity or its 21. Further, the District Engineer may require modifications to the required Conditions h operation may impair reserved tribal water quality management plan to T e following General Conditions must be followed in order for anv rights, including, but not limited to, reserved water rights and treaty fishing ensure that the authorized work results in minimal adverse effects to w t authorization by an NWP to be valid: and hunting rights. a er quality; 1. Navigation. No activity may cause 9. Water Quality. (a) In certain states j. Except for aggregate mining more than a minimal adverse effect on and tribal lands an individual 401 Water activities in lower perennial streams, no navigation. 2. Proper Maintenance. Any structure Quality Certification must be obtained or waived (See 33 CFR 330A(c)) aggregate mining can occur within stream beds where the avera e l or fill authorized shall be properly . (h) For NwYs 12, 14, 17, 18, 32, 39, g annua flow is greater than 1 cubic foot per maintained, including maintenance to ensure public safety. 40, 42, 43, and 44, where the state or tribal 401 certification (either second or in waters of the US within 3. Soil Erosion and Sediment generically or individually) does not 100 feet of the ordinary high water mark of headwater stream segments where the Controls. Appropriate soil erosion and sediment controls must be u d d require or approve water quality average annual flow of the stream is se an maintained in effective operating management measures, the permittee must provide water quality management greater than 1 cubic foot per second (a re at i i condition during construction, and all measures that will ensure that the gg g e m n ng call occur in areas immediately adjacent to the ordinary exposed soil and other fills, as well as any work below the ordinary high water authorized work does not result in more than minimal degradationi of water high water mark of a stream where the mark or high tide line, must be quality (or the Corps determines that average annual flow is 1 cubic foot per permanently stabilized at the earliest compliance with state or local second or less); k. Single and complete project: The practicable date. Permittees are encouraged to perform work within standards, where applicable, will ensure no more than minimal adverse effect on discharge must be for a single and complete project includin su ort waters of the United States during i f l d l water quality). An important component , g PP activities. Discharges of dredged or fill per s o ow-f o ow or no-flow. 4. Aquatic Life Xfovernents. No of water quality management includes stornwater management that minimizes material into waters of the US for multiple mining activities on several activity may substantially disrupt the necessary life-c cle m v ts f th degradation of the downstream aquatic designated parcels of a single and y o emen o ose species of aquatic life indigenous to the system, including water quality (refer to General Condition 21 for stormwater 2090 Federal Register/Vol. 67, No. 10/Tuesday, January 15, 2002/Notices management requirements). Another important component of water quality endspp.html and http: A"v v.nfms,gOvl prot res/esahome htrnl res ecti l written notice from the District or management is the establishment and maintenance of vegetated buffers next to _ . p ve y. 12. Historic Properties. No activity which may affect historic ro erties Division Engineer. Subsequently, the permittee's right to proceed under the open waters, including streams (refer to General Condition 19 for ve etat d p p listed, or eligible for listing, in the Natio l R i f NWP may be, modified, suspended, or revoked only in accordance with the g e buffer requirements for the NWPs). na eg ster o Historic Places is authorized, until the District En ineer procedure set forth in 33 CFR 'I'bis condition is only applicable to h g has complied with the provisions of 33 330.5(d)(2). (b) Contents of Notification: Th projects t at have the potential to affect water quality. While appropriate CFR part 325, Appendix C. The prospective permittee must notify the e notification must be in writing and measures must be taken, in most cases it is t District Engineer if the authorized include the following information: (1) Name, address and tele hone no necessary to conduct detailed studies to identify such measures or to activity may affect any historic properties listed, determined to be p numbers of the prospective permittee; require monitoring. eligible, or which the prospective (2) Location of the proposed project; 10. Coastal Zone Management. In permittee has reason to believe may be (3) Brief description of the proposed certain states, an individual state coastal eligible for listing on the National R roject's project; the ro) purpose; ect s direct and indirect adverse environment l ff zone management consistency concurrence must be obtained or waived egister of Historic Places, and shall not begin the activity until notified by the a e ects the project would cause; any other (see Section 330.4(d)). District Engineer that the requirements NWP(s)' Regional General Permit(s), or 11. Endangered Species. (a) No of the National Historic Preservation Act h b Individual Permit(s) used or intended to be used to authorize an art of th activity is authorized under any NWP which is likely to jeopardize the ave een satisfied and that the activity is authorized. Information on the y p e proposed project or any related activity. continued existence of a threatened or location and existence of historic Sketches should be provided when endangered species or a species proposed for such designation as as resources can be obtained from the State Historic Preservation Office and the necessary to show that the activity complies with the terms of the NWP , identified under the Federal En dangered National Register of Historic Places (see (Sketches usually clarify the project and Species Act (ESA), or which will 33 CFR 330.4(8)). For activities that may ff when provided result in a quicker decision ) destroy or adversely modify the critical a ect historic properties listed in, or . ; C4) F NWP habitat of such species. Non-federal eligible for listing in, the National or s 7, 12, 14, 18, 21, 34, 38, permittees shall notify the District Engineer if any listed species or Register of Historic Places, the notification must state which historic 39, 41, 42, and 43, the PCN Hurst also include a delineation of affected special designated critical habitat might be property may be affected by the a q sites, includin wetlands, q g affected or is in the vicinity of the proposed work or include a vicinit vicinity vegetated shallows (e.g., submerged project, or is located in the designated iti l h b map indicating the location of the historic pro ert aquatic vegetation, seagrass beds), arid riffle and pool complexes (see para ra h cr ca a itat and shall not begin work on the activity until notified by the p y, 13. Notification. g p 13(f))• District Engineer that the requirements D (a) Timing; where required by the (5) For NWP 7 (Outfall Structures and the ESA have been satisfied and that terms of the NWP, the prospective Maintenance), the PCN must include the activity is authorized. For activities permittee must notify the District information regarding the original that may affect Federally-listed Engineer with a preconstruction design capacities and configurations of endangered or threatened species or notification (PCN) as early as possible. those areas of the facility where designated critical habitat the The District Engineer must determine if maintenance dredging or excavation is , notification must include the name(s) of the endangered or threatened species the notification is complete within 30 days of the date of receipt and can proposed; (6) For NWP 14 (Linear that may be affected by the proposed request additional information Transportation Crossings), the PCN work or that utilize the desi nated necessary to make the PCN complete must include a compensatory mitigation g critical habitat that may be affected by only once. However, if the prospective proposal to offset permanent losses of the proposed work. As a result of formal permittee does not provide all of the waters of the US and a statement or informal consultation with the FWS requested information, then the District describing how temporary losses of or NMFS the District Engineer may add Engineer will notify the prospective waters of the US will be minimized to species-specific regional endangered permittee that the notification is still the maxinnuu extent practicable; species conditions to the NWPs incomplete and the PCN review process (7) For NWP 21 (Surface Coal Mining . (b) Authorization of an activity by a will not commence until all of the Activities), the PCN must include an NWP does not authorize the "take" of a requested information has been received Office of Surface Mining (OSM) or state- threatened or endangered species as by the District Engineer. The approved mitigation plan, if applicable. defined under the ESA. In the absence prospective permittee shall not begin the activity To be authorized by this NWP, the District Engineer must determine th t of separate authorization (e.g., an ESA Section 10 Permit a Biolo ical O i i (1) Until notified in writing by the a the activity complies with the terms and , g p n on with "incidental take" provisions, etc.) District Engineer that the activity may proceed under the NWP with any conditions of the NWP and that the adverse erivirounreutal effects are from the USFWS or the NMFS, both lethal and non-lethal "takes" of special conditions imposed by the minimal both individually and protected species are in violation of the District or Division Engineer; or (2) If notified in writing by the District cumulatively and must notify the project sponsor of this determination in ESA. Information on the location of threatened and endangered s ecies and or Division Engineer that an Individual P writing; ' p their critical habitat can be obtained directly from the offices of the USFWS ermit is required; or (3) Unless 45 days have passed from h ' (8) E or NWP 27 (Stream and Wetland Restoration), the PCN Hurst include and NMFS or their world wide web t e District E:ngineer s receipt of the complete notification and the documentation of the prior condition of the site that will be reverted by the pages at burp://rvwrv.fws.gov/r9endspp/ prospective permittee has not received permittee; Federal Register/Vol. 67, No. 10/Tuesday, January 15. 2002 / Nnti(Iec 1) n0 1 (9) For NWP 29 (Single-Family housing), the PCN must also include: (i) Any past use of this NWP by the Individual Permittee and/or the permittee's spouse; (ii) A statement that the single-family housing activity is for a personal residence of the permittee; (iii) A description of the entire parcel, including its size, and a delineation of wetlands. For the purpose of this NWP, parcels of land measuring '/a-acre or less will not require a formal on-site delineation. However, the applicant sliall provide an indication of where the wetlands are and the amount of wetlands that exists on the property. For parcels greater than 1/4-acre in size, formal wetland delineation must be prepared in accordance with the current method required by the Corps. (See paragraph 13(f)); (iv) A written description of all land (including, if available, legal descriptions) owned by the prospective permittee and/or the prospective permittee's spouse, within a one mile radius of the parcel, in any form of ownership (including any land owned as a partner, corporation, joint tenant, co-tenant, or as a tenant-by-the-entirety) and any land on which a purchase and sale agreement or other contract for sale or urchase has been executed; 110) For MVP 31 (Maintenance of Existing Flood Control Projects), the prospective permittee must either notify the District Engineer with a PCN prior to each maintenance activity or submit a five year (or less) maintenance plan. In addition, the PCN must include all of the following: (i) Sufficient baseline information identifying the approved channel depths and configurations and existing facilities. Minor deviations are authorized, provided the approved flood control protection or drainage is not increased; (ii) A delineation of any affected special aquatic, sites, including wetlands; and, (iii) Location of the dredged material disposal site; (11) For NkVP 33 ("Temporary Construction, Access, and Dewatering), the PCN must also include a restoration plan of reasolMble measures to avoid and minirize adverse effects to aquatic resources; (12) For NWPs 39, 43 and 4.1, the PCN must also include a written statement to the District Engineer explaining how avoidance and minimization for losses of waters of the US were achieved on the project site; (13) For NWI' 39 and N4VP 42, the PCN must include a compensatory mitigation proposal to offset losses of waters of the US or justification explaining why compensatory rnitigation should not he required. For discharges that cause the loss of greater than 300 linear feet of an intermittent stream bed, to be authorized, the Distric Engineer must determine that the activity complies with the other terms and conditions of the NMI, determine adverse environmental effects are minimal both individually and s ctmllrlatively, and waive the limitation on stream impacts in writing before the permittee may proceed; (14) For NMI 40 (Agricultural Activities), the PCN must include a compensatory mitigation proposal to offset losses of waters of the US. This NWP does not authorize the relocation of greater than 300 linear-feet of existing serviceable drainage ditches constructed in non-tidal streams unless, for drainage ditches constructed in intermittent non- ticlat streams, the District Engineer waives this criterion in writing, and the District Engineer has determined that the project complies with all terms and conditions of this NWP, and that any adverse impacts of the project on the aquatic environment are minimal, both individually and cumulatively; (15) For NWP 43 (Storrnwater Management Facilities), the PCN must include, for the construction of new stormwater management facilities, a maintenance plan (in accordance with state and local requirements, if applicable) and a compensatory mitigation proposal to offset losses of waters of the US. For discharges that cause the loss of greater than 300 linear feet of an intermittent stream bed, to be authorized, the District Engineer must determine that the activity complies with the other terms and conditions of the MVP, determine adverse environmental effects are minimal both individually and cumulatively, and waive the limitation on stream impacts in writing before the permittee may proceed; (16) For MVP 44 (Mining Activities), the PCN must include a description of all waters of the US adversely affected by the project, a description of measures taken to minimize adverse effects to waters of the US, a description of measures taken to comply with the criteria of the NMI, and a reclamation plan (for all aggregate mining activities in isnlated waters and non-tidal wetlands adjacent to headwaters and any hard rock-hiiineral mining activities); (17) For activities that may adversely affect Federally-listed endangered or threatened species, the PCN trust include the name(s) of those endangered or threatened species that may be affected by the proposed work or utilize the designated critical habitat that may be affected by the proposed work; and (18) For activities that may affect historic properties listed in, or eligible t for listing in, the National Register of Historic Places, the PCN must state which historic property may be affected by the proposed work or include a vicinity map indicating the location of the historic property. (c) Form of Notification: The standard Individual Permit application form (Form ENG 4345) may be used as the notification but must clearly indicate that it is a PCN and must include all of the information required in (b) (1)--(18) of General Condition 13. A letter containing the requisite information may also be used. (d) District Engineer's Decision: In reviewing the PCN for the proposed activity, the District Engineer will determine whether the activity authorized by the NWP will result in more than minimal individual or cumulative adverse environmental effects or may be contrary to the public interest, The prospective permittee may submit a proposed mitigation plan with the PCN to expedite the process. The District Engineer will consider any proposed compensatory mitigation the applicant has included in the proposal in determining whether the net adverse environmental effects to the aquatic environment of the proposed work are minimal. If the District Engineer determines that the activity complies with the terms and conditions of the NWP and that the adverse effects on the aquatic environment are minimal, after considering mitigation, the District Engineer will notify the permittee and include any conditions the District Engineer deems necessary. The District Engineer must approve any compensatory mitigation proposal before the permittee commences work. If the prospective permittee is required to submit a compensatory mitigation proposal with the PCN, the proposal may be either conceptual or detailed. If the prospective permittee elects to submit a compensatory mitigation plan with the PCN, the District Engineer will expeditiously review the proposed compensatory mitigation plan. The District I{ngineer must review the plan within 45 clays of receiving a complete PCN and determine whether the conceptual or specific proposed mitigation would ensure no more than minimal adverse effects on the aquatic environment. If the net adverse effects of the project on the aquatic environment (after consideration of the compensatory mitigation proposal) are determined by the District Engineer to 2092 Federal Register/Vol. 67, No. 10/Tuesday, January 15, 2002/Notices be minimal, the District Engineer will provide a tirnely written response to the applicant. The response will state that the project can proceed under the terms and conditions of the NWP. If the District Engineer determines that the adverse effects of the proposed work are more than minimal, then the District Engineer will notify the applicant either: (1) That the project does not qualify for authorization under the NWP and instruct the applicant on the procedures to seek authorization under an Individual Permit; (2) that the project is authorized under the NWP subject to the applicant's submission of a mitigation proposal that would reduce the adverse effects on the aquatic environment to the minimal level; or (3) that the project is authorized tinder the NWP with specific modifications or conditions. Where the District Engineer determines that mitigation is required to ensure no more than minimal adverse effects occur to the aquatic environment, the activity will be authorized within the 45-day PCN period. The authorization will include the necessary conceptual or specific mitigation or a requirement that the applicant submit a mitigation proposal that would reduce the adverse effects on the aquatic environment to the minimal level. When conceptual mitigation is included, or a mitigation plan is required under item (2) above, no work in waters of the US will occur until the District Engineer has approved a specific mitigation plan. (e) Agency Coordination: The District Engineer will consider any comments from Federal and state agencies concerning the proposed activity's compliance with the terms and conditions of the NWPs and the need for mitigation to reduce the project's adverse environmental effects to a minimal level. , For activities requiring notification to the District Engineer that result in the loss of greater than 1/2-acre of waters of the US, the District Engineer will provide immediately (e.g., via facsimile transmission, overnight mail, or other expeditious manner) a copy to the appropriate Federal or state offices (USFWS, state natural resource or water quality agency, EPA, State Historic Preservation Officer (SHPO), and, if appropriate, the NMFS), With the exception of NWP 37, these agencies will then have 10 calendar days from the date the material is transmitted to telephone or fax the District Engineer notice that they intend to provide substantive, site-specific comments. If so contacted by an agency, the District Engineer will wait an additional 15 calendar days before making a decision on the notification. The District Engineer will fully consider agency comments received within the specifiecl time frame, but will provide oo response to the resource agency, except as provided below. The District Engineer will indicate in the administrative record associated with each notification that the resource agencies' concerns were considered. As required by section 305(b)(4)(F1) of the Ma.nugon-Stevens Fishery Conservation and Management Act, the District Engineer will provide a response to NMFS within 30 days of receipt of any Essential Fish Habitat conservation recommendations. Applicants are encouraged to provide the Corps multiple copies of notifications to expedite agency notification. (f) Wetland Delineations: Wetland delineations must be prepared in accordance with the current method required by the Corps (For NWP 29 see paragraph (b)(9)(iii) for parcels less than ('/'-acre in size). The permittee may ask the Corps to delineate the special aquatic site. There may be some delay if the Corps does the delineation. Furthermore, the 45-day period will not start until the wetland delineation has been completed and submitted to the Corps, where appropriate. 14. Compliance Certification. Every permittee who has received NWP verification front the Corps will submit a signed certification regarding the completed work and any required mitigation. The certification will be forwarded by the Corps with the authorization letter and will include: (a) A statement that the authorized work was done in accordance with the Corps authorization, including any general or specific conditions; (b) A statement that any required mitigation was completed in accordance with the permit conditions; and (c) The signature of the permittee certifying the completion of the work and mitigation. 15. Use of Multiple Nationwide Permits. The use of more than one NWP for a single and complete project is prohibited, except when the acreage loss of waters of the US authorized by the NWPs does riot exceed the acreage limit of the NWP with the highest specified acreage limit (e,g. if a road crossing over tidal waters is constructed under NWP 14, with associated bank stabilization authorized by NWP 13, the maximum acreage loss of waters of the US for the total project cannot exceed'/,-acre). 16. 6Vater Supply Intakes. No activity, including structures and work in navigable waters of the US or discharges of dredged or fill material, pray occur it, the proximity of a public water supply intake except where the activity is for repair of the public water supply intake structures or adjacent bank stabilization. 17. Shellfish Beds. No activity, including structures and work in navigable waters of the US or discharges of dredged or fill material, may occur in areas of concentrated shellfish populations, unless the activity is directly related to a shellfish harvesting activity authorized by NWP 4. 18. Suitable Material. No activity, including structures and work in navigable waters of the US or discharges of dredged or fill material, may consist of unsuitable material (e.g., trash, debris, car bodies, asphalt, etc.) and material used for construction or discharged must be free from toxic pollutants in toxic amounts (see section 307 of the CWA), 19. Mitigation. The District Engineer will consider the factors discussed below when determining the acceptability of appropriate and practicable mitigation necessary to offset adverse effects on the aquatic environment that are more than minimal. (a) The project must be designed and constructed to avoid and minimize adverse effects to waters of the US to the maximum extent practicable at the project site (i.e., on site), (b) Mitigation in all its forms (avoiding, minimizing, rectifying, reducing or compensating) will be required to the extent necessary to ensure that the adverse effects to the aquatic environment are minimal. (c) Compensatory mitigation at a minimum one-for-one ratio will be required for all wetland impacts requiring a PCN, unless the District Engineer determines in writing that some other form of mitigation would be more environmentally appropriate and provides a project-specific waiver of this requirement. Consistent with National policy, the District Engineer will establish a preference for restoration of wetlands as compensatory mitigation, with preservation used only in exceptional Circumstances. (d) Compensatory rnitigation (i.e., replacenient or substitution of aquatic resources for those impacted) will not be used to increase the acreage losses allowed by the acreage limits of some of the NWPs. For example,'/4-acre of wetlands cannot be created to change a /4-acre loss of wetlands to a Ih-acre loss associated with NWP 39 verification. Ilowever, '/t-acre of created wetlands can be used to reduce the impacts of a 1/1-acre loss of wetlands to the mininnmi impact level in order to meet the Federal Register / Vol. 67, No. 10/Tuesday, January 15, 2002/Notices 2093 minimal impact requirement associated with NWP accomplishing and/or complying with discharges of dredged or fill material s. (e) To be practicable, the mitigation the mitigation plan. 20. Spawning Areas. Activities, , into breeding areas for migratory waterfowl must be avoided to the must be available and capable of being done considering costs, existing including structures and work in maximum extent practicable. navigable waters of the US or dischar es 24 R l technology, and logistics in light of the g of dredged or fill material, in spawning . emova of Temporary Fills. Anv temporary fills must be removed in their overall project purposes. Examples of areas during spawning seasons must be entirety and the affected areas returned mitigation that may be appropriate and avoided to the maximum extent to their preexisting elevation practicable include, but are not limited practicable. Activities that result in the , 25. Designated Critical Resource to: reducing the size of the project; physical destruction (e.g., excavate, fill, Waters. Critical resource waters include establishing and maintaining wetland or or smother downstream by substantial , NOAA-designated marine sanctuaries upland vegetated buffers to protect open , turbidity) of an important spawning area National Estuarine Research Reserves waters such as streams; and replacing are not authorized. , National Wild and Scenic Rivers losses of aquatic resource functions and 21. Management of Water Flows. To , critical habitat for Federally listed values by creating, restoring, enhancing, the maximum extent practicable, the threatened and endangered species, or preserving similar functions and activity must be designed to maintain coral reefs, state natural heritage sites values, preferably in the same preconstruction downstream flow , and outstanding national resource watershed. conditions (e.g., location, capacity, and waters or other waters officially (f) Compensatory mitigation plans for flow rates). Furthermore, the activity designated by a state as having projects in or near streams or other open must not permanently restrict or impede the as f l particular environmental or ecoloical ' waters will normally include a p sage o norma or expected high significance and identified by the requirement for the establishment, i t d flows (unless the primary purpose of the fill is to im ound waters) d th District Engineer after notice and ma n enance, an legal protection (e.g., easements, deed restrictions) of p an e structure or discharge of dredged or fill opportunity for public comment. The District Engineer may also designate vegetated buffers to open waters. In material must withstand expected high additional critical resource waters after many cases, vegetated buffers will be flows. The activity must, to the notice and opportunity for comment. the only compensatory mitigation maximum extent practicable, provide (a) Except as noted below, discharges required. Vegetated buffers should for retaining excess flows from the site, of dredged or fill material into waters of consist of native species. The width of provide for maintaining surface flow the US are not authorized by MVPs 7, the vegetated buffers required will rates from the site similar to 12, 14, 16, 17, 21, 29, 31, 35, 39, 40, 42, address documented water quality or preconstruction conditions, and provide 43, and 44 for any activity within, or aquatic habitat loss concerns. Normally, for not increasing water flows from the directly affecting, critical resource the vegetated buffer will be 25 to 50 feet project site, relocating water, or waters, including wetlands adjacent to wide on each side of the stream, but the redirecting water flow beyond such waters. Discharges of dredged or District Engineers may require slightly wider vegetated buffers to address Stream channelizingtwill berreduced to the aters brel uthorizediby the above NWPs in ay Y documented water quality or habitat minimal amount necessary, and the National Wild and Scenic Rivers if the loss concerns. Where both wetlands and Where activity must, to the maximum extent activity complies with General open waters exist the project site, the Corps will determine the appropriate practicable, reduce adverse effects such as flooding or erosion downstream and Condition 7. Further, such discharges may be authorized in designated critical compensatory mitigation (e.g., stream upstream of the project site, unless the habitat for Federally listed threatened or buffers or wetlands compensation) based on what is best for the aquatic at activity is part of a larger system designed to manage water flows. In most endangered species if the activity complies with General Condition 11 and environment a watershed basis. In cases, it will not be a requirement to conduct detailed studies and it i the USFWS or the NMFS has concurred cases where vegetated buffers are mon or ng of water flow in a determination of compliance with determined to be the most appropriate form of compensatory mitigation the . This condition is only applicable to this condition. (b) For MVPs 3, 8, 10, 13, 15, 18, 19, , District Engineer'rnay waive or reduce the requirement to provide wetland projects that have the potential to affect waterflows. While appropriate measures 22, 23, 25, 27, 28, 30, 33, 34, 36, 37, and 38, notification is required in compensatory mitigation for wetland impacts. must be taken, it is not necessary to conduct detailed studies to identify accordance with General Condition 13, for any activity proposed in the (g) Compensatory mitigation p roposals submitted with th such treasures or require monitoring to ensure their effectiveness. Normally, the designated critical resource waters including wetlands adjacent to those e 11 notification'' may be either conceptual or detailed. If conceptual plans are Corps will defer to state and local authorities regarding management of waters. The District Engineer may authorize activities under these MVPs approved under the verification, then water flow. 22. Adverse Fffects From only after it is determined that the i the Corps will condition the verification to require detailed plans be submitted lrnpournrhnents. If the activity creates an mpacts to the critical resource waters will be no more than minimal. and approved by the Corps prior to impoundment of water, adverse effects to the aquatic; system due to the 26. Fills Within 100-Year Floodplains. F construction of the authorized activity in waters of the US acceleration of the passage of water, or purposes of this General Condition, 100-year floodplains will be identified , (h) Permittees may propose the use of and/or the restricting its flow shall be minimized to the maxinulm extent through the existing Federal Emergency Management Agency's (FEMA) Flood mitigation banks, in-lieu fee arrangements or separate activity- f practicable. This includes structures and work in navigable waters of the US, Insurance Rate Maps or FEMA-approved local floodplain maps Speci ic compensatory mitigation. In all cases that require compensator or discharges of dredged or fill material. 23 4Y t l . (a) Dis•chorges in F'loodplain; Belorv y mitigation, the mitigation provisions . a er foa Breeding Areas. Activities, including structures and Fleacltvaters. Discharges of dredged or fill material into waters of the LIS within will specify the party responsible for work in navigable waters of the US or the mapped 100-year floodplain, below 2094 Federal Register/Vol. 67, No. 10 / Tuesday, January 15, 2002/Notices headwaters (i.e. five cfs), resulting in permanent above-grade fills, are not authorized by NWPs 39, 40, 42, 43, and 44. (b) Dischorges in Floodwoy; Above Headwaters. Discharges of dredged or fill material into waters of the US within the FF.MA or locally mapped floodway, resulting in permanent above-grade fills, are not authorized by NWPs 39, 40, 42, and 44. (c) The permittee must comply with any applicable FEMA-approved state or local floodplain management requirements. 27. Construction Period. For activities that have not been verified by the Corps and the project was commenced or under contract to commence by the expiration date of the NWP (or modification or revocation date), the work must be completed within 12- months after such date (including any modification that affects the project). For activities that have been verified and the project was commenced or under contract to commence within the verification period, the work must be completed by the date determined by the Corps. For projects that have been verified by the Corps, an extension of a Corps approved completion date maybe requested. This request must be submitted at least one month before the previously approved completion date. D. Further Information 1. District Engineers have authority to determine if an activity complies with the terms and conditions of an MVP. 2. NWPs do not obviate the need to obtain other Federal, state, or local permits, approvals, or authorizations required by law. 3. NWPs do not grant any property rights or exclusive privileges. 4. NWPs do not authorize any injury to the property or rights of others. 5. NWPs do not authorize interference with any existing or proposed Federal project. E. Definitions Best Management Practices (BMI's): BMPs are policies, practices, procedures, or structures implemented to mitigate the adverse environmental effects on surface water quality resulting from development. BMPs are categorized as structural or non- structural. A BMP policy may affect the limits on a development. Compensatory Mitigation: For purposes of Section 10/404, compensatory mitigation is the restoration, creation, enhancement, or in exceptional circumstances, preservation of wetlands and/or other aquatic resources for the purpose of compensating for unavoidable adverse impacts which remain after all appropriate and practicable avoidance and rninirnization has been achieved. Creation: The establishment of a wetland or other aquatic resource where one did not formerly exist. Enhancement: Activities conducted in existing wetlands or other aquatic resources that increase one or more aquatic'functions. Ephemeral Stream: An ephemeral stream has flowing water only during and for a short duration after, precipitation events in a typical year. Ephemeral stream beds are located above the water table year-round. Groundwater is not a source of water for the stream. Runoff from rainfall is the primary source of water for stream flow. Farm Tract: A unit of contiguous land under one ownership that is operated as a farm or part of a.farrn. Flood Fringe: That portion of the 100- year floodplain outside of the floodway (often referred to as "floodway fringe"). Floodrvay: The area regulated by Federal, state, or local requirements to provide for the discharge of the base flood so the cumulative increase in water surface elevation is no more than a designated amount (not to exceed one foot as set by the National Flood Insurance Program) within the 100-year flood lain. Independent Utility: A test to determine what constitutes a single and complete project in the Corps regulatory program. A project is considered to have independent utility if it would be constructed absent the construction of other projects in the project area. Portions of a multi-phase project that depend upon other phases of the project do not have independent utility. Phases of a project that would be constructed even if the other phases were not built can be considered as separate single and complete projects with independent utility. Intermittent Stream: An intermittent stream has flowing water during certain times of the year, when groundwater provides water for stream flow. During dry periods, intermittent streams niav not have flowing water. Runoff from rainfall is a supplemental source of water for stream flow. Loss of Waters of the US: Waters of the US that include the filled area and other waters that are permanently adversely affected by flooding, excavation, or drainage because of the regulated activity. Permanent adverse effects include permanent above-grade, at-grade, or below-grade fills that change an aquatic area to dry land, increase the bottom elevation of a waterbody, or c}range the use of a waterbody. The acreage of loss of waters of the US is the threshold measurement of the impact to existing waters for determining whother a project may qualify for an N%VI'; it is not a net threshold that is calculated after considering compensatory mitigation that may be used to offset losses of aquatic functions and values. The loss of stream bed includes the linear feet of stream bed that is filled or excavated. Waters of the US temporarily filled, flooded, excavated, or drained, but restored to preconstruction contours and elevations after construction, are not included in the measurement of loss of waters of the US, impacts to ephemeral waters are only not included in the acreage or linear foot measurements of loss of waters of the US or loss of stream bed, for the purpose of determining compliance with the threshold limits of the NWPs. Non-tidal Wetlond: A non-tidal wetland is a wetland (i.e., a water of the US) that is not subject to the ebb and flow of tidal waters. The definition of a wetland can be found at 33 CFR 328.3(b). Non-tidal wetlands contiguous to tidal waters are located landward of the high tide line (i.e., spring high tide line). Open Water: An area that, during a year with normal patterns of precipitation, has standing or flowing water for sufficient duration to establish an ordinary high water mark. Aquatic vegetation within the area of standing or flowing water is either non-emergent, sparse, or absent. Vegetated shallows are considered to be open waters. The term "open water" includes rivers, streams, lakes, and ponds. For the purposes of the NWPs, this term does not include ephemeral waters. Perennial Stream: A perennial stream has flowing water year-round during a typical year. The water table is located above the stream bed for most of the year. Groundwater is the primary source of water for stream flow. Runoff from rainfall is a supplemental source of water for stream flow. Permanent Above-grade Fill: A discharge of dredged or fill material into waters of the US, including wetlands, that results in a substantial increase in ground elevation and permanently converts part or all of the waterbody to dry land. Structural fills authorized by NWPs 3, 25, 36, etc. are not included. Preservation: The protection of ecologically important wetlands or other aquatic resources in perpetuity through the implementation of appropriate legal and physical mechanisms. Preservation may include protection of upland areas adjacent to wetlands as necessary to Federal Register/Vol. 67, No. 10 / "['uesclay, January 15, 2002/Notices 209,9 ensure protection and/or enhancement of the overall aquatic ecosystem. Restoration: Re-establishment of wetland and/or other aquatic resource characteristics and function(s) at a site where they have ceased to exist, or exist in a substantially degraded state Riffle and Pool Complex: Riffle arid pool complexes are special aquatic sites under the 404(b)(1) Guidelines. Riffle and pool complexes sometimes characterize steep gradient sections of streams. Such stream sections are recognizable by their hydraulic characteristics. The rapid movement of water over a course substrate in riffles results in a rough flow, a turbulent surface, and high dissolved oxygen levels in the water. Pools are deeper areas associated with riffles. A slower stream velocity, a streaming flow, a smooth surface, and a finer substrate characterize pools. Single and Complete Project: The term "single and complete project" is defined at 33 CFR'330.2(i) as the total project proposed or accomplished by one owner/developer or partnership or other association of owners/developers (see definition of independent utility). For linear projects, the "single and complete project" (i.e., a single and complete crossing) will apply to each crossing of a separate water of the US (i.e., a single waterbody) at that location. An exception is for linear projects crossing a single waterbody several times at separate and distant locations: each crossing is considered a single and complete project. However, individual channels in a braided stream or river, or individual arms of a large, irregularly shaped wetland or lake, etc., are riot separate waterbodies. StormwoterMonagement: Stormwater management is the mechanism for controlling Stormwater runoff for the purposes of reducing downstream erosion, water quality degradation, and flooding and rniti-atin- the adverse effects of changes in land use on the aquatic environment. Storm water Morrogernent Facilities: Stormwater management facilities are those facilities, including but not limited to, stormwater retention and detention ponds and BMPs, which retain water for a period of time to control runoff and/or improve the quality (i.e., by reducing the concentration of nutrients, sediments, hazardous substances and other pollutants) of storrnwater runoff. Strearn Fled: The substrate of the stream channel between the ordinary high water marks. The substrate may be bedrock or inorganic particles that rane in size frorn clay to boulders. Wetlands' contiguous to the stream bed, but outside of the ordinary high water marks, are riot considered part of the stream bed. Stream Channelizotion: The manipulation of a stream channel to increase the rate of water flow through the stream channel. Manipulation may include deepening, widening, straightening, armoring, or other activities that change the stream cross- section or other aspects of stream channel geometry to increase the rate of water flow through the stream channel. A channelized stream remains a water of the US, despite the modifications to increase the rate of water flow. Tidal Wetland: A tidal wetland is a wetland (i.e., water of the US) that is inundated by tidal waters. The definitions of a wetland and tidal waters can be found at 33 CFR 328.3(6) and 33 CFR 328.3(f), respectively. Tidal waters rise and fall in a predictable and measurable rhythm or cycle due to the gravitational pulls of the moon arid sun. Tidal waters end where the rise and fall of the water surface can no longer be practically measured in a predictable rhythm clue to masking by other waters, wind, or other effects. Tidal wetlands are located channelward of the high tide line (i.e., spring high tide line) and are inundated by tidal waters two times per lunar month, during spring hi-fi tides. Vegetated Buffer: A vegetated upland or wetland area next to rivers, streams, lakes, or other open waters which separates the open water from developed areas, including agricultural land. Vegetated buffers provide a variety of aquatic habitat functions and values (eg., aquatic habitat for fish and other aquatic organisms, moderation of water temperature changes, and detritus for aquatic food webs) and help improve or maintain local water quality. A vegetated buffer can be established by maintaining an existing vegetated area or planting native trees, shrubs, and herbaceous plants on land next to open- waters. Mowed lawns are not considered vegetated buffers because they provide little or no aquatic habitat functions and values. The establishment and maintenance of vegetated buffers is a method of compensatory mitigation that can be used in conjunction with the restoration, creation, enhancement, or preservation of aquatic habitats to ensure that activities authorized by NWPs result in minimal adverse effects to the aquatic environment. (See General Condition 19.) Vegetated Shallows: Vegetated shallows are special aquatic sites under the 404(b)(1) Guidelines. They are areas that are permanently inundated and under normal circumstances have rooted aquatic vegetation, such as seagrasses in marine and estuarine systems and a variety of vascular rooted plants in freshwater systems. Waterbody: A waterbody is any area that in a normal year has water flowing or standing above ground to the extent that evidence of an ordinary high water mark is established. Wetlands contiguous to the waterbody are considered part of the waterbody. (FR Doc. 02-539 Filed 1-14-02; 8:45 and BILLING CODE 3714-92--P 6692 Federal Register/ Vol. 67, No. 30 / Wednesday, February 13, 2002 /Notices ADDRESSES). The holding of such hearing is at the discretion of the Assistant Administrator for Fisheries, NOAH. All statements and opinions contained in the permit action summaries are those of the applicant and do riot necessarily reflect the views of NMF'S. Species Covered in This Notice The following species are covered in this notice: Sea toles "Threatened and endangered green turtle (Chelonia rnydas) Endangered hawksbill turtle (Eretmochelys imbricata) Endangered Kemp's ridley turtle (Lepidochelyskemp ii) Endangered leatherback turtle (Derinochelys coriacea) Threatened loggerhead turtle (Caretta Caretta) Application 1361 The applicant,is applying for a 5-year permit to trawl for turtles, as needed, at dredge and other construction/ destruction sites to remove the turtles to a safe location. The turtles will be captured, tagged, measured and released offshore away from the dredging activities. The applicant expects to capture and relocate 95 green, 11 hawksbill, 160 loggerhead, 14 Kemp's ridley and 4 leatherback turtles on the Atlantic coast and 105 green, 17 hawksbill, 160 loggerhead, 50 Kemp's ridley and 11 leatherback turtles on the Gulf coast. Dated: February 7, 2002. Jill Lewandowski, Acting Chief, Permits, Conservation, and Education Division, Office of Protected Resources, National Marine Fisheries Sarvice. [FR Doc. 02-3522 Filed 2-12-02; 8:45 am] FOR FURTHER INFORMATION CONTACT: Mr. David Olson, at (703) 428-7570, Mr. Kirk Stark, at (202) 761-4664 or Ms. Leesa Beal at (202) 761-4599 or access the U.S. Army Corps of Engineers Regulatory Home Page at: http:// www.usace,,irniy.mil/inet/functions/ cw/cecwo/reg/. SUPPLEMENTARY INFORMATION: In the SUMMARY section on page 2020, the third and fourth sentences are corrected to read: "All NWPs except NWPs 3, 7, 12, 14, 27, 39, 40, 41, 42, 43, and 44 expire on February 11, 2002. Existing NWPs 3, 7, 12, 14, 27, 39, 40, 41, 42, 43, and 44 expire on March 18, 2002." In the last sentence of the SUMMARY section, the expiration date is corrected as "March 18, 2007", instead of "March 19, 2007 On page 2020, in second sentence of the DATES section, the expiration date is corrected as "March 18, 2007", instead of "March 19, 2007". Therefore, the NWPs published in the January 15, 2002; Federal Register will expire on March 18, 2007, five years from their effective date of March 18, 2002. On page 2020, in the fifth paragraph of the Background section, the third and fourth sentences are corrected to read: "All NWPs except NWPs 3, 7, 12, 14, 27, 39, 40, 41, 42, 43, and 44 expire on February 11, 2002. Existing NWPs 3, 7, 12, 14, 27, 39, 40, 41, 42, 43, and 44 expire on March 18, 2002." The expiration date in the last sentence of this paragraph is corrected as "March 18, 2007", instead of "March 19, 2007 On page 2020, the paragraph in the section entitled "Grandfather Provision for Expiring IVWPs at 33 CFR 330.6" is corrected to read: "Activities authorized by the current NWPs issued on December 13, 1996, (except NWPs 3, 7, 12, 14, 27, 39, 40, 41, 42, 43, and 44), that have commenced or are under contract to commence by February 11, 2002, will have until February 11, 2003, to complete the activity. Activities authorized by NWPs 3, 7, 12, 14, 27, 39, 40, 41, 42, 43, and 44, that were issuecl on March 9, 2000, that are commenced or under contract to commence by March 18, 2002, will have until March 18, 2003, to complete the activity." On page 2020, in the "Clean IVater Act Scrtiou 401 Water Quality Certification (IVQ(,') and Coostol Zone Management Act (CZMA) Consistency Agroenlent" section, thrl date ill the fifth sentonce is corrected as "February 11, 2002", instead of "February 11, 2001". On page 2023, third columm, last sentence, tyre number 20 is replaced with the number 19, because this sentence refers to General Condition 19. On page 2024, first column, in the fourth sentence of the last paragraph the phrase "less than" is replaced by "greater than" because the 30 clay completeness review period for NWP pre-construction notifications is greater than the 15 day completeness review period for standard permit applications. On page 2031, second column, second full paragraph, the number 31 is replaced with the number 3 because this paragraph refers to NWP 3. On page 2044, second column, fourth complete paragraph, the title is corrected to read "Stream and Wetland Restoration Activities" because that is the title of NWP 27. On page 2054, second column, the year cited in the third sentence of the second paragraph is the year 2000, not 1996. On page 2058, third column, in the second sentence of the second complete paragraph the word "intermittent" is inserted before the phrase "stream bed" because the waiver for filling or excavating greater than 300 linear feet of stream beds can apply only to intermittent stream beds. On page 2072, third column, last sentence, the number 19 is inserted after the term "General Condition" since this sentence refers to General Condition 19. On page 2076, second column, the street address for the Walla Walla District Engineer is corrected to read "201 N, Third Avenue". On page 2080, second column, third paragraph from the top of the column (in the "Notification" section of NWP 12), the word "or" at the end of paragraph (e) is deleted and the period at the end of the fourth paragraph (paragraph (f)) is replaced with "; or". On page 2080, second column, paragraph (a) of NWP 13 is corrected to read: "No material is placed in excess of the minimum needed for erosion protection;" The change was not intended and we are correcting this paragraph by reinstating the original text as it appeared in the version of NWP 13 published in the December 13, 1996, Federal Register (61 FR 65915). Om page 2080, third column, the word "or" is inserted at the end of paragraph (a)(1) of NWP 14, Linear 'rransportatioll Projects. Paragraph (a) of NWP 14 is corrected to read: "a. This NWP is suhjcct to tlr(', following acreage limits: (1) For linear transportation projects in nou-tidal waters, provided the discharge does not cause the loss of greater than 1/2-acre of waters of the US; or (2) For linear transportation projects in tidal waters, provided the discharge does mot cause the loss of greater than'/-acre of waters of the US." On page. 2085, second column, the last sentence of NWP 36 is corrected to read as follows: "Dredgig to provide BILLING CODE 3510.22-S DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Issuance of Nationwide Permits; Notice; Correction AGENCY: Array Corps of Engincers, DoD. ACTION: Final notice; correction. SUMMARY: This document contains corrections to the final notice of issuance of Nationwide Permits (NWPs) which was published in the Federal Register on 'Tuesday, January 15, 200'2 (67 FR 2020-2095). ADDRESSES: HQUSACE, AT'rN: CECW- OR, 441 "G" Street, NEV., Washington, DC 20314-1000. Federal Register/ Vol. 67, No. 30 / Wednesday, February 13, 2002 /Notices 6693 access to the boat ramp may be authorized by another NWP, regional general permit, or individual permit pursuant to section 10 if located in navigable waters of the United States. * * *" The change was not intended and we are correcting this paragraph by reinstating the original text as it appeared in the version of NWP 3G published in the December 13, 1996, Federal Register (61 FR 65919). On page 2086, in the second full paragraph of the second column, "paragraph (e)" in the second sentence is replaced with "paragraph (f)" and "paragraph (i)" in the third sentence is replaced with "paragraph (j)" to accurately cite the previous paragraphs of NWP 39. The last two sentences of the paragraph before the subdivision paragraph were incorrectly divided into two sentences from the original single sentence and identified as being related to General Condition 15. 'T'his change was not intended and we are correcting this paragraph by reinstating the original last sentence as it exists in the March 9, 2000, text of NWP 39 (65 FR 12890). On page 2086, middle column, the parenthetical statement at the end of the Note at the end of NWP 39 is corrected to read "* * * (except for ephemeral waters, which do not require PCNs under paragraph (c)(2), above; however, activities that result in the loss of greater than V,o acre of ephemeral waters would require PCNs under paragraph (c)(1), above)." The addition to the Note was intended to clarify that under paragraph (c)(2) only the loss of ephemeral open waters were not included in the requirement for a pre- construction notification (PCN). However, under paragraph (c)(1) all ephemeral waters of the United States are included in the measurement for the 1/,o acre PCN requirement. The correction is needed because the statement in the parentheses could be incorrectly interpreted to apply to paragraph (c)(1) and possibly to all PCNs, not just those affected by paragra )h (c)(2). For c?arity, we are providing the text of NWP 39 in its entirety, with the corrections described above: 39. Residerrtiol. Commercial, and 111stitutionrrlI-kvolopilrell ts. Discharges of dredged or fill material into non-tidal waters of the U.S., excluding non-tidal wetlands adjacent to tidal waters, for the construction or expansion of residential, commercial, and institutional building foundations and building pads and attendant features that are necessary for the use and maintenance of the structures. Attendant features pray include, but are not limited to, roads, parking lots, garages, yards, utility lines, stormwater management facilities, and recreation facilities such as playgrounds, playing fields, and golf courses (provided the golf course is art integral part of the residential development). The construction of new ski areas or oil and gas wells is not authorized by this NWP. Residential developments include multiple and single unit developments. Examples of commercial developments include retail stores, industrial facilities, restaurants, business parks, and shopping centers. Examples of institutional developments include schools, fire stations, government office buildings, judicial buildings, public works buildings, libraries, hospitals, and places of worship. The activities listed above are authorized, provided the activities meet all of the following criteria: a. Tlie discharge does not cause the loss of greater than 1/1 z-acre of non-tidal waters of the U.S., excluding non-tidal wetlands adjacent to tidal waters; b. The discharge does not cause the loss of greater than 300 linear-feet of a stream bed, unless for intermittent stream beds this criterion is waived in writing pursuant to a determination by the District Engineer, as specified below, that the project complies with all terms and conditions of this NWP and that any adverse impacts of the project on the aquatic environment are minimal, both individually and cumulatively; c.. The permittee must notify the District Engineer in accordance with General Condition 13, if any of the following criteria are met: (1) The discharge causes the loss of greater than 1/,o-acre of non-tidal waters of the US, excluding non-tidal wetlands adjacent to tidal waters; or (2) The discharge causes the loss of any open waters, including perennial or intermittent streams, below the ordinary hi It water mark (see Note, below); or ?3) The discharge causes the loss of greater than 300 linear feet of intermittent stream bed. In such case, to be authorized the District Engineer must determine that the activity complies with the other terurs and conditions of the NW11, cleternline adverse environ,unntal effects are minimal both individually and cumulatively, and waive the limitation on stream impacts in writing before the permittee may proceed; d. For discharges in special aquatic sites, including wetlands, the notification must include a delineation of affected special aquatic sites; e. The discharge is part of a single and complete project; f. The permittee must avoid and minimize discharges into waters of the US at the project site to the maximum extent practicable. The notification, when required, must include a written statement explaining how avoidance and minimization of losses of waters of the US were achieved on the project site. Compensatory mitigation will normally be required to offset the losses of waters of the US. (See General Condition 19.) The notification must also include a compensatory mitigation proposal for offsetting unavoidable losses of waters of the US. If an applicant asserts that the adverse effects of the project are minimal without mitigation, then the applicant may submit justification explaining why compensatory mitigation should not be required, for,the District Engineer's consideration; g. When this NWP is used in conjunction with any other NWP, any combined total permanent loss of waters of the US exceeding 1/1o-acre requires that the permittee notify the District Engineer in accordance with General Condition 13; It. Any work authorized by this NWP must not cause more than minimal degradation of water quality or more than minimal changes to the flow characteristics of any stream (see General Conditions 9 and 21); i. For discharges causing the loss of 1/, o-acre or less of waters of the US, the permittee must submit a report, within 30 days of completion of the work, to the District Engineer that contains the following information: (1) The name, address, and telephone number of the permittee; (2) The location of the work; (3) A description of the work; (4) The type and acreage of the loss of waters of the US (e.g., 1h-acre of emergent wetlands); and (5) The type and acreage of any compensatory mitigation used to offset the loss of waters of the US (e.g., 1h-acre of emergent wetlands created on-site); j. If there are any open waters or streams within the project area, the permittee will establish and maintain, to the nraximurn extent practicable, wetland or upland vegetated buffers next to those open waters or streams consistent with General Condition 19. Deed restrictions, conservation easements, protective covenants, or other means of land conservation and preservation are required to protect and maintain the vegetated buffers established on the project site. Only residential, commercial, and institutional activities with structures on the foundation(s) or building pad(s), as well as the attendant features, are authorized by this NWP. The 6694 Federal Register/ Vol. 67, No. 30 / Wednesday, February 13, 2002 /Notices compensatory mitigation proposal that is required in paragraph (f) of this NWP may be either conceptual or detailed. The wetland or upland vegetated buffer required in paragraph (j) of this NWP will be determined on a case-by-case basis by the District Engineer for addressing water quality concerns. The required wetland or upland vegetated buffer is part of the overall compensatory mitigation requirement for this NWP. If the project site was previously used for agricultural purposes and the farm owner/operator used NWP 40 to authorize activities in waters of the United States to increase production or construct farm buildings, NWP 39 cannot be used by the developer to authorize additional activities in waters of the United States on the project site in excess of the acreage limit for NWP 39 (i.e., the combined acreage loss authorized under NWPs 39 and 40 cannot exceed 1/2 acre). Subdivisions: For residential subdivisions, the aggregate total loss of waters of US authorized by NWP 39 can not exceed Vz-acre. This includes any loss of waters associated with development of individual subdivision lots. (Sections 10 and 404) Note: Areas where wetland vegetation is not present should be determined by the presence or absence of an ordinary high water mark or bed and bank. Areas that are waters of the US based on this criterion would require a PCN although water is infrequently present in the stream channel (except for ephemeral waters, which do not require PCNs under paragraph (c)(2), above; however, activities that result in the loss of greater than V,o acre of ephemeral waters would require PCNs under paragraph (c)(1), above). On page 2088, in the sixth sentence of the first paragraph in the first column, the phrase "an adequate water quality management plan" is replaced with the phrase "adequate water quality management measures" to reflect the modified language in General Condition 9. This sentence is corrected to read "The facility must have adequate water quality management measures in accordance with General Condition 9, such as a stormwater management facility, to ensure that the recreational facility results in no substantial adverse effects to water quality." On page 2089, first column, the second sentence of paragraph (c) of NWI' 44 is corrected to read "Normally, the water quality management measures required by General Condition 9 should address these impacts;". In addition, the second sentence of paragraph (i) of NWP 44 is corrected to read "Further the District Engineer may require water quality management measures to ensure the authorized work results in minimal adverse effects to water quality;" These corrections are necessary to reflect the modified language in General Condition 9. On page 2089, third column, the text of General Condition 6 is corrected to read: "The activity must comply with any regional conditions that may have been added by the Division Engineer (see 33 CFR 330.4(e)) and with any case specific conditions added by the Corps or by the state or tribe in its Section 401 Water Quality Certification and Coastal Zone Management Act consistency determination." The change to General Condition 5 that was published in the January 15, 2002, Federal Register was not intended and we are correcting this sentence by reinstating the original text as it existed in the March 9, 2000, NWPs. On page 2090, first column, the word "Section" in the parenthetical at the end of General Condition 10 is replaced with "33 CFR" so that the parenthetical reads "(see 33 CFR 330.4(d))". On page 2090, at the top of the second column, the second Internet URL is replaced with "* * * http:// www.nun fs.noaa.gov/prot_ies/overview/ es.html * * *" because the Internet address for the National Marine Fisheries Service home page for endangered species has been changed. On page 2090, third column, in paragraph (b)(4) of General Condition 13, NWP 40 should be added to the list of NWPs that require submission of delineations of special aquatic sites with pre-construction notifications. Therefore, paragraph (b)(4) of General Condition 13 is corrected to read "For NWPs 7, 12, 14, 18, 21, 34, 38, 39, 40, 41, 42, and 43, the PCN must also include a delineation of affected special aquatic sites, including wetlands, vegetated shallows (e.g., submerged aquatic vegetation, seagrass beds), and riffle and pool complexes (see paragraph 13(f));" On page 2090, third column, in paragraph (b)(6) of General Condition 13, the word "Projects" replaces the word "Crossings", because the title of NWP 14 is "Linear Transportation Projects". On page 2090, third columm, in paragraph (b)(8) of General Condition 13, the word "Activities" is inserted after the word "Restoration" because the title of NWP 27 is "Stream and Wetland Restoration Activities". On page 2091, first column, in paragraph (b)(10) of General Condition 13, the word "Projects" is replaced with the word "Facilities" because the title of NWP 31 is "Maintenance of Existing 11 . Flood Control Facilities On page 2094, third column, we are correcting the definition of "Loss of Waters of the US" by deleting the last sentence and inserting the following sentence after the fourth sentence of this definition: "Impacts to ephemeral streams are not included in the linear foot measurement of loss of stream bed for the purpose of determining compliance with the linear foot limits of NWPs 39, 40, 42, and 43." Due to the number of corrections made to the definition of "Loss of Waters of the US", we are providing the text of this definition in its entirety, with the corrections described above: Loss of Waters of the US: Waters of the US that include the filled area and other waters that are permanently adversely affected by flooding, excavation, or drainage because of the regulated activity. Permanent adverse effects include permanent above-grade, at-grade, or below-grade fills that change an aquatic area to dry land, increase the bottom elevation of a waterbody, or change the use of a waterbody. The acreage of loss of waters of the US is the threshold measurement of the impact to existing waters for determining whether a project may qualify for an NWP; it is not a net threshold that is calculated after considering compensatory mitigation that may be used to offset losses of aquatic functions and values. The loss of stream bed includes the linear feet of stream bed that is filled or excavated. Impacts to ephemeral streams are not included in the linear foot measurement of loss of stream bed for the purpose of determining compliance with the linear foot limits of NWPs 39, 40, 42, and 43. Waters of the US temporarily filled, flooded, excavated, or drained, but restored to preconstruction contours and elevations after construction, are not included in the measurement of loss of waters of the us. In the January 15, 2002, Federal Register, it was stated that the definition was being revised (to clarify that ephemeral waters and streams are not included in t1w acreage or linear thresholds for NWPs) to comport with language in the preamble of the March 9, 2000 Federal Register notice. However, the language in the preamble of the March 9, 2000 Federal Register notice (65 FR 12881, third column) does not support this revision. Rather, the referenced preamble states, "During our review of the comments received in response to the July 21, 1999, Federal Register notice, we forum an error in the proposed definition of the terns, "loss of waters of the United States." In the fourth sentence of the draft definition, we stated that the loss of st•eani bed Federal Register/ Vol. 67, No. 30 / Wednesday, February 13, 2002 /Notices 6695 includes the linear feet of perennial or intermittent stream bed that is filled or excavated. This statement is inaccurate because ephemeral stream bed that is filled or excavated can also be considered a loss of waters of the United States. However, the 300 linear foot limit for stream beds filled or excavated does not apply to ephemeral streams. We have modified this sentence to define the loss of stream bed as the linear feet of stream bed that is filled or excavated." Thus, the modification of this definition was intended to clarify that activities that involve filling or excavating ephemeral streams are not included in the linear foot limits for filling or excavating stream beds in NWPs 39, 40, 42, and 43. However, it was not intended to exempt ephemeral waters or streams from calculations of impacted acreages to determine PCN or maximum acreage requirements fn accordance with NWPs 39, 40, 42, and 43. In the August 9, 2001, Federal Register notice (66 FR 42099) we proposed to modify the definition of "Loss of Waters of the US" by adding the sentence "' * * The loss of stream bed includes the linear feet of perennial stream or intermittent stream that is filled or excavated * * *". The proposed change was in response to a commitment to clearly state in the text of the NWPs (which includes the definitions) that the 300 linear foot limit in NWPs 39, 40, 42, and 43 for filling and excavating stream beds would only apply to intermittent and perennial streams, not to ephemeral streams. In the January 15, 2002, Federal Register notice (67 FR 2074-2075) we erroneously stated that both the acreage acid linear limits of the NWPs do not apply to ephemeral waters. This was never intended to be adopted as policy for the NWPs or the Corps regulatory program. A previously stated, in the first column of page 2075 of the January 15, 2002, Federal Register notice, we refer to page 12881 of the March 9, 2000, Federal Register notice, which only discusses the 300 linear foot limit, not the acreage limits of the NWPs. Our intent is to continue to apply acreage limits of NWI's to activities that result ill the permanent loss orephemeral waters, but the linear foot limits of the NWPs N%,Vl's 39, 40, 42, arid 11:3) for filling or excavating stream beds would not apply to activities that involve filling or excavating ephemeral streams, TlIc last sentence of the definition of "boss of Waters of the US" as published in the January 15, 2002, Federal Register notice does not comport with remainder of this NWP package. Therefore, we are correcting this definition as described above. We believe that correcting the text of NWP 39 and the definition of "Loss of Waters of the US" through the publication of this correction notice is appropriate. Nevertheless, in order to give all interested parties further opportunity to continent on this nutter, we intend to publish a Federal Register notice to solicit public comments on those two corrections. If we determine that any other matter relating to the final NWPs requires correction or clarification, but that matter was not adequately dealt with in this correction notice, we will address that additional matter in the forthcoming Federal Register notice, as well. We expect to publish that Federal Register notice within a few weeks. Dated: February 7, 2002. Lawrence A, Lang, Assistant Chief. Operations Division, Directorate of Civil LVorks. [FR Doc. 02-3555 filed 2-12-02; 8:45 aml BILLING CODE 3710-92-P DEPARTMENT OF DEFENSE Uniformed Services University of the Health Sciences Sunshine Act Meeting AGENCY HOLDING THE MEETING: Uniformed Services University of the Health Sciences. TIME AND DATE: 8:00 a.m. to 4:00 p.m., February 5, 2002. PLACE: Uniformed Services University of the Health Sciences, Board of Regents Conference Room (D3001), 4301 Jones Bridge Road, Bethesda, MD 20814-4799. STATUS: Open-under "Government in the Sunshine Act" (5 U.S.C. 5526(e)(3)). MATTERS TO BE CONSIDERED: 8:30 a.m. Meeting-Board of Regents (1) Approval of Minutes-November 14, 2001 (2) Faculty Matters (3) Department Reports (4) Financial Report (:) ) Report--President, USUHS (6) Report- Doan, School of Medicine (7) Report---Dean, Graduate School of Nursing (8) Comments-Chairman, Board of Regents (9) New Business CONTACT PERSON FOR MORE INFORMATION: Mr. Bobby D. Anderson, Executive Secretary, Board of Regents, (301) 295- 3116. Dated: February 8,'2002. Linda Bynum, OSD Federal Register Liaison Officer, Department of Defense. [FR Doc. 02-3683 Filed 2-11-02; 3:32 pmt BILLING CODE 5001--08-M DEPARTMENT OF EDUCATION Submission for OMB Review; Comment Request AGENCY: Department of Education. SUMMARY: The Leader, Regulatory Information Management Group, Office of the Chief Information Officer invites comments on the submission for OMB review as required by the Paperwork Reduction Act of 1995. DATES: Interested persons are invited to submit comments on or before March 15, 2002. ADDRESSES: Written comments should be addressed to the Office of Information and Regulatory Affairs, Attention: Lauren Wittenberg, Desk Officer, Department of Education, Office of Management and Budget, 725 17th Street, NW., Room 10202, New Executive Office Building, Washington, DC 20503 or should be electronically trailed to the internet address Lauren-Wittenberg @onib.eop.gov. SUPPLEMENTARY INFORMATION: Section 3506 of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35) requires that the Office of Management acrd Bridget (OMB) provide interested Federal agencies and the public an early opportunity to comment on information collection requests. OMB may amend or waive the requirement for public consultation to the extent that public participation in the approval process would defeat the purpose of the information collection, violate State or Federal law, or substantially interfere with any agency's ability to perform its statutory obligations. The Leader, Regulatory Information Management Group, Office of the. Chief Information Officer, publishes that notice containing proposed information collection requests prior to submission of these requosts to OMI1. Each proposed information collection, grouped by office, contains the following: (1) Type of review requested, e.g. new, revision, extension, existing or reinstatement; (2) Title; (3) Summary of the collection; (4) Description of the need for, and proposed use of, the information; (5) Respondents and frequency of collection; anti (6) Reporting and/or Recordkeeping burden. OMB invites public comment.